PASSAGE PLANNING
PROVIDENCE YORKTOWNBERTH TO BERTH
-
7/29/2019 Providenc Yorktown Doc.
2/9
F-IMS 10-11
Fleet Reg 8.6
Revision 03 Page 2 of 13
PASSAGE PLAN APPRAISAL
Have navigation charts been selected from chart catalogue, including: large scale charts far coastal waters appropriate scale charts far ocean passages planning charts routing, climatic, pilot and Ioad line zone chartsHave publications been selected, including: Sailing Directions and pilot books light lists
radio signals guides to port entry tide tables and tidal stream atlasHave all navigation charts and publications been corrected up to date, including: the ordering of new charts/publications, if necessary notices to mariners local area warnings NAVAREA navigational warningsHave the following been considered? ships departure and arrival draughts together with any restrictions on under keel clearance due to squat ships cargo and any special cargo stowage/carriage restrictions if there are any special ship operational requirements far the passage
-
7/29/2019 Providenc Yorktown Doc.
3/9
F-IMS 10-11
Fleet Reg 8.6
Revision 03 Page 3 of 13
Have the following been checked? planning charts and publications far advice and recommendations on route to be taken climatological information for weather characteristics of the area navigation charts and publications far landfall features navigation charts and publications far Ships Routeing Schemes, Ship Reporting Systems and Vessel Traffic Services (VTS)Has weather routeing been considered for passage? Have the following preparations been made for port arrival?
navigation charts and publications studied far pilotage requirements Ship-to-Shore Master/Pilot Exchange form prepared (see annex A1) Pilot Card updated (see annex A3) part guides studied far port information including arrival/berthing restrictionsOther checks
F-IMS 10-11 PASSAGE PLAN APPRAISALTOBEFILEDONBOARD
RETENTIONPERIOD: 12 MTHS
-
7/29/2019 Providenc Yorktown Doc.
4/9
F-IMS 10-11
Fleet Reg 8.6
Revision 03 Page 4 of 13
VOYAGE NR: 13/10
FROM : PROVIDENCE
DATE OF DEPARTURE 06.01.2011
DATE OF COMPILATION 06.01.2011
CARGO: GASOLINE
TO: YORKTOWNCOMPILERS NAME AND SIGNATURES:
COMPILER INFOS
RANK: 2/0 OFFICER NAME SUCIU STEFANITA
SIGNATURE
MASTER SIGNATURE
TOTAL MILES SEAPASSAGE: 379 Nm
TOTAL MILES FROM BERTH TO SEA : 28 Nm
TOTAL MILES FROM SEA TO BERTH: 28 Nm
MARPOL AREA: ATLANTIC OCEAN ,
LOAD LINE AREA: SUMMER ZONE
DRAUGHTS (METERS) TIDAL INFOS (IF RELEV. - IN MTRS) WEATHER FORECAST VHF CHANNEL
DEPT. MAX: 08.45 SW
TRANSIT MAX: 08.45 SW
ARRIVAL MAX: 08.45 SW
FWA: 294mm
SQUAT (10KTS,CONFINED) 1.55m
UKC MIN. NAVIG 02.83 m
UKC MIN. PORT: 0.91m
AIR DRAFT: 40.74m/G.A.C.=2.11
DEPARTUREPROVIDENCE
ARRIVAL PORTYORKTOWN
PROVIDENCE YORKTOWN DEPT. PORT ARRIVAL. PORT
TIME HL / LL TIME HL / LLTIME:
STATION:
WIND DIR.:
WIND FOR.:
SEA/SWELL:
VISIBILITY:
NOTES:
See
Weather
Forecast
See
Weather
Forecast
See
Weather
Forecast
PILOTS 16,14,12.
TUGS:
PORT CONTROL:16,
BERTH:
OTHERS: VTS 13.16
PILOTS: 16,.13,12
TUGS:
PORT CONTROL:,
BERTH:
OTHERS: : VTS 16
NIL
NIL
NIL
NIL
NIL
NIL
CHARTS SEQUENCE: 2731,2730,2890,2860,2861,2919.
