NUCLEAR POWER PLANT
2014
EDG Auxiliary System
Aaqib NazirME-01
P I E A S
-
8/18/2019 EDG Auxiliary System (Aaqib Nazir)
2/33
-
8/18/2019 EDG Auxiliary System (Aaqib Nazir)
3/33
ii
ACKNOWLEDGEMENTS
All praises to The Allah Almighty who has created this world of knowledge for us. He is
The Gracious, The Merciful. He bestowed man with intellectual power and
understanding, and gave him spiritual insight, enabling him to discover his “Self” know
his Creator through His wonders, and conquer nature. Next to all His Messenger Hazrat
Muhammad (SAW ) Who is an eternal torch of guidance and knowledge for whole
mankind.
Many individuals have been supportive and instrumental in assisting me with this work,
and I owe them a debt of gratitude. I am deeply thankful to my respective teachers from
mechanical department especially respected Engr. Dr. Javed Hyder , whose continuous
guidance, feedback, advice and encouragements have been truly exceptional. I would
like to appreciate Pakistan Nuclear Regulatory Authority (PNRA) for their kind
cooperation in providing us the best faculty for the nuclear power plant systems
(N.P.P.S) course and their helping attitude inspired me greatly and helps me out. I would
also like to say thanks to all the staff from PNRA especially Dr. Ayub, Mr. Ahsan, Mr.
Moazzam, Mr. Bilal and also Mr. Waqas who always helped us and used to spend a lot
of time for sharing and discussing about the subject. Finally, it would not be justified if Idon’t mention the support of my session fellows. All of my friends have been very
encouraging and accommodating for me.
-
8/18/2019 EDG Auxiliary System (Aaqib Nazir)
4/33
iii
Table of Contents1 System Description .................................................................................................................. 1
1.1 Component Boundaries ................................................................................................... 2
2 Diesel generator building ......................................................................................................... 4
2.1 Non-Safety Class .............................................................................................................. 5
3 Emergency Diesel Generator ................................................................................................... 5
3.1 Main Function .................................................................................................................. 6
3.2 Design Basis ...................................................................................................................... 6
3.3 Equipment Design ............................................................................................................ 7
3.4 Diesel Engine Efficiency ................................................................................................... 7
3.5 Disadvantage of Diesel Engine ......................................................................................... 9
3.6 Electrical Side of EDG ....................................................................................................... 94 Subsystem/ Auxiliary Subsystem of EDG ............................................................................... 10
4.1 EDG train ........................................................................................................................ 11
4.1.1 EDG Operating Characteristics ............................................................................... 11
4.2 EDG Train Boundaries .................................................................................................... 13
5 EDG Subsystem Description ................................................................................................... 14
5.1 Breaker ........................................................................................................................... 14
5.2 Air intake and Exhaust system ....................................................................................... 15
5.2.1 Design Basis ............................................................................................................ 15
5.2.2 System Description ................................................................................................ 15
5.2.3 General Description ............................................................................................... 15
5.2.4 Component Description ......................................................................................... 17
5.2.5 System Operation .................................................................................................. 17
5.2.6 Acceptance Criteria of Air intake and exhaust system .......................................... 18
5.2.7 Safety Evaluation ................................................................................................... 19
5.3 Air Starting System ......................................................................................................... 20
5.4 Fuel Oil System ............................................................................................................... 20
5.5 Instrumentation & Control ............................................................................................ 21
5.6 Lube Oil system .............................................................................................................. 21
5.7 COOLING WATER SYSTEM & WATER PREHEATING SYSTEM .......................................... 22
5.8 Generator Subsystem .................................................................................................... 23
5.9 Exhaust ........................................................................................................................... 23
-
8/18/2019 EDG Auxiliary System (Aaqib Nazir)
5/33
iv
5.10 Diesel Subsystem ........................................................................................................... 24
6 Failure and Most Occurring Mode of EDG subsystem ........................................................... 24
6.1 Most Occuring Mode among EDG Subsystem ............................................................... 24
6.2 Most Failure Mode of EDG Subsystem .......................................................................... 25
6.3 Human Errors ................................................................................................................. 26
-
8/18/2019 EDG Auxiliary System (Aaqib Nazir)
6/33
v
TABLE OF FIGURES
Figure 1: Emergency Diesel Generator and subsystem ................................................................... 3
Figure 2: EDG Building Layout .......................................................................................................... 4
Figure 3: A typical generator installation supplying standby power [4] .......................................... 5
Figure 4: Diesel Engine Efficiency graph over gasoline Engine ........................................................ 8
Figure 5: Generalized EDG Subsystem Layout [5] ....................................................................... 11
Figure 6: Simplified EDG train schematic. ...................................................................................... 14
Figure 7: Events of EDG subsystem ................................................................................................ 24
Figure 8: Root cause distribution for complete CCF events .......................................................... 25
-
8/18/2019 EDG Auxiliary System (Aaqib Nazir)
7/33
1
Emergency Diesel Generator (EDG)
Auxiliary System
1 System Description
The EDGs are part of the class safety-related ac electrical power distribution system
providing reliable emergency power to electrical buses that supply the emergency core
cooling system (ECCS) and various other equipment necessary for safe shutdown of the
reactor plant. In general, each EDG configuration ensures that adequate electrical power
is available in a postulated loss-of-offsite power (LOSP), with, or without a concurrent
large break loss of coolant accident (LOCA). Gas turbine generators and hydroelectric
generators (used at some locations for emergency power) are not part of this study. High-
pressure core spray diesels are considered (for this study) to be a separate train of the
emergency ac power system. Diesel engines used for fire pumps and other non safety-
related backup generators are not included.
