Download - EVALUACION CCERAOCRO
![Page 1: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/1.jpg)
CULTIVOS
COMUNIDAD HECTAREAS PRINCIPAL ROTACION
CALVARIO 80 68.4CUCHUCANCHA 138 51.7MAYUCANCHA 104 148MORCCO 91 105PARIAHUANCA 82 75
TOTAL 495 448.1FUENTE: ELABORACION PROPIA
Nº DE BENEFICIARIOS
![Page 2: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/2.jpg)
CAMPAÑAS AGRICOLASAREA
TOTAL (ha)C. GRANDE (ha)
C. CHICA (ha)
![Page 3: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/3.jpg)
CULTIVOS
TOTAL TOTAL
PAPA 25 25 17 14 31 23 13CEBADA 7 7 0 0 0 20 12MAIZ 9 9 0 0 0 0 0HABA 0 0 2 2 4 24 13TRIGO 7 7 0 0 0 0 0QUINUA 2 2 3 3 6 0 0AVENA 2 2 9 8 17 0 0PASTO 0 0 5 5 10 0 0TOTAL 0 52 52 36 32 68 67 38FUENTE: ELABORACION PROPIA
CULTIVOS
TOTAL TOTAL
PAPA 67.5 67.5 62 62 125.5CEBADA 21 21 0 113.5AVENA 4.5 4.5 34.75 34.75HABA 0 0 7.75 7.75 130.5OLLUCO 7 7 0QUINUA 5 5 11 11TRIGO 19 19 0MAIZ 25 25 0PASTO 0 20.5 20.5TOTAL 0 149 149 0 136 136 0 369.5
CULTIVOSTOTAL TOTAL
PAPA 0.453 0.45302 0.45588 0.45588 0.33965CEBADA 0.1409 0.14094 0 0 0.30717AVENA 0.0302 0.0302 0.25551 0.25551 0HABA 0 0 0.05699 0.05699 0.35318OLLUCO 0.047 0.04698 0 0 0QUINUA 0.0336 0.03356 0.08088 0.08088 0TRIGO 0.1275 0.12752 0 0 0MAIZ 0.1678 0.16779 0 0 0PASTO 0 0 0.15074 0.15074 0TOTAL 0 1 1 0 1 1 0 1
COMUNIDAD DE CUCHUCANCHA
HECTAREAS
COMUNIDAD DE CALVARIO HECTAREAS
COMUNIDAD DE SAN CRISTOBAL DE MORCCO
HECTAREAS
SIN RIEGO
CON RIEGO
SIN RIEGO
CON RIEGO
SIN RIEGO
CON RIEGO
COMUNIDAD DE CUCHUCANCHA
HECTAREAS
COMUNIDAD DE CALVARIO HECTAREAS
COMUNIDAD DE SAN CRISTOBAL DE MORCCO
HECTAREAS
SIN RIEGO
CON RIEGO
SIN RIEGO
CON RIEGO
SIN RIEGO
CON RIEGO
COMUNIDAD DE CUCHUCANCHA
HECTAREAS
COMUNIDAD DE CALVARIO HECTAREAS
COMUNIDAD DE SAN CRISTOBAL DE MORCCO
HECTAREASSIN RIEGO
CON RIEGO
SIN RIEGO
CON RIEGO
SIN RIEGO
CON RIEGO
![Page 4: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/4.jpg)
CULTIVOSTOTAL TOTAL
PAPA 51.7 51.7 68.4 68.4 105CEBADA 51.7 51.7 68.4 68.4 105AVENA 51.7 51.7 68.4 68.4 105HABA 51.7 51.7 68.4 68.4 105OLLUCO 51.7 51.7 68.4 68.4 105QUINUA 51.7 51.7 68.4 68.4 105TRIGO 51.7 51.7 68.4 68.4 105MAIZ 51.7 51.7 68.4 68.4 105PASTO 51.7 51.7 68.4 68.4 105TOTAL 0 465.3 465.3 0 615.6 615.6 0 945
CULTIVOS
TOTAL TOTAL
PAPA 23 23 31 31 36CEBADA 7 7 0 0 32AVENA 2 2 17 17 0HABA 0 0 4 4 37OLLUCO 2 2 0 0 0QUINUA 2 2 6 6 0TRIGO 7 7 0 0 0MAIZ 9 9 0 0 0PASTO 0 0 10 10 0TOTAL 0 52 52 0 68 68 0 105
CULTIVOSTOTAL TOTAL
PAPA 23 23 46 31 31 62 36 36CEBADA 7 7 14 0 0 0 32 32AVENA 2 2 4 17 17 34 0 0HABA 0 0 0 4 4 8 37 37OLLUCO 2 2 4 0 0 0 0 0QUINUA 2 2 4 6 6 12 0 0TRIGO 7 7 14 0 0 0 0 0MAIZ 9 9 18 0 0 0 0 0PASTO 0 0 0 10 10 20 0 0TOTAL 52 52 104 68 68 136 105 105
CULTIVOSTOTAL TOTAL
PAPA 0 0.540441 0.45956 1 0.6377 0.3623CEBADA 0 0.540441 0.45956 1 0.6377 0.3623AVENA 0 0.540441 0.45956 1 0.6377 0.3623HABA 0 0.540441 0.45956 1 0.6377 0.3623OLLUCO 0 0.540441 0.45956 1 0.6377 0.3623QUINUA 0 0.540441 0.45956 1 0.6377 0.3623
COMUNIDAD DE CUCHUCANCHA
HECTAREAS
COMUNIDAD DE CALVARIO HECTAREAS
COMUNIDAD DE SAN CRISTOBAL DE MORCCO
HECTAREASSIN RIEGO
CON RIEGO
SIN RIEGO
CON RIEGO
SIN RIEGO
CON RIEGO
COMUNIDAD DE CUCHUCANCHA
HECTAREAS
COMUNIDAD DE CALVARIO HECTAREAS
COMUNIDAD DE SAN CRISTOBAL DE MORCCO
HECTAREAS
SIN RIEGO
CON RIEGO
SIN RIEGO
CON RIEGO
SIN RIEGO
CON RIEGO
COMUNIDAD DE CUCHUCANCHA
HECTAREAS
COMUNIDAD DE CALVARIO HECTAREAS
COMUNIDAD DE SAN CRISTOBAL DE MORCCO
HECTAREASSIN RIEGO
CON RIEGO
SIN RIEGO
CON RIEGO
SIN RIEGO
CON RIEGO
COMUNIDAD DE CUCHUCANCHA
HECTAREAS
COMUNIDAD DE CALVARIO HECTAREAS
COMUNIDAD DE SAN CRISTOBAL DE MORCCO
HECTAREASSIN RIEGO
CON RIEGO
SIN RIEGO
CON RIEGO
SIN RIEGO
CON RIEGO
![Page 5: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/5.jpg)
TRIGO 0 0.540441 0.45956 1 0.6377 0.3623MAIZ 0 0.540441 0.45956 1 0.6377 0.3623PASTO 0 0.540441 0.45956 1 0.6377 0.3623TOTAL 0 0 0 4.863971 4.13603 9 5.73932 3.26068
CULTIVOSTOTAL TOTAL
PAPA 0 17 14 31 23 13CEBADA 0 0 0 0 20 12AVENA 0 9 8 17 0 0HABA 0 2 2 4 24 13OLLUCO 0 0 0 0 0 0QUINUA 0 3 3 6 0 0TRIGO 0 0 0 0 0 0MAIZ 0 0 0 0 0 0PASTO 0 5 5 10 0 0TOTAL 0 0 0 36 32 68 67 38
CULTIVOSCOMUNIDADES
TOTALCUCHUC CALVARMORCCOMAYUCANPARIAH
Papa 25 31 36 30 33 155Cebaba 7 0 32 12 9 60Maiz 9 0 0 0 13 22Haba G.S 0 4 37 0 0 41Trigo 7 0 0 0 9 16Quinua 2 6 0 0 7 15Avena 2 17 0 41 4 64Pasto 0 10 0 65 0 75
TOTAL 52 68 105 148 75 448
COMUNIDAD DE CUCHUCANCHA
HECTAREAS
COMUNIDAD DE CALVARIO HECTAREAS
COMUNIDAD DE SAN CRISTOBAL DE MORCCO
HECTAREASSIN RIEGO
CON RIEGO
SIN RIEGO
CON RIEGO
SIN RIEGO
CON RIEGO
![Page 6: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/6.jpg)
TOTAL
TOTAL TOTAL TOTAL TOTAL
36 17 13 30 20 13 33 77 78 15532 7 5 12 6 3 9 33 27 60
0 0 0 0 8 5 13 8 14 2237 0 0 0 0 0 0 26 15 41
0 0 0 0 6 3 9 6 10 160 0 0 0 4 3 7 7 8 150 23 18 41 2 2 4 34 30 640 36 29 65 0 0 0 41 34 75
105 83 65 148 46 29 75 232 216 448FUENTE: ELABORACION PROPIA
TOTAL TOTAL TOTAL
125.5 75.5 75.5 55 55113.5 31 31 15 15
0 101 101 6 6130.5 0 0
0 0 00 0 12 120 0 15 150 0 21 210 161.5 161.5 0
369.5 0 369 369 0 124 124
TOTAL TOTAL TOTAL
0.33965 0.204607 0.20461 0.443548 0.443550.30717 0.084011 0.08401 0.120968 0.12097
0 0.273713 0.27371 0.048387 0.048390.35318 0 0 0 0
0 0 0 0 00 0 0 0.096774 0.096770 0 0 0.120968 0.120970 0 0 0.169355 0.169350 0.437669 0.43767 0 01 0 1 1 0 1 1
COMUNIDAD DE SAN CRISTOBAL DE MORCCO
HECTAREAS
COMUNIDAD DE MAYUCANCHA HECTAREAS
COMUNIDAD DE PARIAHUANCA
HECTAREAS
SIN RIEGO
CON RIEGO
SIN RIEGO
CON RIEGO
SIN RIEGO
CON RIEGO
COMUNIDAD DE SAN CRISTOBAL DE MORCCO
HECTAREAS
COMUNIDAD DE MAYUCANCHA HECTAREAS
COMUNIDAD DE PARIAHUANCA
HECTAREAS
SIN RIEGO
CON RIEGO
SIN RIEGO
CON RIEGO
COMUNIDAD DE SAN CRISTOBAL DE MORCCO
HECTAREAS
COMUNIDAD DE MAYUCANCHA HECTAREAS
COMUNIDAD DE PARIAHUANCA
HECTAREASSIN RIEGO
CON RIEGO
SIN RIEGO
CON RIEGO
![Page 7: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/7.jpg)
TOTAL TOTAL TOTAL CALVAR 80.00000
105 148 148 75 75 CUCHU ###105 148 148 75 75 MAYUC ###105 148 148 75 75 MORCC 91.00000105 148 148 75 75 PARIAH 82.00000105 148 148 75 75105 148 148 75 75105 148 148 75 75105 148 148 75 75105 148 148 75 75945 0 1332 1332 0 675 675
TOTAL TOTAL TOTAL
36 30 30 33 3332 12 12 9 9
0 41 41 4 437 0 0 0 0
0 0 0 0 00 0 0 7 70 0 0 9 90 0 0 13 130 65 65 0 0
105 0 148 148 0 75 75
TOTAL TOTAL TOTAL
72 30 30 60 33 33 6664 12 12 24 9 9 18
0 41 41 82 4 4 874 0 0 0 0 0 0
0 0 0 0 0 0 00 0 0 0 7 7 140 0 0 0 9 9 180 0 0 0 13 13 260 65 65 130 0 0 0
210 148 148 296 75 75 150
TOTAL TOTAL TOTAL
1 0.5542 0.445799 1 0.62097 0.379032 11 0.5542 0.445799 1 0.62097 0.379032 11 0.5542 0.445799 1 0.62097 0.379032 11 0.5542 0.445799 1 0.62097 0.379032 11 0.5542 0.445799 1 0.62097 0.379032 11 0.5542 0.445799 1 0.62097 0.379032 1
COMUNIDAD DE SAN CRISTOBAL DE MORCCO
HECTAREAS
COMUNIDAD DE MAYUCANCHA HECTAREAS
COMUNIDAD DE PARIAHUANCA
HECTAREASSIN RIEGO
CON RIEGO
SIN RIEGO
CON RIEGO
COMUNIDAD DE SAN CRISTOBAL DE MORCCO
HECTAREAS
COMUNIDAD DE MAYUCANCHA HECTAREAS
COMUNIDAD DE PARIAHUANCA
HECTAREAS
SIN RIEGO
CON RIEGO
SIN RIEGO
CON RIEGO
COMUNIDAD DE SAN CRISTOBAL DE MORCCO
HECTAREAS
COMUNIDAD DE MAYUCANCHA HECTAREAS
COMUNIDAD DE PARIAHUANCA
HECTAREASSIN RIEGO
CON RIEGO
SIN RIEGO
CON RIEGO
COMUNIDAD DE SAN CRISTOBAL DE MORCCO
HECTAREAS
COMUNIDAD DE MAYUCANCHA HECTAREAS
COMUNIDAD DE PARIAHUANCA
HECTAREASSIN RIEGO
CON RIEGO
SIN RIEGO
CON RIEGO
![Page 8: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/8.jpg)
1 0.5542 0.445799 1 0.62097 0.379032 11 0.5542 0.445799 1 0.62097 0.379032 11 0.5542 0.445799 1 0.62097 0.379032 19 4.9878 4.012195 9 5.58871 3.41129 9
con rieg 47 0.379032
TOTAL TOTAL TOTAL sin rieg 77 0.62096836 17 13 30 20 13 33 12432 7 5 12 6 3 9
0 23 18 41 2 2 437 0 0 0 0 0 0
0 0 0 0 0 0 00 0 0 0 4 3 70 0 0 0 6 3 90 0 0 0 8 5 130 36 29 65 0 0 0
105 83 65 148 46 29 75
COMUNIDAD DE SAN CRISTOBAL DE MORCCO
HECTAREAS
COMUNIDAD DE MAYUCANCHA HECTAREAS
COMUNIDAD DE PARIAHUANCA
HECTAREASSIN RIEGO
CON RIEGO
SIN RIEGO
CON RIEGO
![Page 9: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/9.jpg)
68.451.7148105
75
![Page 10: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/10.jpg)
CÉDULA DE CULTIVO PROPUESTA - CON PROYECTO
CULTIVOMESES DEL AÑO CAMPAÑAS (HAS)
Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic Primera
Papa 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
Cebaba 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
Maiz 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00
Haba G.S 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
Trigo 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
Arveja G.S. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
hortalizas 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Alfalfa 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Total 20.00 20.00 20.00 20.00 20.00 8.00 1.00 1.00 1.00 1.00 1.00 13.00 20.00 20.00
AREA (HAS)
![Page 11: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/11.jpg)
CÉDULA DE CULTIVO PROPUESTA - CON PROYECTO
CAMPAÑAS (HAS)
Segunda
-
-
-
-
-
-
-
-
0.00
![Page 12: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/12.jpg)
CÉDULA DE CULTIVO PROPUESTA - CON PROYECTO
CULTIVOMESES DEL AÑO CAMPAÑAS (HAS)
Ene Feb Mar Abr May Jun Jul Ago Set Oct Nov Dic Primera
Papa 3.00 3.00 3.00 3.00 3.00 2.00 2.00 2.00 2.00 2.00 2.00 3.00 3.00 3.00
Cebaba 3.00 3.00 3.00 3.00 3.00 3.00 2.00 2.00 2.00 2.00 2.00 2.00 3.00 3.00
Maiz 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00
