Download - Format RAB Bangunan Gedung
-
8/10/2019 Format RAB Bangunan Gedung
1/44
NO MATERIAL DAN UPAH KERJA SATUAN HARGA
1 Bak Cuci Stainless Steel buah 250,000Rp
2 Balok kayu kelas I m 3,500,000Rp
3 Bata merah buah 550Rp4 Bathtub buah 4,000,000Rp
5 Batu Belah 15 cm m 237,000Rp
6 Besi beton polos kg 12,600Rp
7 Cat Kayu kg 56,000Rp
8 Cat Meni kg 16,500Rp
9 Cat Tembok kg 19,000Rp
10 Dempul kayu kg 11,000Rp
11 Dolken kayu galam, panjang 4 m batang 20,000Rp
12 Engsel Jendela 3" buah 26,000Rp
13 Engsel Pintu 4" buah 35,500Rp
14 Floor Drain buah 20,000Rp
15 Genteng Metal lembar 50,000Rp
16 Grendel jendela buah 14,400Rp
17 Gypsum board lembar 66,500Rp
18 Hak Angin buah 14,000Rp
19 Kaca m 82,800Rp
20 Kawat beton kg 21,000Rp
21 Kayu kelas II balok m 3,162,500Rp
22 Kayu kelas III m 1,983,000Rp
23 Kerikil m 277,000Rp
24 Kloset Duduk/Monoblok buah 453,000Rp25 Kran Air buah 26,000Rp
26 Kran Air tipe bebek buah 32,000Rp
27 Kunci Tanam Kamar Mandi Bulat set 30,000Rp
28 Kunci Tanam pintu alumunium set 1,000,000Rp
29 Kunci Tanam Slaag set 109,000Rp
30 Kusen + daun pintu PVC set 400,000Rp
31 Lem kayu kg 30,000Rp
32 Lis kayu profil m' 7,000Rp
33 Minyak bekisting liter 2,900Rp
34 Paku 10 cm kg 17,500Rp
35 Paku 5-12 cm kg 17,500Rp
36 Paku 5-7 cm kg 17,500Rp
37 Paku sekrup kg 29,000Rp
38 Papan kayu kelas I m 3,205,000Rp
39 Pasir Beton m 148,000Rp
40 Pasir Pasangan m 134,000Rp
41 Pasir Urug m 128,000Rp
42 Pekerjaan septictank unit 3,500,000Rp
HARGA SATUAN BAHAN & UPAH KERJA
-
8/10/2019 Format RAB Bangunan Gedung
2/44
43 Pintu alumunium m' 145,000Rp
44 Plamur kg 7,500Rp
45 Plywood 9 mm lembar 125,000Rp
46 Portland cement kg 1,250Rp
47 Profil alumunium m' 145,000Rp
48 Profil kaca m' 90,000Rp
49 Rangka atap baja ringan m 95,000Rp50 Rangka plafon alumunium m 32,000Rp
51 Seal Tape buah 2,000Rp
52 Sealant tube 35,000Rp
53 Semen warna kg 13,500Rp
54 Skrup fixer buah 600Rp
55 Tanah Urug m 152,000Rp
56 Tarikan jendela buah 5,000Rp
57 Ubin keramik m 45,500Rp
58 Wastafel buah 195,500Rp
1 Pekerja OH 50,000Rp
2 Tukang batu / kayu / cat / besi OH 75,000Rp
3 Kepala Tukang OH 100,000Rp
4 Mandor OH 100,000Rp
-
8/10/2019 Format RAB Bangunan Gedung
3/44
DEPARTEMEN DIKLAT PROFESI DAN KEILMUAN
HIMPUNAN MAHASISWA SIPIL FT-UH
PEKERJAAN
LOKASI
TAHUN ANGGARAN
NO URAIAN PEKERJAAN SATUAN VOLUME
A. PEKERJAAN PERSIAPAN DAN TANAH
1. Pembersihan lahan dan bowplank Ls 1.000
2. Pekerjaan galian tanah m 0.000 panjang
lebar
tinggi
3. Pekerjaan urugan tanah kembali sisi pondasi m 0.000 panjang
luas penampangsisi kanan kiri
4. Pekerjaan urugan tanah peninggian lantai m 0.000 luasan
tebal
5. Pekerjaan urugan pasir di bawah pondasi m 0.000 panjang
lebar
tebal
6. Pekerjaan urugan pasir di bawah lantai m 0.000 luasan
tebal
B. PEKERJAAN PONDASI1. Pekerjaan batu kosong (aanstamping) m 0.000 panjang
lebar
tinggi
2. Pekerjaan pondasi batu kali 1:4 m 0.000 panjang
sisi atas
sisi bawah
tinggi
C. PEKERJAAN BETON
1. Pekerjaan sloof beton 15/20 m 0.000 panjang
lebar
tinggi
2. Pekerjaan kolom beton 15/20 m 0.000 panjang
lebar
tinggi
jumlah
3. Pekerjaan kolom beton 15/15 m 0.000 panjang
lebar
tinggi
jumlah
4. Pekerjaan balok beton 20/40 m 0.000 panjang
lebar
tinggi
PERHITUNGAN VOLUME
VOLUME PEKERJAAN
: PEMBANGUNAN RUMAH TYPE 110/200
: PERUMAHAN DOSEN TAMALANREA
: 2014
-
8/10/2019 Format RAB Bangunan Gedung
4/44
NO URAIAN PEKERJAAN SATUAN VOLUME PERHITUNGAN VOLUME
lebar
tinggi
8. Pekerjaan meja dapur beton tebal 12 cm m 0.000 panjang
lebar
tebal
D. PEKERJAAN PASANGAN DINDING
1. Pasangan dinding 1/2 bata 1:5 m panjang
tinggi
4. Pasangan dinding 1/2 bata 1:3 m panjang
tinggi
7. Plesteran dan aci 1:5 m 0.000 luasan dinding
luar dalam
8. Plesteran dan aci 1:3 m 0.000 luasan dinding
luar dalam
E. PEKERJAAN PENUTUP LANTAI DAN DINDING
1. Pasangan lantai keramik 40/40 m 0.000 luasan
3. Pasangan lantai keramik 20/20 untuk KM/WC m 0.000 luasan
4. Pasangan dinding keramik 20/20 m 0.000 panjang dinding
tinggi
5. Pasangan tegel plin 10/30 m 0.000 panjang dinding
tinggi
F. PEKERJAAN ATAP1. Pasang rangka atap baja ringan m 0.000 luasan atap
2. Pasang atap genteng metal m 0.000 luasan atap
3. Pasang lisplank woodplank 3/30 m' 0.000 panjang
