METODE PELAKSANAAN PEMASANGAN BOX CULVERT SALURAN GUNUNG SARI
( P. 71+00 s/d P. 77+50 ) AVOOR SIMO –DARMO SATELIT
TUGAS AKHIR
Oleh :DODIE MULYAWANNRP. 3108 038 703
SITI SALMAHNRP. 3108 038 718
Program Diploma III Teknik SipilFakultas Teknik Sipil dan PerencanaanInstitut Teknologi Sepuluh Nopember Surabaya2011
![Page 2: Box Culvert](https://reader034.vdocuments.pub/reader034/viewer/2022050616/54555716b1af9f1c048b4a0a/html5/thumbnails/2.jpg)
KONDISI JALAN BANYU URIP
![Page 3: Box Culvert](https://reader034.vdocuments.pub/reader034/viewer/2022050616/54555716b1af9f1c048b4a0a/html5/thumbnails/3.jpg)
Curah Hujan Tinggi
BANJIR
Perekonomian terganggu
Kemacetan Lalu lintas
BOX CULVERT
Efisiensi
Waktu dan Biaya
Saluran Gunungsari
SURABAYA BARAT
Kebutuhan lahanUntuk jalan Normalisasi
saluran
![Page 4: Box Culvert](https://reader034.vdocuments.pub/reader034/viewer/2022050616/54555716b1af9f1c048b4a0a/html5/thumbnails/4.jpg)
PETA SITUASIPETA SITUASI
3 sel 2 sel
![Page 5: Box Culvert](https://reader034.vdocuments.pub/reader034/viewer/2022050616/54555716b1af9f1c048b4a0a/html5/thumbnails/5.jpg)
SUSUNAN BOX CULVERTSUSUNAN BOX CULVERT
![Page 6: Box Culvert](https://reader034.vdocuments.pub/reader034/viewer/2022050616/54555716b1af9f1c048b4a0a/html5/thumbnails/6.jpg)
DETAIL BOX CULVERT 2 CELL
![Page 7: Box Culvert](https://reader034.vdocuments.pub/reader034/viewer/2022050616/54555716b1af9f1c048b4a0a/html5/thumbnails/7.jpg)
DETAIL BOX CULVERT 3 CELL
![Page 8: Box Culvert](https://reader034.vdocuments.pub/reader034/viewer/2022050616/54555716b1af9f1c048b4a0a/html5/thumbnails/8.jpg)
RRUAUANGNG LILINNGGKUKUP P PPEKEKERERJAJAANAN
I. PEKERJAAN PENDAHULUAN
1. PERSIAPAN DAN SEWA DIREKSI KEET2. UITSET DENGAN WATER PASS/THEODOLIT3. PASANG RAMBU PENGAMAN4. PEMBUATAN BOUWPLANK
II. PEKERJAAN TANAH1. GALIAN TANAH LUMPUR DAN BIASA2. URUGAN TANAH3. PENGANGKUTAN TANAH KELUAR
![Page 9: Box Culvert](https://reader034.vdocuments.pub/reader034/viewer/2022050616/54555716b1af9f1c048b4a0a/html5/thumbnails/9.jpg)
RUANG LINGKUP PEKERJAANIII. PEKERJAAN BOX CULVERT
1. PENGADAAN DAN PEMASANGAN PRE CAST BOX CULVERT K4002. PENGADAAN DAN PEMASANGAN MAIN HOLE TERMASUK TUTUP
DAN TANGGA3. BETON BERTULANG K-225 (LANTAI BETON + OVERTOPING)
PEMAKAIAN BESI BETON 130 Kg4. PEKERJAAN LANTAI KERJA K-125 t=10 cm5. URUGAN PASIR (PADAT)6. PEMASANGAN TERUCUK KAYU GELAM d.8-12 Pj 4 m7. BESI GRILL UNTUK PELALUAN AIR8. SEWA SHEET PILE9. PENGADAAN DAN PEMASANGAN PONDASI MINI PILE
(20 x 20)
IV. PEKERJAAN JALAN1. LAPIS ASPAL P[ENGIKAT (TACK COAT)2. LAPISAN ATB tb 6 cm3. LAPISAN AC tb 4 cm
