Download - PERSENTASI EXTERNAL SMK3
![Page 1: PERSENTASI EXTERNAL SMK3](https://reader036.vdocuments.pub/reader036/viewer/2022081417/5876c4b31a28ab6d5a8b5955/html5/thumbnails/1.jpg)
KERETA API RINGAN /LIGHT RAIL TRANSIT (LRT)
PALEMBANGSUMATERA SELATAN
SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3)
![Page 2: PERSENTASI EXTERNAL SMK3](https://reader036.vdocuments.pub/reader036/viewer/2022081417/5876c4b31a28ab6d5a8b5955/html5/thumbnails/2.jpg)
URAIAN RINGKAS PROYEK
Nama Proyek : LRT Sumsel Lokasi : Palembang, Sumatra Selatan
(Bandara Sultan Mahmud Badaruddin s/d Komplek Olahraga Jakabaring)
Pemilik Proyek : Kementerian Perhubungan Kontraktor Pelaksana : PT. Waskita Karya (Persero) Tbk. Waktu Pelaksanaan : 21 Oktober 2015 s/d 30 Juni 2018 Panjang Trase : 23 Km (Sta. 0+000 s/d 23+400)
(terbagi atas 5 zona) Jumlah Stasiun : 13 Stasiun & 9 Substasion Depo & Sarana : Kap. 14 Train set, Penggerak
Listrik Jembatan S. Musi : Bentang Sungai 350 m
![Page 3: PERSENTASI EXTERNAL SMK3](https://reader036.vdocuments.pub/reader036/viewer/2022081417/5876c4b31a28ab6d5a8b5955/html5/thumbnails/3.jpg)
DATA TEKNIS LRT PALEMBANGSUMSEL
No Deskripsi Keterangan1 Lebar Jalan Rel (Gauge) 1067 mm2 Exel Load 12 Ton3 Kecepatan Rencana 100 km/jam4 Kecepatan Max 85 km/jam5 Konstruksi Jalur Elevated (Slab Track)
Fasilitas Operasi6 Persinyalan Fixed Block With Cap Signal
(ETCS Level 1)7 System Electrical Third Rail System
750 VDC8 System Telekomunikasi Backbone Network System
SCADA/OCC
![Page 4: PERSENTASI EXTERNAL SMK3](https://reader036.vdocuments.pub/reader036/viewer/2022081417/5876c4b31a28ab6d5a8b5955/html5/thumbnails/4.jpg)
ZONA 1
ZONA 2ZONA 3
ZONA 4ZONA 5
Panjang Total = 23,40 Km
POSISI 13 STASIUN
TRASE
![Page 5: PERSENTASI EXTERNAL SMK3](https://reader036.vdocuments.pub/reader036/viewer/2022081417/5876c4b31a28ab6d5a8b5955/html5/thumbnails/5.jpg)
JUMLAH STASIUN
1. Sts. Bandara
2. Sts. Asrama Haji
3. Sts. Telkom
4. Sts. RSUD
5. Sts. POLDA
6. Sts. Demang
7. Sts. Palembang Icon
8. Sts. Dishub
9. Sts. Cinde
10. Sts. Ampera
11. Sts. Polresta
12. Sts. Jakabaring
13. Sts. OPI
![Page 6: PERSENTASI EXTERNAL SMK3](https://reader036.vdocuments.pub/reader036/viewer/2022081417/5876c4b31a28ab6d5a8b5955/html5/thumbnails/6.jpg)
6
STASIUN BANDARA L R T PALEMBANG
![Page 7: PERSENTASI EXTERNAL SMK3](https://reader036.vdocuments.pub/reader036/viewer/2022081417/5876c4b31a28ab6d5a8b5955/html5/thumbnails/7.jpg)
STASIUN BANDARA L R T PALEMBANG
![Page 8: PERSENTASI EXTERNAL SMK3](https://reader036.vdocuments.pub/reader036/viewer/2022081417/5876c4b31a28ab6d5a8b5955/html5/thumbnails/8.jpg)
STASIUN TYPICAL L R T PALEMBANG
![Page 9: PERSENTASI EXTERNAL SMK3](https://reader036.vdocuments.pub/reader036/viewer/2022081417/5876c4b31a28ab6d5a8b5955/html5/thumbnails/9.jpg)
STASIUN TYPICAL L R T PALEMBANG
![Page 10: PERSENTASI EXTERNAL SMK3](https://reader036.vdocuments.pub/reader036/viewer/2022081417/5876c4b31a28ab6d5a8b5955/html5/thumbnails/10.jpg)
10
7. Accident, Incident, NC & CAPA
AGENDA SMK3LIGHT RAIL TRANSIT (LRT) PALEMBANG PROJECT
8. Review on EMS & OHSMS of Legal & Other Requirements
END
1. Facilities
2. Organization
5. Objective, Program
3. HIRADC
4. Policy
10. Dokumentasi Aktivitas K3L
SCOPE SMK3 PLAN
Home9. Training , Awareness and Competencies
11. VIDEO
![Page 11: PERSENTASI EXTERNAL SMK3](https://reader036.vdocuments.pub/reader036/viewer/2022081417/5876c4b31a28ab6d5a8b5955/html5/thumbnails/11.jpg)