Transcript
  • eM-Plant 7.0

  • Where is the Name of PITOTECH come fromLeading Technology supplier

  • ( PITOTECH ):Pitot TubeTechnologyPITOTECH

  • :(e-ManufacturingMPM)e-Learning

  • :!

  • :: :2002

  • Offer e-Manufacturing solution (Tecnomatix,NASDAQ) Reliability software (Relex) Femlab: Multiphysic /PDE by finite element Megaputer: Data Mining NeuroDimension: Neuro network software Palisade: RiskData fitting software ILOG: Optimization component (NASDAQ) System ViewDSP and communication On-line Learning System (click2learnNASDAQ)

  • The Advanced Knowledge Provider

  • (Evaluative Model)(Optimal Model)

  • (Explanatory devices)(Design assessors)(Analysis vehicles)(Predictors)

  • eM-AssemblerSequence of assembly operations Dynamic collision detection Process validation Clear communication

  • eM-Assembler Example: Pump AssemblyAssembly study to define sub-assemblies and assembly sequence.Tools like the clipping plane help to examine critical areas in detail.

  • eM-Assembler Example: Camera AssemblyIn the initial design stage the camera cannot be assembled due to a collision problem.Improved camera design enables collision-free assembly.

  • eM-Assembler Example: ENGINE AssemblyIn the initial design stage the ENGINE cannot be assembled due to a collision problem. And then Improved ENGINE design enables collision-free assembly.

  • eM-Workplace NTYou can use the eM-Workplace NT module to easily perform 3D layout planning and workplace design. 3D Layouting allows early error recognition and facilitates communication, documentation and presentation.

  • eM-Workplace NTBlock LayoutStructure LayoutDetailed LayouteM-Workplace NT enables structured top-down planning in 3D: Customizable 3D component libraries allow fast and efficient layout design.

  • eM-Workplace NT Example:Electronics Assembly LineLayout of an assembly line for electronic parts

  • eM-Workplace NT Example:Plant LayoutLayout of an assembly line for mechanical parts produced by a tier-one automotive supplier.

  • eM-Human Example:Electronics Industry WorkplaceOriginal workplace designWorkplace design leads to bad worker posture.

    Cycle time is not optimized.Improved workplace design enables correct worker posture

    Optimized cycle time due to shorter reach distancesImproved workplace design

  • eM-Human Example: AssemblyAssembly study of a seat to evaluate the assembly time and verify feasibility.

  • eM-Human Example:Water PumpImplementation of ergonomic and assembly time analyses for the assembly of a water pump.

  • eM-Workplace(RobCAD)eM-Workplace NTLayoutRobCADRobot

  • RobCAD OLP

  • eM-Plant

  • eM-Plant

  • eM-Plant

  • eM-Plant

  • eM-Plant

  • eM-Plant

  • eM-Plant

  • eM-Plant AGV

  • eM-Plant

  • ISO 9000

  • hank You!

    Q & A

    PITO TUDEINFORMATION

    We take Pitot tude as my company name.

    Because the fighter is the faster flight in the world.Show Pitotech always provide the newest information to our customers.


Top Related