Resource Allocation
Class 7: 3/9/11
-
5/28/2018 MBA8503C7
2/64
3.1 WHYNETWORKPLANNING?
Find the right balance between inventory,transportation and manufacturing costs,
Match supply and demand under uncertainty bypositioning and managing inventory effectively,
Utilize resources effectively by sourcing productsfrom the most appropriate manufacturing facility
-
5/28/2018 MBA8503C7
3/64
RESOURCEALLOCATION
In operations and supply chain management thereare several problems related to resource allocation:
Production mix: how many units of each product orservice should be produced given their profitability and
constraints on available resources and their usage foreach product
Network location and sourcing:
where to locate facilities, including manufacturing plants,distribution centers, and warehouses
Given a network of facilities, how to best service my customermix considering transportation and distribution costs (sourcingdecision)
-
5/28/2018 MBA8503C7
4/64
NETWORKSCHEDULINGEXAMPLE
Single product
Two plants p1 and p2
Plant p2 has an annual capacity of 60,000 units.
The two plants have the same productioncosts.
There are two warehouses w1 and w2 withidentical warehouse handling costs.
There are three markets areas c1,c2 and c3with demands of 50,000, 100,000 and50,000, respectively.
-
5/28/2018 MBA8503C7
5/64
UNITDISTRIBUTIONCOSTS
Facilitywarehouse
p1 p2 c1 c2 c3
w1 0 4 3 4 5
w2 5 2 2 1 2
-
5/28/2018 MBA8503C7
6/64
HEURISTIC#1:CHOOSETHECHEAPESTWAREHOUSETOSOURCEDEMAND
D = 50,000
D = 100,000
D = 50,000
Cap = 60,000
$5 x 140,000
$2 x 60,000
$2 x 50,000
$1 x 100,000
$2 x 50,000
Total Costs = $1,120,000
-
5/28/2018 MBA8503C7
7/64
HEURISTIC#2:CHOOSETHEWAREHOUSEWHERETHETOTALDELIVERY
COSTSTOANDFROMTHEWAREHOUSEARETHELOWEST[CONSIDERINBOUNDANDOUTBOUNDDISTRIBUTIONCOSTS]
D = 50,000
D = 100,000
D = 50,000
Cap = 60,000
$4
$5
$2
$3
$4$5
$2
$1
$2
$0
P1 to WH1 $3
P1 to WH2 $7P2 to WH1 $7P2 to WH 2 $4
P1 to WH1 $4P1 to WH2 $6P2 to WH1 $8P2 to WH 2 $3
P1 to WH1 $5P1 to WH2 $7P2 to WH1 $9P2 to WH 2 $4
Market #1 is served by WH1, Markets 2 and 3
are served by WH2
-
5/28/2018 MBA8503C7
8/64
D = 50,000
D = 100,000
D = 50,000
Cap = 60,000
Cap = 200,000
$5 x 90,000
$2 x 60,000
$3 x 50,000
$1 x 100,000
$2 x 50,000
$0 x 50,000
P1 to WH1 $3
P1 to WH2 $7P2 to WH1 $7P2 to WH 2 $4
P1 to WH1 $4P1 to WH2 $6P2 to WH1 $8P2 to WH 2 $3
P1 to WH1 $5P1 to WH2 $7P2 to WH1 $9P2 to WH 2 $4
Total Cost = $920,000
HEURISTIC#2:CHOOSETHEWAREHOUSEWHERETHETOTALDELIVERYCOSTSTOANDFROMTHEWAREHOUSEARETHELOWEST[CONSIDERINBOUNDANDOUTBOUNDDISTRIBUTIONCOSTS]
-
5/28/2018 MBA8503C7
9/64
OPTIMIZATIONAPPROACH
The problem described earlier can beframed as a linear programming problem.
A much better solution is foundtotal cost= $740,000!
How does optimization work?
-
5/28/2018 MBA8503C7
10/64
LINEAR PROGRAMMING
LP deals with the problem of allocating limitedresources among competing activities
For example, consider a company that makestables and chairs (competing activities) using alimited amount of large and small Legos
(limited resources).
-
5/28/2018 MBA8503C7
11/64
LINEAR PROGRAMMING
The objective of LP is to select the best oroptimal solution from the set of feasiblesolutions (those that satisfy all of therestrictions on the resources).
Suppose profit for each table is $20 whileprofit for each chair is $16.
