30th Annual General Meeting of the Malaysian Gas Association (MGA)12 May 2016Dewan Sri Pinang, Level 3, Etiqa Twins,Jalan Pinang, Kuala Lumpur
Johor Petroleum Development Corporation Berhad | 2016
Development Masterplan of Pengerang
Mohd Yazid Ja’afarChief ExecutiveJohor Petroleum Development Corporation
1
To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC
JPDC is a federal Government agency entrusted to plan,
coordinate, and promote the development of downstream
O&G in Johor
2Singapore
2
31
IskandarPuteri
Tanjung
Langsat
Pengerang
Tanjung
Bin
MANDATES
To promote and market Johor’
downstream oil & gas industry to
potential investors
To coordinate and drive the execution of
development projects in JohorCoordination
Promotion &
Marketing
To identify and manage funds required
for financing the downstream oil and gas
development in Johor
Sufficient
Fund
To plan and develop strategies for the
downstream oil and gas development in
Johor
Integrated
Planning
To ensure the availability of industry
ready workforce to drive and sustain
PIPC’s development growth
Industry
Ready
Workforce
To enhance inclusiveness towards an
equitable society with more access to
economic opportunities in PIPC
Local
Participation
1
2
4
3
5
6
South China Sea
212 May 2016
To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC 3
43
1
2
4
89
7
2
1
5
6
3
1
Legend Facilities Locations
Oil Refineries1.Kertih 2.Kemaman 3.Port
Dickson 4.Melaka
Petrochemicals
1.Gurun 2.Prai 3.Kertih
4.Gebeng 5.Nilai 6.Pasir Gudang
7.Bintulu 8.Labuan 9.Sipitang
LNG RGT 1.Sungai Udang, Melaka
• Scattered and non-integrated;
• No space for expansion;
• No deepwater facility;
• Unable to produce EURO 4/5; and
• Far from international ports.
Locations of downstream oil & gas in Malaysia
Current facilities in Malaysia
Malaysia’s downstream oil & gas development has
limited capacity to grow in existing locations
12 May 2016
To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC
Unleashing the potential of Pengerang, the place..
4
Pengerang
Natural water depth of 24 m
Single plot of 80 km2 ~ 10% the
size of Singapore
Low socioeconomic and
environmental impact
Near major markets
633 million ASEAN population
3 billion Asia region population
STRATEGIC LOCATION
Major international shipping
lane
12 May 2016
Pengerang Integrated Petroleum Complex (PIPC)
To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC
.. and transforming it into an integrated
downstream Oil & Gas hub
5
Refineries and Naphtha CrackersDedicated Jetties
Medium & Light Industries
12 May 2016
To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC
PIPC in numbers
1 million bbl/day Refining Capacity
3.5 MTARGT Capacity
11.8 MTAPetrochemical Production
5 million m3
Oil Storage Capacity
1,220 MWCo-generation Plant
520 MLDRaw water supply
612 May 2016
To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC
Bringing huge benefits to the country and ample
opportunities for businesses..
7
Helping transform Malaysia into a
high income nation
Diversifying the country’s economy
Increasing Malaysia’s export capacity
Opening up of Oil & Gas tradingopportunities
Providing the nation’s growing
energy needs
12 May 2016
To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC 8
..and guided by a comprehensive PIPC Masterplan
to ensure development success
Pengerang Integrated
Complex (PIC)
Plastics & Fine
Chemicals Park
Downstream finished
product zoneMedium & Light
Industries Hub
Commercial
Services Hub
Solid
Logistics Hub
Future
integrated
investor 3Future
integrated
investor 2
Future
integrated
investor 1
Pengerang Deepwater
Terminal (PDT)
CUF WMC
ERC
12 May 2016
To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC 9
1. Macro economic analysis
2. Benchmarking analysis
3. Conceptual Layout Planning
4. Implementation Planning
1. Market Analysis
2. Investment Scenario
Planning
3. PIPC Site Selection
and Layout Planning
4. Non-refining Industry
Planning
5. Marine Support
Service Planning
6. Infrastructure Planning
7. Utility Planning
8. Site Preparation
Planning
9. Social and Economic
Impact Analysis
10. Project Management
Organisation (PMO)
Design
Conceptual Masterplan (Phase 1) Detailed Masterplan (Phase 2)
2011 2012 2013 2016
Conceptualization Realization
PIPC Masterplan was developed over the years
from conceptual to detailed masterplan…
12 May 2016
To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC 10
.. and proposes the development of PIPC to take
place over four (4) phases…
PIPC Four (4) Development Phases
Investor 4
Phase 3.1
2021 – 2024
Phase 1
2013 – 2017
Phase 3.2
2018 – 2022
Phase 3.3
2018 – 2022 Phase 2
2014 – 2018
Phase 4
2023 – 2027
Phase 2
2014 – 2018
Phase 3.4
2015 – 2022
P&C Park
12 May 2016
11
Implementation phase is crucial for PIPC success
and remains our focus for Phase 1..
