Download - Just In Time 관리
-
Just In Time
*Just In Time
(Just-In-Time) . JIT Taiichi Ohno Shigeo Shingo . Hall (1983): " " Schonberger (1983): "JIT : /, /, /, / "(JIT) 1/2
*Just In Time
(JIT) 2/2Japanese Management Association (1986): " , Heiko(1989): " (production lead time) JIT "
*Just In Time
JIT JIT 80 : JIT , , , , , , : . , Lot , ,
*Just In Time
JIT Lot
Pull Flexible worker
*Just In Time
*Just In Time
*Just In Time
PUSH Ex) MRP PULL Ex) JIT Kanban , ( ) : PULL : PULL PUSH/PULL Push and Pull System
*Just In Time
JIT
. () . (Pull system) . ().() . . . . . () .
*Just In Time
*Just In Time
-> . 1) . 2) 3) . (conveyance kanban) (production kanban)
*Just In Time
(Kanban System)JIT JIT , (Move Kanban) (Production Kanbans)
*Just In Time
*Just In Time
(kanban) . . . . . . .
*Just In Time
*Just In Time
(1)(2)(3)(4)(5)(6)(7)M1M2M2M3M1M2
*Just In Time
*Just In Time
() () . . . . . .
*Just In Time
MRP
MRP
lead time ()
*Just In Time
JIT 1/3 (focused factory) , , . (reduced setup time) EOQ .TPM (total productive maintenance)JIT TPM (preventive maintenance) . TPM .
*Just In Time
JIT 2/3 (multi-function employees) JIT . . (uniform workloads) . , . (Kanban system) "(pull)" .
*Just In Time
JIT 3/3JIT (JIT purchasing)JIT . TQC (total quality control)TQC . , . TQC . (quality circles) . , JIT .
*Just In Time
---------------------------------------------------------------- (pull): JIT JIT-(pull) (rate based) ----------------------------------------------------------------- (hybrid) (push)-(pull): JIT-MRP (pull) (pull) , MRP ---------------------------------------------------------------- (hybrid) (push)-(pull): MRP MRP (pull) , ----------------------------------------------------------------- (push): MRP
*Just In Time
. JIT . JIT . . JIT .JIT
*Just In Time
JIT
*Just In Time
JIT : JIT vs.
*Just In Time
THEND
Q/A