INSTALLATION G3V MAZDA BT-50 PRO D/CAB
1-4
1 23 4 65
DETAIL B 7
4
5
3
21 4 5
8
14
17 18
6
11
13
10 11
1 2 3
7 8
45
9
manual
............
12
15
109
ST. โช๊คห้ามดึง
.....................
7
16
Ball Strut
JP 8-1/2 EDP Screw
Clean the surface of the truck top edge . AB
B
Place the sponge seal the truck top edge.
A
Spare part carton
2.5m. Double Side Tape Bushing
Put the hardtop on top fo the sponge seal and align left and right
properly.
.
è
20
HOLESAW 20
DETAIL A
2-4
INSTALLATION G3V
E
4-5 NM.
F
+
-
Demister-switch
Fuse Relay
Housing
Room lamp
+
-
Dim/Brake
Defroster
Dim/BrakeWIRING DIAGRAM
Align and adjust with 2 steps rotarylock system.
CONNECT
Run the wiring kit and tie up with cable tie provided.G
Fuse
15A Demister
5A Roomlamp
Adjust the position of rear door latches both LH and RH by 13mm. spanner.
MAZDA BT-50 PRO D/CAB
3-4
INSTALLATION G3V
.
Demister Wiring Method
Remove the boot set both LH and RH.
Insert through the demister switch from the back to the front console and plug it back properly.
Run the wiring from the battery through the front bushing hole.
Front hole for wiring to go through
Battery
Remove the front console to install the demister switch.1 2
3
4
MAZDA BT-50 PRO D/CAB
INSTALLATION G3V
4-4
FF
DETAIL B
DETAIL F
3 cm.
DETAIL A
Put the gas strut sticker on as per detail A. Install the weatherstrip over the rain channel edge and put along from RH to LH as per detial B.
Remark : Cut the end of weatherstrip in angle as per showed arrows and apply the silicone this area.
FG
MAZDA BT-50 PRO D/CAB