PIPC Master Plan
(2011)
PIPC Detailed Master Plan
(2012-2013)
Implementation Phase
(2012-2027)
Planning and Development Areas Stage 1 Stage 2 Stage 3
Master Plan Layout / Buffer Zoning / Investment Planning Conceptual/High-level Detailed Implementation
Utilities planning / Infrastructures planning High-level Detailed Implementation
Site preparation planning (incl. drainage) Detailed Implementation
Land surveys High-level Detailed
Marine facilities,Traffic Congestion Study / Anchorage planning High-level Detailed Implementation
Emergency Response Plan (ERP) Detailed Implementation
Environmental impact High level Preliminary EIA Detailed EIA
Economic impact High-level Detailed ECBc Application
Social Impact Detailed SIA Application
Governance High-level Detailed Implementation
Project/Programme Management PMO design Implementation
PIPC Development Stages
To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC 1112 May 2016
To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDCTo transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC
PIPC core activities
Power Plant
Petrochemical PlantsRefineries
Oil Storage Tanks
LNG Storage Tanks
Naphtha CrackersRegasification Plant
1212 May 2016
To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC
Emergency Response Centre (10 acres)• Fire Response Team• Ambulance Base
Medium and Light Industry Hub (700 acres)• Support Industries• Testing and Metering
Solid Logistics Hub (125 acres)• Container Facilities• Sulphur and Coke
Downstream Finished Product Zone (1,081 acres)• Plastics and Fine Chemicals• Small / Medium Enterprise
Commercial Services Hub (180 acres)• Professional Services• Banking and Finance
Emergency Coordination Centre• Emergency Coordination• Hospital / Clinic• PIPC Security Coordination
Waste Management Centre (60 acres)• Waste Water Treatment• Solid Waste Conversion
Centralised Tank Farm; CTF (1,400 acres)• Crude and Product Handling• Sulphur and Coke Handling
PIPC non-refining industry planning
1312 May 2016
To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC
Two major investors are already on the ground
leading the way..
14
Pengerang Integrated Complex (PIC)
by PETRONASsdasdasdPengerang Deepwater Terminal (PDT)
by DIALOG-Royal Vopak-SSI Johor
• Final Investment Decision (FID) was approved on 3 April 2014
• Work is progressing to plan at 27.8% vs target 29.1% as at end March 2016
• The refinery’s Ready for Start Up
(RFSU) date is Q1 of 2019
• Completed 1.3 million m3 storage in
December 2014
• Started operations since April 2014 and
has received more than 537 shipmentsas of 12 April 2016
• Second phase under construction
1 2
12 May 2016
To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC
With strong support from the Government of
Malaysia..
15
Support from the Government
Development of world-class
infrastructure and public amenities
Dedicated agency to plan,
coordinate, facilitate and oversee
the implementation of PIPC
Dedicated Government forums
to fast track development
1
2
3
12 May 2016
To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC
.. infrastructure and public amenity projects are
progressing according to plan
16
New schools
(completed)
New Police Station
(under construction)
New medical clinic
(completed)
New Fire Stations
(under construction)New Roads
(under construction)
26 work packages:
Overall development progress of 12.12% (vs plan 12.23%)*
Note: * RMK-10 & RMK-11 Progress as at 14 April 2016 and all projects to be completed in early 2019
12 May 2016
To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC
.. and with other milestones achieved according to
plan, the dream will soon become a reality..
17
DIALOG
Phase 2
& RGT2
construction
commenced
Q1 2015
DIALOG
Phase 1
operation
commenced
12 April 2014
PETRONAS
GAS
RGT2 operation
commences
Q4 2017
PETRONASRefinery Ready
For Start-Up
Q1 2019
DIALOG
Phase 2
operation
commences
Q1 2019
TODAY
2014 2015 2017 2018 2019
PETRONAS
FID – 3 April
2016
12 May 2016
To transform Johor into a Sustainable, World-Class Downstream Oil & Gas Hub - JPDC 18
No longer a pipedream… PIPC has secured
commitment from private investors and strong
support from the Government of Malaysia..
National Project of strategic importance
PIPC is already operating! Independent
storage started April 2014
PIC project is progressing at 27.8% and is
on track to achieve PIC start-up Q1 2019
Public and private players are committed to
realise the dream of an oil and gas hub in
Pengerang
12 May 2016
Thank you
Johor Petroleum Development Corporation Berhad | 2016
Main OfficeSuite 17.03A, Level 17,Menara MSC Cyberport,No. 5, Jalan Bukit Meldrum,80300 Johor Bahru,Johor, Malaysia.Tel : +607 – 267 2900Fax : +607 – 267 2999
facebook.com/johorpetroleumdevelopmentcorporationberhad
www.jpdc.gov.my
19