The EDGs are normally in standby, whether the plant is at power or shutdown. At least
one EDG is required by Technical Specifications to be aligned to provide emergency
power to safety related electrical buses in case of a LOSP to the plant. In some cases a
"swing" EDG is used to supply power to more than one power plant (but not
simultaneously). The result is that two power plants will have a total of only three EDGs:
one EDG dedicated to each specific power plant, and the third, a swing EDG, capable of
powering either plant. Electrical load shedding (intentional load removal) of the safety
bus and subsequent sequencing of required loads after closure of the EDG output breaker
is considered part of the EDG function.
The EDG system is automatically actuated by signals that sense either a loss of coolant
accident or a loss of, or degraded, electrical power to its safety bus. The control room
operator accomplishes manual initiation of the EDG system if necessary.
-
8/18/2019 EDG Auxiliary System (Aaqib Nazir)
8/33
-
8/18/2019 EDG Auxiliary System (Aaqib Nazir)
9/33
3
diesel generators (namely water and air cooling) and experience-based recommendations
for approaching related new projects.
At the beginning of an additional diverse diesel generator installation project an extensive
external events analysis needs to be carried out to properly define the site-specific risks
(for example flooding, earthquake, tornado, shock wave, man-made hazards, extreme
ambient temperatures) [1]
Figure 1: Emergency Diesel Generator and subsystem
-
8/18/2019 EDG Auxiliary System (Aaqib Nazir)
10/33
4
2 Diesel generator building
The diesel generator building houses two identical slide-along diesel generators separated
by a three hour fire wall. These generators provide backup power for plant operation in
the event of disruption of normal power sources. The diesel generator building is
classified as non seismic and is designed as a structure subject to wind loads in
accordance with the Uniform Building Code. The building is not located adjacent to the
nuclear island and diesel generators supply only selected plant non-Safety-Related a.c.
loads. The building is a single storey steel framed structure with insulated metal siding.
The roof is composed of a metal deck supporting a concrete slab and serves as a
horizontal diaphragm to transmit lateral loads to sidewall bracing and thereby to the
foundation. The foundation consists of a reinforced concrete mat. [2]
Figure 2: EDG Building Layout
-
8/18/2019 EDG Auxiliary System (Aaqib Nazir)
11/33
5
2.1 Non-Safety Class
The diesel generator building is a non-safety related structure that houses the two
standby diesels engine powered generators and the power conversion cycle equipment and
auxiliaries. There is no safety-related equipment in the diesel generator building. The
diesel generator building is located on a separate foundation at a distance from the
nuclear island structures [3]
3 Emergency Diesel Generator
An Emergency Diesel Generator is a standby generator which may include
lighting, electric generators, fuel cells, uninterruptible power supplies and other
apparatus, to provide backup power resources in a crisis or when regular systems fail.
An emergency generator system is a very specific system with very specific equipment. It
consists of the generator, engine, exhaust system, engine electrical system, fuel system
and lubrication system.