G. PEKERJAAN PLAFON
1. Pasang rangka plafon hollow m 0.000 luasan
2. Pasang penutup plafon gypsum m 0.000 luasan
3. Pasang lis plafon kayu profil 5 cm m' 0.000 panjang dinding
luar dalam
H. PEKERJAAN KUSEN, PINTU, DAN JENDELA
4. Pasang kusen pintu jendela Type PJ kayu kelas I m 0.000 panjang
lebar
tebal
jumlah
2. Pasang kusen pintu Type P2 kayu kelas I m 0.000 panjang
lebar
tebaljumlah
-
8/10/2019 Format RAB Bangunan Gedung
5/44
NO URAIAN PEKERJAAN SATUAN VOLUME PERHITUNGAN VOLUME
5. Pasang kusen jendela Type J1 kayu kelas I m 0.000 panjang
lebar
tebal
jumlah
6. Pasang kusen jendela Type J2 kayu kelas I m 0.000 panjangjumlah
8. Pasang daun pintu panel kayu kelas I m 0.000 lebar
tinggi
jumlah
10. Pasang daun jendela kaca rangka kayu kelas I Type PJ1 m 0.000 lebar
tinggi
jumlah daun per kusen
jumlah kusen
11. Pasang daun jendela kaca rangka kayu kelas I m 0.000 lebar
tinggijumlah daun per kusen
jumlah kusen
I. PEKERJAAN PERLENGKAPAN PINTU & JENDELA
1. Pasang kunci pintu slaag bh 0.000 jumlah pintu
4. Pasang kunci pintu tipe bulat bh 0.000 jumlah pintu
5. Pasang engsel pintu 4" bh 0.000 jumlah per pintu
jumlah pintu
7. Pasang engsel jendela 3" bh 0.000 jumlah per jendela
jumlah jendela
8. Pasang grendel jendela bh 0.000 jumlah jendela
9. Pasang hak angin jendela bh 0.000 jumlah per jendela
jumlah jendela
10. Pasangan tarikan jendela bh 0.000 jumlah jendela
J. PEKERJAAN SANITASI
1. Pasang kloset jongkok bh 0.000 jumlah
2. Pasang kran air bh 0.000 jumlah
3. Pasang kran air tipe bebek untuk meja dapur bh 0.000 jumlah
5. Pasang kitchen sink set 0.000 jumlah
6. Pasang floor drain KM/WC bh 0.000 jumlah
7. Pasang wastafel bh 0.000 jumlah
8. Pembuatan Septictank 2 x 1.5 x 1.5 m unit 1.000 jumlah
9. Pasang pipa PVC diameter 3/4 inch untuk instalasi air bersih m' 0.000 panjang
10. Pasang pipa PVC diameter 3 inch untuk instalasi air kotor m' 0.000 panjang
11. Pasang pipa PVC diameter 4 inch untuk instalasi tinja m' 0.000 panjang
-
8/10/2019 Format RAB Bangunan Gedung
6/44
NO URAIAN PEKERJAAN SATUAN VOLUME PERHITUNGAN VOLUME
13. Pasang penyambung air bersih ke PDAM ls 1.000
K. PEKERJAAN INSTALASI LISTRIK
Pasangan instalasi titik nyala lampu kabel NYM 3 x 2,5 mm titik jumlah
Pasangan instalasi daya stop kontak kabel NYM 3 x 2,5 mm titik jumlah
Pasangan lampu pijar 15 watt buah jumlah
Pasangan lampu pijar 20 watt buah jumlah
Pasangan lampu TL 1 x 20 watt buah jumlah
Pasangan panel listrik buah jumlah
Pasangan penyambung daya ke PLN Ls 1.000
L PEKERJAAN PENGECATAN
1. Pengecatan dinding dengan cat tembok m 0.000 luas dinding
luar dalam
2. Pengecatan plafon dengan cat tembok m 0.000 luas plafon
3. Pengecatan kusen dengan cat kayu m 0.000 lebar permukaan
panjang
4. Pengecatan daun pintu dengan cat kayu m 0.000 luasan pintu
luar dalam
5. Pengecatan daun jendela dengan cat kayu m 0.000 luasan jendelaluar dalam
M PEKERJAAN PEMBERSIHAN
1. Pembersihan lahan setelah pekerjaan Ls 1.000
-
-
8/10/2019 Format RAB Bangunan Gedung
7/44
DEPARTEMEN DIKLAT PROFESI DAN KEILMUAN
HIMPUNAN MAHASISWA SIPIL FT-UH
PEKERJAAN
LOKASI
TAHUN ANGGARAN
NO URAIAN PEKERJAAN SATUAN VOLUME
A. PEKERJAAN PERSIAPAN DAN TANAH
1. Pembersihan lahan dan bowplank Ls 1.000
2. Pekerjaan galian tanah m 0.000 panjang
lebar
tinggi
3. Pekerjaan urugan tanah kembali sisi pondasi m 0.000 panjang
luas penampangsisi kanan kiri
4. Pekerjaan urugan tanah peninggian lantai m 0.000 luasan
tebal
5. Pekerjaan urugan pasir di bawah pondasi m 0.000 panjang
lebar
tebal
6. Pekerjaan urugan pasir di bawah lantai m 0.000 luasan
tebal
B. PEKERJAAN PONDASI1. Pekerjaan batu kosong (aanstamping) m 0.000 panjang
lebar
tinggi
2. Pekerjaan pondasi batu kali 1:4 m 0.000 panjang
sisi atas
sisi bawah
tinggi
C. PEKERJAAN BETON
1. Pekerjaan sloof beton 15/20 m 0.000 panjang
lebar
tinggi
2. Pekerjaan kolom beton 15/20 m 0.000 panjang
lebar
tinggi
jumlah
3. Pekerjaan kolom beton 15/15 m 0.000 panjang
lebar
tinggi
jumlah
4. Pekerjaan balok beton 20/40 m 0.000 panjang
lebar
tinggi
PERHITUNGAN VOLUME
VOLUME PEKERJAAN
: PEMBANGUNAN RUMAH TYPE 110/200
: PERUMAHAN DOSEN TAMALANREA
: 2014
-
8/10/2019 Format RAB Bangunan Gedung
8/44
