BASIC LOGISTIC
Danni Hidayat
22 March 2014
![Page 2: PRESENTASI DANNI - SRIWIJAYA](https://reader036.vdocuments.pub/reader036/viewer/2022081507/58800d681a28ab421b8b6441/html5/thumbnails/2.jpg)
“It’s easy to change the cash into inventory …… the challenge is to turn inventory back into Cash!”
- maximum efficiency -
Service
Turnover
“The Art of Leadership is going from Failure to Failure without Losing Enthusiasm”
![Page 3: PRESENTASI DANNI - SRIWIJAYA](https://reader036.vdocuments.pub/reader036/viewer/2022081507/58800d681a28ab421b8b6441/html5/thumbnails/3.jpg)
Warehouse Lay Out – Indoor type 1 door – Tarakan (capacities 3000 line item)
![Page 4: PRESENTASI DANNI - SRIWIJAYA](https://reader036.vdocuments.pub/reader036/viewer/2022081507/58800d681a28ab421b8b6441/html5/thumbnails/4.jpg)
Warehouse Lay Out – Indoor type 1 door– Samarinda Capacities 1500 line item
![Page 5: PRESENTASI DANNI - SRIWIJAYA](https://reader036.vdocuments.pub/reader036/viewer/2022081507/58800d681a28ab421b8b6441/html5/thumbnails/5.jpg)
Warehouse Lay Out – Container – Berau Capacities 300 line item
![Page 6: PRESENTASI DANNI - SRIWIJAYA](https://reader036.vdocuments.pub/reader036/viewer/2022081507/58800d681a28ab421b8b6441/html5/thumbnails/6.jpg)
STORAGE CALCULATION
tahunmgedungsewabeaxrDistributoamountStockareastorageLuas
//1)( 2
22 063.1
/200.1$1797.275.1$ m
mUSxUSareastorageLuas
Catatan :Misal harga sewa gudang = US$ 1.200 / m2
STORAGE AREA S/D 1000m2 1000 - 3000 m2 3000-… m2
- Small Storage 50% 40% 30%- Large Storage 30% 30% 30%- Floor Storage 15% 20% 25%- Outdoor Storage 5% 10% 15%
Jumlah 100% 100% 100%
Misalnya 1.063m2 maka yang dipakai:
• Small parts = 1.063 x 40% = 425 m2
• Large parts = 1.063 x 30% = 319 m2
• Floor partsArea = 1.063 x 20% = 213 m2
• Outdoor storage Area = 1.063 x 10% = 106 m2
TOTAL = 1.063 m2
![Page 7: PRESENTASI DANNI - SRIWIJAYA](https://reader036.vdocuments.pub/reader036/viewer/2022081507/58800d681a28ab421b8b6441/html5/thumbnails/7.jpg)
Storaging System
![Page 8: PRESENTASI DANNI - SRIWIJAYA](https://reader036.vdocuments.pub/reader036/viewer/2022081507/58800d681a28ab421b8b6441/html5/thumbnails/8.jpg)
Location System
New Standard :
A 1 A 1 0 M 2
Row 2Column 2Level / drawer MCabinet no. 10Aisle ALevel 1
LogicalAlphabetic first digit to cover more areasEasy to understand1 item 1 location (for drawers / bin)Support multilevel storage system
2
Area A
![Page 9: PRESENTASI DANNI - SRIWIJAYA](https://reader036.vdocuments.pub/reader036/viewer/2022081507/58800d681a28ab421b8b6441/html5/thumbnails/9.jpg)
I found and believe that “Logistic is about 2 things; space of warehouse and speed of replenishment/ supplying stock within planned distribution.”
![Page 10: PRESENTASI DANNI - SRIWIJAYA](https://reader036.vdocuments.pub/reader036/viewer/2022081507/58800d681a28ab421b8b6441/html5/thumbnails/10.jpg)
Distribution Control
![Page 11: PRESENTASI DANNI - SRIWIJAYA](https://reader036.vdocuments.pub/reader036/viewer/2022081507/58800d681a28ab421b8b6441/html5/thumbnails/11.jpg)
MRP’s Schedule Chart
SAMARINDA
Anggana
Melak
Kota Bangun
Port
ETD : ?ETA : ?
ETD : ?ETA : ?
ETD : ?ETA : ?
ETD : ?ETA : ?
ETD : ?ETA : ?
FactFactNow days, we don’t have any regular transport’s schedule and delivery time.ProposedProposed• Pick up consolidation• Last cut off transfer schedule
NTN
![Page 12: PRESENTASI DANNI - SRIWIJAYA](https://reader036.vdocuments.pub/reader036/viewer/2022081507/58800d681a28ab421b8b6441/html5/thumbnails/12.jpg)
Inventory Concept
![Page 13: PRESENTASI DANNI - SRIWIJAYA](https://reader036.vdocuments.pub/reader036/viewer/2022081507/58800d681a28ab421b8b6441/html5/thumbnails/13.jpg)
Rup 6,798,324,940.78 Rup 279,118,924.81jika
DEADSTOCK
Dampak finansial yang berkaitan langsung dengan Asset Dampak finansial yang berkaitan langsung dengan Asset InventoriInventori
Stok yang ada di Gudang = Rp 19,191,770,931.84
EXHAUSTED
Rp 12,393,445,991.06Rp 12,114,327,066.25
Tapi, permasalahan yang berdampak besar adalah “SURPLUS”, karena sebelumnya tidak ada kontrol minimum dan maksimum suatu stok di setiap site dan di gudang Rapak Dalam
Dan jika kita bisa mengontrol stok yang berlebih itu dan effisiensi? Rp 1,587,669,744.44Rp 1,587,669,744.44
PT. Mitra Riau Pratama ( Offline DATA – Not For PT. Mitra Riau Pratama ( Offline DATA – Not For Shared)Shared)
![Page 14: PRESENTASI DANNI - SRIWIJAYA](https://reader036.vdocuments.pub/reader036/viewer/2022081507/58800d681a28ab421b8b6441/html5/thumbnails/14.jpg)
Forecasting Taxonomyproper on end-user company/ such as fabricant, construction, exploration and or manufacturing company.
FORECASTING
CAUSAL
EXPONENTIALSMOOTHING
MOVINGAVERAGE
AVERAGE
SMOOTHING
REGRESSION
TIME SERIES
MODELQUALITATIVE
MODELQUALITATIVE
![Page 15: PRESENTASI DANNI - SRIWIJAYA](https://reader036.vdocuments.pub/reader036/viewer/2022081507/58800d681a28ab421b8b6441/html5/thumbnails/15.jpg)
Thank Youplease your advise