Group Technology
Batch manufacturing is estimated to be the mostcommon form of production in the United States,
constituting more than 50% of total manufacturing
actiity!
There is a gro"ing need to ma#e batchmanufacturing more efficient and productie!$n addition, there is an increasing trend to"ard
achieing a higher leel of integration bet"een the
design and manufacturing functions in a firm!n approach directed at both of these ob&ecties
is group technology 'GT(!
3
-
8/20/2019 Grupne Tehnoilogije
4/72
Group Technology
Group technology is a manufacturing philosophyin "hich similar parts are identified and grouped
together to ta#e adantage of their similarities in
design and production!
Similar parts are arranged into part families , "hereeach part family possesses similar design and/or
manufacturing characteristics!)or e*ample, a plant producing +0,000 different
part numbers may be able to group the ast
ma&ority of these parts into 0-.0 distinct families!
4
-
8/20/2019 Grupne Tehnoilogije
5/72
Group Technology
The manufacturing efficiencies are generallyachieed by arranging the production euipment into
machine groups or cells, to facilitate "or# flo"!Grouping the production euipment into machine
cells, "here each cell specialies in the production ofa part family, is called cellular manufacturing.
5
-
8/20/2019 Grupne Tehnoilogije
6/72
Group Technology
GT is most appropriately applied under thefollowing conditions:
The plant currently uses traditional batchproduction and a process type layout andthis results in much material handling eort,high in-process inentory, and longmanufacturing lead times!
The parts can be grouped into partfamilies. This is a necessary condition! "ach
machine cell is designed to produce a gien partfamily or limited collection of part families, so itmust e possile to group parts made in theplant into families!
6
-
8/20/2019 Grupne Tehnoilogije
7/72
Group Technology
There are two ma$or tas%s that a companymust underta%e when it implements grouptechnology! These two tas%s representsigni&cant ostacles to the application of GT!
Identifying the part families.
'f the plant
ma%es 1(,((( dierent parts, reiewing all ofthe part drawings and grouping the parts intofamilies is a sustantial tas% that consumes asigni&cant amount of time!
Rearranging production machines into
machine cells.
't is time consuming andcostly to plan and accomplish thisrearrangement and the machines are notproducing during the changeoer!
7
-
8/20/2019 Grupne Tehnoilogije
8/72
Group Technology - )art *amilies
Group technology oers sustantial ene&ts tocompanies that hae the perseerance toimplement it! The ene&ts include:
GT promotes standardi+ation of tooling,&turing and setups!
aterial handling is reduced ecause parts aremoed within a machine cell rather than withinthe entire factory!
)rocess planning and production scheduling aresimpli&ed!
.etup times are reduced, resulting in lower
manufacturing lead times!/or%-in-process is reduced!/or%er satisfaction usually improes when
wor%ers collaorate in a GT cell!0igher uality wor% is accomplished using
group technology! 8
-
8/20/2019 Grupne Tehnoilogije
9/72
Group Technology - )art *amilies
)art *amilies2 part family is a collection of parts that are
similar either ecause of geometric shape andsi+e or ecause similar processing steps arereuired in their manufacturing!
2 group of parts that possess similarities in
geometric shape and si+e, or in the processingsteps used in their manufacture
)art families are a central feature of grouptechnology
There are always dierences among parts in afamily
ut the similarities are close enough that theparts can e grouped into the same family
9
-
8/20/2019 Grupne Tehnoilogije
10/72
Group Technology - )art*amiliesT"o parts that are identical in shape and sie but
uite different in manufacturing1'a(+,000,000 units/yr, tolerance 2 30!0+0 inch, +0+5
C4 steel, nic#el plate 'C4 2 Cold 4olled (
'b(+00/yr, tolerance 2 30!00+ inch, +- stainless
steel
10
-
8/20/2019 Grupne Tehnoilogije
11/72
Group Technology - )art*amilies Ten parts that are dierent in si+e and shape, ut
uite similar in terms of manufacturing
2ll parts are machined from cylindrical stoc% yturning4 some parts reuire drilling and5or milling
11
-
8/20/2019 Grupne Tehnoilogije
12/72
Group Technology - )art *amilies
The biggest single obstacle in changing oer to
group technology from a conentional productionshop is the problem of grouping the parts into
families!There are three general methods for soling this
problem, "hich inole the analysis of much data
by properly trained personnel!