We may choose to identify the number oftables and chairs to produce to maximizeprofit while not using more Legos than areavailable.
-
5/28/2018 MBA8503C7
12/64
COMPONENTS OF AN LP
Decision Variables: factors which are controlledby the decision maker.
x1 = the number of tables produced per day
x2 = the number of chairs produced per day
Objective function: profit, cost, time, or servicemust be optimized.
The objective may be to optimize profit.
-
5/28/2018 MBA8503C7
13/64
COMPONENTS OF AN LP
Constraints: restrictions which limit theavailability and manner with which resourcescan be used to achieve the objective
It takes 2 large and 2 small Legos to producea table and 1 large and 2 smalls to produce achair
We may only have 6 large and 8 small Legos
available each day
-
5/28/2018 MBA8503C7
14/64
ASSUMPTIONS
Linearity: Linear objective function and linearconstraints.
This implies proportionality and additivity.
For example, it takes 2 large Legos toproduce 1 table and 4 to produce 2 tables.
It takes 3 large Legos to produce 1 table and1 chair.
-
5/28/2018 MBA8503C7
15/64
ASSUMPTIONS
Divisibility: The decision variables can take onfractional values.
The optimal solution may tell us to produce2.5 tables each day.
Certainty: The parameters of the model areknown or can be accurately estimated.
For example, we assume that the profitabilityinformation is accurate.
-
5/28/2018 MBA8503C7
16/64
ASSUMPTIONS
Non-negativity: All decision variables must takeon positive or zero values.
-
5/28/2018 MBA8503C7
17/64
LEGO PRODUCTS, INC.
Lego Products, Inc. manufactures tables and
chairs.
Profit for each table is $20 while each chairgenerates $16 profit.
Each table is made by assembling two large andtwo small legos. Each chair requires one large
and two small legos.
Currently, Lego Products has six large and eight
small legos available each day.
-
5/28/2018 MBA8503C7
18/64
Table Chair
LEGO EXAMPLE: INTRODUCTION
Pictures of a table and a chair are shown below.
-
5/28/2018 MBA8503C7
19/64
How many tables and chairs should we produce
to maximize daily profit?producing 3 tables generates a daily profit of
$60,
producing 4 chairs generates a daily profit of$64, however,
producing 2 tables and 2 chairs generates theoptimal daily profit of $72.
LEGO EXAMPLE: OPTIMALSOLUTION
-
5/28/2018 MBA8503C7
20/64
USINGSOLVER
Solver in Excel can be used to obtain the solution andwill now be demonstrated
The problem formulation is:
MAX 20*X1+16*X2Subject to:
2*X1+1*X2
-
5/28/2018 MBA8503C7
21/64
Do we have any unused large or small legos for
all of the solutions that you just found?There are no unused large or small legos forthe optimal solution.
There are 2 unused small legos if 3 tables aremade.
There are 2 unused large legos if 4 chairs aremade.
LEGO EXAMPLE: UNUSEDLEGOS
-
5/28/2018 MBA8503C7
22/64
The difference between the available resources
and resources used is either slack or surplus.
Slack is associated with each less than or equal
to constraint, and represents the amount ofunused resource.
Surplus is associated with each greater than orequal to constraint, and represents theamount of excess resource above the statedlevel.
LEGO EXAMPLE: SLACKANDSURPLUS
-
5/28/2018 MBA8503C7
23/64
We have two slack values - one for large legosand one for small legos - and no surplusvalues.
The slack or surplus section shows that bothconstraints have zero slack.
Suppose we must produce at least one table(X1>=1). The original optimal solution is stillthe best. Since X1=2, we produce one surplustable.
LEGO EXAMPLE: SLACKANDSURPLUS
-
5/28/2018 MBA8503C7
24/64
RIGHTHANDSIDECHANGES
Now we are ready to illustrate the keyconcepts of sensitivity analysis.
How much would you be willing to spend for
one additional large Lego?One additional large Lego is worth $4.
Original solution: X1=2, X2=2, profit = $72;
New solution: X1=3, X2=1, profit = $76.You would be willing to spend up to $4 (76-72) for one additional large Lego.
-
5/28/2018 MBA8503C7
25/64
How much would you be willing to spend for twoadditional large Legos?
Two additional large Legos are worth $8.
Original solution: X1=2, X2=2, profit = $72;
New solution: X1=4, X2=0, profit = $80.
You would be willing to spend up to $8 (80-72)for two additional large Legos.
