PICs4All: Photonic Integrated Circuits Accessible to Everyone
Deliverable Report (WP1, D1.1)
Uniform working protocol for the JePPIX Application
Support Centers
Paraskevas Bakopoulos, Sharon Dolmans, Andrea Melloni,
Pascual Munoz, Katarzyna Lawniczuk
Project Number: EU H2020-ICT-27-2015 687777 PICs4All
Project Start Date: 1st January 2016
Duration: 36 months
Due date of Deliverable: M2
Actual Submission Date: 29 April 2016
Lead Partner: TU/e
Other Contributing Partners: ICCS/NTUA, PoliMi, UPV, TU/e
Ref: EU H2020-ICT-27-2015 687777 PICs4All
Dissemination Level
PU Public Report
2
Summary
The uniform working protocol for the JePPIX Application Support Centers (ASCs) is
a step-by-step procedure (including legal, technical, economical aspects) to support
external users in development of photonic integrated circuits.
The provided support and related procedure include feasibility and technical advice
(part of WP3 activity); legal and export control aspects; collect useful and relevant
information on ASCs efficiency and effectiveness as well user case information (part
of WP4 activity); promotion and outreach (part of WP2 activity).
This uniform working protocol is a general guideline for ASCs in PICs4All and shall
be updated and/or adapted due project duration, aiming at the best practice among
all ASCs.
Ref: EU H2020-ICT-27-2015 687777 PICs4All
Dissemination Level
PU Public Report
3
Table of Content
1. Introduction - op pagina 4
2. Overview of working flow procedure - op pagina 4
3. Detailed working protocol - op pagina 5
4. Accompanying documents, checklists, surveys - op pagina 8
5. Conclusions and outline - op pagina 12
Ref: EU H2020-ICT-27-2015 687777 PICs4All
Dissemination Level
PU Public Report
4
1. Introduction
The uniform working protocol for the JePPIX Application Support Centers (ASCs) is a
step-by-step procedure and guidelines for ASCs to support external users in
development of photonic integrated circuits. The guideline includes legal, technical, and
economical aspects, and related procedure for feasibility and technical advice (part of
WP3 activity); legal and export control aspects; collection of useful and relevant
information on ASCs efficiency and effectiveness, as well user case information (part of
WP4 activity); promotion, dissemination and outreach (part of WP2 activity).
The working protocol shall be accompanied with a data collection tool that:
1) Gives ASCs an easy, accessible and practical way to follow the work protocol;
2) Allows ASCs to track their progress in a natural, structured manner that is
understandable for all partners;
3) Assures that general progress data and reporting occurs in compliance with
PICS4ALL reporting requirements;
4) Allows WP3 to present technical and economic aspects;
5) Allows WP4 to collect useful and relevant information on support center
efficiency and effectiveness as well user case information.
2. Overview of working flow procedure
The work flow is organized in four phases: 1) Outreach and dissemination; 2) Scouting
and Advisory; 3) Project and user support; 4) Contract phase and project execution. The
overview and general steps are shown in Figure 1.
Ref: EU H2020-ICT-27-2015 687777 PICs4All
Dissemination Level
PU Public Report
5
Figure 1. Overview of the working flow procedure.
3. Detailed working protocol
Detailed working protocol is presented in Figure 2. The PICs4All project coordinator
together with the ASCs drives the dissemination activities to reach a wide range of
potential PIC users (phase 1 - Outreach). In the case the PIC user is not assigned to
any of the ASCs, the project coordinator assigns the party to ASC based on 1.
geographical location; 2. ASC competences to support user and ASC availability. The
ASCs register a potential PIC user in a system and inform that the user might be
approached by the member of ITEM-TU/e for an interview.
The scouting activity (phase 2 – Scouting and Advisory) is performed in one-to-one
basis; NDA for that step might be required (dependent on the company request). A
short summary about the meeting and company interest is needed for marketing
analyses (combined with ITEM–TU/e survey).
Ref: EU H2020-ICT-27-2015 687777 PICs4All
Dissemination Level
PU Public Report
6
Project and user support (phase 3) relates to preparation of a project description and
tasks to be performed to support the user, as well as including information about the
work to be funded by the user itself. The support offered by the ASC includes technical
and economic feasibility study (information about available photonic integration
platforms, typical development time, prototyping costs), design support and
measurement support. A contract with PIC users (including the work to be performed) is
recommended to organize the work, and secure confidential information exchange. The
contract assures commitment from the user and work to be delivered timely, as well as
agreement on the IP matters. Additional NDA and/or agreements with the PIC foundries
might be required to access relevant process design kits or design manuals. The NDAs
are accessible via broker organization and for JePPIX technologies available on the
share drive. ASC updates coordinator on the project progress (through an entry in the
system).