Haba G.S 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
Trigo 3.00 3.00 3.00 3.00 3.00 3.00 1.00 1.00 1.00 1.00 1.00 1.00 3.00 3.00
Arveja G.S. 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
hortalizas 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
Alfalfa 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00
Total 30.00 30.00 30.00 30.00 30.00 19.00 16.00 16.00 16.00 16.00 16.00 27.00 30.00 30.00
AREA (HAS)
![Page 13: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/13.jpg)
CÉDULA DE CULTIVO PROPUESTA - CON PROYECTO
CAMPAÑAS (HAS)
Segunda
2.00
2.00
0.00
2.00
1.00
2.00
3.00
3.00
15.00
![Page 14: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/14.jpg)
Año dato censo 2007Año a extender 2011
4
POBLACION DE REFERENCIA
A POBLACION COMUNIDAD 2007 [A x (1 + B )2] 360
B TASA DE CRECIMIENTO ANUAL * % 0.4
C POBLACION COMUNIDAD 2011 [A x (1 + B )2] 366
D Nº DE PERSONAS PROMEDIO EN UNA AFAMILIA 2010 4
Nº FAMILIAS COMUNIDAD 2011 [C/D] 91
F
G
POBLACION DE REFERENCIA (2010) = C * ( 1+B) PARA LOS SIGUIENTES AÑOS: Poblacion de referencia ( T-1) *( 1+B)
Nº DE PERSONAS
![Page 15: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/15.jpg)
AÑOS 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
POBLACION 367 369 370 372 373 375 376 378 379 381
Nº FAMILIAS 91 92 92 92 93 93 94 94 94 95
POBLACION DE REFERENCIA (2010) = C * ( 1+B) PARA LOS SIGUIENTES AÑOS: Poblacion de referencia ( T-1) *( 1+B)
73.4516 73.7454 74.0404 74.3365 74.6339 74.9324 75.2321 75.5331 75.835 76.13979 80
281 285 290 294 298 303 307 313 317 32270.25 71.25 72.5 73.5 74.5 75.75 76.75 78.25 79.25 80.5
![Page 16: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/16.jpg)
2011 2012 2013 2014 2015 2016
A POBLACION REFERENCIA Nº DE FAMILIAS 91 92 92 92 93 93
B 87 74 74 74 75 75
POBLACION DE REFERENCIA (2010) = C * ( 1+B) PARA LOS SIGUIENTES AÑOS: Poblacion de referencia ( T-1) *( 1+B)
91 92 92 92 93 93
72.8 73.6 73.6 73.6 74.4 74.4
POBLACION DEMANDANTE SIN PROYECTO Nº DE FAMILIAS AGRICULTURA (A * 95% )
![Page 17: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/17.jpg)
2017 2018 2019 2020
94 94 94 95
76 76 76 76
POBLACION DE REFERENCIA (2010) = C * ( 1+B) PARA LOS SIGUIENTES AÑOS: Poblacion de referencia ( T-1) *( 1+B)
94 94 94 95
75.2 75.2 75.2 76
![Page 18: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/18.jpg)
CULTIVO
COSTOS DE PRODUCCIÓN
S/. Por Kgr. S/. Por Ha.
Papa 0.35 0.28 2800 3920 0.50Cebaba 0.45 0.38 403 476.28 0.64Maiz 0.99 0.92 987 1283.8 1.41Haba G.S 0.85 0.78 717.36 922 1.22Trigo 0.92 0.85 834 1079.078 1.31Arveja G.S. 0.80 0.73 664 848.26 1.18hortalizas 0.27 0.20 1330 1372 0.38Alfalfa 0.14 0.07 4312 3018.4 0.20FUENTE: ELABORACION PROPIA
CULTIVOSRENDIMIENTO Kg./Ha.
Papa 8,000.00 14,000.00Cebaba 900.00 1,260.00Maiz 1,000.00 1,400.00Haba G.S 840.00 1,176.00Trigo 910.00 1,274.00Quinua 830.00 1,162.00Avena 5,000.00 7,000.00Pasto 30,800.00 43,120.00FUENTE: ELABORACION PROPIA
PREC. CHACRA (S/./Kg)
SIN PROYECTO
CON PROYECTO
SIN PROYECTO
CON PROYECTO
SIN PROYECTO
CON PROYECTO
![Page 19: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/19.jpg)
VALOR DE LA PRODUCCION SIN PROYECTO
NºAREA (Ha) PROD. (T.M.)
.(1) .(2) (3)=((1)*(2))/1000 .(4) (5)=(1)*(2)*(4) .(6) (7)=(6)*(1) (8)=(5)-(7) (9)=(8)/(1)1 Papa 3.00 8,000.00 24.00 0.50 12,000.00 2,800.00 8,400.00 3,600.00 1,200.002 Cebaba 2.00 900.00 1.80 0.64 1,152.00 403.20 806.40 345.60 172.803 Maiz 8.00 1,000.00 8.00 1.41 11,280.00 987.00 7,896.00 3,384.00 423.004 Haba G.S 2.00 840.00 1.68 1.22 2,049.60 717.36 1,434.72 614.88 307.445 Trigo 2.00 910.00 1.82 1.31 2,384.20 834.47 1,668.94 715.26 357.636 Arveja G.S. 1.00 830.00 0.83 1.18 979.40 664.00 664.00 315.40 315.407 hortalizas 1.00 5,000.00 5.00 0.38 1,900.00 1,330.00 1,330.00 570.00 570.008 Alfalfa 1.00 30,800.00 30.80 0.20 6,160.00 4,312.00 4,312.00 1,848.00 1,848.00
TOTAL 20.00 73.93 37,905.20 12,048.03 26,512.06 11,393.14 569.66
569.66
VALOR DE LA PRODUCCION CON PROYECTO
NºAREA (Ha) PROD. (T.M.)
.(1) .(2) (3)=((1)*(2))/1000 .(4) (5)=(1)*(2)*(4) .(6) (7)=(6)*(1) (8)=(5)-(7) (9)=(8)/(1)1 Papa 5.00 14,000.00 70.00 0.50 35,000.00 3,920.00 19,600.00 15,400.00 3,080.002 Cebaba 5.00 1,260.00 6.30 0.64 4,032.00 476.28 2,381.40 1,650.60 330.123 Maiz 10.00 1,400.00 14.00 1.41 19,740.00 1,283.80 12,838.00 6,902.00 690.204 Haba G.S 4.00 1,176.00 4.70 1.22 5,738.88 921.98 3,687.94 2,050.94 512.745 Trigo 4.00 1,274.00 5.10 1.31 6,675.76 1,079.08 4,316.31 2,359.45 589.866 Arveja G.S. 4.00 1,162.00 4.65 1.18 5,484.64 848.26 3,393.04 2,091.60 522.907 hortalizas 6.00 7,000.00 42.00 0.38 15,960.00 1,372.00 8,232.00 7,728.00 1,288.008 Alfalfa 7.00 43,120.00 301.84 0.20 60,368.00 3,018.40 21,128.80 39,239.20 5,605.60
TOTAL 45.00 448.59 152,999.28 12,919.80 75,577.49 77,421.79 1,720.48
1,720.48
CULTIVOS PRINCIPALES
RDTO. (Kg/Ha)
PREC. CHACRA (S/. / Kg)
VALOR PROD. TOTAL (S/.)
COSTO PROD.
POR HA (S/. / Ha)
COSTO PROD. TOTAL (S/.)
UTILIDAD NETA TOTAL
(S/.)
UTILIDAD NETA POR
HA (S/. / Ha)
UTILIDAD / HA / AÑO =
CULTIVOS PRINCIPALES
RDTO. (Kg/Ha)
PREC. CHACRA (S/. / Kg)
VALOR PROD. TOTAL (S/.)
COSTO PROD.
POR HA (S/. / Ha)
COSTO PROD. TOTAL (S/.)
UTILIDAD NETA TOTAL
(S/.)
UTILIDAD NETA POR
HA (S/. / Ha)
UTILIDAD / HA / AÑO =
![Page 20: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/20.jpg)
SUPERFICIE CULTIVADA "SIN PROYECTO"EN HECTAREAS
CULTIVOAÑOS
1 2 3 4 5 6 7 8 9 10Papa 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00Cebaba 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00Maiz 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00Haba G.S 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00Trigo 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00Arveja G.S. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00hortalizas 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Alfalfa 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
TOTAL 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00
![Page 21: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/21.jpg)
PRODUCCION TOTAL SIN PROYECTOEN KILOGRAMOS
CULTIVOAÑOS
1 2 3 4 5 6 7 8 9 10Papa 24,000.00 24,000.00 24,000.00 24,000.00 24,000.00 24,000.00 24,000.00 24,000.00 24,000.00 24,000.00Cebaba 1,800.00 1,800.00 1,800.00 1,800.00 1,800.00 1,800.00 1,800.00 1,800.00 1,800.00 1,800.00Maiz 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00 8,000.00Haba G.S 1,680.00 1,680.00 1,680.00 1,680.00 1,680.00 1,680.00 1,680.00 1,680.00 1,680.00 1,680.00Trigo 1,820.00 1,820.00 1,820.00 1,820.00 1,820.00 1,820.00 1,820.00 1,820.00 1,820.00 1,820.00Arveja G.S. 830.00 830.00 830.00 830.00 830.00 830.00 830.00 830.00 830.00 830.00hortalizas 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00Alfalfa 30,800.00 30,800.00 30,800.00 30,800.00 30,800.00 30,800.00 30,800.00 30,800.00 30,800.00 30,800.00
TOTAL 73,930.00 73,930.00 73,930.00 73,930.00 73,930.00 73,930.00 73,930.00 73,930.00 73,930.00 73,930.00
CUADRO Nº A- 09
![Page 22: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/22.jpg)
VALOR BRUTO DE LA PRODUCCION A PRECIOS PRIVADOS - SIN PROYECTO
CULTIVOAÑOS
1 2 3 4 5 6 7 8 9 10
Papa 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00
Cebaba 1,152.00 1,152.00 1,152.00 1,152.00 1,152.00 1,152.00 1,152.00 1,152.00 1,152.00 1,152.00
Maiz 11,280.00 11,280.00 11,280.00 11,280.00 11,280.00 11,280.00 11,280.00 11,280.00 11,280.00 11,280.00
Haba G.S 2,049.60 2,049.60 2,049.60 2,049.60 2,049.60 2,049.60 2,049.60 2,049.60 2,049.60 2,049.60
Trigo 2,384.20 2,384.20 2,384.20 2,384.20 2,384.20 2,384.20 2,384.20 2,384.20 2,384.20 2,384.20
Arveja G.S. 979.40 979.40 979.40 979.40 979.40 979.40 979.40 979.40 979.40 979.40
hortalizas 1,900.00 1,900.00 1,900.00 1,900.00 1,900.00 1,900.00 1,900.00 1,900.00 1,900.00 1,900.00
Alfalfa 6,160.00 6,160.00 6,160.00 6,160.00 6,160.00 6,160.00 6,160.00 6,160.00 6,160.00 6,160.00
TOTAL 37,905.20 37,905.20 37,905.20 37,905.20 37,905.20 37,905.20 37,905.20 37,905.20 37,905.20 37,905.20
CUADRO Nº A- 10
![Page 23: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/23.jpg)
COSTOS DE PRODUCCION - SIN PROYECTOEN NUEVOS SOLES
CULTIVOAÑOS
1 2 3 4 5 6 7 8 9 10Papa 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00 8,400.00Cebaba 806.40 806.40 806.40 806.40 806.40 806.40 806.40 806.40 806.40 806.40Maiz 7,896.00 7,896.00 7,896.00 7,896.00 7,896.00 7,896.00 7,896.00 7,896.00 7,896.00 7,896.00Haba G.S 1,434.72 1,434.72 1,434.72 1,434.72 1,434.72 1,434.72 1,434.72 1,434.72 1,434.72 1,434.72Trigo 1,668.94 1,668.94 1,668.94 1,668.94 1,668.94 1,668.94 1,668.94 1,668.94 1,668.94 1,668.94Arveja G.S. 664.00 664.00 664.00 664.00 664.00 664.00 664.00 664.00 664.00 664.00hortalizas 1,330.00 1,330.00 1,330.00 1,330.00 1,330.00 1,330.00 1,330.00 1,330.00 1,330.00 1,330.00Alfalfa 4,312.00 4,312.00 4,312.00 4,312.00 4,312.00 4,312.00 4,312.00 4,312.00 4,312.00 4,312.00
TOTAL 26,512.06 26,512.06 26,512.06 26,512.06 26,512.06 26,512.06 26,512.06 26,512.06 26,512.06 26,512.06
![Page 24: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/24.jpg)
CUADRO Nº 20
ALTERNATIVA I Y IIBENEFICIOS EN LA SITUACION SIN PROYECTO - A PRECIOS DE MERCADO
CULTIVOAÑOS
1 2 3 4 5 6 7 8 9 10