NO URAIAN PEKERJAAN SATUAN VOLUME PERHITUNGAN VOLUME
lebar m
tinggi m
8. Pekerjaan meja dapur beton tebal 12 cm m 0.000 panjang m
lebar m
tebal m
D. PEKERJAAN PASANGAN DINDING
1. Pasangan dinding 1/2 bata 1:5 m panjang m
tinggi m
4. Pasangan dinding 1/2 bata 1:3 m panjang m
tinggi m
7. Plesteran dan aci 1:5 m 0.000 luasan dinding m
luar dalam x
8. Plesteran dan aci 1:3 m 0.000 luasan dinding m
luar dalam x
E. PEKERJAAN PENUTUP LANTAI DAN DINDING
1. Pasangan lantai keramik 40/40 m 0.000 luasan m
3. Pasangan lantai keramik 20/20 untuk KM/WC m 0.000 luasan m
4. Pasangan dinding keramik 20/20 m 0.000 panjang dinding m
tinggi m
5. Pasangan tegel plin 10/30 m 0.000 panjang dinding m
tinggi m
F. PEKERJAAN ATAP1. Pasang rangka atap baja ringan m 0.000 luasan atap m
2. Pasang atap genteng metal m 0.000 luasan atap m
3. Pasang lisplank woodplank 3/30 m' 0.000 panjang m
G. PEKERJAAN PLAFON
1. Pasang rangka plafon hollow m 0.000 luasan m
2. Pasang penutup plafon gypsum m 0.000 luasan m
3. Pasang lis plafon kayu profil 5 cm m' 0.000 panjang dinding m
luar dalam x
H. PEKERJAAN KUSEN, PINTU, DAN JENDELA
4. Pasang kusen pintu jendela Type PJ kayu kelas I m 0.000 panjang m
lebar m
tebal m
jumlah b
2. Pasang kusen pintu Type P2 kayu kelas I m 0.000 panjang m
lebar m
tebal mjumlah b
-
8/10/2019 Format RAB Bangunan Gedung
9/44
NO URAIAN PEKERJAAN SATUAN VOLUME PERHITUNGAN VOLUME
5. Pasang kusen jendela Type J1 kayu kelas I m 0.000 panjang m
lebar m
tebal m
jumlah b
6. Pasang kusen jendela Type J2 kayu kelas I m 0.000 panjang mjumlah b
8. Pasang daun pintu panel kayu kelas I m 0.000 lebar m
tinggi m
jumlah b
10. Pasang daun jendela kaca rangka kayu kelas I Type PJ1 m 0.000 lebar m
tinggi m
jumlah daun per kusen b
jumlah kusen b
11. Pasang daun jendela kaca rangka kayu kelas I m 0.000 lebar m
tinggi mjumlah daun per kusen b
jumlah kusen b
I. PEKERJAAN PERLENGKAPAN PINTU & JENDELA
1. Pasang kunci pintu slaag bh 0.000 jumlah pintu b
4. Pasang kunci pintu tipe bulat bh 0.000 jumlah pintu b
5. Pasang engsel pintu 4" bh 0.000 jumlah per pintu b
jumlah pintu b
7. Pasang engsel jendela 3" bh 0.000 jumlah per jendela b
jumlah jendela b
8. Pasang grendel jendela bh 0.000 jumlah jendela b
9. Pasang hak angin jendela bh 0.000 jumlah per jendela b
jumlah jendela b
10. Pasangan tarikan jendela bh 0.000 jumlah jendela b
J. PEKERJAAN SANITASI
1. Pasang kloset jongkok bh 0.000 jumlah b
2. Pasang kran air bh 0.000 jumlah b
3. Pasang kran air tipe bebek untuk meja dapur bh 0.000 jumlah b
5. Pasang kitchen sink set 0.000 jumlah b
6. Pasang floor drain KM/WC bh 0.000 jumlah b
7. Pasang wastafel bh 0.000 jumlah b
8. Pembuatan Septictank 2 x 1.5 x 1.5 m unit 1.000 jumlah u
9. Pasang pipa PVC diameter 3/4 inch untuk instalasi air bersih m' 0.000 panjang m
10. Pasang pipa PVC diameter 3 inch untuk instalasi air kotor m' 0.000 panjang m
11. Pasang pipa PVC diameter 4 inch untuk instalasi tinja m' 0.000 panjang m
-
8/10/2019 Format RAB Bangunan Gedung
10/44
NO URAIAN PEKERJAAN SATUAN VOLUME PERHITUNGAN VOLUME
13. Pasang penyambung air bersih ke PDAM ls 1.000
K. PEKERJAAN INSTALASI LISTRIK
Pasangan instalasi titik nyala lampu kabel NYM 3 x 2,5 mm titik jumlah
Pasangan instalasi daya stop kontak kabel NYM 3 x 2,5 mm titik jumlah
Pasangan lampu pijar 15 watt buah jumlah
Pasangan lampu pijar 20 watt buah jumlah
Pasangan lampu TL 1 x 20 watt buah jumlah
Pasangan panel listrik buah jumlah
Pasangan penyambung daya ke PLN Ls 1.000
L PEKERJAAN PENGECATAN
1. Pengecatan dinding dengan cat tembok m 0.000 luas dinding
luar dalam
2. Pengecatan plafon dengan cat tembok m 0.000 luas plafon
3. Pengecatan kusen dengan cat kayu m 0.000 lebar permukaan
panjang
4. Pengecatan daun pintu dengan cat kayu m 0.000 luasan pintu
luar dalam
5. Pengecatan daun jendela dengan cat kayu m 0.000 luasan jendelaluar dalam
M PEKERJAAN PEMBERSIHAN
1. Pembersihan lahan setelah pekerjaan Ls 1.000
-
-
8/10/2019 Format RAB Bangunan Gedung
11/44
DEPARTEMEN DIKLAT PROFESI DAN KEILMUAN
HIMPUNAN MAHASISWA SIPIL FT-UH
PEKERJAAN : PEMBANGUNAN RUMAH TYPE 110/200
LOKASI : PERUMAHAN DOSEN TAMALANREA
TAHUN ANGGARAN : 2014
NO SATUAN KOEF.