CONTINGENCY PLAN :YORKTOWN :
ABORT POINT : Lat:3656'.5N Long: 07556'.3WCONTINGENCY ANCHORAGE: Lat:3649'.1N Long:07544'.1W
CONSULTED PUBBLICATIONS
ADMIRALTY SAILING DIRECTIONS:,68,69.ADMIRALTY TIDE TABLESVOL,1, 2 ADMIRALTY LIST OF RADIO SIGNALS 286(5), ADMIRALITY TIDAL STREAMATLAS 250,251,233. ADMIRALTY LIST OF LIGHTS VOL.81,82. PORTOLANI
FARI E FANALI TAVOLE DI MAREA THE MARINERS HANDBOOK ADMIRALTY DISTANCE TABLES
CHART NR. 5500 BROWNS NAUTICAL ALMANAC GUIDE TO PORT ENTRY
CHART & PUBLICATION CORRECTED
UP NTM ____01/11
OTHER:
-
7/29/2019 Providenc Yorktown Doc.
5/9
F-IMS 10-11
Fleet Reg 8.6
Revision 03 Page 5 of 13
Signature
Chief Officer:
Signature
Third Officer:
Signature
Chief Officer Sovran: N/A
PASSAGE NOTES :
DEPARTURE FROM PROVIDENCE, Rhode Is: 41_48' N 071_23' WAlso see General before first port
OVERVIEW: Multi-product port handling cement, chemicals, petroleumproducts, aggregate, coal, pearlite, salt, timber, scrap metal and steelproducts.
LOCATION: On the Atlantic east coast shoreline 150 miles from NewYork,50 miles from Boston and 200 miles within major city and ports of EasternCanada.
.ISPS COMPLIANCE: Port is compliant.PFSO: USCG Captain of the Port, 20 Risho Avenue, Providence, RI 02914.Tel: +1 (401) 435 2300.
MAX. SIZE: Pilot advised depth 40 ft. (MLW), draft 38 ft. However, Agentrecommends 38 ft. with 2 ft. under-keel clearance.
DENSITY: 1016.
RESTRICTIONS: Vessels can enter and leave at any stage of the tide,day or night.
APPROACHES: The 7 n.m. port approach channel in the ProvidenceRiver has dredged depth 40 ft. (MLW) and width 600 ft.
PILOTAGE: Compulsory. Pilot boards 1 n.m. south of Brenton Reef LightTower (position Lat. 41_25' N, Long. 71_23' W). Send ETA to Agent 24 hours
prior to arrival. Pilots (call sign Rhode Island Pilots) on VHF Channels 16,12 and 18A.
ANCHORAGES: There is no port anchorage for dry cargo vessels. It wasreported that tankers can discharge into barges off Newport.
PRATIQUE: See General Pratique before first USA port.
VHF: Port Authority listens on Channel 16 and works on Channel 18A.Agent listens on Channel 16 and works on Channels 18A, 13 and 9.Also see Pilotage.TUGS: Nine tugs available, 1,600 3,200 h.p. Vessels may dock andundock without tugs, however, they are required for turning in the harbour.
Providence Steamboat Company serving ports of Providence,Narragansett Bay, Fall River and New England Electric at Brayton Point. Fourtugs, 24-hour
dispatching service. 2_3,000 h.p. tugs.
BERTHS: Quay: Granite slab construction with a wooden pile facing.A large number of the piles are missing but there are still sufficient to landon. Surface of
quay looks rough and covered in sand and earth but it ismetalled under this and will take heavy mobile crawler cranes.
* Breasted 15 ft. off the quay wall at MLW.
Distance from entrance to berth 25 miles. Length and beam no limit. Max.draft 38 ft. Least depth of water in channel from sea to berth reported to be
-
7/29/2019 Providenc Yorktown Doc.
6/9
F-IMS 10-11
Fleet Reg 8.6
Revision 03 Page 6 of 13
40 ft. Mean tidal range at berth 4.5 ft. General: The Wilkes Barre Terminal of the American Chemical Company islocated 26 miles from the Sea Buoy on the
Providence River. This facilitywas formerly operated by Exxon Company USA. It is now operated by UnionOil Company of California and Getty Oil Co Inc. The
wharf has a 75 ft. face,300 ft. with dolphins; 30 ft. depth alongside. Deck height of 9 ft.The berth can accommodate vessels up to 600 ft. in length, 85 ft. beam,
maximum 25,000 d.w.t., and maximum drafts to 27 ft. Docking isaccomplished at HW or rising tide only. Undocking can take place at anystate of the tide.
Pilotage and Docking: The services of a Pilot and Docking Master arerecommended. The width in the existing berthing area and requiredapproachmanoeuvres make utilisation of the Docking Master mandatory. Two tugs areequired when docking vessels of any tonnage. A minimum of one tug
(1,800 h.p.) is required when undocking. During strong southerly winds twotugs should be employed for undocking.