Papa 3,600.00 3,600.00 3,600.00 3,600.00 3,600.00 3,600.00 3,600.00 3,600.00 3,600.00 3,600.00Cebaba 345.60 345.60 345.60 345.60 345.60 345.60 345.60 345.60 345.60 345.60Maiz 3,384.00 3,384.00 3,384.00 3,384.00 3,384.00 3,384.00 3,384.00 3,384.00 3,384.00 3,384.00Haba G.S 614.88 614.88 614.88 614.88 614.88 614.88 614.88 614.88 614.88 614.88Trigo 715.26 715.26 715.26 715.26 715.26 715.26 715.26 715.26 715.26 715.26Arveja G.S. 315.40 315.40 315.40 315.40 315.40 315.40 315.40 315.40 315.40 315.40hortalizas 570.00 570.00 570.00 570.00 570.00 570.00 570.00 570.00 570.00 570.00Alfalfa 1,848.00 1,848.00 1,848.00 1,848.00 1,848.00 1,848.00 1,848.00 1,848.00 1,848.00 1,848.00
TOTAL 11,393.14 11,393.14 11,393.14 11,393.14 11,393.14 11,393.14 11,393.14 11,393.14 11,393.14 11,393.14
CUADRO Nº A- 11
SUPERFICIE CULTIVADA "CON PROYECTO"EN HECTAREAS
CULTIVOAÑOS
1 2 3 4 5 6 7 8 9 10Papa 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00Cebaba 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00Maiz 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00Haba G.S 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00Trigo 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00Arveja G.S. 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00hortalizas 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00Alfalfa 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00
TOTAL 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00
CUADRO Nº A- 12PRODUCCION TOTAL CON PROYECTO
EN KILOGRAMOS
CULTIVOAÑOS
1 2 3 4 5 6 7 8 9 10Papa 70,000.00 70,000.00 70,000.00 70,000.00 70,000.00 70,000.00 70,000.00 70,000.00 70,000.00 70,000.00Cebaba 6,300.00 6,300.00 6,300.00 6,300.00 6,300.00 6,300.00 6,300.00 6,300.00 6,300.00 6,300.00Maiz 14,000.00 14,000.00 14,000.00 14,000.00 14,000.00 14,000.00 14,000.00 14,000.00 14,000.00 14,000.00Haba G.S 4,704.00 4,704.00 4,704.00 4,704.00 4,704.00 4,704.00 4,704.00 4,704.00 4,704.00 4,704.00Trigo 5,096.00 5,096.00 5,096.00 5,096.00 5,096.00 5,096.00 5,096.00 5,096.00 5,096.00 5,096.00Arveja G.S. 4,648.00 4,648.00 4,648.00 4,648.00 4,648.00 4,648.00 4,648.00 4,648.00 4,648.00 4,648.00
![Page 25: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/25.jpg)
hortalizas 42,000.00 42,000.00 42,000.00 42,000.00 42,000.00 42,000.00 42,000.00 42,000.00 42,000.00 42,000.00Alfalfa 301,840.00 301,840.00 301,840.00 301,840.00 301,840.00 301,840.00 301,840.00 301,840.00 301,840.00 301,840.00
TOTAL 448,588.00 448,588.00 448,588.00 448,588.00 448,588.00 448,588.00 448,588.00 448,588.00 448,588.00 448,588.00
CUADRO Nº A- 13VALOR BRUTO DE LA PRODUCCION A PRECIOS PRIVADOS - CON PROYECTO
CULTIVOAÑOS
1 2 3 4 5 6 7 8 9 10
Papa 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00 35,000.00Cebaba 4,032.00 4,032.00 4,032.00 4,032.00 4,032.00 4,032.00 4,032.00 4,032.00 4,032.00 4,032.00Maiz 19,740.00 19,740.00 19,740.00 19,740.00 19,740.00 19,740.00 19,740.00 19,740.00 19,740.00 19,740.00Haba G.S 5,738.88 5,738.88 5,738.88 5,738.88 5,738.88 5,738.88 5,738.88 5,738.88 5,738.88 5,738.88Trigo 6,675.76 6,675.76 6,675.76 6,675.76 6,675.76 6,675.76 6,675.76 6,675.76 6,675.76 6,675.76Arveja G.S. 5,484.64 5,484.64 5,484.64 5,484.64 5,484.64 5,484.64 5,484.64 5,484.64 5,484.64 5,484.64hortalizas 15,960.00 15,960.00 15,960.00 15,960.00 15,960.00 15,960.00 15,960.00 15,960.00 15,960.00 15,960.00Alfalfa 60,368.00 60,368.00 60,368.00 60,368.00 60,368.00 60,368.00 60,368.00 60,368.00 60,368.00 60,368.00
TOTAL 152,999.28 152,999.28 152,999.28 152,999.28 152,999.28 152,999.28 152,999.28 152,999.28 152,999.28 152,999.28
CUADRO Nº A- 14COSTOS DE PRODUCCION - CON PROYECTO
EN NUEVOS SOLES
CULTIVOAÑOS
1 2 3 4 5 6 7 8 9 10Papa 19,600.00 19,600.00 19,600.00 19,600.00 19,600.00 19,600.00 19,600.00 19,600.00 19,600.00 19,600.00Cebaba 2,381.40 2,381.40 2,381.40 2,381.40 2,381.40 2,381.40 2,381.40 2,381.40 2,381.40 2,381.40Maiz 12,838.00 12,838.00 12,838.00 12,838.00 12,838.00 12,838.00 12,838.00 12,838.00 12,838.00 12,838.00Haba G.S 3,687.94 3,687.94 3,687.94 3,687.94 3,687.94 3,687.94 3,687.94 3,687.94 3,687.94 3,687.94Trigo 4,316.31 4,316.31 4,316.31 4,316.31 4,316.31 4,316.31 4,316.31 4,316.31 4,316.31 4,316.31Arveja G.S. 3,393.04 3,393.04 3,393.04 3,393.04 3,393.04 3,393.04 3,393.04 3,393.04 3,393.04 3,393.04hortalizas 8,232.00 8,232.00 8,232.00 8,232.00 8,232.00 8,232.00 8,232.00 8,232.00 8,232.00 8,232.00Alfalfa 21,128.80 21,128.80 21,128.80 21,128.80 21,128.80 21,128.80 21,128.80 21,128.80 21,128.80 21,128.80
TOTAL 75,577.49 75,577.49 75,577.49 75,577.49 75,577.49 75,577.49 75,577.49 75,577.49 75,577.49 75,577.49
CUADRO Nº 20BENEFICIOS EN LA SITUACION CON PROYECTO
ALTERNATIVA I Y II BENEFICIOS EN LA SITUACION CON PROYECTO - A PRECIOS DE MERCADO
CULTIVOAÑOS
1 2 3 4 5 6 7 8 9 10
Papa 15,400.00 15,400.00 15,400.00 15,400.00 15,400.00 15,400.00 15,400.00 15,400.00 15,400.00 15,400.00Cebaba 1,650.60 1,650.60 1,650.60 1,650.60 1,650.60 1,650.60 1,650.60 1,650.60 1,650.60 1,650.60Maiz 6,902.00 6,902.00 6,902.00 6,902.00 6,902.00 6,902.00 6,902.00 6,902.00 6,902.00 6,902.00
![Page 26: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/26.jpg)
Haba G.S 2,050.94 2,050.94 2,050.94 2,050.94 2,050.94 2,050.94 2,050.94 2,050.94 2,050.94 2,050.94Trigo 2,359.45 2,359.45 2,359.45 2,359.45 2,359.45 2,359.45 2,359.45 2,359.45 2,359.45 2,359.45Arveja G.S. 2,091.60 2,091.60 2,091.60 2,091.60 2,091.60 2,091.60 2,091.60 2,091.60 2,091.60 2,091.60hortalizas 7,728.00 7,728.00 7,728.00 7,728.00 7,728.00 7,728.00 7,728.00 7,728.00 7,728.00 7,728.00Alfalfa 39,239.20 39,239.20 39,239.20 39,239.20 39,239.20 39,239.20 39,239.20 39,239.20 39,239.20 39,239.20
TOTAL 77,421.79 77,421.79 77,421.79 77,421.79 77,421.79 77,421.79 77,421.79 77,421.79 77,421.79 77,421.79
![Page 27: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/27.jpg)
CUADRO Nº 22BENEFICIOS CON Y SIN PROYECTOS EN NUEVOS SOLES
BENEFICIOS CON Y SIN PROYECTOS EN NUEVOS SOLES ALTERNATIVA I y II
RUBROAÑOS
1 2 3 4 5 6 7 8 9 10
VBP CON PROYECTO 152,999.28 152,999.28 152,999.28 152,999.28 152,999.28 152,999.28 152,999.28 152,999.28 152,999.28 152,999.28
CONSUMO CON PROYECTO 15,299.93 15,299.93 15,299.93 15,299.93 15,299.93 15,299.93 15,299.93 15,299.93 15,299.93 15,299.93
COSTOS DE PRODUCCION CP 75,577.49 75,577.49 75,577.49 75,577.49 75,577.49 75,577.49 75,577.49 75,577.49 75,577.49 75,577.49
BENEFICIOS CON PROYECTO 62,121.86 62,121.86 62,121.86 62,121.86 62,121.86 62,121.86 62,121.86 62,121.86 62,121.86 62,121.86
VBP SIN PROYECTO 37,905.20 37,905.20 37,905.20 37,905.20 37,905.20 37,905.20 37,905.20 37,905.20 37,905.20 37,905.20
CONSUMO SIN PROYECTO 7,581.04 7,581.04 7,581.04 7,581.04 7,581.04 7,581.04 7,581.04 7,581.04 7,581.04 7,581.04
COSTOS DE PRODUCCION SP 26,512.06 26,512.06 26,512.06 26,512.06 26,512.06 26,512.06 26,512.06 26,512.06 26,512.06 26,512.06
BENEFICIOS SIN PROYECTO 3,812.10 3,812.10 3,812.10 3,812.10 3,812.10 3,812.10 3,812.10 3,812.10 3,812.10 3,812.10
CUADRO Nº 22
BENEFICIOS INCREMENTALES ALTERNATIVA I Y II A PRECIOS DE MERCADO EN NUEVOS SOLES
RUBROAÑOS
1 2 3 4 5 6 7 8 9 10BENEFICIOS CON PROYECTO 62,121.86 62,121.86 62,121.86 62,121.86 62,121.86 62,121.86 62,121.86 62,121.86 62,121.86 62,121.86BENEFICIOS SIN PROYECTO 3,812.10 3,812.10 3,812.10 3,812.10 3,812.10 3,812.10 3,812.10 3,812.10 3,812.10 3,812.10BENEFICIOS INCREMENTALES 58,309.76 58,309.76 58,309.76 58,309.76 58,309.76 58,309.76 58,309.76 58,309.76 58,309.76 58,309.76
BENEFICIOS INCREMENTALES ALTERNATIVA I Y II A PRECIOS SOCIALES EN NUEVOS SOLES
RUBROAÑOS
1 2 3 4 5 6 7 8 9 10BENEFICIOS CON PROYECTO 74,188.86 74,188.86 74,188.86 74,188.86 74,188.86 74,188.86 74,188.86 74,188.86 74,188.86 74,188.86BENEFICIOS SIN PROYECTO 8,045.12 8,045.12 8,045.12 8,045.12 8,045.12 8,045.12 8,045.12 8,045.12 8,045.12 8,045.12BENEFICIOS INCREMENTALES 66,143.74 66,143.74 66,143.74 66,143.74 66,143.74 66,143.74 66,143.74 66,143.74 66,143.74 66,143.74
![Page 28: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/28.jpg)
COSTO DE OPERACIÓN DE MANTENIMIENTO
COSTOS DE OPERACIÓN, MANTENIMIENTO
COSTOS DE OPERACIÓN
INSUMOS Y MATERIALES DE ORIGEN NACIONAL
DESCRIPCION UNIDAD CANTIDAD UNITARIO
LIMPIEZA DE CANAL GLB 1 50.00LIMPIEZA DE DERRUMBES GLB 1 50.00TOTAL
COSTOS DE MANTENIMIENTO
INSUMOS Y MATERIALES DE ORIGEN NACIONAL
DESCRIPCION UNIDAD CANTIDAD UNITARIO
ARENA FINA M3 0.5 80.00CEMENTO PORTLAND TIPO I BL 2 21.50HORMIGON M3 0.5 80.00HERRAMIENTAS GLB 1 20.00TOTAL
Fuente: Elaboración equipo técnico
![Page 29: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/29.jpg)
COSTO DE OPERACIÓN DE MANTENIMIENTO
COSTOS DE OPERACIÓN, MANTENIMIENTO
COSTOS DE OPERACIÓN
PARCIALCON IGV FACTOR DE CORR. PARCIALSIN IGV
50.00 0.41 20.5050.00 0.41 20.50
100.00 41.00
COSTOS DE MANTENIMIENTO
PARCIALCON IGV FACTOR DE CORR. PRECIO SOCIAL
40.00 0.85 34.0043.00 0.85 36.5540.00 0.85 34.0020.00 0.85 17.00
143.00 121.55
Fuente: Elaboración equipo técnico
![Page 30: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/30.jpg)
ALTERNATIVA I
ITEM DESCRIPCION UND. METRADO PRECIO PARCIAL
01 CONSTRUCCION DE RESERVORIO DE 650M3 219,702.82
01.01 TRABAJOS PRELIMINARES 20,658.94
01.01.01 INSTALACION DE CAMPAMENTO m2 42.00 43.97 1,846.74
01.01.02 TRAZO Y REPLANTEO m2 343.64 1.31 450.17
01.01.03 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m u 1.00 1,201.19 1,201.19
01.01.04 TRANSPORTE DE MATERIALES Y HERRAMIENTAS A OBRA kg 109,269.99 0.10 10,927.00
01.01.05 TRANSPORTE DE AGRGADO A OBRA m3 397.06 15.70 6,233.84
01.02 MOVIMIENTO DE TIERRAS 62,590.22
01.02.01 DEMOLICION DE MUROS DE CONCRETO ARMADO m3 173.73 94.60 16,434.86
01.02.02 EXCAVACION MASIVA EN TERRENO SUELTO m3 1,555.20 11.40 17,729.28