A. PEKERJAAN PERSIAPAN DAN TANAH
1 Pembersihan Lahan dan pemasangan bouwplank Ls 1.000
2 Menggali 1 m tanah biasa sedalam 2 meterPekerja OH 0.900
Mandor OH 0.045
3 Mengurug kembali 1 m tanah
Pekerja OH 0.300
Mandor OH 0.015
4 Mengurug 1 m tanah urug
Tanah Urug m 1.200
Pekerja OH 0.300
Mandor OH 0.010
5 Mengurug 1 m pasir urug
Pasir Urug m 1.200
Pekerja OH 0.300
Mandor OH 0.010
B. PEKERJAAN PONDASI
1 Memasang 1 m batu kosong (aanstamping)
Batu Belah 15 cm m 1.200
Pasir Urug m 0.432
Pekerja OH 0.780
ANALISA HARGA SATUAN PEKERJAAN
URAIAN
-
8/10/2019 Format RAB Bangunan Gedung
12/44
Tukang Batu OH 0.390
Kepala Tukang OH 0.390
Mandor OH 0.390
2 Memasang 1 m pondasi batu belah, 1 PC : 4 PP
Batu Belah 15 cm m 1.200Portland Cement kg 163.000
Pasir Pasangan m 0.520
Pekerja OH 1.500
Tukang Batu OH 0.750
Kepala Tukang OH 0.075
Mandor OH 0.075
3 Membuat 1 m pondasi beton bertulang
Kayu kelas III m 0.200
Paku 5-12 cm kg 1.500
Minyak bekisting liter 0.400
Besi beton polos kg 157.500
Kawat beton kg 2.250
Portland Cement kg 336.000
Pasir beton m 0.540
Kerikil m 0.810
Pekerja OH 5.300
Tukang batu OH 0.275Tukang kayu OH 1.300
Tukang besi OH 1.050
Kepala Tukang OH 0.262
Mandor OH 0.265
C. PEKERJAAN BETON
1 Membuat 1 m sloof beton bertulang
Kayu kelas III m 0.270
Paku 5-12 cm kg 2.000
Minyak bekisting liter 0.600
Besi beton polos kg 210.000
Kawat beton kg 3.000
Portland Cement kg 336.000
Pasir beton m 0.540
Kerikil m 0.810
Pekerja OH 5.650
Tukang batu OH 0.275
-
8/10/2019 Format RAB Bangunan Gedung
13/44
Tukang kayu OH 1.560
Tukang besi OH 1.400
Kepala Tukang OH 0.323
Mandor OH 0.283
2 Membuat 1 m kolom beton bertulangKayu kelas III m 0.400
Paku 5-12 cm kg 4.000
Minyak bekisting liter 2.000
Besi beton polos kg 315.000
Kawat beton kg 4.500
Portland Cement kg 336.000
Pasir beton m 0.540
Kerikil m 0.810
Kayu kelas II balok m 0.150
Plywood 9 mm lembar 3.500
Dolken kayu galam, panjang 4 m batang 20.000
Pekerja OH 7.050
Tukang batu OH 0.275
Tukang kayu OH 1.650
Tukang besi OH 2.100
Kepala Tukang OH 0.403
Mandor OH 0.353
3 Membuat 1 m balok beton bertulangKayu kelas III m 0.320
Paku 5-12 cm kg 3.200
Minyak bekisting liter 1.600
Besi beton polos kg 210.000
Kawat beton kg 3.000
Portland Cement kg 336.000
Pasir beton m 0.540
Kerikil m 0.810
Kayu kelas II balok m 0.140
Plywood 9 mm lembar 2.800
Dolken kayu galam, panjang 4 m batang 16.000
Pekerja OH 6.350
Tukang batu OH 0.275
Tukang kayu OH 1.650
Tukang besi OH 1.400
Kepala Tukang OH 0.333
Mandor OH 0.318
-
8/10/2019 Format RAB Bangunan Gedung
14/44
-
8/10/2019 Format RAB Bangunan Gedung
15/44
Besi beton polos kg 210.000
Kawat beton kg 3.000
Portland cement kg 336.000
Pasir beton m 0.540
Kerikil m 0.810
Kayu kelas II balok m 0.140
Plywood 9 mm lembar 2.800Dolken kayu galam, panjang 4 m batang 16.000
Pekerja OH 6.350
Tukang batu OH 0.275
Tukang kayu OH 1.650
Tukang besi OH 1.400
Kepala Tukang OH 0.333
Mandor OH 0.318
D. PEKERJAAN PASANGAN DINDING
1 Memasang 1 m dinding 1/2 bata 1:5
Bata merah buah 70.000
Portland cement kg 9.680
Pasir pasangan m 0.045
Pekerja OH 0.300
Tukang Batu OH 0.100
Kepala Tukang OH 0.010
Mandor OH 0.015
2 Memasang 1 m dinding 1/2 bata 1:3
Bata merah buah 70.000
Portland cement kg 14.300
Pasir pasangan m 0.040
Pekerja OH 0.300
Tukang Batu OH 0.100
Kepala Tukang OH 0.010
Mandor OH 0.015
3 Memasang 1 m plesteran 1:5
Portland cement kg 5.184
Pasir pasangan m 0.026
Pekerja OH 0.200
Tukang Batu OH 0.150
Kepala Tukang OH 0.015
-
8/10/2019 Format RAB Bangunan Gedung
16/44
Mandor OH 0.010
4 Memasang 1 m plesteran 1:3
Portland cement kg 7.776
Pasir pasangan m 0.023
Pekerja OH 0.200
Tukang Batu OH 0.150
Kepala Tukang OH 0.015
Mandor OH 0.010
5 Memasang 1 m acian
Portland cement kg 3.250
Pekerja OH 0.150
Tukang Batu OH 0.100
Kepala Tukang OH 0.010
Mandor OH 0.008
E. PEKERJAAN PENUTUP LANTAI DAN DINDING
1 Memasang 1 m lantai keramik ukuran 30 x 30 cm
Ubin keramik m 1.000
Portland cement kg 10.000
Pasir Pasangan m 0.045
Semen warna kg 1.500
Pekerja OH 0.620
Tukang Batu OH 0.350
Kepala Tukang OH 0.035
Mandor OH 0.030
2 Memasang 1 m lantai keramik ukuran 40 x 40 cm
Ubin keramik m 1.000