The project execution – contract phase (phase 4) relates to actual work and
collaboration with a user. An application note based on the conducted project finalizes
the successful support.
For some users there is also an option to move to ACTPHAST programme for PIC
development, which will be treated outside the project.
Along the cooperation with the PIC users, the ASCs are asked to fill in the survey
prepared by ITEM-TU/e group; which aims at PIC market analysis, barriers and needs
of the PIC users; focusing on the best practice. End survey, user feedback with
evaluation, and company’s visits combined with ITEM interviews are planned along the
duration of the project.
Ref: EU H2020-ICT-27-2015 687777 PICs4All
Dissemination Level
PU Public Report
7
Figure 2. Detailed work flow.
Ref: EU H2020-ICT-27-2015 687777 PICs4All
Dissemination Level
PU Public Report
8
4. Accompanying documents, checklists, surveys
1. The geographical allocation of PIC users to ASC:
EU and EEA Country ASC
Austria TUB
Belgium TU/e
Bulgaria ICCS
Croatia PoliMi
Czech Republic TUB
Denmark AU
Estonia AU
Finland AU
France TPT
Germany TUB
Greece ICCS
Hungary TUB
Iceland UCAM
Ireland UCAM
Israel ICCS
Italy PoliMi
Latvia WUT
Liechtenstein TPT
Lithuania WUT
Luxembourg TPT
Malta UPV
Netherlands TU/e
Norway AU
Poland WUT
Portugal UPV
Republic of Cyprus ICCS
Romania ICCS
Slovakia WUT
Slovenia PoliMi
Spain UPV
Sweden AU
Switzerland TPT
the United Kingdom UCAM
Ref: EU H2020-ICT-27-2015 687777 PICs4All
Dissemination Level
PU Public Report
9
2. ITEM – TU/e check list and survey (to be implemented in the data collection system
together with the working flow).
STEP 2/ 3
Potential
interested
parties
entry
STEP 2/3
First
further
exploration
meeting/co
ntact (may
ASC from
which SME
was
reassigned
Date first
contact
Contact
initiated by
SME
already
JEPPIX
contact/us
er?
Scouting
mechanism
First
contact
moment
SME
interested
YES/NO?
Please
explain
SME
reassigned
to other
ASC? Date
Primary
topics
discussed
during
meeting
Did the
center
share any
of these
items
during the
meeting?
(select all
applicable)
Did the
SME share
any of
these
items
during the
meeting?
(select all
applicable)
ITEM
contacts
SME's that
do not
proceedfor
short
telephone
survey/inte
rview
New; not
reassigned
SME 1/1/2017
Support
Center YES Cold calling
Face to
face
Meeting YES ASC 2 … Problem Narrative
[Dropdown
]
[dd-mm-
yy]
[Dropdown
]
[Dropdown
]
[Dropdown
]
[Dropdown
]
[Dropdown
]
[Dropdown
]
[dd-mm-
yy] [OPEN}
[More than
one option
is possible]
[More than
one option
is possible]
Sharon
notified
[yes/no]
STEP 4
SME
commitme
nt level in
photonics?
SME
reliability/i
nterest
level in
photonics?
Targeted
application
SME is
considering
?
User
requireme
nts?
Novelty of
application
?
Overall
Technical
Feasibility?
Estimated
prototype
developme
nt costs
Expected
benefits
High-
volume
production
expectatio
ns?
Overall
economic
feasibility?
How did
ASC
determine
technical
feasibility?
How did
ASC
determine
economic
feasibility?
What are
main
opportuniti
es
regarding
PICs/PICS4
All from
SME
perspectiv
e?
What are
main
barriers
regarding
PICs/PICS4
All from
SME
perspectiv
e?
What are
main
uncertainti
es
regarding
PICs/PICS4
All from
SME
perspectiv
e?
Commitme
nt - SME
continues
YES/NO?