01.02.03 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 1,138.95 11.14 12,687.90
01.02.04 BASE DE 0.20 m m2 343.64 16.67 5,728.48
01.02.05 LECHO FILTRANTE MAT SELECCIONADO m3 68.73 44.69 3,071.54
01.02.06 ELIMINACION MATERIAL EXCEDENTE m3 589.98 11.76 6,938.16
01.03 CONCRETO ARMADO 130,243.58
01.03.01 SOLADO 7,325.90
01.03.01.01 CONCRETO f'c=100 kg/cm2 PARA SOLADOS Y/O SUB-BASES m3 34.36 213.21 7,325.90
01.03.02 ZAPATA 40,369.85
01.03.02.01 ENCOFRADO DE CIMENTACION m2 15.14 26.39 399.54
01.03.02.02 ACERO DE REFUERZO fy=4200 kg/cm2 kg 2,652.63 4.47 11,857.26
01.03.02.03 CONCRETO f'c= 210 kg/cm2 EN ZAPATAS m3 76.82 365.96 28,113.05
01.03.03 MURO PANTALLA 62,245.84
01.03.03.01 ENCOFRADO Y DESENCOFRADO CARAVISTA DE ESTRUCTURAm2 569.98 35.98 20,507.88
01.03.03.02 ACERO DE REFUERZO fy=4200 kg/cm2 kg 3,515.91 4.47 15,716.12
01.03.03.03 CONCRETO f'c= 210 kg/cm2 EN MURO m3 65.27 398.68 26,021.84
01.03.04 LOSA DE FONDO 13,719.21
01.03.04.01 ENCOFRADO Y DESENCOFRADO m2 8.10 30.57 247.62
01.03.04.02 ACERO DE REFUERZO fy=4200 kg/cm2 kg 968.33 4.47 4,328.44
01.03.04.03 CONCRETO f'c= 210 kg/cm2 DE LOSA PISO m3 26.06 350.85 9,143.15
01.03.05 ACABADOS 6,582.78
01.03.05.01 TARRAJEO CON IMPERMEABILIZANTE DE LOSA DE FONDO P m2 165.44 25.71 4,253.46
01.03.05.02 TARRAJEO CON IMPERMEABILIZANTE EN MURO m2 84.00 27.73 2,329.32
01.04 VERTEDERO DE EXCEDNCIAS 812.48
01.04.01 ENCOFRADO Y DESENCOFRADO CARA VISTA m2 12.05 35.98 433.56
01.04.02 CONCRETO f'c= 210 kg/cm2 m3 1.08 350.85 378.92
01.05 JUNTA DE CONSTRUCCION 2,608.34
01.05.01 JUNTA WATER STOP DE NEOPRENE DE 6" m 92.20 28.29 2,608.34
01.06 CASETA DE VALVULA 2,789.26
01.06.01 ENCOFRADO Y DESENCOFRADO m2 29.04 30.57 887.75
01.06.02 ACERO DE REFUERZO fy=4200 kg/cm2 kg 174.39 4.47 779.52
01.06.03 CONCRETO f'c= 210 kg/cm2 m3 1.45 350.85 508.73
01.06.04 TAPA METALICA DE 1/8" 1.60X1.2M u 1.00 178.84 178.84
01.06.05 VALVULA DE COMPUERTA DE FIERRO FUNDIDO MAZZA DE 6" u 1.00 177.21 177.21
01.06.06 VALVULA DE COMPUERTA DE FIERRO FUNDIDO MAZZA DE 8" u 1.00 257.21 257.21
02 REHABILITACION DE BOCATOMA 3,175.28
02.01 TRABAJOS PRELIMINARES 65.50
02.02 TRAZO Y REPLANTEO m2 50.00 1.31 65.50
02.03 MOVIMIENTO DE TIERRAS 569.80
02.03.01 EXCAVACION EN MATERIAL ROCOS m3 9.28 46.70 433.38
02.03.02 ELIMINACION MATERIAL EXCEDENTE m3 11.60 11.76 136.42
02.04 OBRAS DE CONCRETO 2,539.98
02.04.01 CONCRETO f'c= 210 kg/cm2 + 50 P.G. m3 3.50 220.03 770.11
02.04.02 CONCRETO f'c= 210 kg/cm2 m3 3.00 350.85 1,052.55
02.04.03 ENCOFRADO Y DESENCOFRADO m2 13.72 37.64 516.42
02.04.04 TARRAJEO MEZCLA 1: 3 m2 8.20 24.50 200.90
03 REHABILITACION DE CANAL 14,623.48
03.01 TRABAJOS PRELIMINARES 27.51
03.01.01 TRAZO Y REPLANTEO m2 21.00 1.31 27.51
03.02 MOVIMIENTO DE TIERRAS 730.80
03.02.01 EXCAVACION MASIVA EN TERRENO SUELTO m3 28.00 11.40 319.20
03.02.02 ELIMINACION MATERIAL EXCEDENTE m3 35.00 11.76 411.60
03.03 OBRAS DE CONCRETO 8,055.23
03.03.01 CONCRETO f'c= 210 kg/cm2 m3 4.50 350.85 1,578.83
03.03.02 ENCOFRADO Y DESENCOFRADO CARA VISTA m2 180.00 35.98 6,476.40
03.04 TAPA DE CONCRETO EN CANAL 488.61
03.04.01 CONCRETO f'c= 210 kg/cm2 m3 0.48 350.85 168.41
03.04.02 ENCOFRADO Y DESENCOFRADO m2 4.00 37.64 150.56
03.04.03 ACERO DE REFUERZO fy=4200 kg/cm2 kg 37.95 4.47 169.64
03.05 MURO DE GRAVEDAD EN CANAL 5,321.33
03.05.01 TRABAJOS PRELIMINARES 2.62
03.05.01.01 TRAZO Y REPLANTEO m2 2.00 1.31 2.62
PRECIO UNITARIO
![Page 31: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/31.jpg)
ITEM DESCRIPCION UND. METRADO PRECIO PARCIALPRECIO UNITARIO
03.05.02 MOVIMIENTO DE TIERRAS 783.00
03.05.02.01 EXCAVACION MASIVA EN TERRENO SUELTO m3 30.00 11.40 342.00
03.05.02.02 ELIMINACION MATERIAL EXCEDENTE m3 37.50 11.76 441.00
03.05.03 OBRAS DE CONCRETO 4,535.71
03.05.03.01 CONCRETO f'c= 210 kg/cm2 + 50 P.G. m3 10.35 220.03 2,277.31
03.05.03.02 ENCOFRADO Y DESENCOFRADO m2 60.00 37.64 2,258.40
04 MITIGACION AMBIENTAL 1,050.16
04.01 MITIGACION AMBIENTAL glb 1.00 1,050.16 1,050.16
05 CAPACITACION 1,100.00
05.01 CAPACITACION AL COMITE DE RIEGO glb 1.00 1,100.00 1,100.00
COSTO DIRECTO 239,651.74 239,651.74GASTOS GENERALES (10%) 23,965.17 23,965.17GASTOS DE SUPERVISION (5%) 11,982.59 11,982.59EXPEDIENTE TECNICO 5,000.00 5,000.00
PRESUPUESTO TOTAL 280,599.50 275,599.50
![Page 32: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/32.jpg)
0.000.000.000.00
5,000.00
![Page 33: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/33.jpg)
DESCRIPCION UND. METRADO PRECIO PARCIAL
RESERVORIO CON GEOMEMBRANA 235,163.72
TRABAJOS PRELIMINARES 20,658.94
INSTALACION DE CAMPAMENTO m2 42.00 43.97 1,846.74
TRAZO Y REPLANTEO m2 343.64 1.31 450.17
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m u 1.00 1,201.19 1,201.19
TRANSPORTE DE MATERIALES Y HERRAMIENTAS A OBRA kg 109,269.99 0.10 10,927.00
TRANSPORTE DE AGRGADO A OBRA m3 397.06 15.70 6,233.84
MOVIMIENTO DE TIERRAS 62,590.22
DEMOLICION DE MUROS DE CONCRETO ARMADO m3 173.73 94.60 16,434.86
EXCAVACION MASIVA EN TERRENO SUELTO m3 1,555.20 11.40 17,729.28
RELLENO CON MATERIAL PROPIO SELECCIONADO m3 1,138.95 11.14 12,687.90
BASE DE 0.20 m m2 343.64 16.67 5,728.48
LECHO FILTRANTE MAT SELECCIONADO m3 68.73 44.69 3,071.54
ELIMINACION MATERIAL EXCEDENTE m3 589.98 11.76 6,938.16
OBRAS DE CONCRETO 969.95
CONCRETO SIMPLE FC=140 KG/CM2 + 70% P.M. m3 1.23 239.86 295.03
CONCRETO f´c = 210 kg/cm2 m3 1.23 409.65 503.87
ENCOFRADO Y DESENCOFRADO (03 USOS) m2 7.81 20.08 156.82
JUNTAS CON MEZCLA ASFALTICA 1:4 ASFALTO:ARENA m 3.62 3.93 14.23
INSTALACION DE GEOMEMBRANAS 137,495.21
SUMINISTRO Y COLOCACION DE GEOMEMBRANAS TIPO PVC, e= 1.5 mm. m2 632.22 180.98 114,419.18
SUMINISTRO Y COLOCACION DE MALLAS DE GEOTEXTIL TIPO I m2 632.22 36.50 23,076.03
TUBERIAS, ACCESORIOS Y MISCELANEOS 1,337.30
TUBERIAS Y ACCESORIOS EN RESERVORIO und 0.43 3,110.00 1,337.30
CERCO PERIMETRICO Y VEREDAS 5,168.36
EXCAVACION PARA ESTRUCTURAS RENDIMIENTO=25 M3/DIA m3 3.72 20.12 74.85
CONCRETO f'c=140 kg/cm2 +30% PM m3 3.72 203.80 758.14
CERCO PERIMETRICO MALLA DE ALAMBRE GALVANIZADO (H=2.50 M) m 51.39 22.12 1,136.75
POSTE DE CONCRETO 0.10 X0.15 X3.20 und 17.63 100.00 1,763.00
CONCRETO F'C=140 KG/CM2 PARA VEREDAS m3 3.77 345.45 1,302.35
ENCOFRADO Y DESENCOFRADO NORMAL m2 1.06 29.37 31.13
JUNTAS ASFALTICAS EN VEREDAS m 14.11 7.24 102.16
CANAL DE INGRESO EN RESERVORIO 66.83
EXCAVACION MANUAL PARA ESTRUCTURAS m3 0.20 19.32 3.86
NIVELACION Y COMPACTACION DE SUBRASANTE m2 0.50 8.87 4.44
CONCRETO F'C=100 KG/CM2.PARA SOLADOS Y/O SUB-BASES m3 0.03 257.65 7.73
CONCRETO f'c=175 kg/cm2 m3 0.06 368.56 22.11
ENCOFRADO Y DESENC. PARA ESTRUCT. CONCRETO ARMADO m2 0.13 17.09 2.22
JUNTA CON MATERIAL ELASTOMERICO m 1.12 23.63 26.47
ESTRUCTURAS DE PURGA Y ALIVIADERO 4,930.07
EXCAVACION MANUAL PARA ESTRUCTURAS m3 15.61 19.32 301.59
RELLENO COMPACTADO CON MATERIAL PROPIO m3 5.25 8.61 45.20
CONCRETO F'C=100 KG/CM2.PARA SOLADOS Y/O SUB-BASES m3 0.18 257.65 46.38
CONCRETO f´c = 210 kg/cm2 m3 3.70 409.65 1,515.70
ENCOFRADO Y DESENC. PARA ESTRUCT. CONCRETO ARMADO m2 25.59 17.09 437.33
ACERO DE REFUERZO fy=4,200 kg/cm2 kg 382.83 5.09 1,948.60
JUNTA WATER STOP 6 " m 7.31 34.13 249.49
LISTON DE ACERO DE 1/4'' X 2'' kg 4.20 8.37 35.15
PERNOS DE ANCLAJE DE 3/8'' @ 0.20 (INCLUYE ARANDELA) und 10.32 5.66 58.41
REJILLA METALICA und 0.43 679.54 292.20
ESTRUCTURA REGULADORARA DE CAUDAL 1,133.19
EXCAVACION MANUAL PARA ESTRUCTURAS m3 1.43 19.32 27.63
CONCRETO F'C=100 KG/CM2.PARA SOLADOS Y/O SUB-BASES m3 0.05 257.65 12.88
CONCRETO f´c = 210 kg/cm2 m3 0.62 409.65 253.98
ENCOFRADO Y DESENC. PARA ESTRUCT. CONCRETO ARMADO m2 6.45 17.09 110.23
ACERO DE REFUERZO fy=4,200 kg/cm2 kg 28.81 5.09 146.64
VALVULA COMPUERTA DE FIF P/ISO 7259 D=200MM UF und 0.43 571.61 245.79
TAPA METALICA DE 1.00 X 1.20 M2 und 0.43 781.46 336.03
AMORTIGUADOR TIPO IMPACTO USBR Nº 06 813.66
EXCAVACION MANUAL PARA ESTRUCTURAS m3 2.93 19.32 56.61
CONCRETO F'C=100 KG/CM2.PARA SOLADOS Y/O SUB-BASES m3 0.09 257.65 23.19
CONCRETO f´c = 210 kg/cm2 m3 0.61 409.65 249.89
ENCOFRADO Y DESENC. PARA ESTRUCT. CONCRETO ARMADO m2 8.09 17.09 138.26
ACERO DE REFUERZO fy=4,200 kg/cm2 kg 58.40 5.09 297.26
JUNTA WATER STOP 6 " m 1.42 34.13 48.46
REHABILITACION DE BOCATOMA 3,175.28
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO m2 50.00 1.31 65.50
MOVIMIENTO DE TIERRAS 569.80
EXCAVACION EN MATERIAL ROCOS m3 9.28 46.70 433.38
ELIMINACION MATERIAL EXCEDENTE m3 11.60 11.76 136.42
OBRAS DE CONCRETO 2,539.98
PRECIO UNITARIO
![Page 34: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/34.jpg)
DESCRIPCION UND. METRADO PRECIO PARCIALPRECIO UNITARIO
CONCRETO f'c= 210 kg/cm2 + 50 P.G. m3 3.50 220.03 770.11
CONCRETO f'c= 210 kg/cm2 m3 3.00 350.85 1,052.55
ENCOFRADO Y DESENCOFRADO m2 13.72 37.64 516.42
TARRAJEO MEZCLA 1: 3 m2 8.20 24.50 200.90
REHABILITACION DE CANAL 14,623.48
TRABAJOS PRELIMINARES 27.51
TRAZO Y REPLANTEO m2 21.00 1.31 27.51
MOVIMIENTO DE TIERRAS 730.80
EXCAVACION MASIVA EN TERRENO SUELTO m3 28.00 11.40 319.20
![Page 35: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/35.jpg)
COSTOS DEL PROYECTO ALTERNATIVA I Item
01 CONSTRUCCION DE RESERVORIO DE 650M3 219,702.82 01
01.01 TRABAJOS PRELIMINARES 20,658.94 01.01
01.02 MOVIMIENTO DE TIERRAS 62,590.22 01.02
01.03 CONCRETO ARMADO 130,243.58 01.03
01.04 VERTEDERO DE EXCEDNCIAS 812.48 01.04
01.05 JUNTA DE CONSTRUCCION 2,608.34 01.05
01.06 CASETA DE VALVULA 2,789.26 01.06
02 REHABILITACION DE BOCATOMA 3,175.28 02
02.01 TRABAJOS PRELIMINARES 65.50 02.01