Portland cement kg 9.800
Pasir Pasangan m 0.045
Semen warna kg 1.300
Pekerja OH 0.620
Tukang Batu OH 0.350
Kepala Tukang OH 0.035
Mandor OH 0.030
-
8/10/2019 Format RAB Bangunan Gedung
17/44
2 Memasang 1 m lantai keramik ukuran 20 x 20 cm
Ubin keramik m 1.000
Portland cement kg 10.400
Pasir Pasangan m 0.045
Semen warna kg 1.620
Pekerja OH 0.620Tukang Batu OH 0.350
Kepala Tukang OH 0.035
Mandor OH 0.030
3 Memasang 1 m dinding keramik ukuran 20 x 20 cm
Ubin keramik m 1.000
Portland cement kg 9.300
Pasir Pasangan m 0.018
Semen warna kg 1.940
Pekerja OH 0.600
Tukang Batu OH 0.450
Kepala Tukang OH 0.045
Mandor OH 0.030
4 Memasang 1 m plint keramik ukuran 10 x 30 cm
Ubin keramik m 1.000
Portland cement kg 10.000
Pasir Pasangan m 0.045Semen warna kg 1.940
Pekerja OH 0.620
Tukang Batu OH 0.350
Kepala Tukang OH 0.035
Mandor OH 0.030
F. PEKERJAAN ATAP
1 Memasang 1 m rangka atap baja ringan
Rangka atap baja ringan m 1.000
2 Memasang 1 m atap genteng multiroof
Genteng Metal Lbr 1.020
Paku Biasa 5-12 cm Kg 0.200
Pekerja Oh 0.200
Tukang Besi Oh 0.100
-
8/10/2019 Format RAB Bangunan Gedung
18/44
Kepala Tukang Oh 0.010
Mandor Oh 0.001
3 Memasang 1 m' lisplank kayu 3/30
Papan kayu m 0.011
Paku 5-7 cm kg 0.050
Pekerja OH 0.100
Tukang Kayu OH 0.200
Kepala Tukang OH 0.020
Mandor OH 0.005
G. PEKERJAAN PLAFON
1 Memasang 1 m rangka plafon alumunium
Rangka plafon alumunium m 1.050
2 Memasang 1 m plafon gypsum
Gypsum board lembar 0.364
Paku sekrup kg 0.110
Pekerja OH 0.100
Tukang kayu OH 0.050
Kepala Tukang OH 0.005
Mandor OH 0.005
3 Memasang 1 m' lis profil kayu 5 cm
Lis kayu profil m' 1.050
Paku kg 0.010
Pekerja OH 0.050
Tukang kayu OH 0.050
Kepala tukang OH 0.005
Mandor OH 0.003
H. PEKERJAAN KUSEN, PINTU, DAN JENDELA
1 Memasang 1 m kusen pintu & jendela kayu kelas I
Balok kayu kelas I m 1.100
Paku 10 cm kg 1.250
Lem kayu kg 1.000
Pekerja OH 6.000
Tukang kayu OH 20.000
-
8/10/2019 Format RAB Bangunan Gedung
19/44
Kepala tukang OH 2.000
Mandor OH 0.300
2 Memasang 1 set kusen pintu daun pintu PVC
Kusen + daun pintu PVC set 1.000
3 Memasang 1 m' kusen pintu alumunium
Profil alumunium m 1.100
Skrup fixer buah 2.000
Sealant tube 0.060
Pekerja OH 0.043
Tukang besi OH 0.043
Kepala Tukang OH 0.004
Mandor OH 0.002
4 Memasang 1 m kusen jendela kaca kayu kelas I
Balok kayu m 0.040
Kaca m 1.100
Lem kayu kg 0.300
Pekerja OH 0.800
Tukang kayu OH 2.000
Kepala tukang OH 0.200
Mandor OH 0.040
5 Memasang 1 m daun pintu panel kayu
Papan kayu kelas I m 0.040
Lem kayu kg 0.500
Pekerja OH 1.000
Tukang kayu OH 2.500
Kepala tukang OH 0.250
Mandor OH 0.050
6 Memasang 1 m pintu kaca rangka alumunium
Pintu alumunium m 4.400
Profil kaca m 4.500
Sealant tube 0.270
Pekerja OH 0.085
Tukang besi OH 0.085
-
8/10/2019 Format RAB Bangunan Gedung
20/44
Kepala tukang OH 0.008
Mandor OH 0.004
7 Memasang 1 m daun jendela kaca kayu kelas I
Papan kayu m 0.024
Kaca m 1.100Lem kayu kg 0.300
Pekerja OH 0.800
Tukang kayu OH 2.000
Kepala tukang OH 0.200
Mandor OH 0.040
8 Memasang 1 m dinding kaca rangka alumunium
Profil alumunium m 8.500
Profil kaca m 4.500
Sealant tube 0.540
Pekerja OH 0.100
Tukang besi OH 0.100
Kepala tukang OH 0.010
Mandor OH 0.008
I. PEKERJAAN PERLENGKAPAN PINTU & JENDELA
1 Memasang 1 buah kunci pintu slaagKunci Tanam Slaag set 1.000
Pekerja OH 0.010
Tukang Kayu OH 0.500
Kepala Tukang OH 0.010
Mandor OH 0.005
2 Memasang 1 buah kunci pintu alumunium
Kunci tanam pintu alumunium set 1.000
Pekerja OH 0.060
Tukang Kayu OH 0.600
Kepala Tukang OH 0.060
Mandor OH 0.003
3 Memasang 1 buah kunci pintu tipe bulat
Kunci Tanam Kamar Mandi Bulat set 1.000
-
8/10/2019 Format RAB Bangunan Gedung
21/44
-
8/10/2019 Format RAB Bangunan Gedung
22/44
Pekerja OH 0.015
Tukang Kayu OH 0.150
Kepala Tukang OH 0.015
Mandor OH 0.001
J. PEKERJAAN SANITASI1 Memasang 1 buah kloset duduk
Kloset Duduk/Monoblok Bh 1.000
Pekerja Oh 3.300
Tukang Batu Oh 1.100
Kepala Tukang Oh 0.001
Mandor Oh 0.160
2 Memasang 1 buah kran air 3/4
Kran Air buah 1.000
Seal Tape buah 0.025
Pekerja OH 0.010
Tukang Batu OH 0.100
Kepala Tukang OH 0.010
Mandor OH 0.005
3 Memasang 1 buah kran air tipe bebek