12
-
8/20/2019 Grupne Tehnoilogije
13/72
Group Technology - )art*amilies
+( 6isual inspection - using best &udgment to group partsinto appropriate families, based on the parts or photos of the
parts7( 8roduction flo" analysis - using information contained
on route sheets to classify parts
( 8arts classification and coding - identifying similarities
and differences among parts and relating them by means of
a coding scheme
13
-
8/20/2019 Grupne Tehnoilogije
14/72
Group Technology
+( The visual inspection method is the leastsophisticated and least e*pensie method! $tinoles the classification of parts into families
by loo#ing at either the physical parts or their
photographs and arranging them into groupshaing similar features!
lthough this method is generally considered to be the least accurate of the three, one of the first
ma&or success stories of GT in the United Statesmade the changeoer using the isual inspectionmethod!
14
-
8/20/2019 Grupne Tehnoilogije
15/72
Group Technology
15
-
8/20/2019 Grupne Tehnoilogije
16/72
Group Technology
2) Production flow analysis18arts that go through common operations are grouped
into part families!
The machines used to perform these common
operations may be grouped as a cell, conseuently this
techniue can be used in facility layout 'factory layout(
16
-
8/20/2019 Grupne Tehnoilogije
17/72
Group Technology
'nitially, a machine6component chartmust e formed! This is an 7 matri,where
numer of machines
7 numer of parts* 2 + if part & has an operation on machine i9 0
other"ise!
'f the machine6component chart is small,parts with similar operations might egrouped together y
manually sorting the rows and columns!
17
-
8/20/2019 Grupne Tehnoilogije
18/72
18
-
8/20/2019 Grupne Tehnoilogije
19/72
-
8/20/2019 Grupne Tehnoilogije
20/72
Parts Classication and Coding
3) Parts Classication and Coding
This is the most time consuming of thethree methods! 'n parts classi&cationand coding,
similarities among partsare identi&ed, and these similarities are
related in a coding system!
20
-
8/20/2019 Grupne Tehnoilogije
21/72
Parts Classication andCodingost classi&cation and coding systems are one of the
following:.ystems ased on part design attriutes
.ystems ased on part manufacturing attriutes
.ystems ased on oth design and manufacturingattriutes
Part esign !ttributesa$or dimensions
asic eternal shape
asic internal shape
Length5diameter ratio
aterial type
)art function
Tolerances
.urface &nish
21
-
8/20/2019 Grupne Tehnoilogije
22/72
Parts Classication andCodingPart "anufacturing !ttributesa$or process
9peration seuence
atch si+e2nnual production
achine tools
utting toolsaterial type
22
-
8/20/2019 Grupne Tehnoilogije
23/72
Parts Classication and Coding
Classification and coding systems are deised toinclude both a part:s design attributes and itsmanufacturing attributes! 4easons for using acoding scheme include1
;esign retrieal designer faced "ith the tas# ofdeeloping a ne" part can use a design retriealsystem to determine if a similar part alreadye*ists! simple change in an e*isting part "ouldta#e much less time than designing a "hole ne"
part from scratch!
23
-
8/20/2019 Grupne Tehnoilogije
24/72
Parts Classication and Coding
utomated process planning The part code for a ne" part
can be used to search for process plans for e*isting parts
"ith identical or similar codes!
-
8/20/2019 Grupne Tehnoilogije
25/72
Parts Classication and Coding
Coding methods1These are employed in classifying parts into part
families!
Coding refers to the process of assigning symbols to
the parts!The symbols represent design attributes of parts or
manufacturing features of part families!
25
-
8/20/2019 Grupne Tehnoilogije
26/72
Parts Classication and Coding
The ariations in codes resulting from theway the symols are assigned can egrouped into three distinct type of codes:
"onocode or hierarchical
codePolycode or attribute
#ybrid or mi$ed code
26
-
8/20/2019 Grupne Tehnoilogije
27/72
-
8/20/2019 Grupne Tehnoilogije
28/72
28
-
8/20/2019 Grupne Tehnoilogije
29/72
29
-
8/20/2019 Grupne Tehnoilogije
30/72
"onocode or hierarchical code
Structure of Monocode 30
-
8/20/2019 Grupne Tehnoilogije
31/72
"onocode or hierarchical code
A monocode 'hierarchical code( proides a largeamount of information in a relatiely small number ofdigits!
Useful for storage and retrieal of design related
information such as part geometry, material, size,etc!
$t is difficult to capture information on manufacturingseuences in hierarchical manner , so applicability ofthis code in manufacturing is rather limited!