02.03 MOVIMIENTO DE TIERRAS 569.80 02.03
02.04 OBRAS DE CONCRETO 2,539.98 02.04
03 REHABILITACION DE CANAL 14,623.48 03
03.01 TRABAJOS PRELIMINARES 27.51 03.01
03.02 MOVIMIENTO DE TIERRAS 730.80 03.02
03.03 OBRAS DE CONCRETO 8,055.23 03.03
03.04 TAPA DE CONCRETO EN CANAL 488.61 03.04
03.05 MURO DE GRAVEDAD EN CANAL 5,321.33 03.05
04 MITIGACION AMBIENTAL 1,050.16 04
05 CAPACITACION 1,100.00 05
COSTO DIRECTO 239,651.74 COSTO DIRECTOGASTOS GENERALES (10%) 23,965.17 GASTOS GENERALES (10%)UTILIDAD (5%) 11,982.59 UTILIDAD (5%)EXPEDIENTE TECNICO (3%) 5,000.00 EXPEDIENTE TECNICO (3%)PRESUPUESTO TOTAL 280,599.50 PRESUPUESTO TOTAL
0.00
![Page 36: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/36.jpg)
Descripción
CONSTRUCCION DE RESERVORIO DE 650M3 219,702.82 0.85 186,747.40 TRABAJOS PRELIMINARES 20,658.94 0.85 17,560.10 MOVIMIENTO DE TIERRAS 62,590.22 0.85 53,201.69 CONCRETO ARMADO 130,243.58 0.85 110,707.04 VERTEDERO DE EXCEDNCIAS 812.48 0.85 690.61 JUNTA DE CONSTRUCCION 2,608.34 0.85 2,217.09 CASETA DE VALVULA 2,789.26 0.85 2,370.87REHABILITACION DE BOCATOMA 3,175.28 0.85 2,698.99 TRABAJOS PRELIMINARES 65.50 0.85 55.68 MOVIMIENTO DE TIERRAS 569.80 0.85 484.33 OBRAS DE CONCRETO 2,539.98 0.85 2,158.98REHABILITACION DE CANAL 14,623.48 0.85 12,429.96 TRABAJOS PRELIMINARES 27.51 0.85 23.38 MOVIMIENTO DE TIERRAS 730.80 0.85 621.18 OBRAS DE CONCRETO 8,055.23 0.85 6,846.95 TAPA DE CONCRETO EN CANAL 488.61 0.85 415.32 MURO DE GRAVEDAD EN CANAL 5,321.33 0.85 4,523.13MITIGACION AMBIENTAL 1,050.16 0.85 892.64CAPACITACION 1,100.00 0.85 935.00
COSTO DIRECTO 239,651.74 203,703.98GASTOS GENERALES (10%) 23,965.17 0.91 21,808.31UTILIDAD (5%) 11,982.59 0.91 10,904.15EXPEDIENTE TECNICO (3%) 5,000.00 0.91 4,550.00
PRESUPUESTO TOTAL 280,599.50 240,966.44
0.00
PRECIO PRIVADO
FACTOR CORREC.
PRECIO SOCIAL
![Page 37: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/37.jpg)
01.04 VERTEDERO DE EXCEDNCIAS
01.05 JUNTA DE CONSTRUCCION
01.06 CASETA DE VALVULA
02 REHABILITACION DE BOCATOMA
02.01 TRABAJOS PRELIMINARES
02.03 MOVIMIENTO DE TIERRAS
![Page 38: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/38.jpg)
COSTOS DE OPERACIÓN, MANTENIMIENTO
TOTAL COSTOS DE OPERACIÓN
REMUNERACIONES
DESCRIPCION UNIDAD CANTIDAD UNITARIO
OPERADOR DEL RESERVORIO MES 12 100.00TOTAL REMUNERACIONES
TOTAL DE COSTOS DE MANTENIMIENTO
INSUMOS Y MATERIALES DE ORIGEN NACIONALDESCRIPCION UNIDAD CANTIDAD UNITARIOARENA FINA M3 1 90CEMENTO PORTLAND TIPO I BL 8 21.5HORMIGON M3 2 80HERRAMIENTAS GLB 1 80TOTAL
TOTAL COSTOS DE OPERACIÓN Y MANTENIMIENTO
FUENTE: ELABORACION PROPIA
![Page 39: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/39.jpg)
COSTOS DE OPERACIÓN, MANTENIMIENTOF.C.
P. SOCIAL
1,200.00 1,020.00
1,200.00 0.85 1,020.001,200.00 0.85 1,020.00
502.00 426.70
PARCIALCON IGV90.00 0.85 76.50
172.00 0.85 146.20160.00 0.85 136.0080.00 0.85 68.00
502.00 426.70
1,702.00 1,446.70
FUENTE: ELABORACION PROPIA
PARCIAL CON IMP.
![Page 40: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/40.jpg)
FLUJO DE COSTOS A PRECIOS PRIVADOS ALTERNATIVA 01
DESCRIPCIONAño Año Año
0 1 2A) COSTOS DE INVERSION 1.- Intangibles 5,000.00
Elaboración del expediente técnico2.- Tangibles Infraestructura de Riego 239,651.74COSTO DIRECTO
GASTOS GENERALES (10%) 23,965.17GASTOS DE SUPERVISION (5%) 11,982.59
PRESUPUESTO TOTAL 280,599.50
1,702.00 1,702.00
Operación 1,200.00 1,200.00Mantenimiento 502.00 502.00
243.00 243.00
Operación y Mantenimiento 243.00 243.00
D. COSTOS INCREMENTALES 280,599.50 1,459.00 1,459.00
FUENTE: ELABORACION PROYECTISTA0
FLUJO DE COSTOS A PRECIOS PRIVADOS ALTERNATIVA 02
DESCRIPCIONAño Año Año
0 1 2A) COSTOS DE INVERSION 1.- Intangibles 5,000.00
Elaboración del expediente técnico2.- Tangibles Infraestructura de Riego 255,112.64COSTO DIRECTO
GASTOS GENERALES (10%) 25,511.26GASTOS DE SUPERVISION (5%) 12,755.63
PRESUPUESTO TOTAL 298,379.54
1,702.00 1,702.00
Operación 1,200.00 1,200.00Mantenimiento 502.00 502.00
243.00 243.00
Operación y Mantenimiento 243.00 243.00
E. COSTOS INCREMENTALES 298,379.54 1,459.00 1,459.00
FUENTE: ELABORACION PROYECTISTA
0.00
B) COSTOS DE OPERACIÓN Y MANTENIMIENTO CON PROYECTO
C. COSTO DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO
B) COSTOS DE OPERACIÓN Y MANTENIMIENTO CON PROYECTO
D. COSTO DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO
![Page 41: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/41.jpg)
FLUJO DE COSTOS A PRECIOS PRIVADOS ALTERNATIVA 01Año Año Año Año Año Año Año Año
3 4 5 6 7 8 9 10
1,702.00 1,702.00 1,702.00 1,702.00 1,702.00 1,702.00 1,702.00 1,702.00
1,200.00 1,200.00 1,200.00 1,200.00 1,200.00 1,200.00 1,200.00 1,200.00502.00 502.00 502.00 502.00 502.00 502.00 502.00 502.00
243.00 243.00 243.00 243.00 243.00 243.00 243.00 243.00
243.00 243.00 243.00 243.00 243.00 243.00 243.00 243.00
1,459.00 1,459.00 1,459.00 1,459.00 1,459.00 1,459.00 1,459.00 1,459.00
FUENTE: ELABORACION PROYECTISTA
FLUJO DE COSTOS A PRECIOS PRIVADOS ALTERNATIVA 02Año Año Año Año Año Año Año Año
3 4 5 6 7 8 9 10
1,702.00 1,702.00 1,702.00 1,702.00 1,702.00 1,702.00 1,702.00 1,702.00
1,200.00 1,200.00 1,200.00 1,200.00 1,200.00 1,200.00 1,200.00 1,200.00502.00 502.00 502.00 502.00 502.00 502.00 502.00 502.00
243.00 243.00 243.00 243.00 243.00 243.00 243.00 243.00
243.00 243.00 243.00 243.00 243.00 243.00 243.00 243.00
1,459.00 1,459.00 1,459.00 1,459.00 1,459.00 1,459.00 1,459.00 1,459.00
FUENTE: ELABORACION PROYECTISTA
![Page 42: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/42.jpg)
FLUJO DE COSTOS A PRECIOS SOCIALES ALTERNATIVA 01
DESCRIPCIONAño Año Año
0 1 2A) COSTOS DE INVERSION 1.- Intangibles 4,550.00
Elaboración del expediente técnico2.- Tangibles Infraestructura de Riego 203,703.98COSTO DIRECTO
GASTOS GENERALES (10%) 21,808.31GASTOS DE SUPERVISION (5%) 10,904.15
PRESUPUESTO TOTAL 240,966.44
1,446.70 1,446.70
Operación 1,020.00 1,020.00Mantenimiento 426.70 426.70
162.55 162.55
Operación y Mantenimiento 162.55 162.55
E. COSTOS INCREMENTALES 240,966.44 1,284.15 1,284.15
FUENTE: ELABORACION PROYECTISTA0
FLUJO DE COSTOS A PRECIOS SOCIALES ALTERNATIVA 02
DESCRIPCIONAño Año Año
0 1 2A) COSTOS DE INVERSION 1.- Intangibles 4,550.00
Elaboración del expediente técnico2.- Tangibles Infraestructura de Riego 216,845.74COSTO DIRECTO
GASTOS GENERALES (10%) 23,215.25GASTOS DE SUPERVISION (5%) 11,607.63
PRESUPUESTO TOTAL 256,218.62
1,446.70 1,446.70
Operación 1,020.00 1,020.00Mantenimiento 426.70 426.70
162.55 162.55
Operación y Mantenimiento 162.55 162.55
E. COSTOS INCREMENTALES 256,218.62 1,284.15 1,284.15
FUENTE: ELABORACION PROYECTISTA0.00
B) COSTOS DE OPERACIÓN Y MANTENIMIENTO CON PROYECTO
D. COSTO DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO
B) COSTOS DE OPERACIÓN Y MANTENIMIENTO CON PROYECTO
D. COSTO DE OPERACIÓN Y MANTENIMIENTO SIN PROYECTO
![Page 43: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/43.jpg)
FLUJO DE COSTOS A PRECIOS SOCIALES ALTERNATIVA 01Año Año Año Año Año Año Año Año
3 4 5 6 7 8 9 10
1,446.70 1,446.70 1,446.70 1,446.70 1,446.70 1,446.70 1,446.70 1,446.70
1,020.00 1,020.00 1,020.00 1,020.00 1,020.00 1,020.00 1,020.00 1,020.00426.70 426.70 426.70 426.70 426.70 426.70 426.70 426.70
162.55 162.55 162.55 162.55 162.55 162.55 162.55 162.55
162.55 162.55 162.55 162.55 162.55 162.55 162.55 162.55
1,284.15 1,284.15 1,284.15 1,284.15 1,284.15 1,284.15 1,284.15 1,284.15
FUENTE: ELABORACION PROYECTISTA
FLUJO DE COSTOS A PRECIOS SOCIALES ALTERNATIVA 02Año Año Año Año Año Año Año Año
3 4 5 6 7 8 9 10
1,446.70 1,446.70 1,446.70 1,446.70 1,446.70 1,446.70 1,446.70 1,446.70
1,020.00 1,020.00 1,020.00 1,020.00 1,020.00 1,020.00 1,020.00 1,020.00426.70 426.70 426.70 426.70 426.70 426.70 426.70 426.70
162.55 162.55 162.55 162.55 162.55 162.55 162.55 162.55
162.55 162.55 162.55 162.55 162.55 162.55 162.55 162.55
1,284.15 1,284.15 1,284.15 1,284.15 1,284.15 1,284.15 1,284.15 1,284.15
FUENTE: ELABORACION PROYECTISTA
![Page 44: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/44.jpg)
FLUJO DE CAJA A PRECIOS PRIVADOS ALTERNATIVA 01 (en nuevos soles)
ConceptoAño Año Año Año Año
0 1 2 3 4Ingresos incrementales del proyecto (1) 0.00 2,119.45 2,119.45 2,119.45 2,119.45
Venta de agua para riego con proyecto 0.00 2,119.45 2,119.45 2,119.45 2,119.45
Incremento en el valor neto de la producción (2) 0.00 58,309.76 58,309.76 58,309.76 58,309.76
Agrícola 0.00 58,309.76 58,309.76 58,309.76 58,309.76
Costos incrementales del proyecto (3) 280,599.50 1,459.00 1,459.00 1,459.00 1,459.00
FLUJO NETO = ((1+2)-(3)) (4) -280,599.50 58,970.21 58,970.21 58,970.21 58,970.21
FACTOR DE ACTUALIZACIÓN 9% (5) 1.000 0.917 0.842 0.772 0.708
VALOR ACTUAL NETO ( 4 x 5) (6) -280,599.50 54,101.11 49,634.05 45,535.83 41,775.99
VAN (Tsd = 9%) 97,851.15
TASA INTERNA DE RETORNO 16.42%
RELACIÓN BENEFICIO/COSTO 1.34
Beneficios 0.00 60,429.21 60,429.21 60,429.21 60,429.21
387,814.02 0.00 55,439.65 50,862.06 46,662.44 42,809.58
289,962.86 280,599.50 1,338.53 1,228.01 1,126.62 1,033.59
PRECIOS PRIVADOS
ALTERNATIVA
1 2
VAN 97,851.15 80,071.12
TIR 16% 15%
B/C 1.34 1.26
INDICADORES
![Page 45: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/45.jpg)
FLUJO DE CAJA A PRECIOS PRIVADOS ALTERNATIVA 01 (en nuevos soles)
Año Año Año Año Año Año Valor5 6 7 8 9 10 Actual
2,119.45 2,119.45 2,119.45 2,119.45 2,119.45 2,119.45 21,194.51
2,119.45 2,119.45 2,119.45 2,119.45 2,119.45 2,119.45 2,119.45