Kran Air tipe bebek buah 1.000Seal Tape buah 0.025
Pekerja OH 0.010
Tukang Batu OH 0.100
Kepala Tukang OH 0.010
Mandor OH 0.005
4 Memasang 1 buah bathtub
Bathtub bh 1.000
Portland Cement kg 6.000
Pasir Pasang m3 0.010
Pekerja OH 2.100
Tukang Batu OH 0.750
Kepala Tukang OH 0.070
Mandor OH 0.110
-
8/10/2019 Format RAB Bangunan Gedung
23/44
5 Memasang 1 set kitchen sink
Bak Cuci Stainless Steel buah 1.000
Pekerja OH 0.030
Tukang Batu OH 0.300
Kepala Tukang OH 0.030
Mandor OH 0.002
6 Memasang 1 buah floor drain
Floor Drain bh 1.000
Pekerja OH 0.010
Tukang Batu OH 0.100
Kepala Tukang OH 0.010
Mandor OH 0.005
7 Memasang 1 buah wastafel
Wastafel buah 1.000
Semen warna Kg 6.000
Pasir Pasang m3 0.010
Pekerja Oh 1.200
Tukang Batu Oh 1.450
Kepala Tukang Oh 0.150
Mandor Oh 0.100
8 Pembuatan 1 unit septictank
Pekerjaan septictank unit 1.000
L PEKERJAAN PENGECATAN
1 1 m Pengecatan dinding dengan cat tembok
Plamur kg 0.120
Cat Tembok kg 0.180
Pekerja OH 0.028
Tukang Cat OH 0.042
Kepala Tukang OH 0.004
Mandor OH 0.003
2 1 m Pengecatan plafon dengan cat tembok
Plamur kg 0.120
Cat Tembok kg 0.180
-
8/10/2019 Format RAB Bangunan Gedung
24/44
Pekerja OH 0.050
Tukang Cat OH 0.070
Kepala Tukang OH 0.004
Mandor OH 0.003
3 1 m Pengecatan dengan cat kayu
Cat Meni kg 0.200
Dempul kayu kg 0.150
Cat kayu kg 0.260
Pekerja OH 0.070
Tukang Cat OH 0.009
Kepala Tukang OH 0.006
Mandor OH 0.003
M PEKERJAAN PEMBERSIHAN
1 Pembersihan Lahan Ls 1.000
-
8/10/2019 Format RAB Bangunan Gedung
25/44
HARGA SATUAN JUMLAH
1,000,000Rp 1,000,000Rp
1,000,000Rp
50,000Rp 45,000Rp
100,000Rp 4,500Rp
49,500Rp
50,000Rp 15,000Rp
100,000Rp 1,500Rp
16,500Rp
152,000Rp 182,400Rp
50,000Rp 15,000Rp
100,000Rp 1,000Rp
198,400Rp
128,000Rp 153,600Rp
50,000Rp 15,000Rp
100,000Rp 1,000Rp169,600Rp
237,000Rp 284,400Rp
128,000Rp 55,296Rp
50,000Rp 39,000Rp
-
8/10/2019 Format RAB Bangunan Gedung
26/44
75,000Rp 29,250Rp
100,000Rp 39,000Rp
100,000Rp 39,000Rp
485,946Rp
237,000Rp 284,400Rp1,250Rp 203,750Rp
134,000Rp 69,680Rp
50,000Rp 75,000Rp
75,000Rp 56,250Rp
100,000Rp 7,500Rp
100,000Rp 7,500Rp
704,080Rp
1,983,000Rp 396,600Rp
17,500Rp 26,250Rp
2,900Rp 1,160Rp
12,600Rp 1,984,500Rp
21,000Rp 47,250Rp
1,250Rp 420,000Rp
148,000Rp 79,920Rp
277,000Rp 224,370Rp
50,000Rp 265,000Rp
75,000Rp 20,625Rp75,000Rp 97,500Rp
75,000Rp 78,750Rp
100,000Rp 26,200Rp
100,000Rp 26,500Rp
3,470,255Rp
1,983,000Rp 535,410Rp
17,500Rp 35,000Rp
2,900Rp 1,740Rp
12,600Rp 2,646,000Rp
21,000Rp 63,000Rp
1,250Rp 420,000Rp
148,000Rp 79,920Rp
277,000Rp 224,370Rp
50,000Rp 282,500Rp
75,000Rp 20,625Rp
-
8/10/2019 Format RAB Bangunan Gedung
27/44
75,000Rp 117,000Rp
75,000Rp 105,000Rp
100,000Rp 32,300Rp
100,000Rp 28,300Rp
4,591,165Rp
1,983,000Rp 793,200Rp
17,500Rp 70,000Rp
2,900Rp 5,800Rp
12,600Rp 3,969,000Rp
21,000Rp 94,500Rp
1,250Rp 420,000Rp
148,000Rp 79,920Rp
277,000Rp 224,370Rp
3,162,500Rp 474,375Rp
125,000Rp 437,500Rp
20,000Rp 400,000Rp
50,000Rp 352,500Rp
75,000Rp 20,625Rp
75,000Rp 123,750Rp
75,000Rp 157,500Rp
100,000Rp 40,300Rp
100,000Rp 35,300Rp
7,698,640Rp
1,983,000Rp 634,560Rp
17,500Rp 56,000Rp
2,900Rp 4,640Rp
12,600Rp 2,646,000Rp
21,000Rp 63,000Rp
1,250Rp 420,000Rp
148,000Rp 79,920Rp
277,000Rp 224,370Rp
3,162,500Rp 442,750Rp
125,000Rp 350,000Rp
20,000Rp 320,000Rp
50,000Rp 317,500Rp
75,000Rp 20,625Rp
75,000Rp 123,750Rp
75,000Rp 105,000Rp
100,000Rp 33,300Rp
100,000Rp 31,800Rp
5,873,215Rp
-
8/10/2019 Format RAB Bangunan Gedung
28/44
1,983,000Rp 495,750Rp
17,500Rp 52,500Rp
2,900Rp 3,480Rp
12,600Rp 2,520,000Rp
21,000Rp 63,000Rp1,250Rp 403,750Rp
148,000Rp 76,960Rp
277,000Rp 216,060Rp
3,162,500Rp 332,063Rp
125,000Rp 312,500Rp
20,000Rp 280,000Rp
50,000Rp 280,000Rp
75,000Rp 26,250Rp
75,000Rp 172,500Rp
75,000Rp 105,000Rp
100,000Rp 40,500Rp
100,000Rp 20,200Rp
5,400,513Rp
1,983,000Rp 495,750Rp
17,500Rp 52,500Rp
2,900Rp 3,480Rp
12,600Rp 2,520,000Rp
21,000Rp 63,000Rp1,250Rp 403,750Rp
148,000Rp 76,960Rp
277,000Rp 216,060Rp
3,162,500Rp 332,063Rp
125,000Rp 312,500Rp
20,000Rp 280,000Rp
50,000Rp 280,000Rp
75,000Rp 26,250Rp
75,000Rp 172,500Rp
75,000Rp 105,000Rp
100,000Rp 40,500Rp
100,000Rp 20,200Rp
5,400,513Rp
1,983,000Rp 634,560Rp