RIGHT HAND SIDE CHANGES
-
5/28/2018 MBA8503C7
26/64
How much would you be willing to spend for
three more large legos?
The third large lego is not worth anything sincethe optimal solution remains unchanged.
What happens if your supplier can only providefive large legos each day?
The optimal solution is: X1=1, X2=3, profit=68,so we lose $4.
RIGHT HAND SIDE CHANGES
-
5/28/2018 MBA8503C7
27/64
What happens if your supplier can only providefour large legos each day?
The optimal solution is: X1=0, X2=4, profit=64,so we lose another $4.
What happens if your supplier can only providethree large legos each day?
The optimal solution is: X1=0, X2=3, profit=48,so we lose an additional $16, and not $4.
RIGHT HAND SIDE CHANGES
-
5/28/2018 MBA8503C7
28/64
SHADOW PRICESThis last set of exercises enables us to determine
the shadow price for a resource constraint(large legos).
The shadow price, for a particular constraint, isthe amount the objective function value willincrease (decrease) if the right hand side valueof that constraint is increased (decreased) by
one unit.
We found that the shadow price for large legos is
$4.
-
5/28/2018 MBA8503C7
29/64
SHADOW PRICES
What is the shadow price of the small legos?
With two additional small legos the new solution:
X1=1, X2=4, profit = $84.
You would be willing to spend up to $12 (84-72) fortwo additional small legos, so the shadow price is $6(12/2).
-
5/28/2018 MBA8503C7
30/64
SHADOW PRICES
In general, the shadow prices are meaningful ifone right hand side (RHS) value of aconstraint is changed,
and all other parameters of the model remainunchanged.
-
5/28/2018 MBA8503C7
31/64
What happens if the profit of tables increases to$35?
The optimal solution is X1=3, X2=0, profit =
$105. Note that no chairs are being produced.
REDUCED COSTS
-
5/28/2018 MBA8503C7
32/64
REDUCED COSTSWhen a decision variable has an optimal value
of zero, the allowable increase for the objectivefunction coefficient is also called the reducedcost.
The reduced cost of a decision variable is theamount the corresponding objective functioncoefficient would have to change before the
optimal value would change from zero to somepositive value.
-
5/28/2018 MBA8503C7
33/64
REDUCED COSTSThe reduced cost for tables is zero in the
original formulation. Why is this the case?
We are already producing tables.
What is the reduced cost for X2 and what doesit mean?
The reduce cost is -1.5 meaning that if I forceproduction of 1 chair profit will drop by 1.5
-
5/28/2018 MBA8503C7
34/64
SENSITIVITY ANALYSIS PROBLEM
A manufacturing firm has discontinuedproduction of a certain unprofitable productline thus creating considerable excessproduction capacity.
Management is considering devoting this excesscapacity to one or more of three products; call
them products 1, 2, and 3.
The available capacity on the machines thatmight limit output is summarized below:
-
5/28/2018 MBA8503C7
35/64
AVAILABLE TIMEMACHINE TYPE (machine hours /week)
Milling machine 500
Lathe 350
Grinder 150
SENSITIVITY ANALYSIS PROBLEM
-
5/28/2018 MBA8503C7
36/64
The number of machine hours required for eachunit of the respective products is:
MACHINE TYPE P1 P2 P3
Milling machine 9 3 5
Lathe 5 4 0
Grinder 3 0 2
SENSITIVITY ANALYSIS PROBLEM
-
5/28/2018 MBA8503C7
37/64
The sales department indicates that the salespotential for products 1 and 2 exceeds themaximum production rate and that the sales
potential for product 3 is 20 units per week.
The unit profit would be $3000, $1200, and$900, respectively, for products 1, 2, and 3.
SENSITIVITY ANALYSIS PROBLEM
-
5/28/2018 MBA8503C7
38/64
Solver is used to determine the optimal solution
a. What are the optimal weekly productionlevels for each of the three products?
Product 1 = 45.23
Product 2 = 30.95
Product 3 = 0
SENSITIVITY ANALYSIS PROBLEM
-
5/28/2018 MBA8503C7
39/64
b. What profit will be obtained if the optimalsolution is implemented?
$172,857.10 per week
c. How much unused capacity exists on themilling machine, the lathe, and the grinder?