Figure 3: A typical generator installation supplying standby power [4]
-
8/18/2019 EDG Auxiliary System (Aaqib Nazir)
12/33
6
3.1 Main Function
The emergency AC power system is installed only for emergency conditions; emergency
AC power system is an independent onsite medium-voltage power system to provide
adequate and reliable power for safety load and ensure the safe shutdown and accident
mitigation of the reactor, and prevent important equipment damage resulted from a loss
of offsite power
3.2 Design Basis
The emergency diesel generator set (genset) with its auxiliary systems shall have a good
starting and operating reliability as required. It is ensures by
Each genset should be installed in separated building
Two independent air starting systems which can start the genset independently
should be provided for each genset
The fuel storage system should be provided for each genset
The cooling water system should be provided for each genset.
In order to protect the diesel generator against mechanical damage from starting
and loading, provisions should be provided for cooling water and lubricating oil
heating and circulating during its standby condition.
During emergency condition, the genset can start automatically. The time from receiving
the starting signal to reaching the rated speed and voltage should be within l2s. Then the
load group will be loaded automatically according to a specified loading sequence. After
automatic loading sequence, some unimportant loads can be loaded manually by operatorin main control room according to the genset operating condition.
-
8/18/2019 EDG Auxiliary System (Aaqib Nazir)
13/33
7
3.3 Equipment Design
The genset shall be designed to withstand the following failures:
• Short circuit occurs on the three or two phases of the genset caused by external
fault for duration not less than 3 seconds.
• Operate at 115 percent of nominal speed for 5 seconds.
• Over voltage reach up to 1.4 times the nominal voltage at 50 Hz for 4 seconds.
3.4 Diesel Engine Efficiency
In Nuclear Power Plant, mostly Diesel Engine are preferred over Gasoline Engine
because of their efficiency and following reason
One positive aspect of the diesel engine is that they are thermally efficient.
The improved efficiency is caused by the relatively high compression ratios
The diesel engine is 54% thermally efficient, while gasoline engines are only
34%.
As a result of diesel engines thermally efficiency, they are able to achieve better
gas mileage because they produce greater horsepower output for fuel intake
-
8/18/2019 EDG Auxiliary System (Aaqib Nazir)
14/33
8
One main reason for the diesel engine’s excellent fuel economy is that it burns far
more air than fuel.
In a gasoline engine, it’s air intake is carefully restricted and controlled by the
carburetor for a 15:1 air to fuel ratio.
However, in the diesel engine, the air intake is unrestricted
The diesel engine compresses at a very high ratio of 14:1 to 25:1.
The higher the compression ratio, the more power is generated.
The main limiting factor to compression ratio is based on the knock limits of the
fuel.
Knock is the term used to describe the auto ignition that occurs when a fuel
ignites because the pressure in the cylinder is such that combustion occurs.
The knock limit of the fuel is determined by the point at which the engine begins
to shake.
The higher the knock limits, the higher the compression ratio, the more power is
generated.
The following graphs also show s the efficiency of the diesel engine over gasoline
engine.
Figure 4: Diesel Engine Efficiency graph over gasoline Engine
-
8/18/2019 EDG Auxiliary System (Aaqib Nazir)
15/33
9
3.5 Disadvantage of Diesel Engine
Diesel engine has following disadvantages over gasoline engine.
Components of diesel engines are usually heavier that those of gasoline engines
because of the additional structural strength needed to obtain the higher
compression ratio and power output.
They can emit large amounts of ozone-forming constituents and particulates.
Diesel engines are harder to start in cold weather conditions, because it is difficult
to get the temperature inside the cylinder up to the self-ignition temperature of the
diesel fuel
3.6 Electrical Side of EDG
Each diesel generator set has a continuous power capacity of 3400 kW ,short-time rating
of 3740 kW, power factor of 0.8 (lagged), rated voltage of 6.3 kV, three-phase. The
diesel generators are designed to reach rated speed and be ready to take loads within 12
seconds, to carry rated loads within 60 seconds after receipt of a starting signal to the
diesel engine, and to accept the emergency core cooling loads within the time stipulated
The requirement of voltage and frequency during loading of emergency diesel are:
Frequency should be more than 95% rated value (47.5Hz)
Load terminal voltage should be more than 75% rated value (4630V).
Frequency should be restored to within 2 percent (49Hz) of nominal, and voltage
should be restored to within 10 percent (5670V) of nominal within 60 percent of
each load-sequence time interval.
During the loading sequence, if largest single motor load isn't completely loaded
and reached up to its ratings, it can be reloaded continuously at the next loading
step.