17,500Rp 56,000Rp
2,900Rp 4,640Rp
-
8/10/2019 Format RAB Bangunan Gedung
29/44
12,600Rp 2,646,000Rp
21,000Rp 63,000Rp
1,250Rp 420,000Rp
148,000Rp 79,920Rp
277,000Rp 224,370Rp
3,162,500Rp 442,750Rp
125,000Rp 350,000Rp20,000Rp 320,000Rp
50,000Rp 317,500Rp
75,000Rp 20,625Rp
75,000Rp 123,750Rp
75,000Rp 105,000Rp
100,000Rp 33,300Rp
100,000Rp 31,800Rp
5,873,215Rp
550Rp 38,500Rp
1,250Rp 12,100Rp
134,000Rp 6,030Rp
50,000Rp 15,000Rp
75,000Rp 7,500Rp
100,000Rp 1,000Rp
100,000Rp 1,500Rp
81,630Rp
550Rp 38,500Rp
1,250Rp 17,875Rp
134,000Rp 5,360Rp
50,000Rp 15,000Rp
75,000Rp 7,500Rp
100,000Rp 1,000Rp
100,000Rp 1,500Rp
86,735Rp
1,250Rp 6,480Rp
134,000Rp 3,484Rp
50,000Rp 10,000Rp
75,000Rp 11,250Rp
100,000Rp 1,500Rp
-
8/10/2019 Format RAB Bangunan Gedung
30/44
100,000Rp 1,000Rp
33,714Rp
1,250Rp 9,720Rp
134,000Rp 3,082Rp
50,000Rp 10,000Rp
75,000Rp 11,250Rp
100,000Rp 1,500Rp
100,000Rp 1,000Rp
36,552Rp
1,250Rp 4,063Rp
50,000Rp 7,500Rp
75,000Rp 7,500Rp
100,000Rp 1,000Rp
100,000Rp 800Rp
20,863Rp
45,500Rp 45,500Rp
1,250Rp 12,500Rp
134,000Rp 6,030Rp
13,500Rp 20,250Rp
50,000Rp 31,000Rp
75,000Rp 26,250Rp
100,000Rp 3,500Rp
100,000Rp 3,000Rp
148,030Rp
58,000Rp 58,000Rp
1,250Rp 12,250Rp
134,000Rp 6,030Rp
13,500Rp 17,550Rp
50,000Rp 31,000Rp
75,000Rp 26,250Rp
100,000Rp 3,500Rp
100,000Rp 3,000Rp
157,580Rp
-
8/10/2019 Format RAB Bangunan Gedung
31/44
45,500Rp 45,500Rp
1,250Rp 13,000Rp
134,000Rp 6,030Rp
13,500Rp 21,870Rp
50,000Rp 31,000Rp75,000Rp 26,250Rp
100,000Rp 3,500Rp
100,000Rp 3,000Rp
150,150Rp
45,500Rp 45,500Rp
1,250Rp 11,625Rp
134,000Rp 2,412Rp
13,500Rp 26,190Rp
50,000Rp 30,000Rp
75,000Rp 33,750Rp
100,000Rp 4,500Rp
100,000Rp 3,000Rp
156,977Rp
45,500Rp 45,500Rp
1,250Rp 12,500Rp
134,000Rp 6,030Rp13,500Rp 26,190Rp
50,000Rp 31,000Rp
75,000Rp 26,250Rp
100,000Rp 3,500Rp
100,000Rp 3,000Rp
153,970Rp
95,000Rp 95,000Rp
95,000Rp
50,000Rp 51,000Rp
17,500Rp 3,500Rp
50,000Rp 10,000Rp
75,000Rp 7,500Rp
-
8/10/2019 Format RAB Bangunan Gedung
32/44
100,000Rp 1,000Rp
100,000Rp 100Rp
73,100Rp
3,205,000Rp 35,255Rp
17,500Rp 875Rp
50,000Rp 5,000Rp
75,000Rp 15,000Rp
100,000Rp 2,000Rp
100,000Rp 500Rp
58,630Rp
32,000Rp 33,600Rp
33,600Rp
66,500Rp 24,206Rp
29,000Rp 3,190Rp
50,000Rp 5,000Rp
75,000Rp 3,750Rp
100,000Rp 500Rp
100,000Rp 500Rp
37,146Rp
7,000Rp 7,350Rp
17,500Rp 175Rp
50,000Rp 2,500Rp
75,000Rp 3,750Rp
100,000Rp 500Rp
100,000Rp 300Rp
14,575Rp
3,500,000Rp 3,850,000Rp
17,500Rp 21,875Rp
30,000Rp 30,000Rp
50,000Rp 300,000Rp
75,000Rp 1,500,000Rp
-
8/10/2019 Format RAB Bangunan Gedung
33/44
100,000Rp 200,000Rp
100,000Rp 30,000Rp
5,931,875Rp
400,000Rp 400,000Rp
400,000Rp
145,000Rp 159,500Rp
600Rp 1,200Rp
35,000Rp 2,100Rp
50,000Rp 2,150Rp
75,000Rp 3,225Rp
100,000Rp 430Rp
100,000Rp 210Rp
168,815Rp
3,500,000Rp 140,000Rp
82,800Rp 91,080Rp
30,000Rp 9,000Rp
50,000Rp 40,000Rp
75,000Rp 150,000Rp
100,000Rp 20,000Rp
100,000Rp 4,000Rp454,080Rp
3,205,000Rp 128,200Rp
30,000Rp 15,000Rp
50,000Rp 50,000Rp
75,000Rp 187,500Rp
100,000Rp 25,000Rp
100,000Rp 5,000Rp
410,700Rp
145,000Rp 638,000Rp
90,000Rp 405,000Rp
35,000Rp 9,450Rp
50,000Rp 4,250Rp
75,000Rp 6,375Rp
-
8/10/2019 Format RAB Bangunan Gedung
34/44
100,000Rp 800Rp
100,000Rp 400Rp
1,064,275Rp
3,205,000Rp 76,920Rp
82,800Rp 91,080Rp30,000Rp 9,000Rp
50,000Rp 40,000Rp
75,000Rp 150,000Rp
100,000Rp 20,000Rp
100,000Rp 4,000Rp
391,000Rp
145,000Rp 1,232,500Rp
90,000Rp 405,000Rp
35,000Rp 18,900Rp
50,000Rp 5,000Rp
75,000Rp 7,500Rp
100,000Rp 1,000Rp
100,000Rp 800Rp
1,670,700Rp
109,000Rp 109,000Rp
50,000Rp 500Rp
75,000Rp 37,500Rp
100,000Rp 1,000Rp
100,000Rp 500Rp
148,500Rp
1,000,000Rp 1,000,000Rp
50,000Rp 3,000Rp
75,000Rp 45,000Rp
100,000Rp 6,000Rp
100,000Rp 300Rp
1,054,300Rp
30,000Rp 30,000Rp
-
8/10/2019 Format RAB Bangunan Gedung
35/44
50,000Rp 250Rp
75,000Rp 37,500Rp
100,000Rp 500Rp
100,000Rp 250Rp
68,500Rp
35,500Rp 35,500Rp
50,000Rp 750Rp
75,000Rp 11,250Rp
100,000Rp 1,500Rp
100,000Rp 75Rp
49,075Rp
26,000Rp 26,000Rp
50,000Rp 750Rp
75,000Rp 11,250Rp
100,000Rp 1,500Rp
100,000Rp 75Rp
39,575Rp
14,400Rp 14,400Rp
50,000Rp 750Rp
75,000Rp 11,250Rp
100,000Rp 1,500Rp
100,000Rp 75Rp
27,975Rp
14,000Rp 14,000Rp
50,000Rp 750Rp
75,000Rp 11,250Rp