Mooring: Normal mooring leads are adequate for this berth. However, strongsoutherly winds are cause for concern. There is a poor lead for the afterspring and
breast lines. During times of excessive southerly winds, all linesshould be tended and checked frequently. The terminal does not provide a
gangway.Only No. 2 heating oil is discharged at this terminal. Discharge isaccomplished through 2_8 in. hoses using ASA flange connections. Pumping
pressure is 125 p.s.i. The terminal has no facilities for receiving ballast orslopsAmoco, Providence, Kettle Pt:
General: The Amoco Wharf is on the east side of Providence River 26 milesfrom the Sea Buoy. This wharf is used for the receipt and shipment ofpetroleum
products. The berth is aligned north and south with a total of sixwooden breasting dolphins. The wharf has a 500 ft. face (600 ft. withdolphins). Hose rig and hoist
are located on a T-head 90 ft. long, 30 ft. wideat the centre of the pier.conditions. One tug is used for normal undocking. Both tugs and Docking
Master meet the vessel 0.5 miles below Kettle Point and assist vessels tothe berth.
Gasoline, heating oil, diesel, and No. 5 fuel are all discharged through 8 in.hoses. All connections are made with ASA flanges. Maximum pumping
pressure for all cargo lines is 90 p.
Tankers: LPG discharged at No. 5. Municipal wharf at a bulk rate of750 tonnes per hour, through a 10 in. chicksan. This chicksan is a mobileone
connectedtemporarily into an underground line, and jacked up off itswheels; thus it is rather fragile and demands precise positioning during
berthing, and careful control of the list during the discharge as it is at itsmaximum reach when a 60,000 cu.m. vessel is in ballast.
Density: Salt.
Fire Precautions: LPG Tanker, only those imposed by the ship.Surveyors: Saybolt attended this LPG vessel on behalf of receivers.
Gangway/Deck Watchmen: None. Ships accommodation ladder wasused to the wharf.Customs Allowances: Usual USA allowances but no check of
bond madeon this visit.Repatriation: Local airport with services to Philadelphia for internationalflights, or by bus approximately 1 hour ($7.00) to Boston
International.
Time: GMT minus 5 hours. Eastern Daylight Saving Time GMT minus4 hours in the summer.
Emergency: USCG Castle Hill on VHF Channel 16, working 22A or 12.Telephone: At Municipal Wharf No. 5 there is a public telephone booth
-
7/29/2019 Providenc Yorktown Doc.
7/9
F-IMS 10-11
Fleet Reg 8.6
Revision 03 Page 7 of 13
within 250 ft. of the foot of the gangway, against the wall of a warehouse.Storing: No known restrictions.Shore Leave: Bus route into town (2 miles) about
100 yards from WharfNo. 5.Identification Cards: Standard USA Immigration requirements.Regulations: All LNG/LPG Tankers have to anchor off
Brenton Tower for
USCG inspection (2 3 hours), even those with valid letters of complianceand if no LOC then the inspection could take about 6 7 hours. During the
discharge of LPG, two USCG personnel are permanently stationed by theshore manifold, and do occasional spot checks onboard.Delays: See above.SHIPMASTERS REPORT: October 1991..Operator: ProvPort, 35 Terminal Road, Providence, Rhode Island 02905,US
ARRIVAL AT YORKTOWN, Virginia: 37_14' N 076_30' W(See Plan)
Also see General before first port
OPERATORS REPORT: January 1981.
LOCATION: The Amoco Oil Terminal at Yorktown, Virginia is located about3 miles below the York River bridge on the south side of the riverapproximately 38 miles from the Chesapeake Bay Sea Buoy CB.
Co-ordinates of the terminal are Lat. 37_13' 37" N, Long. 75_26' 23" W.A 3,000 ft. finger pier ending with a marginal pier, reaches the deepwaterchannel in the
river. Tankers supply the refinery with crude and intermediatefeedstocks which are refined into gasolines, fuel oil, liquefied petroleum gas,coke, and liquid sulphur
which is distributed by barges and tankers.
MAX. SIZE: The pier has depths of 40 ft. along the outer face.
APPROACHES: Cautionary Advice: RDF stations at Chesapeake Lightand Cape Henry provide coverage for position fixing and numerous buoys
mark the fairways, channels and obstructions. While proceeding to the Pilot 3248 Readers are encouraged to send updates and additions (pagexi)
Station one should be aware of the heavy traffic in this area and the shipshould stay within the prescribed traffic lane. Careful consideration shouldbe given to the
current, which has a velocity of up to 3.0 knots and higherand which tends to set a vessel out of the channel.