31
-
8/20/2019 Grupne Tehnoilogije
32/72
Poly CodeChain-type structure, #no"n as a polycode, in "hich
the interpretation of each symbol in the seuence isal"ays the same9 it does not depend on the alue of
preceding symbols, so symbols are independent of
each other!
=ach digit in specific location of the code describes auniue property of the "or#piece!
$t is easy to learn and useful in manufacturing
situations "here the manufacturing process hae to
be described!
The length of a 8olycode may become e*cessie
because of its unlimited combinational features!
32
-
8/20/2019 Grupne Tehnoilogije
33/72
Poly Code
33
-
8/20/2019 Grupne Tehnoilogije
34/72
Group Technology
-
8/20/2019 Grupne Tehnoilogije
35/72
%ome of the importantsystems?pit classification system @the Uniersity of
achen in Germany, nonproprietary, Chain type!
Brisch System @'Brisch-Birn $nc!(
C?;= '
-
8/20/2019 Grupne Tehnoilogije
36/72
Group Technology
The P!T" classification system#
$t is a mi$ed 'hybrid( coding system
;eeloped by pitz, Technical Uniersity of achen,
+EF0
$t is "idely used in industry
$t proides a basic frame"or# for understanding the
classification and coding process
$t can be applied to machined parts, non-machined
parts 'both formed and cast( and purchased parts
$t considers both design and manufacturing
information
38
-
8/20/2019 Grupne Tehnoilogije
37/72
Group Technology
The &pit' coding system consists of three groups of
digits(
Form Supplementary Secondary
code code code
12345 6789 ABCD
part geometry
and feature
rele!ant to part
de"gn
"nformat"on
rele!ant to
manufactur"ng
#polycode$
%roduct"on
procee and
product"on
e&uence
39
-
8/20/2019 Grupne Tehnoilogije
38/72
40
-
8/20/2019 Grupne Tehnoilogije
39/72
9pit+ .ystem
41
-
8/20/2019 Grupne Tehnoilogije
40/72
42
*orm code in 9pit s stem for rotational parts in
-
8/20/2019 Grupne Tehnoilogije
41/72
*orm code in 9pit+ system for rotational parts inclasses 3, and ;
43
-
8/20/2019 Grupne Tehnoilogije
42/72
.upplemental code in 9pit+ system
44
-
8/20/2019 Grupne Tehnoilogije
43/72
The &PIT classicationsystemExample: A part coded 20801< - )arts has L5= ratio > 3
( - 7o shape element ?eternal shapeelements@
8 - 9perating thread( - 7o surface machining
1 - )art is aial
45
-
8/20/2019 Grupne Tehnoilogije
44/72
The &PIT classication systemExample
46
-
8/20/2019 Grupne Tehnoilogije
45/72
The &PIT classicationsystem=*ample1 Gien the part design sho"n define the
form code using the ?pit system
Step +1 The total length of the part is +!F5, oerall
diameter +!75, A/; 2 +!. 'code +(
Step 71 =*ternal shape - a rotational part that isstepped on both "ith one thread 'code 5(
Step 1 $nternal shape - a through hole 'code +(
Step .1 By e*amining the dra"ing of the part 'code 0(
Step 51 o au*iliary holes and gear teeth 'code 0(
Code# %&%''
47
-
8/20/2019 Grupne Tehnoilogije
46/72
Group Technology
S=A=CT$? ?) CASS$)$CT$? ; C?;$G SST=
-
8/20/2019 Grupne Tehnoilogije
47/72
C*++,+!R "!,!CT,RIG
Cellular manufacturing is an application of grouptechnology in manufacturing, in "hich all or a
portion of a firmHs manufacturing system has been
conerted into cells!
49
-
8/20/2019 Grupne Tehnoilogije
48/72
-
8/20/2019 Grupne Tehnoilogije
49/72
C*++,+!R "!,!CT,RIG
The primary ob&ecties in implementing acellular manufacturing system are to reduce1
Setup times 'by using part family tooling andseuencing(
)lo" times 'by reducing setup and moetimes and "ait time for moes and usingsmaller batch sies(
4educe inentories
-
8/20/2019 Grupne Tehnoilogije
50/72
C*++,+!R "!,!CT,RIG
*unctional and ellular layouts of an electronics plant:
52
-
8/20/2019 Grupne Tehnoilogije
51/72
C*++,+!R "!,!CT,RIG
53
-
8/20/2019 Grupne Tehnoilogije
52/72
Cell esign;esign of cellular manufacturing system is a comple*
e*ercise "ith broad implications for an organiation!
