Download - Biaya Alat
![Page 1: Biaya Alat](https://reader030.vdocuments.pub/reader030/viewer/2022020211/577c7e091a28abe054a06dd2/html5/thumbnails/1.jpg)
BIAYA ALAT BERAT
![Page 2: Biaya Alat](https://reader030.vdocuments.pub/reader030/viewer/2022020211/577c7e091a28abe054a06dd2/html5/thumbnails/2.jpg)
BIAYA ALAT
![Page 3: Biaya Alat](https://reader030.vdocuments.pub/reader030/viewer/2022020211/577c7e091a28abe054a06dd2/html5/thumbnails/3.jpg)
HARGA SATUAN PEKERJAAN
![Page 4: Biaya Alat](https://reader030.vdocuments.pub/reader030/viewer/2022020211/577c7e091a28abe054a06dd2/html5/thumbnails/4.jpg)
BIAYA ALAT
BIAYA SEWA
OWNING COST
Biaya kepemilikan alat selama alat dioperasikan, karena
alat semakin lama akan semakin berkurang produksinya.
OPERATING COST
Biaya umum untuk menjalankan alat
![Page 5: Biaya Alat](https://reader030.vdocuments.pub/reader030/viewer/2022020211/577c7e091a28abe054a06dd2/html5/thumbnails/5.jpg)
BIAYA SEWA
(CM) contoh untuk pekerjaan pemadatan
![Page 6: Biaya Alat](https://reader030.vdocuments.pub/reader030/viewer/2022020211/577c7e091a28abe054a06dd2/html5/thumbnails/6.jpg)
1. Suatu pekerjaan galian dengan volume pekerjaan 3500 m3, yang dapat
diselesaikan selama 9 hari kerja memerlukan alat berat berupa 2 buah
backhoe dan 3 dumptruck . Hitung biaya alat tersebut apabila kontraktor
proyek harus menyewa kedua jenis ala tersebut dengan biaya sewa :
Backhoe 310.000/jam all in
Dumptruck 240.000/jam all in
2. Proses pekerjaan level ing pada proyek perkerasan jalan membutuhkan
alat berat berupa 2 bul ldozer, 2 loader, dan 3 dumptruck . Apabi la
volume pekerjaan tersebut sebesar 10.000m3 dan direncanakan selesa i
dalam waktu 21 hari , hitung biaya sewa alat tersebut jika telah
ditentukan biaya sewa sebesar :
bulldozer 350.000/jam all in
loader 260.000/jam all in
Dumptruck 210.000/jam all in
LATIHAN SOAL A
![Page 7: Biaya Alat](https://reader030.vdocuments.pub/reader030/viewer/2022020211/577c7e091a28abe054a06dd2/html5/thumbnails/7.jpg)
OWNING COST
SUKU BUNGA
%/tahun dari harga alat
HARGA ALAT (YANG TERDEPRESIASI)
- Straight line method
- Reducing Charge Method :
a) Sum of the year’s digit method
b) Declining balance method
![Page 8: Biaya Alat](https://reader030.vdocuments.pub/reader030/viewer/2022020211/577c7e091a28abe054a06dd2/html5/thumbnails/8.jpg)
Suatu alat berat dibeli dengan harga 500 juta rupiah dengan
perkiraan nilai sisa 75 juta rupiah, dengan umur ekonomis 5
tahun. Hitunglah depresiasi dan nilai alat berat tiap tahunnya!
CONTOH DEPRESIASI
![Page 9: Biaya Alat](https://reader030.vdocuments.pub/reader030/viewer/2022020211/577c7e091a28abe054a06dd2/html5/thumbnails/9.jpg)
STRAIGHT LINE METHOD / METODE
GARIS LURUS
![Page 10: Biaya Alat](https://reader030.vdocuments.pub/reader030/viewer/2022020211/577c7e091a28abe054a06dd2/html5/thumbnails/10.jpg)
STRAIGHT LINE METHOD / METODE
GARIS LURUS
![Page 11: Biaya Alat](https://reader030.vdocuments.pub/reader030/viewer/2022020211/577c7e091a28abe054a06dd2/html5/thumbnails/11.jpg)
STRAIGHT LINE METHOD / METODE
GARIS LURUS
NILAI BUKU
![Page 12: Biaya Alat](https://reader030.vdocuments.pub/reader030/viewer/2022020211/577c7e091a28abe054a06dd2/html5/thumbnails/12.jpg)
SUM OF THE YEAR’S DIGIT METHOD /
METODE JUMLAH ANGKA TAHUN
![Page 13: Biaya Alat](https://reader030.vdocuments.pub/reader030/viewer/2022020211/577c7e091a28abe054a06dd2/html5/thumbnails/13.jpg)
CONTOH SUM OF THE YEAR’S DIGIT
METHOD
![Page 14: Biaya Alat](https://reader030.vdocuments.pub/reader030/viewer/2022020211/577c7e091a28abe054a06dd2/html5/thumbnails/14.jpg)
DECLINING BALANCE METHOD / METODE
SALDO MENURUN
![Page 15: Biaya Alat](https://reader030.vdocuments.pub/reader030/viewer/2022020211/577c7e091a28abe054a06dd2/html5/thumbnails/15.jpg)
CONTOH DECLINING BALANCE METHOD
![Page 16: Biaya Alat](https://reader030.vdocuments.pub/reader030/viewer/2022020211/577c7e091a28abe054a06dd2/html5/thumbnails/16.jpg)
CONTOH DECLINING BALANCE METHOD
XXXXX
![Page 17: Biaya Alat](https://reader030.vdocuments.pub/reader030/viewer/2022020211/577c7e091a28abe054a06dd2/html5/thumbnails/17.jpg)
PERBANDINGAN 3 METODE DEPRESIASI
![Page 18: Biaya Alat](https://reader030.vdocuments.pub/reader030/viewer/2022020211/577c7e091a28abe054a06dd2/html5/thumbnails/18.jpg)
Sebuah alat pemadat tanah dibeli dengan harga
Rp100.000.000,- , apabila alat tersebut memiliki umur
ekonomis selama 5 tahun dengan nilai sisa pada akhir tahun ke
– 5 adalah Rp 20.000.000,- , tentukan harga alat yang telah
terdepresiasi setiap tahunnya dengan metode :
a. Straight line method
b. Sum of the year’s digit method
c. Declining balance method
LATIHAN SOAL