100,000Rp 1,500Rp
100,000Rp 75Rp
27,575Rp
5,000Rp 5,000Rp
-
8/10/2019 Format RAB Bangunan Gedung
36/44
50,000Rp 750Rp
75,000Rp 11,250Rp
100,000Rp 1,500Rp
100,000Rp 75Rp
18,575Rp
453,000Rp 453,000Rp
50,000Rp 165,000Rp
75,000Rp 82,500Rp
100,000Rp 100Rp
100,000Rp 16,000Rp
716,600Rp
26,000Rp 26,000Rp
2,000Rp 50Rp
50,000Rp 500Rp
75,000Rp 7,500Rp
100,000Rp 1,000Rp
100,000Rp 500Rp
35,550Rp
32,000Rp 32,000Rp2,000Rp 50Rp
50,000Rp 500Rp
75,000Rp 7,500Rp
100,000Rp 1,000Rp
100,000Rp 500Rp
41,550Rp
4,000,000Rp 4,000,000Rp
1,250Rp 7,500Rp
134,000Rp 1,340Rp
50,000Rp 105,000Rp
75,000Rp 56,250Rp
100,000Rp 7,000Rp
100,000Rp 11,000Rp
4,188,090Rp
-
8/10/2019 Format RAB Bangunan Gedung
37/44
250,000Rp 250,000Rp
50,000Rp 1,500Rp
75,000Rp 22,500Rp
100,000Rp 3,000Rp
100,000Rp 150Rp277,150Rp
20,000Rp 20,000Rp
50,000Rp 500Rp
75,000Rp 7,500Rp
100,000Rp 1,000Rp
100,000Rp 500Rp
29,500Rp
195,500Rp 195,500Rp
13,500Rp 81,000Rp
134,000Rp 1,340Rp
50,000Rp 60,000Rp
75,000Rp 108,750Rp
100,000Rp 15,000Rp
100,000Rp 10,000Rp
471,590Rp
3,500,000Rp 3,500,000Rp
3,500,000Rp
7,500Rp 900Rp
19,000Rp 3,420Rp
50,000Rp 1,400Rp
75,000Rp 3,150Rp
100,000Rp 420Rp
100,000Rp 250Rp
9,540Rp
7,500Rp 900Rp
19,000Rp 3,420Rp
-
8/10/2019 Format RAB Bangunan Gedung
38/44
50,000Rp 2,500Rp
75,000Rp 5,250Rp
100,000Rp 400Rp
100,000Rp 250Rp
12,720Rp
16,500Rp 3,300Rp
11,000Rp 1,650Rp
56,000Rp 14,560Rp
50,000Rp 3,500Rp
75,000Rp 675Rp
100,000Rp 600Rp
100,000Rp 250Rp
24,535Rp
1,000,000Rp 1,000,000Rp
1,000,000Rp
-
8/10/2019 Format RAB Bangunan Gedung
39/44
DEPARTEMEN DIKLAT PROFESI DAN KEILMUAN
HIMPUNAN MAHASISWA SIPIL FT-UH
PEKERJAAN
LOKASI
TAHUN ANGGARAN
NO SATUAN VOLUME
A. PEKERJAAN PERSIAPAN DAN TANAH
1. Pembersihan lahan dan bowplank Ls
2. Pekerjaan galian tanah m
3. Pekerjaan urugan tanah kembali sisi pondasi m
4. Pekerjaan urugan tanah peninggian lantai m
5. Pekerjaan urugan pasir di bawah pondasi m
6. Pekerjaan urugan pasir di bawah lantai m
B. PEKERJAAN PONDASI
1. Pekerjaan batu kosong (aanstamping) m
2. Pekerjaan pondasi batu kali 1:4 m
C. PEKERJAAN BETON
1. Pekerjaan sloof beton 20/30 m
2. Pekerjaan kolom beton 30/30 m
3. Pekerjaan kolom beton 15/15 m
4. Pekerjaan balok beton 20/40 m
5. Pekerjaaan plat beton tebal 12 cm m
6. Pekerjaan tangga beton m
7. Pekerjaan ringbalk beton 20/20 m
8. Pekerjaan meja dapur beton tebal 12 cm m
D. PEKERJAAN PASANGAN DINDING
1. Pasangan dinding 1/2 bata 1:5 m
4. Pasangan dinding 1/2 bata 1:3 m
3. Plesteran dan aci 1:5 m
4. Plesteran dan aci 1:3 m
E. PEKERJAAN PENUTUP LANTAI DAN DINDING
1. Pasangan lantai keramik 40/40 m
3. Pasangan lantai keramik 20/20 untuk KM/WC m
4. Pasangan dinding keramik 20/20 m
5. Pasangan tegel plin 10/30 m
F. PEKERJAAN ATAP
RENCANA ANGGARAN BIAYA
URAIAN PEKERJAAN
: PEMBANGUNAN RUMAH TYPE 110/200
: PERUMAHAN DOSEN TAMALANREA
: 2014
-
8/10/2019 Format RAB Bangunan Gedung
40/44
-
8/10/2019 Format RAB Bangunan Gedung
41/44
K. PEKERJAAN INSTALASI LISTRIK
L PEKERJAAN PENGECATAN
1. Pengecatan dinding dengan cat tembok m
2. Pengecatan plafon dengan cat tembok m
3. Pengecatan kusen dengan cat kayu m
4. Pengecatan daun pintu dengan cat kayu m
5. Pengecatan daun jendela dengan cat kayu m
M PEKERJAAN PEMBERSIHAN
1. Pembersihan lahan setelah pekerjaan Ls
TERBILANG
-
8/10/2019 Format RAB Bangunan Gedung
42/44
HARGA SATUAN JUMLAH HARGA
1,000,000.00Rp -Rp
49,500.00Rp -Rp
16,500.00Rp -Rp
16,500.00Rp -Rp
169,600.00Rp -Rp
169,600.00Rp -Rp
Subtotal I -Rp
485,946.00Rp -Rp
704,080.00Rp -Rp
Subtotal II -Rp
4,591,165.00Rp -Rp
7,698,640.00Rp -Rp
7,698,640.00Rp -Rp
5,873,215.00Rp -Rp
5,400,512.50Rp -Rp
5,400,512.50Rp -Rp
5,873,215.00Rp -Rp
5,400,512.50Rp -Rp
Subtotal III -Rp
81,630.00Rp -Rp
86,735.00Rp -Rp
54,576.50Rp -Rp
57,414.50Rp -RpSubtotal IV -Rp
148,863Rp -Rp
150,150Rp -Rp
156,977Rp -Rp
153,970Rp -Rp
Subtotal V -Rp
-
8/10/2019 Format RAB Bangunan Gedung
43/44
-
8/10/2019 Format RAB Bangunan Gedung
44/44
Subtotal X -Rp
-Rp
-Rp
-Rp
-Rp
-Rp-Rp
-Rp
-Rp
-Rp
Subtotal XI -Rp
9,540.00Rp -Rp
12,720.00Rp -Rp
24,535.00Rp -Rp
24,535.00Rp -Rp
24,535.00Rp -Rp
Subtotal XII -Rp
1,000,000.00Rp -Rp
Subtotal XIII -Rp
Total I s.d. XIII -Rp