![Page 10: Box Culvert](https://reader034.vdocuments.pub/reader034/viewer/2022050616/54555716b1af9f1c048b4a0a/html5/thumbnails/10.jpg)
RUANG LINGKUP PEKERJAAN
V. PEKERJAAN MEDIAN1. PASANGAN BATU KALI2. PLESTERAN HALUS 1pc:4ps tb 1,5 CM3. SIARAN 1pc:2ps4. CURBING (pj 50 cm)5. PENGADAAN DAN PEMASANGAN LAMPU HPS 150 W 1 PHASE
TIANG CABANG 2-9 m (OKTOGONAL)KABEL TANAH
VI. PEKERJAAN SALURAN TEPI1. URUGAN PASIR (PADAT)2. U GUTTER + COVER PRECAST (FABRIKAN) UK.80 x
1000 (UNTUK SALURAN TEPI)
![Page 11: Box Culvert](https://reader034.vdocuments.pub/reader034/viewer/2022050616/54555716b1af9f1c048b4a0a/html5/thumbnails/11.jpg)
1. BETON BERTULANG K-350 PEMAKAIAN BESI BETON ULIR 240 Kg
2. BETON BERTULANG K-225 PEMAKAIAN BESI BETON ULIR 240 Kg
3. PEKERJAAN LANTAI KERJA K-125 t=10 cm4. PONDASI PANCANG DAN PEMASANGAN TIANG
PANCANG d.60
RUANG LINGKUP PEKERJAANVII. PEKERJAAN BANGUNAN
VIII. PEKERJAAN BANGUNAN1. MOBILISASI DAN DEMOBILISASI2. PEMBERSIHAN LOKASI3. DEWATERING4. PEMBUATAN KISDAM TINGGI 2 m TEBAL 0.6 m5. PEMBONGKARAN JEMBATAN BETON DENGAN
PEMBERSIHAN
![Page 12: Box Culvert](https://reader034.vdocuments.pub/reader034/viewer/2022050616/54555716b1af9f1c048b4a0a/html5/thumbnails/12.jpg)
ANALISA WAKTUVOLUME
KOEFISIEN TENAGA KERJA PER
HARI
DIPAKAI TENAGA KERJA PER HARI
KAPASITAS PRODUKSI
WAKTU YANG DIPERLUKAN
![Page 13: Box Culvert](https://reader034.vdocuments.pub/reader034/viewer/2022050616/54555716b1af9f1c048b4a0a/html5/thumbnails/13.jpg)
ANALISA ALAT BERAT
VOLUME
JENIS DAN KAPASITAS ALAT
CYCLE TIME
KAPASITAS PRODUKSI ALAT BERAT
![Page 14: Box Culvert](https://reader034.vdocuments.pub/reader034/viewer/2022050616/54555716b1af9f1c048b4a0a/html5/thumbnails/14.jpg)
RENCANAANGGARAN BIAYA
![Page 15: Box Culvert](https://reader034.vdocuments.pub/reader034/viewer/2022050616/54555716b1af9f1c048b4a0a/html5/thumbnails/15.jpg)
JADI BIAYA KESELURUHAN PEMASANGAN BOX CULVERT PADA SAL.GUNUNGSARI DI BANYUURIP SEBESAR : Rp. 47.816.463.000,-
![Page 16: Box Culvert](https://reader034.vdocuments.pub/reader034/viewer/2022050616/54555716b1af9f1c048b4a0a/html5/thumbnails/16.jpg)
RUMUSAN STR ATEGI
BAR CHART ( JADWAL PELAKSANAAN )
NETWORK PLANNING
TIME SCHEDULE ( KURVA “ S” )
MATERIAL, EQUIPMENT &
MAN POWER SCHEDULE
![Page 17: Box Culvert](https://reader034.vdocuments.pub/reader034/viewer/2022050616/54555716b1af9f1c048b4a0a/html5/thumbnails/17.jpg)
NETWORK PLANNING
NETWORK DIAGRAM PDM
NETWORK DIAGRAM MS. PROJECT 2003
![Page 18: Box Culvert](https://reader034.vdocuments.pub/reader034/viewer/2022050616/54555716b1af9f1c048b4a0a/html5/thumbnails/18.jpg)
T E R I M A K A S I H