-
8/18/2019 EDG Auxiliary System (Aaqib Nazir)
16/33
10
During recovery from transients caused by disconnection of the full load, the
speed of the diesel generator unit should not exceed the nominal speed plus 75
percent of the difference between nominal speed and the over-speed trip set point
Each diesel generator will be started automatically in any of the following
conditions
Safety injection signal
Under voltage on the 6 kV Class 1E buses (EMA, EMB).[LOOP]
Manual Starting Each diesel generator can be manually started either by a control switch
located on the main control board or by a control switch located on the diesel generator's
local control panel. A two position select switch (MCR/LOCAL), located on the control
panel in the main control room, is used to select the location control. Its position is
monitored by indicating lights in the main control room.
4 Subsystem/ Auxiliary Subsystem of EDG
This section contains a brief description of each of the subsystems that comprise the
emergency diesel generator. These descriptions are intended only to provide a general
overview of the most common EDG.A typical layout of a nuclear power plant application
includes the Emergency Diesel Genset with its main subsystems.
Breaker
Fuel Oil System
Air Starting System
Air intake and Exhaust System
cooling water system
Lubrication oil system
Instrumentation and control equipment
Ventilation system for Diesel Generator Building
Generator subsystem
Diesel Engine subsystem
-
8/18/2019 EDG Auxiliary System (Aaqib Nazir)
17/33
11
Figure 5: Generalized EDG Subsystem Layout [5]
4.1 EDG train
4.1.1 EDG Operating Charact erist ic s
The EDG train is part of the standby emergency onsite ac power system and is required to
be available as a reliable source of ac power in the event of a loss of normal ac power
during all plant modes (operating or shutdown). Normally, each plant has two safety-
related buses that power the electrical loads required for safe shutdown and emergency
conditions. These buses typically receive power from either the auxiliary or the startup
transformers, which are powered from the main generator or offsite power. In the event
of the loss of offsite power or the failure of the normal power to the individual safety-
related buses, an EDG train will provide a backup source of power to its associated
safety-related bus. The EDG train has sufficient capacity to power all the loads required
to safely shut the plant down or supply emergency core cooling system (ECCS) loads on
-
8/18/2019 EDG Auxiliary System (Aaqib Nazir)
18/33
12
a loss-of-coolant accident (LOCA). Plant-specific technical specifications identify the
requirements for the emergency ac power system operability under various plant
conditions.[11]
Instrumentation is provided in the control room to monitor EDG operation following an
automatic start signal. Control switches are also available to control EDG operation or
manually start the EDG if necessary. In addition, local manual controls are available in or
near the EDG room. Generally, any automatic start of the EDG train is considered an
emergency start regardless of whether the start was planned (i.e., surveillance test) or
unplanned (i.e., low-voltage condition).
An EDG train is required to automatically start upon indication of the following:
• A loss-of-coolant accident (safety injection signal)
•
A low-voltage condition on the safety-related bus.
A safety injection signal without a loss of offsite power will automatically start the EDG;
however, the EDG output breaker will not close. The EDG train will not supply power to
the safety-related bus for safety injection events unless a low-voltage condition exists.
The EDG will remain at rated speed and voltage with the output breaker open until
manually stopped. Should a LOCA occur during loss of offsite power, the bus is first
stripped of all loads (automatic load shedding), except for selected feeds for motor-
operated valves, and isolated from offsite power sources before the loading sequence
begins. After the bus is stripped of loads, the EDG output breaker automatically closes,
and the load sequencer automatically restarts selected equipment at a preset time interval
onto the affected safety-related bus.
A low-voltage condition on the safety-related bus requires automatic starting of the EDG
and closing of the output breaker to supply electrical power to designated equipment on
the affected bus. Should a loss of offsite power on any safety-related bus occur, the bus is
tripped of loads by a load-shedding scheme? Automatic loading of the safety-related bus
begins after the EDG has obtained rated speed and voltage and the EDG output breaker
has closed. During an under-voltage condition, the EDG train operates independently
without being in parallel with any other electrical power source. When normal power
again becomes available, the EDG train can then be paralleled with the grid, unloaded,
secured, and returned to standby condition.
-
8/18/2019 EDG Auxiliary System (Aaqib Nazir)
19/33
13
For most testing purposes, the EDG train is manually started, brought up to speed,
synchronized to the plant power system, and loaded. Normally, voltage is regulated
automatically. If offsite power is lost during parallel operation with the plant electrical
system, the EDG output breaker will open automatically via an under-frequency relay.