58,309.76 58,309.76 58,309.76 58,309.76 58,309.76 58,309.76 583,097.64
58,309.76 58,309.76 58,309.76 58,309.76 58,309.76 58,309.76 583,097.64
1,459.00 1,459.00 1,459.00 1,459.00 1,459.00 1,459.00 295,189.50
58,970.21 58,970.21 58,970.21 58,970.21 58,970.21 58,970.21 309,102.65
0.650 0.596 0.547 0.502 0.460 0.422
38,326.59 35,162.01 32,258.73 29,595.16 27,151.53 24,909.66 97,851.15
60,429.21 60,429.21 60,429.21 60,429.21 60,429.21 60,429.21
39,274.84 36,031.97 33,056.85 30,327.39 27,823.29 25,525.95 Benefic. actualiz
948.25 869.95 798.12 732.22 671.76 616.30 Costos actualiz
![Page 46: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/46.jpg)
FLUJO DE CAJA A PRECIOS SOCIALES ALTERNATIVA 01 (en nuevos soles)
ConceptoAño Año Año Año Año Año
0 1 2 3 4 5
Ingresos incrementales del proyecto (1) 0.00 1,674.37 1,674.37 1,674.37 1,674.37 1,674.37
Venta de agua para riego con proyecto 0.00 1,674.37 1,674.37 1,674.37 1,674.37 1,674.37
Incremento en el valor neto de la producción (2) 0.00 66,143.74 66,143.74 66,143.74 66,143.74 66,143.74
Agrícola 0.00 66,143.74 66,143.74 66,143.74 66,143.74 66,143.74
Costos incrementales del proyecto (3) 240,966.44 1,284.15 1,284.15 1,284.15 1,284.15 1,284.15
FLUJO NETO = ((1+2)-(3)) (4) -240,966.44 66,533.96 66,533.96 66,533.96 66,533.96 66,533.96
FACTOR DE ACTUALIZACIÓN 9% (5) 1.00 0.92 0.84 0.77 0.71 0.65
VALOR ACTUAL NETO ( 4 x 5) (6) -240,966.44 61,040.33 56,000.30 51,376.42 47,134.33 43,242.51
VAN (Tsd = 9%) 186,025.71
TASA INTERNA DE RETORNO 24.53%
RELACIÓN BENEFICIO/COSTO 1.75
Beneficios 0.00 67,818.11 67,818.11 67,818.11 67,818.11 67,818.11
435,233.39 0.00 62,218.45 57,081.14 52,368.02 48,044.06 44,077.12
249,207.68 240,966.44 1,178.12 1,080.84 991.60 909.72 834.61
PRECIOS SOCIALES
ALTERNATIVA
1 2
VAN 186,025.71 170,773.53
TIR 25% 23%
B/C 1.75 1.65
INDICADORES
![Page 47: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/47.jpg)
FLUJO DE CAJA A PRECIOS SOCIALES ALTERNATIVA 01 (en nuevos soles)
Año Año Año Año Año Valor
6 7 8 9 10 Actual
1,674.37 1,674.37 1,674.37 1,674.37 1,674.37 16,743.66
1,674.37 1,674.37 1,674.37 1,674.37 1,674.37 16,743.66
66,143.74 66,143.74 66,143.74 66,143.74 66,143.74 661,437.40
66,143.74 66,143.74 66,143.74 66,143.74 66,143.74 661,437.40
1,284.15 1,284.15 1,284.15 1,284.15 1,284.15 253,807.94
66,533.96 66,533.96 66,533.96 66,533.96 66,533.96 424,373.12
0.60 0.55 0.50 0.46 0.42
39,672.02 36,396.35 33,391.15 30,634.08 28,104.66 186,025.71
67,818.11 67,818.11 67,818.11 67,818.11 67,818.11
40,437.72 37,098.83 34,035.62 31,225.34 28,647.10 Benefic. actualiz
765.70 702.47 644.47 591.26 542.44 Costos actualiz
![Page 48: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/48.jpg)
FLUJO DE CAJA A PRECIOS PRIVADOS ALTERNATIVA 02 (en nuevos soles)
ConceptoAño Año Año Año Año Año
0 1 2 3 4 5
Ingresos incrementales del proyecto (1) 0.00 2,119.45 2,119.45 2,119.45 2,119.45 2,119.45
Venta de agua para riego con proyecto 0.00 2,119.45 2,119.45 2,119.45 2,119.45 2,119.45
Incremento en el valor neto de la producción (2) 0.00 58,309.76 58,309.76 58,309.76 58,309.76 58,309.76
Agrícola 0.00 58,309.76 58,309.76 58,309.76 58,309.76 58,309.76
Costos incrementales del proyecto (3) 298,379.54 1,459.00 1,459.00 1,459.00 1,459.00 1,459.00
FLUJO NETO = ((1+2)-(3)) (4) -298,379.54 58,970.21 58,970.21 58,970.21 58,970.21 58,970.21
FACTOR DE ACTUALIZACIÓN 9% (5) 1.00 0.92 0.84 0.77 0.71 0.65
VALOR ACTUAL NETO ( 4 x 5) (6) -298,379.54 54,101.11 49,634.05 45,535.83 41,775.99 38,326.59
VAN (Tsd = 9%) 80,071.12
TASA INTERNA DE RETORNO 14.79%
RELACIÓN BENEFICIO/COSTO 1.26
0.00 60,429.21 60,429.21 60,429.21 60,429.21 60,429.21
387,814.02 0.00 55,439.65 50,862.06 46,662.44 42,809.58 39,274.84
307,742.90 298,379.54 1,338.53 1,228.01 1,126.62 1,033.59 948.25
5
![Page 49: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/49.jpg)
FLUJO DE CAJA A PRECIOS PRIVADOS ALTERNATIVA 02 (en nuevos soles)
Año Año Año Año Año Valor
6 7 8 9 10 Actual
2,119.45 2,119.45 2,119.45 2,119.45 2,119.45 21,194.51
2,119.45 2,119.45 2,119.45 2,119.45 2,119.45 21,194.51
58,309.76 58,309.76 58,309.76 58,309.76 58,309.76 583,097.64
58,309.76 58,309.76 58,309.76 58,309.76 58,309.76 583,097.64
1,459.00 1,459.00 1,459.00 1,459.00 1,459.00 312,969.54
58,970.21 58,970.21 58,970.21 58,970.21 58,970.21 291,322.61
0.60 0.55 0.50 0.46 0.42
35,162.01 32,258.73 29,595.16 27,151.53 24,909.66 80,071.12
60,429.21 60,429.21 60,429.21 60,429.21 60,429.21
36,031.97 33,056.85 30,327.39 27,823.29 25,525.95 Benefic. actualiz
869.95 798.12 732.22 671.76 616.30 Costos actualiz
![Page 50: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/50.jpg)
FLUJO DE CAJA A PRECIOS SOCIALES ALTERNATIVA 02 (en nuevos soles)
ConceptoAño Año Año Año Año Año
0 1 2 3 4 5
Ingresos incrementales del proyecto (1) 0.00 1,674.37 1,674.37 1,674.37 1,674.37 1,674.37
Venta de agua para riego con proyecto 0.00 1,674.37 1,674.37 1,674.37 1,674.37 1,674.37
Incremento en el valor neto de la producción (2) 0.00 66,143.74 66,143.74 66,143.74 66,143.74 66,143.74
Agrícola 0.00 66,143.74 66,143.74 66,143.74 66,143.74 66,143.74
Costos incrementales del proyecto (3) 256,218.62 1,284.15 1,284.15 1,284.15 1,284.15 1,284.15
FLUJO NETO = ((1+2)-(3)) (4) -256,218.62 66,533.96 66,533.96 66,533.96 66,533.96 66,533.96
FACTOR DE ACTUALIZACIÓN 9% (5) 1.00 0.92 0.84 0.77 0.71 0.65
VALOR ACTUAL NETO ( 4 x 5) (6) -256,218.62 61,040.33 56,000.30 51,376.42 47,134.33 43,242.51
VAN (Tsd = 9%) 170,773.53
TASA INTERNA DE RETORNO 22.58%
RELACIÓN BENEFICIO/COSTO 1.65
0.00 67,818.11 67,818.11 67,818.11 67,818.11 67,818.11
435,233.39 0.00 62,218.45 57,081.14 52,368.02 48,044.06 44,077.12
264,459.86 256,218.62 1,178.12 1,080.84 991.60 909.72 834.61
![Page 51: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/51.jpg)
FLUJO DE CAJA A PRECIOS SOCIALES ALTERNATIVA 02 (en nuevos soles)
Año Año Año Año Año Valor
6 7 8 9 10 Actual
1,674.37 1,674.37 1,674.37 1,674.37 1,674.37 16,743.66
1,674.37 1,674.37 1,674.37 1,674.37 1,674.37 16,743.66
66,143.74 66,143.74 66,143.74 66,143.74 66,143.74 661,437.40
66,143.74 66,143.74 66,143.74 66,143.74 66,143.74 661,437.40
1,284.15 1,284.15 1,284.15 1,284.15 1,284.15 269,060.12
66,533.96 66,533.96 66,533.96 66,533.96 66,533.96 409,120.94
0.60 0.55 0.50 0.46 0.42
39,672.02 36,396.35 33,391.15 30,634.08 28,104.66 170,773.53
67,818.11 67,818.11 67,818.11 67,818.11 67,818.11
40,437.72 37,098.83 34,035.62 31,225.34 28,647.10 Benefic. actualiz
765.70 702.47 644.47 591.26 542.44 Costos actualiz
![Page 52: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/52.jpg)
EVALUACION A PRECIOS PRIVADOS ALTERNATIVA 01
AÑOS BENEFICIOS
0 280,599.501 60,429.22 60,429.23 60,429.24 60,429.25 60,429.26 60,429.27 60,429.28 60,429.29 60,429.2
10 60,429.2TASA DE DESCUENTOVALOR ACTUAL NETO VAN =TASA INTERNA DE RETORNO TIR =
RATIO BENEFICIO/COSTO B/C =
EVALUACION A PRECIOS PRIVADOS ALTERNATIVA 02
AÑOS BENEFICIOS
0 298,379.541 60,429.22 60,429.23 60,429.24 60,429.25 60,429.26 60,429.27 60,429.28 60,429.29 60,429.2
10 60,429.2TASA DE DESCUENTOVALOR ACTUAL NETO VAN =TASA INTERNA DE RETORNO TIR =
RATIO BENEFICIO/COSTO B/C =
COSTOS DE INVERSION
COSTOS DE INVERSION
![Page 53: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/53.jpg)
EVALUACION A PRECIOS SOCIALES ALTERNATIVA 01
AÑOS BENEFICIOS
0 240,966.441 67,818.12 67,818.13 67,818.14 67,818.15 67,818.16 67,818.17 67,818.18 67,818.19 67,818.1
10 67,818.1TASA DE DESCUENTOVALOR ACTUAL NETO VAN =TASA INTERNA DE RETORNO TIR =
RATIO BENEFICIO/COSTO B/C =
EVALUACION A PRECIOS SOCIALES ALTERNATIVA 02
AÑOS BENEFICIOS
0 256,218.621 67,818.12 67,818.13 67,818.14 67,818.15 67,818.16 67,818.17 67,818.18 67,818.19 67,818.1
10 67,818.1TASA DE DESCUENTOVALOR ACTUAL NETO VAN =TASA INTERNA DE RETORNO TIR =
RATIO BENEFICIO/COSTO B/C =
COSTOS DE INVERSION
COSTOS DE INVERSION
![Page 54: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/54.jpg)
IndicadorPrivado
Alternativa 01
TSD 9%
VAN 97,851.15
TIR 16.42%
B/C 1.34
![Page 55: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/55.jpg)
EVALUACION A PRECIOS PRIVADOS ALTERNATIVA 01
-280,599.501,459.00 58,970.2151,459.00 58,970.2151,459.00 58,970.2151,459.00 58,970.2151,459.00 58,970.2151,459.00 58,970.2151,459.00 58,970.2151,459.00 58,970.2151,459.00 58,970.2151,459.00 58,970.215
TASA DE DESCUENTO 9%VALOR ACTUAL NETO VAN = S/. 97,851.15 VNA BENEFICIOS
TASA INTERNA DE RETORNO TIR = 16.42% VNA COSTOS
RATIO BENEFICIO/COSTO B/C = 1.34
EVALUACION A PRECIOS PRIVADOS ALTERNATIVA 02
-298,379.541,459.0 58,970.2151,459.0 58,970.2151,459.0 58,970.2151,459.0 58,970.2151,459.0 58,970.2151,459.0 58,970.2151,459.0 58,970.2151,459.0 58,970.2151,459.0 58,970.215
1,459.00 58,970.215TASA DE DESCUENTO 9%VALOR ACTUAL NETO VAN = S/. 80,071.12 VNA BENEFICIOS
TASA INTERNA DE RETORNO TIR = 14.79% VNA COSTOS
RATIO BENEFICIO/COSTO B/C = 1.26
COSTOS DE OPERACIÓN Y
MANTENIMIENTO
BENEFICIOS NETOS
COSTOS DE OPERACIÓN Y
MANTENIMIENTO
BENEFICIOS NETOS
![Page 56: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/56.jpg)
EVALUACION A PRECIOS SOCIALES ALTERNATIVA 01
-240,966.441,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.956
TASA DE DESCUENTO 9%VALOR ACTUAL NETO VAN = S/. 186,025.71 VNA BENEFICIOS
TASA INTERNA DE RETORNO TIR = 24.53% VNA COSTOS
RATIO BENEFICIO/COSTO B/C = 1.75
EVALUACION A PRECIOS SOCIALES ALTERNATIVA 02
-256,218.621,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.956