PILOTAGE: Pilots board 1.5 miles NE of Cape Henry Light. Vessels shoulduse traffic lanes as outlined on Chart No. 12221 when approaching the pilotarea.
US flag should call the Chesapeake Federal pilot boat approximately 1 hourbefore arrival to arrange Pilot embarkation. Non-US flag vessels should call
the Virginia State pilot boat 1 hour before arrival.
ANCHORAGES: Anchorage and Lightering: Vessels requiring lighteringproceed to Hampton Roads where all lightering operations are conducted.
-
7/29/2019 Providenc Yorktown Doc.
8/9
F-IMS 10-11
Fleet Reg 8.6
Revision 03 Page 8 of 13
This channel is well marked and presents no difficulties. Upon completion oflightering, the vessel must return to Cape Henry before proceeding to the
berth. The bottom of Hampton Roads consists of soft mud and provides goodholding ground.
PRE-ARRIVAL INFORMATION: ETA messages should be sent to
Agent 72, 48 and 24 hours before arrival. Any change in ETA should alsobe advised, as the pilot vessel is not continually on station. Advise draft(brackish water)
in first message.VHF:
Pilots Channels 6, 11, 13, 16, 19A
Tugs Channels 9, 10, 12, 13, 16
U.S.C.G. Channel 16
Marine Operators Norfolk Channels 16, 22, 27
BERTHS: The Docking Master boards the vessel from a tug 1 2 mileseast of the Amoco Dock. Two tugs are generally used for docking; vessels
over 28,000 d.w.t. may require 3 tugs at the Docking Masters discretion. Thevessel makes a normal marginal approach to Dock No. 1 with the tugs
breasting the vessel alongside and holding it there until secured. Vesselsgenerally dock port side to at Berth No. 1. Berth No. 2 is of new construction
and is located 1,122 ft. to the West of Berth No. 1. When docking at BerthNo. 2, vessels approach Dock No. 1 on a southwesterly heading to initially
avoid a shoal area located NNW of Berth No. 2. When the vessel is within550 ft. of Berth No. 2, the approach is made parallel to the dock face untilthe vessel is off the dock when it is breasted into position port side to by thetugs. Extra caution must be exercised when approaching Dock No. 2 when
there is a ship at Dock No. 1. At Dock No. 2, difficulties will be experiencedin placing vessels gangway due to the extremely limited dock spaceamidships.
No. 2 Tanker Dock is equipped with 2_12 in. chicksan arms for crude or.No. 6 Oil discharge. Weather conditions are carefully monitored by terminal
personnel, and vessels are shut down when conditions warrant such action.
WASTE DISPOSAL: A dumpster is provided at the end of the dock.
SLOPS DISPOSAL: No service available.
FRESH WATER: Available.
FUEL: No fuel available at No. 2 Tanker Dock.
SEAMANS CLUBS: None.
AUTHORITY: Operator: Amoco Oil Company, Yorktown Refinery,2201 Goodwin Neck Road, Grafton, Virginia 23690-0578, USA.
Tel: +1 (804) 898 9700. FAX: +1 (804) 898 9636. Contact: Kirk Bell,
Supervisor (Email: [email protected]).
CONTINGENCY PLAN
-
7/29/2019 Providenc Yorktown Doc.
9/9
F-IMS 10-11
Fleet Reg 8.6
Revision 03 Page 9 of 13
01.BROKEN TOWING LINE:USE ENGINE / RUDDER TO STOP SWINGING;DROP ANCHOR IF IS NECESSARY / POSSIBLE;REPLACE THE TOWING LINE;
02.MAIN ENGINE FAILURE:USE TUG TO REACH CONTINGENCY ANCHORAGE;DROP ANCHOR;
03.GENERATOR FAILURE:
START EMERGENCY GENERATOR;STOP MAIN ENGINE;USE TUG TO REACH CONTINGENCY ANCHORAGEDROP ANCHOR
04.STEERINGGEAR FAILURE:STOP MAIN ENGINE;USE EMERGENCY STEERING GEAR;
IF IS NECESSARY USE TUG TO REACH CONTINGENCY ANCHORAGE;DROP ANCHOR
Signatures : OOW ______________________________________ Master ______________________________________