The under frequency relay protects the EDG from an over-load condition during parallel
operation. The under-frequency relay opens only the output breaker and is interlocked to
operate only in parallel operation. Once the output breaker has been opened by the under-
frequency relay, an undervoltage condition on the affected bus will exist, causing the
output breaker to reclose automatically. Operation of the EDG train from this point is
similar to the loss-of-offsite-power or under-voltage condition discussed earlier.
4.2 EDG Train Boundaries
The EDG train boundaries selected for this study are shown in Figure 6. These
boundaries are consistent with the boundaries identified in similar studies: NUREG-1032,
Evaluation of Station Blackout Accidents at Nuclear Power Plants and NUREG-2989.
The boundary of the EDG train includes the diesel engine, electrical generator, and
generator exciter, output breaker, load shedding and sequencing controls, EDG room
heating/ventilating subsystems (including combustion air), the exhaust path, lubricating
oil (with the device that physically controls the cooling medium, i.e., the nearest
isolation/control valve to the EDG boundary that is actuated on a start signal), fuel oil
subsystem (including all storage tanks permanently connected to the engine supply), and
the starting compressed air subsystem. All pumps, valves, valve operators, the power
supply breakers for the powered items, and associated piping for the above support
subsystems are inside the boundary of the EDG train.
-
8/18/2019 EDG Auxiliary System (Aaqib Nazir)
20/33
14
Figure 6: Simplified EDG train schematic.
5 EDG Subsystem Description
5.1 Breaker
The breaker subsystem includes the main EDG output breaker as well as the loading and
sequencing circuitry. The automatic load shedding and sequencing controls the order and
-
8/18/2019 EDG Auxiliary System (Aaqib Nazir)
21/33
15
timing of emergency loads that are loaded onto the safety-related bus. The purpose of this
equipment is to prevent the instantaneous full loading (ECCS loads during a LOCA vent)
the engine when the output breaker is closed.
5.2 Air intake and Exhaust system
The diesel generator air intake and exhaust system (DGAIES) provides the diesel engine
with combustion air from the outside. The combustion air passes through a filter, silencer,
and heater before being compressed by a turbocharger and cooled by the coolant system
before entering the individual cylinders for combustion.
The exhaust gas system collects the exhaust gas from the individual cylinders and
conveys them via the engine-mounted turbocharger, emissions equipment, and an exhaust
gas silencer to the outside [8]
5.2.1 Design B asis
The design of the system and EPGB establishes that the arrangement and location of the
combustion air intake and exhaust gas discharge are such that dilution and contamination
of the intake air will not prevent operation of the EDG at rated power output or cause
engine shutdown as a consequence of any metrological or accident condition. Each EDG
set has a separate, independent diesel engine combustion air and exhaust gas system
5.2.2 Sys tem Descr ip t ion
The diesel engine combustion air system provides the necessary combustion air for the
diesel engine, and the exhaust gas system provides a path for exhaust products of
combustion from the EDGs to the environment under all operating conditions
5.2.3 General Desc rip t ion
The combustion air for the diesel engine is taken directly from outside the EPGB via an
air duct located on the upper floor level (i.e., elevation +51 ft, 6 in) of the building inside
-
8/18/2019 EDG Auxiliary System (Aaqib Nazir)
22/33
16
the missile protection area. The air passes through a filter, inlet damper, silencer and
heater before entering the diesel engine turbocharger.
The turbocharger is operated by the kinetic energy of the exhaust gas and compresses the
combustion air, which then passes through an intercooler before entering the individual
cylinders. Compressed combustion air is supplied to the ejector of the crankcase
ventilation system. The air flow through the ejector creates a vacuum that removes
combustible vapors from the engine crankcase..
The intercooler is a heat exchanger, supplied with DGCWS to cool the intake air that has
been heated by compression. The cooled compressed air forces more air into each
cylinder during the intake portion of the combustion cycle, increasing the horsepower of
the engine. The compressed air is required for the EDG to meet its rated output. The
exhaust gas system, which consists of pipes, emission control equipment, and an exhaust
gas silencer, is insulated to reduce radiated heat in the EPGB to an acceptable level.
The layout of the main components (i.e., piping, filters, and valves) provides the space
required to permit inspection, cleaning, maintenance, and repair of the system
After Cooler
-
8/18/2019 EDG Auxiliary System (Aaqib Nazir)
23/33
17
5.2.4 Component Descr ip t ion
The system contains the following components:• Intake and exhaust silencers to attenuate the sound levels both in the EPGB and
outside the building to meet site requirements.
