RTN and DDF installation inside TP48
RTN
Install All DDF received in the
delivery at the site , if you receive
2 DDF you need to install both
inside the cabinet.
-
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 3
35pt
: R153 G0 B0
:
FrutigerNext LT Medium
: Arial
32pt
: R153 G0 B0
22pt
) :18pt
:
FrutigerNext LT Regular
: Arial
20pt
):18pt
Power cable connection and layout
-
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 4
35pt
: R153 G0 B0
:
FrutigerNext LT Medium
: Arial
32pt
: R153 G0 B0
22pt
) :18pt
:
FrutigerNext LT Regular
: Arial
20pt
):18pt
DDF
Use the Coronas on DDF must be utilized in the below order :
-
HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 5
35pt
: R153 G0 B0
:
FrutigerNext LT Medium
: Arial
32pt
: R153 G0 B0
22pt
) :18pt
:
FrutigerNext LT Regular
: Arial
20pt
):18pt
ODU & IF cable installation
- Extra one IF cable
length to be left on
the Dish side and
another one to be
from BTS side.
- Printed steal label to
be used for the IF
cable to indicate the
far end.
- Earth kit to used on 2
stages , one on the
tower and one from
BTS side.
- ODU need to be
grounded to the
nearest bus bar
- IF cable to be fixed by ties
on the tower/pole.
-