TASA DE DESCUENTO 9%VALOR ACTUAL NETO VAN = S/. 170,773.53 VNA BENEFICIOS
TASA INTERNA DE RETORNO TIR = 22.58% VNA COSTOS
RATIO BENEFICIO/COSTO B/C = 1.65
COSTOS DE OPERACIÓN Y
MANTENIMIENTO
BENEFICIOS NETOS
COSTOS DE OPERACIÓN Y
MANTENIMIENTO
BENEFICIOS NETOS
![Page 57: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/57.jpg)
Privado Social
Alternativa 02 Alternativa 01 Alternativa 02
9% 9% 9%
80,071.12 186,025.71 170,773.53
14.79% 24.53% 22.58%
1.26 1.75 1.65
![Page 58: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/58.jpg)
S/. 387,814.02S/. 289,962.86
S/. 387,814.02S/. 307,742.90
![Page 59: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/59.jpg)
S/. 435,233.39S/. 249,207.68
S/. 435,233.39S/. 264,459.86
![Page 60: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/60.jpg)
0%EVALUACION A PRECIOS SOCIALES ALTERNATIVA 01
AÑOS BENEFICIOS
0 240,966.441 67,818.12 67,818.13 67,818.14 67,818.15 67,818.16 67,818.17 67,818.18 67,818.19 67,818.1
10 67,818.1TASA DE DESCUENTOVALOR ACTUAL NETO VAN =TASA INTERNA DE RETORNO TIR =
RATIO BENEFICIO/COSTO B/C =
EVALUACION A PRECIOS SOCIALES ALTERNATIVA 02
AÑOS BENEFICIOS
0 256,218.621 67,818.12 67,818.13 67,818.14 67,818.15 67,818.16 67,818.17 67,818.18 67,818.19 67,818.1
10 67,818.1TASA DE DESCUENTOVALOR ACTUAL NETO VAN =TASA INTERNA DE RETORNO TIR =
RATIO BENEFICIO/COSTO B/C =
10%
COSTOS DE INVERSION
COSTOS DE INVERSION
![Page 61: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/61.jpg)
EVALUACION A PRECIOS SOCIALES ALTERNATIVA 01
AÑOS BENEFICIOS
0 240,966.441 67,818.12 67,818.13 67,818.14 67,818.15 67,818.16 67,818.17 67,818.18 67,818.19 67,818.1
10 67,818.1TASA DE DESCUENTOVALOR ACTUAL NETO VAN =TASA INTERNA DE RETORNO TIR =
RATIO BENEFICIO/COSTO B/C =
EVALUACION A PRECIOS SOCIALES ALTERNATIVA 02
AÑOS BENEFICIOS
0 256,218.621 67,818.12 67,818.13 67,818.14 67,818.15 67,818.16 67,818.17 67,818.18 67,818.19 67,818.1
10 67,818.1TASA DE DESCUENTOVALOR ACTUAL NETO VAN =TASA INTERNA DE RETORNO TIR =
RATIO BENEFICIO/COSTO B/C =
20%EVALUACION A PRECIOS SOCIALES ALTERNATIVA 01
COSTOS DE INVERSION
COSTOS DE INVERSION
![Page 62: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/62.jpg)
AÑOS BENEFICIOS
0 240,966.441 67,818.12 67,818.13 67,818.14 67,818.15 67,818.16 67,818.17 67,818.18 67,818.19 67,818.1
10 67,818.1TASA DE DESCUENTOVALOR ACTUAL NETO VAN =TASA INTERNA DE RETORNO TIR =
RATIO BENEFICIO/COSTO B/C =
EVALUACION A PRECIOS SOCIALES ALTERNATIVA 02
AÑOS BENEFICIOS
0 256,218.621 67,818.12 67,818.13 67,818.14 67,818.15 67,818.16 67,818.17 67,818.18 67,818.19 67,818.1
10 67,818.1TASA DE DESCUENTOVALOR ACTUAL NETO VAN =TASA INTERNA DE RETORNO TIR =
RATIO BENEFICIO/COSTO B/C =
30%EVALUACION A PRECIOS SOCIALES ALTERNATIVA 01
AÑOS BENEFICIOS
COSTOS DE INVERSION
COSTOS DE INVERSION
COSTOS DE INVERSION
![Page 63: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/63.jpg)
0 240,966.441 67,818.12 67,818.13 67,818.14 67,818.15 67,818.16 67,818.17 67,818.18 67,818.19 67,818.1
10 67,818.1TASA DE DESCUENTOVALOR ACTUAL NETO VAN =TASA INTERNA DE RETORNO TIR =
RATIO BENEFICIO/COSTO B/C =
EVALUACION A PRECIOS SOCIALES ALTERNATIVA 02
AÑOS BENEFICIOS
0 256,218.621 67,818.12 67,818.13 67,818.14 67,818.15 67,818.16 67,818.17 67,818.18 67,818.19 67,818.1
10 67,818.1TASA DE DESCUENTOVALOR ACTUAL NETO VAN =TASA INTERNA DE RETORNO TIR =
RATIO BENEFICIO/COSTO B/C =
-10%EVALUACION A PRECIOS SOCIALES ALTERNATIVA 01
AÑOS BENEFICIOS
0 240,966.441 67,818.12 67,818.1
COSTOS DE INVERSION
COSTOS DE INVERSION
![Page 64: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/64.jpg)
3 67,818.14 67,818.15 67,818.16 67,818.17 67,818.18 67,818.19 67,818.1
10 67,818.1TASA DE DESCUENTOVALOR ACTUAL NETO VAN =TASA INTERNA DE RETORNO TIR =
RATIO BENEFICIO/COSTO B/C =
EVALUACION A PRECIOS SOCIALES ALTERNATIVA 02
AÑOS BENEFICIOS
0 256,218.621 67,818.12 67,818.13 67,818.14 67,818.15 67,818.16 67,818.17 67,818.18 67,818.19 67,818.1
10 67,818.1TASA DE DESCUENTOVALOR ACTUAL NETO VAN =TASA INTERNA DE RETORNO TIR =
RATIO BENEFICIO/COSTO B/C =
-20%EVALUACION A PRECIOS SOCIALES ALTERNATIVA 01
AÑOS BENEFICIOS
0 240,966.441 67,818.12 67,818.13 67,818.14 67,818.15 67,818.1
COSTOS DE INVERSION
COSTOS DE INVERSION
![Page 65: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/65.jpg)
6 67,818.17 67,818.18 67,818.19 67,818.1
10 67,818.1TASA DE DESCUENTOVALOR ACTUAL NETO VAN =TASA INTERNA DE RETORNO TIR =
RATIO BENEFICIO/COSTO B/C =
EVALUACION A PRECIOS SOCIALES ALTERNATIVA 02
AÑOS BENEFICIOS
0 256,218.621 67,818.12 67,818.13 67,818.14 67,818.15 67,818.16 67,818.17 67,818.18 67,818.19 67,818.1
10 67,818.1TASA DE DESCUENTOVALOR ACTUAL NETO VAN =TASA INTERNA DE RETORNO TIR =
RATIO BENEFICIO/COSTO B/C =
-30%EVALUACION A PRECIOS SOCIALES ALTERNATIVA 01
AÑOS BENEFICIOS
0 240,966.441 67,818.12 67,818.13 67,818.14 67,818.15 67,818.16 67,818.17 67,818.18 67,818.1
COSTOS DE INVERSION
COSTOS DE INVERSION
![Page 66: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/66.jpg)
9 67,818.110 67,818.1
TASA DE DESCUENTOVALOR ACTUAL NETO VAN =TASA INTERNA DE RETORNO TIR =
RATIO BENEFICIO/COSTO B/C =
EVALUACION A PRECIOS SOCIALES ALTERNATIVA 02
AÑOS BENEFICIOS
0 256,218.621 67,818.12 67,818.13 67,818.14 67,818.15 67,818.16 67,818.17 67,818.18 67,818.19 67,818.1
10 67,818.1TASA DE DESCUENTOVALOR ACTUAL NETO VAN =TASA INTERNA DE RETORNO TIR =
RATIO BENEFICIO/COSTO B/C =
ALT 1113,735.78
1,525.22 137,832.42
COSTOS DE INVERSION
![Page 67: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/67.jpg)
1,525.22 161,929.071,525.22 186,025.711,525.22 210,122.361,525.22 234,219.001,525.22 258,315.65
30 20 10 0 -10 -20 -300.00
100,000.00
200,000.00
300,000.00
400,000.00
500,000.00
600,000.00ANALISIS DE SENSIBILIDAD
ALT 02ALT 1
![Page 68: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/68.jpg)
0%EVALUACION A PRECIOS SOCIALES ALTERNATIVA 01
-240,966.441,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.956
TASA DE DESCUENTO 9%VALOR ACTUAL NETO VAN = S/. 186,025.71 VNA BENEFICIOS S/. 435,233.39TASA INTERNA DE RETORNO TIR = 24.53% VNA COSTOS S/. 249,207.68
RATIO BENEFICIO/COSTO B/C = 1.75
EVALUACION A PRECIOS SOCIALES ALTERNATIVA 02
-256,218.621,284.2 66,533.9561,284.2 66,533.9561,284.2 66,533.9561,284.2 66,533.9561,284.2 66,533.9561,284.2 66,533.9561,284.2 66,533.9561,284.2 66,533.9561,284.2 66,533.956
1,284.15 66,533.956TASA DE DESCUENTO 9%VALOR ACTUAL NETO VAN = S/. 170,773.53 VNA BENEFICIOS S/. 435,233.39TASA INTERNA DE RETORNO TIR = 22.58% VNA COSTOS S/. 264,459.86
RATIO BENEFICIO/COSTO B/C = 1.65
10%
COSTOS DE OPERACIÓN Y
MANTENIMIENTO
BENEFICIOS NETOS
COSTOS DE OPERACIÓN Y
MANTENIMIENTO
BENEFICIOS NETOS
![Page 69: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/69.jpg)
EVALUACION A PRECIOS SOCIALES ALTERNATIVA 01
-265,063.091,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.956
TASA DE DESCUENTO 9%VALOR ACTUAL NETO VAN = S/. 161,929.07 VNA BENEFICIOS S/. 435,233.39TASA INTERNA DE RETORNO TIR = 21.53% VNA COSTOS S/. 249,207.68
RATIO BENEFICIO/COSTO B/C = 1.75
EVALUACION A PRECIOS SOCIALES ALTERNATIVA 02
-281,840.481,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.956
TASA DE DESCUENTO 9%VALOR ACTUAL NETO VAN = S/. 145,151.67 VNA BENEFICIOS S/. 435,233.39TASA INTERNA DE RETORNO TIR = 19.70% VNA COSTOS S/. 264,459.86
RATIO BENEFICIO/COSTO B/C = 1.65
20%EVALUACION A PRECIOS SOCIALES ALTERNATIVA 01
COSTOS DE OPERACIÓN Y
MANTENIMIENTO
BENEFICIOS NETOS
COSTOS DE OPERACIÓN Y
MANTENIMIENTO
BENEFICIOS NETOS
![Page 70: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/70.jpg)
-289,159.731,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.956
TASA DE DESCUENTO 9%VALOR ACTUAL NETO VAN = S/. 137,832.42 VNA BENEFICIOS S/. 435,233.39TASA INTERNA DE RETORNO TIR = 18.95% VNA COSTOS S/. 249,207.68
RATIO BENEFICIO/COSTO B/C = 1.75
EVALUACION A PRECIOS SOCIALES ALTERNATIVA 02
-307,462.341,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.956
TASA DE DESCUENTO 9%VALOR ACTUAL NETO VAN = S/. 119,529.81 VNA BENEFICIOS S/. 435,233.39TASA INTERNA DE RETORNO TIR = 17.22% VNA COSTOS S/. 264,459.86
RATIO BENEFICIO/COSTO B/C = 1.65
30%EVALUACION A PRECIOS SOCIALES ALTERNATIVA 01
COSTOS DE OPERACIÓN Y
MANTENIMIENTO
BENEFICIOS NETOS
COSTOS DE OPERACIÓN Y
MANTENIMIENTO
BENEFICIOS NETOS
COSTOS DE OPERACIÓN Y
MANTENIMIENTO
BENEFICIOS NETOS
![Page 71: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/71.jpg)
-313,256.371,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.956
TASA DE DESCUENTO 9%VALOR ACTUAL NETO VAN = S/. 113,735.78 VNA BENEFICIOS S/. 435,233.39TASA INTERNA DE RETORNO TIR = 16.71% VNA COSTOS S/. 249,207.68
RATIO BENEFICIO/COSTO B/C = 1.75
EVALUACION A PRECIOS SOCIALES ALTERNATIVA 02
-333,084.211,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.956
TASA DE DESCUENTO 9%VALOR ACTUAL NETO VAN = S/. 93,907.95 VNA BENEFICIOS S/. 435,233.39TASA INTERNA DE RETORNO TIR = 15.07% VNA COSTOS S/. 264,459.86
RATIO BENEFICIO/COSTO B/C = 1.65
-10%EVALUACION A PRECIOS SOCIALES ALTERNATIVA 01
-216,869.801,284.15 66,533.9561,284.15 66,533.956
COSTOS DE OPERACIÓN Y
MANTENIMIENTO
BENEFICIOS NETOS
COSTOS DE OPERACIÓN Y
MANTENIMIENTO
BENEFICIOS NETOS
![Page 72: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/72.jpg)
1,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.956
TASA DE DESCUENTO 9%VALOR ACTUAL NETO VAN = S/. 210,122.36 VNA BENEFICIOS S/. 435,233.39TASA INTERNA DE RETORNO TIR = 28.10% VNA COSTOS S/. 249,207.68