• Filter(s) to separate dirt from the injection stream remove dust and small particles
from the combustion air supply to the turbochargers.
• Pipes and ducting to route the air into the engine to minimize pressure drop, and
piping to route exhaust from the engine to meet backpressure specifications of the
engine manufacturer.
• Exhaust emission equipment to control exhaust emissions to meet federal, state,
and local emissions requirements.
• Sensor(s) to monitor exhaust gas temperature, and filter differential pressure to
alert the operators of abnormal conditions which may warrant operator action.
5.2.5 System Operation
The DGAIES supports the EDG and as such normal operation of the system is required
any time the EDG is running. During normal diesel engine operation, air flows from
outside the EPGB into the air duct and then through the air intake filter for particulate
removal and a silencer for noise reductions. The power of the diesel engine is raised by
compression of the combustion air in the engine-mounted turbocharger before the air
enters the cylinders. The exhaust gas heat is used to operate the turbocharger. The
exhaust gas flow is directed through the exhaust gas emissions equipment and silencer for
noise attenuation and then discharged to the outside.
5.2.5.1 Normal Operation
When the plant is operating under normal conditions, the EDGs are maintained in
standby. The air intake and exhaust system is maintained ready to support diesel
operation.
-
8/18/2019 EDG Auxiliary System (Aaqib Nazir)
24/33
18
5.2.5.2 Abnormal Operation
The combustion air and exhaust air systems are monitored and an alarm is sounded in the
MCR to alert the operator when a degraded condition exists. The intake filters are
monitored for differential pressure and an alarm sounds when a condition exists that
could affect the operability of the engine it supplies. The filter elements are replaceable
and in extreme conditions they could be replaced online. The temperature of the engine
exhaust gas is monitored to verify that the engine is operating as designed. An alarm is
sounded if the exhaust temperature exceeds established parameters which could damage
internal components of the engine or prevent the engine from meeting its design power
requirements. Heat generated by the engine combustion is maintained in a defined range
to allow the engine, turbocharger, and emissions equipment to function as designed.The exhaust system is equipped with a bypass valve and a bypass stack which provides
a safety-related exhaust path in the event that a system failure downstream restricts the
exhaust flow.
5.2.6 A cceptanc e Criter ia of Air intake and exh aust sy stem
A. Each diesel engine has an independent combustion air intake and exhaust system.
B.
The components are designed, fabricated, erected, and tested to acceptable quality
standards.
C. The system has boundary divisions between safety-related and nonsafety-related
sections.
D. Failures of any non-seismic Category 1 structure, system, or component (SSC) (or
failures of other non-seismic components or systems) will not affect the safety
functions of the system adversely.
E. Sections of the system important to safety are housed in or on a seismic Category
I structure.
F. The consequences of a single, active failure in an engine combustion air intake or
exhaust system will not lead to the loss of function of more than one diesel
generator.
-
8/18/2019 EDG Auxiliary System (Aaqib Nazir)
25/33
19
G. Instrumentation and control features permit operational testing of the system and
assure that normal protective interlocks do not preclude engine operation during
emergency conditions.
H. Sufficient space permits inspection, cleaning, maintenance, and repair of the
system.
5.2.7 Safety Evaluation
1. The safety-related portion of the combustion air system is located inside the
EPGB and meets the same safety objectives as the diesel engine itself. This
building is designed to withstand the effects of earthquakes, tornadoes,
hurricanes, floods, external missiles, and other natural phenomena. Sections 3.3,
3.4, 3.5, 3.7(B), and 3.8 provide the bases for the adequacy of the structural
design of these buildings.
2. The safety-related portion of the DGAIES is designed to remain functional after
an SSE. Sections 3.7(B).2 and 3.9(B provide the design loading conditions that
were considered. There are no high- or moderate-pressure lines in the EPGB
whose failure can affect the function of more than one DGAIES. Sections 3.5, 3.6
and 9.5.1 provide the hazards analyses to establish that a safe shutdown, as
outlined in Section 7.4, can be achieved and maintained.
3. The DGAIES for each diesel engine is independent of any other diesel engine’s
DGAIES. This precludes the sharing of any safety-related systems and
components that could prevent those systems or components from performing
required safety functions.