Please
explain
ITEM
contacts
SME for
short
telephone
survey/inte
rview
Low Medium … …
Existing
application
: specify Medium 300,000 10,000 … Medium … … … … … NO/QUIT
[Dropdown
]
[Dropdown
] [Open] [Open]
[Partially
open]
[Dropdown
]
[Rounded
Number]
[Rounded
number] [Open]
[Dropdown
] [Open] [Open] [Open] [Open] [Open]
[Dropdown
]
Sharon
notified
[yes/no]
Ref: EU H2020-ICT-27-2015 687777 PICs4All
Dissemination Level
PU Public Report
10
STEP 5/6 STEP 7 STEP 8 STEP 9 STEP 10
Assigned
contact
person ASC
Responsibl
e expert
NDA/Contr
act
Date
company
visit
ASC's
joining for
visit
Technical
Feasibility?
Economic
Feasibility?
How did
ASC
determine
technical
feasibility?
How did
ASC
determine
economic
feasibility?
What are
main
opportuniti
es
regarding
PICs/PICS4
All from
SME
perspectiv
e?
What are
main
barriers
regarding
PICs/PICS4
All from
SME
perspectiv
e?
What are
main
uncertainti
es
regarding
PICs/PICS4
All from
SME
perspectiv
e?
Commitme
nt - SME
continues
YES/NO?
Please
explain
Short
Summary
Further
actions
ASC
decides
GO/NO GO
Further
arrangeme
nts
ITEM
contacts
SME for
short
telephone
survey/inte
rview
… …
New
bilateral
NDA
(between
ASC and
company) 1/1/2017 ASC 5 Low Medium … … … … … UNSURE … … GO
Via
ACTPHAST
[Open] [Open]
[Dropdown
]
[dd-mm-
yy]
[Dropdown
]
[Dropdown
]
[Dropdown
] [Open] [Open] [Open] [Open] [Open]
[Dropdown
] [Open] [Open]
[Dropdown
]
[Dropdown
]
Sharon
notified
[yes/no]
STEP 11, 12,
13
STEP 14, 15,
16 STEP 17 STEP 18
Responsibl
e expert
Work to be
done by
ASC
Work to be
done/fund
ed by SME Contract
Responsibl
e for
design
Design
Progress
Frabricatio
n process
Progress
Fabrication
Testing
responsibil
ity
Progress
Testing
End status
project
Application
Note
ITEM
contacts
SME for
short
telephone
survey/inte
rview
… … … …
Design
House … Jeppix … ASC … 1/1/2017 …
[Open] [Open] [Open] [Open]
[Dropdown
] [Open]
[Dropdown
] [Open]
[Dropdown
] [Open]
[dd-mm-
yy] [Open]
Sharon
notified
[yes/no]
Ref: EU H2020-ICT-27-2015 687777 PICs4All
Dissemination Level
PU Public Report
11
3. Technical and economic feasibility: part of WP3 guidelines to be described in
Milestone 3.1. The achievement of the Milestone 3.1 will be reported in Deliverables
3.1-3.3 (yearly summary reports on technical and economic feasibility, user support and
guidance). The general feasibility is supported by detailed analysis of user
requirements: both technical and economical.
General overview of the feasibility:
4. JePPIX – user agreement and standard NDAs with foundries can be accessed via
JePPIX or from the project exchange server. Contract example is available on the
project exchange server.
About the system Yes No
Generates light
Amplifies light
Detects light
Divides/combines light (power)
Divides/combines light (wavelengths)
Modulates light
Optical input
Optical output
Electrical input
Electrical output
Minimum Center Maximum
Wavelength range
Operation temperature
About yourself Yes No
Photonic IC design skills
Photonic IC test skills
Photonic IC packaging skills
Do you require support from others? Yes No
Design support (you do with help)
Design service (fully done by others)
Test support (you do with help)
Test service (fully done by others)
Packaging support (you do with help)
Packaging service (fully done by others)
Ref: EU H2020-ICT-27-2015 687777 PICs4All
Dissemination Level
PU Public Report
12
5. Conclusions and outline
In this deliverable we proposed the uniform working protocol for the JePPIX Application
Support Centers, being a general guideline for ASCs in PICs4All for collaboration with
external user. The guideline might be updated and/or adapted due project duration,
aiming at the best practice among all ASCs. The guideline includes legal, technical,
and economical aspects, and related procedure for feasibility and technical advice (part
of WP3 activity); legal and export control aspects; collection of useful and relevant
information on ASCs efficiency and effectiveness, as well user case information (part of
WP4 activity); promotion, dissemination and outreach (part of WP2 activity).