RATIO BENEFICIO/COSTO B/C = 1.75
EVALUACION A PRECIOS SOCIALES ALTERNATIVA 02
-230,596.761,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.956
TASA DE DESCUENTO 9%VALOR ACTUAL NETO VAN = S/. 196,395.40 VNA BENEFICIOS S/. 435,233.39TASA INTERNA DE RETORNO TIR = 25.99% VNA COSTOS S/. 264,459.86
RATIO BENEFICIO/COSTO B/C = 1.65
-20%EVALUACION A PRECIOS SOCIALES ALTERNATIVA 01
-192,773.151,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.956
COSTOS DE OPERACIÓN Y
MANTENIMIENTO
BENEFICIOS NETOS
COSTOS DE OPERACIÓN Y
MANTENIMIENTO
BENEFICIOS NETOS
![Page 73: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/73.jpg)
1,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.956
TASA DE DESCUENTO 9%VALOR ACTUAL NETO VAN = S/. 234,219.00 VNA BENEFICIOS S/. 435,233.39TASA INTERNA DE RETORNO TIR = 32.43% VNA COSTOS S/. 249,207.68
RATIO BENEFICIO/COSTO B/C = 1.75
EVALUACION A PRECIOS SOCIALES ALTERNATIVA 02
-204,974.901,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.956
TASA DE DESCUENTO 9%VALOR ACTUAL NETO VAN = S/. 222,017.26 VNA BENEFICIOS S/. 435,233.39TASA INTERNA DE RETORNO TIR = 30.13% VNA COSTOS S/. 264,459.86
RATIO BENEFICIO/COSTO B/C = 1.65
-30%EVALUACION A PRECIOS SOCIALES ALTERNATIVA 01
-168,676.511,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.956
COSTOS DE OPERACIÓN Y
MANTENIMIENTO
BENEFICIOS NETOS
COSTOS DE OPERACIÓN Y
MANTENIMIENTO
BENEFICIOS NETOS
![Page 74: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/74.jpg)
1,284.15 66,533.9561,284.15 66,533.956
TASA DE DESCUENTO 9%VALOR ACTUAL NETO VAN = S/. 258,315.65 VNA BENEFICIOS S/. 435,233.39TASA INTERNA DE RETORNO TIR = 37.85% VNA COSTOS S/. 249,207.68
RATIO BENEFICIO/COSTO B/C = 1.75
EVALUACION A PRECIOS SOCIALES ALTERNATIVA 02
-179,353.031,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.9561,284.15 66,533.956
TASA DE DESCUENTO 9%VALOR ACTUAL NETO VAN = S/. 247,639.12 VNA BENEFICIOS S/. 435,233.39TASA INTERNA DE RETORNO TIR = 35.29% VNA COSTOS S/. 264,459.86
RATIO BENEFICIO/COSTO B/C = 1.65
ANALISIS DE SENSIBILIDAD A PRECIOS SOCIALESALTERNATIVA 01
VANS
30 113,735.7820 137,832.4210 161,929.070 186,025.71
-10 210,122.36-20 234,219.00-30 258,315.65
ANALISIS DE SENSIBILIDAD A PRECIOS SOCIALESALTERNATIVA 02
VANS
ALT 02 30 93,907.9593,907.95 19,827.83 20 119,529.81
119,529.81 18,302.61 10 145,151.67
COSTOS DE OPERACIÓN Y
MANTENIMIENTO
BENEFICIOS NETOS
VARIACION DE LA INVERSION (%)
VARIACION DE LA INVERSION (%)
![Page 75: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/75.jpg)
145,151.67 16,777.40 0 170,773.53170,773.53 15,252.18 -10 196,395.40196,395.40 13,726.96 -20 222,017.26222,017.26 12,201.74 -30 247,639.12247,639.12 10,676.53
30 20 10 0 -10 -20 -300.00
100,000.00
200,000.00
300,000.00
400,000.00
500,000.00
600,000.00ANALISIS DE SENSIBILIDAD
ALT 02ALT 1
![Page 76: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/76.jpg)
ANALISIS DE SENSIBILIDAD A PRECIOS SOCIALESALTERNATIVA 01
TIR B/C
16.71% 1.7518.95% 1.75 -24,096.6421.53% 1.75 -24,096.6424.53% 1.75 -24,096.6428.10% 1.75 -24,096.6432.43% 1.75 -24,096.6437.85% 1.75 -24,096.64
ANALISIS DE SENSIBILIDAD A PRECIOS SOCIALESALTERNATIVA 02
TIR B/C
15% 1.6517% 1.65 -25,621.8620% 1.65 -25,621.86
![Page 77: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/77.jpg)
23% 1.65 -25,621.8626% 1.65 -25,621.8630% 1.65 -25,621.8635% 1.65 -25,621.86
![Page 78: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/78.jpg)
CALCULO DE LA TARIFA DE AGUA DE EQUILIBRIOALTERNATIVA 01 (Precios Privados)
Tarifa de agua de equilibrio 0.0036
ConceptoAño Año
1 2Ingresos por venta de agua
588,736.30 588,736.30
0.00 0.00Total S/. ((a) x (b)) (1) 2,119.45 2,119.45Egresos de la junta de usuarios(c) Operación y Mantenimientode la Infraestructura 1,702.00 1,702.00Total S/. (2) 1,702.00 1,702.00FLUJO NETO = ((1)-(2)) 417.45 417.45FACTOR DE ACTUALIZACIÓN (9%) 0.917 0.842VALOR ACTUAL NETO 2,679.06 382.98 351.36
588,736.30Total area regada (Has) 867.00
679.05
0.00360Tarifa de agua (S/. /ha/año) 2.44
(a) m3 vendidos
(b) tarifa por m3
m3 vendidos anuales
Volumen de agua vendido por hectárea (m3/ha/año)
Tarifa de agua (S/. /m3)
![Page 79: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/79.jpg)
CALCULO DE LA TARIFA DE AGUA DE EQUILIBRIOALTERNATIVA 01 (Precios Privados)
Año Año Año Año Año Año3 4 5 6 7 8
588,736.30 588,736.30 588,736.30 588,736.30 588,736.30 588,736.30
0.00 0.00 0.00 0.00 0.00 0.002,119.45 2,119.45 2,119.45 2,119.45 2,119.45 2,119.45
1,702.00 1,702.00 1,702.00 1,702.00 1,702.00 1,702.001,702.00 1,702.00 1,702.00 1,702.00 1,702.00 1,702.00
417.45 417.45 417.45 417.45 417.45 417.450.772 0.708 0.650 0.596 0.547 0.502
322.35 295.73 271.31 248.91 228.36 209.50
![Page 80: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/80.jpg)
CALCULO DE LA TARIFA DE AGUA DE EQUILIBRIO CALCULO DE LA TARIFA DE AGUA DE EQUILIBRIOALTERNATIVA 01 (Precios Privados) ALTERNATIVA 01 (Precios Sociales)
Tarifa de agua de equilibrio 0.002844Año Año
ConceptoAño
9 10 1Ingresos por venta de agua
588,736.30 588,736.30 588,736.30
0.00 0.00 0.002,119.45 2,119.45 Total S/. ((a) x (b)) (1) 1,674.37
Egresos de la junta de usuarios1,702.00 1,702.00 (c) Operación y Mantenimiento de la Infraestructur 1,446.701,702.00 1,702.00 Total S/. (2) 1,446.70
417.45 417.45 FLUJO NETO = ((1)-(2)) 227.670.460 0.422 FACTOR DE ACTUALIZACIÓN (9%) 0.917
192.21 176.34 VALOR ACTUAL NETO 1,461.08 208.87
588,736.30Total area regada (Has) 867.00
679.05
0.002844000Tarifa de agua (S/. /ha/año) 1.93
(a) m3 vendidos
(b) tarifa por m3
m3 vendidos anuales
Volumen de agua vendido por hectárea (m3/ha/año)
Tarifa de agua (S/. /m3)
![Page 81: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/81.jpg)
CALCULO DE LA TARIFA DE AGUA DE EQUILIBRIOALTERNATIVA 01 (Precios Sociales)
Año Año Año Año Año Año2 3 4 5 6 7
588,736.30 588,736.30 588,736.30 588,736.30 588,736.30 588,736.30
0.00 0.00 0.00 0.00 0.00 0.001,674.37 1,674.37 1,674.37 1,674.37 1,674.37 1,674.37
1,446.70 1,446.70 1,446.70 1,446.70 1,446.70 1,446.701,446.70 1,446.70 1,446.70 1,446.70 1,446.70 1,446.70
227.67 227.67 227.67 227.67 227.67 227.670.842 0.772 0.708 0.650 0.596 0.547
191.62 175.80 161.28 147.97 135.75 124.54
![Page 82: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/82.jpg)
CALCULO DE LA TARIFA DE AGUA DE EQUILIBRIOALTERNATIVA 01 (Precios Sociales)
Año Año Año8 9 10
588,736.30 588,736.30 588,736.30
0.00 0.00 0.001,674.37 1,674.37 1,674.37
1,446.70 1,446.70 1,446.701,446.70 1,446.70 1,446.70
227.67 227.67 227.670.502 0.460 0.422
114.26 104.82 96.17
![Page 83: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/83.jpg)
Item Descripción MES 1 MES 2
01 CONSTRUCCION DE RESERVORIO DE 650M3
01.01 TRABAJOS PRELIMINARES 20,658.94 20,658.94
01.02 MOVIMIENTO DE TIERRAS 62,590.22 62,590.22
01.03 CONCRETO ARMADO 130,243.58 13,024.36
01.04 VERTEDERO DE EXCEDNCIAS 812.48
01.05 JUNTA DE CONSTRUCCION 2,608.34 260.83
01.06 CASETA DE VALVULA 2,789.26
02 REHABILITACION DE BOCATOMA
02.01 TRABAJOS PRELIMINARES 65.50
02.03 MOVIMIENTO DE TIERRAS 569.80
02.04 OBRAS DE CONCRETO 2,539.98
03 REHABILITACION DE CANAL
03.01 TRABAJOS PRELIMINARES 27.51
03.02 MOVIMIENTO DE TIERRAS 730.80
03.03 OBRAS DE CONCRETO 8,055.23
03.04 TAPA DE CONCRETO EN CANAL 488.61
03.05 MURO DE GRAVEDAD EN CANAL 5,321.33
04 MITIGACION AMBIENTAL 1,050.16
05 CAPACITACION 1,100.00
COSTO DIRECTO 239,651.74
GASTOS GENERALES (10%) 23,965.17 4,793.03
GASTOS DE SUPERVISION (5%) 11,982.59 2,396.52
EXPEDIENTE TECNICO 5,000.00 5,000.00
PRESUPUESTO TOTAL 280,599.50 5,000.00 103,723.90
0.00
Item Descripción
01 CONSTRUCCION DE RESERVORIO DE 650M3
01.01 TRABAJOS PRELIMINARES 20,658.94 100.00%
01.02 MOVIMIENTO DE TIERRAS 62,590.22 100.00%
01.03 CONCRETO ARMADO 130,243.58 10.00%
01.04 VERTEDERO DE EXCEDNCIAS 812.48
01.05 JUNTA DE CONSTRUCCION 2,608.34 10.00%
01.06 CASETA DE VALVULA 2,789.26
02 REHABILITACION DE BOCATOMA
02.01 TRABAJOS PRELIMINARES 65.50
02.03 MOVIMIENTO DE TIERRAS 569.80
02.04 OBRAS DE CONCRETO 2,539.98
03 REHABILITACION DE CANAL
03.01 TRABAJOS PRELIMINARES 27.51
03.02 MOVIMIENTO DE TIERRAS 730.80
03.03 OBRAS DE CONCRETO 8,055.23
03.04 TAPA DE CONCRETO EN CANAL 488.61
03.05 MURO DE GRAVEDAD EN CANAL 5,321.33
04 MITIGACION AMBIENTAL 1,050.16
05 CAPACITACION 1,100.00
COSTO DIRECTO 239,651.74
GASTOS GENERALES (10%) 23,965.17 20.00%
GASTOS DE SUPERVISION (5%) 11,982.59 20.00%
EXPEDIENTE TECNICO 5,000.00 100.00%
PRESUPUESTO TOTAL 280,599.50 1.78% 36.97%
PRECIO PRIVADO
PRECIO PRIVADO
TRIMESTRE 1
TRIMESTRE 2
![Page 84: EVALUACION CCERAOCRO](https://reader035.vdocuments.pub/reader035/viewer/2022062320/55cf9a22550346d033a09939/html5/thumbnails/84.jpg)
MES 3 MES 4 TOTAL
0.00
20,658.94 0.00
62,590.22 0.00
78,146.15 39,073.07 130,243.58 0.00
812.48 812.48 0.00
1,565.00 782.50 2,608.34 0.00
2,789.26 2,789.26 0.00
0.00
65.50 65.50 0.00
569.80 569.80 0.00
2,539.98 2,539.98 0.00
0.00
27.51 27.51 0.00
730.80 730.80 0.00
8,055.23 8,055.23 0.00
488.61 488.61 0.00
5,321.33 5,321.33 0.00
1,050.16 1,050.16 0.00
1,100.00 1,100.00 0.00
0.00 -239,651.74
9,586.07 9,586.07 23,965.17 0.00
4,793.03 4,793.03 11,982.59 0.00
5,000.00 0.00
97,265.54 74,610.06 280,599.50 0.00
TOTAL
100.00%
100.00%
60.00% 30.00% 100.00%
100.00% 100.00%
60.00% 30.00% 100.00%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
0.00%
40.00% 40.00% 100.00%
40.00% 40.00% 100.00%
100.00%
34.66% 26.59% 100.00%
TRIMESTRE 3
TRIMESTRE 4