4. The four-division design of the EDG air system provides complete redundancy;
therefore no single failure compromises the EDG system safety functions. Vital power can be supplied from either onsite or offsite power systems, as described
in This meets the recommendation of NUREG/CR-0660 [7]
5. All the power supplies and control functions necessary for safe function of the air
handling system are Class IE
-
8/18/2019 EDG Auxiliary System (Aaqib Nazir)
26/33
20
5.3 Air Starting System
The starting air subsystem consists of those components required to start the EDG.
Typically, this system uses compressed air. The air start system provides compressed air
to the engine through a system of valves, relief valves, compressed gas cylinders, air
motor, and a distribution.
The diesel engine in CNPP uses compressed air for startup. There are two independent
starting air systems (for each Diesel Generator set) which provide the compressed air for
engine starting.
5.4 Fuel Oil System
The Fuel System ensures the supply of fuel from he fuel storage tank through the service
tank into the diesel engine. The fuel oil subsystem provides fuel oil from large external
storage tanks, having a capacity for several days of system operation, to a smaller day
tank for each engine. The day tank typically has capacity to operate the engine for 4 to 6
hours. Day tank fuel is supplied to the cylinder injectors, which inject the fuel to each
individual cylinder for combustion. Each Diesel Generator train has two Fuel Oil Storage
Tanks. The capacity of these tanks ensures that Diesel Generator can operate reliably for
14 days at rated power.
Air
compressor
two sta e
-
8/18/2019 EDG Auxiliary System (Aaqib Nazir)
27/33
21
During operation of Diesel Generator two fuel oil transfer pumps (back up of each other
continuously supply fuel oil to daily fuel tank. The capacity of daily oil tank ensures that
Diesel Generator can operate for 60 minutes at 1.1 times the rated power.
The diesel fuel oil system is an ESF system. It supplies diesel fuel for the auxiliary
feedwater pump diesel as well as the two site emergency diesel generators. Two
independent trains of fuel oil supply are provided. Each consists of an underground
storage tank, a transfer pump, and transfer piping. Each independent source of fuel
supplies the auxiliary feedwater pump day tank.
The day tank has sufficient capacity (500 gallons) to allow diesel operation at design
capacity (960 gpm at 3400 ft of head) for 10 hours. The minimum allowed level in the
AFW pump diesel fuel oil day tank per Technical Specifications is 450 gallons (69%) to
fulfill the operability requirements for train B of AFW. Each storage tank has sufficient
capacity to
5.5 Instrumentation & Control
The instrumentation and control I&C) subsystem components function to start, stop, and
provide operational control and protective trips for the EDG. Controls for the EDGs are a
mix of pneumatic and electrical devices, depending on the manufacturer. These function
to control the voltage and speed of the EDG. Various safety trips for the engine and
generator exist to protect the EDG. During the emergency start mode of operation, some
of these protective trips associated with the EDG engine are bypassed.
5.6 Lube Oil system
The lube oil circuit, featured with a level monitoring, is supplying the engine with
lubricating oil and dissipating heat into a cooling circuit.
-
8/18/2019 EDG Auxiliary System (Aaqib Nazir)
28/33
22
Lube oil system for the engine is a wet-sump forced feed system. The system can be
divided into following sub-systems:
Oil Conditioning Sub-System
Running Gear Oil Sub-System
Valve Gear Sub-System
Piston Cooling Oil Sub-System
Valve Seat Lubricating Sub-System
Pre Lubricating Oil Sub-System
5.7 COOLING WATER SYSTEM & WATER
PREHEATING SYSTEM
The cooling subsystem is a closed-loop water system that is integral to the engine and
generator, and has an external-cooling medium, typically, the plant emergency service
water. The pumps, heat exchangers, and valves are part of this system. The cooling water
jacket is part of the Engine subsystem.
-
8/18/2019 EDG Auxiliary System (Aaqib Nazir)
29/33
23
The diesel engine is cooled by two independent cooling circuits: the engine coolant
system (high temp.) and the charge air coolant system (low temp.). The heat for both
circuits is dissipated via external electrical fan cooling units, tube bundle heat exchangers
or plate heat exchangers. The coolant pump is engine driven.
The cooling water system is designed for 1000 hours continuous operation at rated load,
and 2 hour operation within 24 hours at 10% overload above rated load
5.8 Generator Subsystem
The generator subsystem consists of the generator casing, rotor, windings, and exciter.
These components all function to deliver electrical power to the output breaker.
5.9 Exhaust
The exhaust subsystem consists of the piping and valves installed to direct the engine
exhaust out of the building.