Milling = 0; Lathe = 0; Grinder =
14.28(See SLACK entries)
SENSITIVITY ANALYSIS PROBLEM
-
5/28/2018 MBA8503C7
40/64
d. How much would the objective functionchange if the amount of available time on thegrinder increased from 150 hours per week to250 hours?
Will the objective function increase ordecrease?
Currently the grinder has 14.28 hours of slacktime so its shadow price is 0.
Increasing the available hours from 150 to 250will not change the total profit.
SENSITIVITY ANALYSIS PROBLEM
-
5/28/2018 MBA8503C7
41/64
e. The profit for product 3 is $900 per unitand the current production level is zero.
How much would the profit per unit have to
change before it would be profitable toproduce product 3's?
The profit per unit would have to increase by
its reduced cost of $528.57.
SENSITIVITY ANALYSIS PROBLEM
-
5/28/2018 MBA8503C7
42/64
f. The milling machine capacity can be increasedat a cost of $160 per hour. Is it economic toincrease capacity by 10 hours?
The shadow price per hour (285.7143) is greater than
the cost (160), so it is worth increasing milling capacityon the margin. However, since the shadow price mightchange with increasing capacity we need to rerun to seethe full effect of increasing capacity by 10 hours. Profitdoes increase by 2857 (10*285.714) which is greater
than the cost increase of 1600 (10*160). Therefore themilling capacity should be increased b y 10 hours.
SENSITIVITY ANALYSIS PROBLEM
-
5/28/2018 MBA8503C7
43/64
TRANSPORTATION PROBLEM
Mathematical programming has beensuccessfully applied to important supply chainproblems.
These problems address the movement ofproducts across links of the supply chain(supplier, manufacturers, and customers).
We now focus on supply chain applications in
transportation and distribution planning.
-
5/28/2018 MBA8503C7
44/64
TRANSPORTATION PROBLEMA manufacturer ships TV sets from three warehouses to four retail
stores each week. Warehouse capacities (in hundreds) anddemand (in hundreds) at the retail stores are as follows:
Capacity Demand
Warehouse 1 200 Store 1 100Warehouse 2 150 Store 2 200
Warehouse 3 300 Store 3 125
650 Store 4 225
650
-
5/28/2018 MBA8503C7
45/64
The shipping cost per hundred TV sets for each route is
given below:
To
From Store 1 Store 2 Store 3 Store 4
warehouse 1 $10 5 12 3
warehouse 2 4 9 15 6
warehouse 3 15 8 6 11
TRANSPORTATION PROBLEM
-
5/28/2018 MBA8503C7
46/64
-
5/28/2018 MBA8503C7
47/64
What are the decision variables?
XIJ=number of TV sets (in cases) shippedfrom warehouse I to store J
I is the index for warehouses (1,2,3)
J is the index for stores (1,2,3,4)
TRANSPORTATION PROBLEM
-
5/28/2018 MBA8503C7
48/64
What is the objective?
Minimize the total cost of transportation which isobtained by multiplying the shipping cost by theamount of TV sets shipped over a given route
and then summing over all routes
OBJECTIVE FUNCTION ;
MIN = 10*X11+5*X12+12*X13+ 3*X14+
4* X21+9*X22+15*X23+ 6*X24+
15*X31+8*X32+ 6*X33+11*X34
TRANSPORTATION PROBLEM
-
5/28/2018 MBA8503C7
49/64
How are the supply constraints expressed?For each warehouse the amount of TV sets
shipped to all stores must equal the capacityat the warehouse
X11+X12+X13+X14=200; SUPPLYCONSTRAINT FOR WAREHOUSE 1
X21+X22+X23+X24=150; SUPPLY
CONSTRAINT FOR WAREHOUSE 2X31+X32+X33+X34=300; SUPPLY
CONSTRAINT FOR WAREHOUSE 3
TRANSPORTATION PROBLEM
-
5/28/2018 MBA8503C7
50/64
How are the demand constraints expressed?For each store the amount of TV sets shipped
from all warehouses must equal the demand ofthe store
X11+X21+X31=100; DEMAND CONSTRAINTFOR STORE 1
X12+X22+X32=200; DEMAND CONSTRAINTFOR STORE 2
X13+X23+X33=125; DEMAND CONSTRAINTFOR STORE 3
X14+X24+X34=225; DEMAND CONSTRAINTFOR STORE 4
TRANSPORTATION PROBLEM
-
5/28/2018 MBA8503C7
51/64
Since partial shipment cannot be made,the decision variables must be integervalued
However, if all supplies and demands areinteger-valued, the values of our decisionvariables will be integer valued
TRANSPORTATION PROBLEM
-
5/28/2018 MBA8503C7
52/64
After solution in Solver:
The total shipment cost is $3500, and theoptimal shipments are: warehouse 1 ships
25 cases to store 2 and 175 to store 4;warehouse 2 ships 100 to store 1 and 50 tostore 4, and warehouse 3 ships 175 to store2 and 125 to store 3.