The cell design process inoles issues related to both
(ystem structure and (ystem operation.
54
-
8/20/2019 Grupne Tehnoilogije
53/72
*/aluation of Cell esign
ecisionsThe ealuation of design decisions can be categoried
as related to either
the system structure
or
the system operation!
55
-
8/20/2019 Grupne Tehnoilogije
54/72
Typical considerations related to the systemstructure include:
=uipment and tooling inestment 'lo"(
=uipment relocation cost 'lo"(
-
8/20/2019 Grupne Tehnoilogije
55/72
The system operation
=aluations of cell system design are incomplete
unless they relate to the operation of the system!
fe" typical performance ariables related to
system operation are1
=uipment utiliation 'high(
Ior#-in-process inentory 'lo"(
Jueue lengths at each "or#station 'short(
Kob throughput time 'short(Kob lateness 'lo"(
57
-
8/20/2019 Grupne Tehnoilogije
56/72
ell =esign
ma&or problem throughout the cell design process is the necessity of trading off against each
other ob&ecties related to structural parameters
and performance ariables!
)or e*ample, higher machine utiliation can be
achieed if seeral cells route their parts through
the same machine! The dra"bac#s are increased
ueuing and control problems!
58
-
8/20/2019 Grupne Tehnoilogije
57/72
ell =esign
System cost and performance are affected by eerydecision related to system structure and system
operation!
59
C*++ &R"!TI&
-
8/20/2019 Grupne Tehnoilogije
58/72
C*++ &R"!TI&!PPR&!C#*%
achine * Component +roup Analysis#
-
8/20/2019 Grupne Tehnoilogije
59/72
)roduction Aow analysis
Stage +1 achine classification!
-
8/20/2019 Grupne Tehnoilogije
60/72
)roduction Aow analysis
Stage 71 Checing parts list and productionroute information.
)or each part, information on the operations to be
underta#en and the machines reuired to performeach of these operations is chec#ed thoroughly!
62
-
8/20/2019 Grupne Tehnoilogije
61/72
)roduction Aow analysis
Stage 1 -actory flow analysis.
This inoles a micro-leel e*amination of flo" of
components through machines! This, in turn, allo"s
the problem to be decomposed into a number ofmachine-component groups!
63
) d ti A
-
8/20/2019 Grupne Tehnoilogije
62/72
)roduction Aow
analysis
Stage .1achine*component group analysis. n intuitie manual method is suggested to
manipulate the matri* to form cells! >o"eer, as the problem sie becomes large, the manual approach
does not "or#! Therefore, there is a need to deelopanalytical approaches to handle large problemssystematically!
64
"B2)L"
-
8/20/2019 Grupne Tehnoilogije
63/72
"B2)L":
onsider a prolem of ; machines and C parts!
Try to group them!
-
8/20/2019 Grupne Tehnoilogije
64/72
omponents
-
8/20/2019 Grupne Tehnoilogije
65/72
Duantitatie 2nalysis in ellularanufacturing
Ean% 9rder lustering 2lgorithm:Ean% 9rder lustering 2lgorithm is a
simple algorithm used to form machine-part groups!
67
Ean% 9rder lustering
-
8/20/2019 Grupne Tehnoilogije
66/72
Ean% 9rder lustering2lgorithm.tep 1: 2ssign inary weight and calculate a decimal weight for
each row and column using the following formulas:
∑
∑
−n
+2 p
m
+2 p
p-m
ip
72 &columnfor"eight;ecimal
7 b2i ro"for"eight;ecimal
pn
pjb
Where “i” is ro no!" “#” is co$umn num%er" m is num%er of
co$umns" n is num%er of ros" p is the component&p'rt ro or
co$umn num%er
68
-
8/20/2019 Grupne Tehnoilogije
67/72
.tep
-
8/20/2019 Grupne Tehnoilogije
68/72
"B2)L": onsider a prolem of F machines and 1(parts! Try to group them y using Ean% 9rderlustering 2lgorithm!
-
8/20/2019 Grupne Tehnoilogije
69/72
(in'r) ei*ht
-
8/20/2019 Grupne Tehnoilogije
70/72
Binary"eight
-
8/20/2019 Grupne Tehnoilogije
71/72
Binary"eight
-
8/20/2019 Grupne Tehnoilogije
72/72
g g Techniue