Air coolers, lube oil coolers;
fuel cooler etc
Circuit 1
Circuit 2
-
8/18/2019 EDG Auxiliary System (Aaqib Nazir)
30/33
24
5.10 Diesel Subsystem
The engine sub-system is the physical engine block and piece-parts internal to it. These
parts include pistons, crankshafts, turbochargers, cooling water jackets, and the governor.
The engine governor maintains correct engine speed by metering the fuel oil to each
cylinder injector
6 Failure and Most Occurring Mode of EDG
subsystem
6.1 Most Occuring Mode among EDG Subsystem Now we will see by graph which EDG subsystem is mostly used when EDG is under
operational. Figure 7 shows the distribution of the CCF events by EDG sub-system. The
highest number of events occurred in the instrumentation and control sub-system (41
events or 30 percent). The cooling, engine, fuel oil, and generator sub-systems are also
significant contributors. Together, these five subsystems comprise over 80 percent of the
EDG CCF events. The battery, exhaust, and lubricating oil subsystems are minor
contributors [9]
Figure 7: Events of EDG subsystem
-
8/18/2019 EDG Auxiliary System (Aaqib Nazir)
31/33
25
6.2 Most Failure Mode of EDG Subsystem
Now we will see which EDG subsystem is mostly fail. Fgure 6 how the distributions of
CCF events for subsystems for all events and complete CCF events by failure mode
Figure 8: Root cause distribution for complete CCF events
Cooling, engine, and fuel oil are most likely to result in fail-to-run. I&C, output breaker,
and starting air are most likely to result in fail-to-start. This does not shift significantly
between the set of all CCF events and the set of complete CCF events. Cooling and
engine become much less significant and I&C and fuel oil become much more
significant. The I&C contribution is consistent with the nature of that system since it
controls the EDG during operation and contains the shutdown controls.
-
8/18/2019 EDG Auxiliary System (Aaqib Nazir)
32/33
26
The fuel oil subsystem shifts from mostly fail-to-run to all fail-to-start between the all
CCF case and the complete CCF case. This is primarily due to most of the fuel oil fail-to-
run events involving minor leaks.
6.3 Human Errors
This category is worth mentioning. The instrumentation and control subsystem is
especially vulnerable to CCF from the human factor. Again, this is due to the complexity
and the function of instrumentation and control. Procedures, maintenance, and operations
all contribute to this root cause. The human error root cause category increases in
importance between all events and the set of complete CCF events. They also exhibit a
shift from an even number of fail-to-start and fail to-run events to more fail-to-start
events. The human errors contributing to this phenomenon include mis-positioned valves,
inadvertent switch operation, and a design modification error[10]
-
8/18/2019 EDG Auxiliary System (Aaqib Nazir)
33/33
27
References
[1] http://www.neimagazine.com/features/featurecooling-options-for-emergency-backup-
diesel-generators-4159521/
[2] http://www.onr.org.uk/new-reactors/reports/step3-ap1000-civil-engineering-externa-
hazards-assessment.pdf
[3] http://pbadupws.nrc.gov/docs/ML1117/ML11171A319.pdf
[4]http://www.aspenational.org/userfiles/file/Technical%20Papers/2011/ET
011February-TechPaper.pdf
[5]
http://www.mtuonsiteenergy.com/index.php?id=4517&L=0&tx_mcgbsecuredownload_
pi1%5Bfile%5D=media-all-site/pdf/en/brochure/3061871_OE_Brochure_NPP_2_14_lay_ES.pdf&tx_mcgbsecuredo
wnload_pi1%5BfullPath%5D=/fileadmin/fm-dam/mtu_onsite_energy/media-all-
site/pdf/en/brochure/3061871_OE_Brochure_NPP_2_14_lay_ES.pdf
[6] http://pbadupws.nrc.gov/docs/ML0705/ML070550033.pdf
[7] NUREG/CR-0660, “Enhancement of Onsite Emergency Diesel Generator
Reliability,” University of Dayton Research Institute for the U.S. NRC; UDR -TR-79-07;
February 1979.
[8] http://pbadupws.nrc.gov/docs/ML1307/ML13073A704.pdf
[9] http://www.nrc.gov/reading-rm/doc-collections/nuregs/contract/cr6819/cr6819v1.pdf
[10] http://www.oecd-nea.org/nsd/docs/2000/csni-r2000-20.pdf
[11] http://nrcoe.inel.gov/resultsdb/publicdocs/SystemStudies/edg-system-description.pdf