The reduced cost of X11 is 9, so the cost ofshipping from warehouse 1 to store 1 wouldhave to be reduced by $9 before this route
would be used
TRANSPORTATION PROBLEM
-
5/28/2018 MBA8503C7
53/64
UNBALANCED PROBLEMS
Suppose warehouse 2 actually has 175 TV sets.
How should the original problem be modified?
Since total supply across all warehouses is nowgreater than total demand, all supply
constraints are now
-
5/28/2018 MBA8503C7
54/64
RESTRICTED ROUTE
Referring to the original problem, suppose there isa strike by the shipping company such that theroute from warehouse 3 to store 2 cannot beused.
How can the original problem be modified toaccount for this change?
Add the constraint:
X32=0
-
5/28/2018 MBA8503C7
55/64
WAREHOUSE LOCATIONSuppose that the warehouses are currently not open,
but are potential locations.
The fixed cost to construct warehouses and theircapacity values are given as:
WAREHOUSES FIXED COST CAPACITY
Warehouse 1 125,000 300
Warehouse 2 185,000 525Warehouse 3 100,000 325
-
5/28/2018 MBA8503C7
56/64
How do we model the fact that thewarehouses may or may not be open?
Define a set of binary decision variables YI, I
=1,2,3, where warehouse I is open if YI = 1and warehouse I is closed if YI= 0
WAREHOUSE LOCATION
-
5/28/2018 MBA8503C7
57/64
How must the objective function change?
Additional terms are added to the objectivefunction which multiply the fixed costs ofoperating the warehouse by YI and summingover all warehouses I:
125000*Y1+185000*Y2+100000*Y3
Why cant we use the current capacityconstraints?
Product cannot be shipped from a warehouseif it is not open. Since the capacity isavailable only if the warehouse is open, wemultiply warehouse 1s capacity by Y1.
WAREHOUSE LOCATION
-
5/28/2018 MBA8503C7
58/64
Also, we must make the YI variablesbinary integer
Total fixed and shipping costs are$289,100; warehouses 2 and 3 areopen; warehouse 2 ships 100 to store 1,225 to store 4; and warehouse 3 ships
200 to store 2 and 125 to store 4
WAREHOUSE LOCATION
-
5/28/2018 MBA8503C7
59/64
FINALLY, BACKTOTHEMOTIVATINGPROBLEM.. .
-
5/28/2018 MBA8503C7
60/64
NETWORKSCHEDULINGEXAMPLE
Single product
Two plants p1 and p2
Plant p2 has an annual capacity of 60,000 units.
The two plants have the same productioncosts.
There are two warehouses w1 and w2 withidentical warehouse handling costs.
There are three markets areas c1,c2 and c3with demands of 50,000, 100,000 and50,000, respectively.
-
5/28/2018 MBA8503C7
61/64
UNITDISTRIBUTIONCOSTS
Facilitywarehouse
p1 p2 c1 c2 c3
w1 0 4 3 4 5
w2 5 2 2 1 2
-
5/28/2018 MBA8503C7
62/64
D = 50,000
D = 100,000
D = 50,000
Cap = 60,000
THENETWORK
-
5/28/2018 MBA8503C7
63/64
THEOPTIMIZATIONMODEL
This problem can be framed as the following linearprogramming problem:
Let
x(p1,w1), x(p1,w2), x(p2,w1) and x(p2,w2) be theflows from the plants to the warehouses.
x(w1,c1), x(w1,c2), x(w1,c3) be the flows from thewarehouse w1 to customer zones c1, c2 and c3.
x(w2,c1), x(w2,c2), x(w2,c3) be the flows fromwarehouse w2 to customer zones c1, c2 and c3
-
5/28/2018 MBA8503C7
64/64
OPTIMALSOLUTION
Facilitywarehouse
p1 p2 c1 c2 c3
w1 140,000 0 50,000 40,000 50,000
w2 0 60,000 0 60,000 0
Total cost for the optimal strategy is$740,000