Download - RAB Kel I qmal
1. Type Rumah : RUMAH TINGGAL SEMENTARA TYPE 85/120 m²
Luas Bagunan : 85 m²
Luas Tanah : 120 m²2. Pondasi : Batu Gunung 1 : 43. Lantai : a. Ruangan : Keramik 40/40
b. Wc/Km : Keramik 20/20
c. Teras : Keramik 30/304. Dinding : Batu Bata merah pas. 1/2 Bata 1 : 55. Penutup atap : Genteng6. Beton : a. Sloof 1 : 2 : 3
b. Kolom 1 : 2 : 3
c. Ringbalok 1 : 2 : 37. Plafond : Calsiboard8. Kaca : Polos 5 cm9. Sanitasi : a. Bak Mandi : Fiber
b. Closet : Duduk10. Kayu : a. Konstruksi : Kelas I
b. Kusen : Kelas I
c. Pintu : Kelas I11. Cartport : Beton Tumbuk12. Finishing : Avitex 5kg
SPESIFIKASI TEKNIS
No. Jenis Bahan Satuan Harga Keterangan
1. Pekerja Org/Hr 30,000Rp
Tukang
2. Tukang Kayu Org/Hr 45,000Rp
3. Tukang Batu Org/Hr 45,000Rp
4. Tukang Cat Org/Hr 45,000Rp
5. Tukang Listrik Org/Hr 45,000Rp
6. Tukang Pipa Org/Hr 45,000Rp
7. Tukang Besi Org/Hr 45,000Rp
Kepala Tukang
1. Kepala Tukang Kayu Org/Hr 51,000Rp
2. Kepala Tukang Batu Org/Hr 51,000Rp
3. Kepala Tukang Cat Org/Hr 51,000Rp
4. Kepala Tukang Listrik Org/Hr 51,000Rp
5. Kepala Tukang Pipa Org/Hr 51,000Rp
6. Kepala Tukang Besi Org/Hr 50,000Rp
7. Mandor Org/Hr 50,000Rp
8. Pembantu Masinis Org/Hr 45,000Rp
9. Penjaga Gudang Org/Hr 45,000Rp
10. Penjaga Malam Org/Hr 45,000Rp
DAFTAR SATUAN UPAH PEKERJA
STANDAR PEMERINTAH PROVINSI SULAWESI SELATAN
MAKASSAR, Maret 2008
No. Jenis Bahan Satuan Harga Keterangan
BAHAN DASAR1. Batu Kali
Utuh m³ 80,000Rp Split 7 - 10 cm m³ 125,000Rp Split 5 - 7 cm m³ 130,000Rp Split 3 - 5 cm m³ 125,000Rp Split 2 - 3 cm m³ 180,000Rp Split 1 - 2 cm m³ 210,000Rp Split 0.51 - 1 cm m³ 220,000Rp
2. Batu Gunung m³ 80,000Rp Batu Alam Andesit Biasa m² 135,000Rp Andesit Susun Sirih m² 180,000Rp Andesit Halus m² 135,000Rp Andesit Gelombang m² 180,000Rp Batu Candi Permukaan Rata m² 100,000Rp Batu Palimanan Kuning m² 80,000Rp Batu Hijau Sukabumi m² 100,000Rp Batu Bali Greon m² 80,000Rp Batu Kali Napoli m² 140,000Rp Paras Jogja Besar m² 115,000Rp Batu Cirebon Beraturan m² 80,000Rp Batu CirebonTidak Beraturan m² 80,000Rp
3. Tanah Timbunan m³ 95,000Rp
4. PasirTimbunan/Urug m³ 60,000Rp Pasangan m³ 80,000Rp Beton m³ 95,000Rp
5. Kerikil m³ 200,000Rp
6. Sirtu m³ 75,000Rp
7. Kapur Pasangan Zak 50,000Rp
8. Semen Pc (40Kg) Zak 35,000Rp
Semen Pc (50Kg) Zak 43,750Rp
9. Semen Putih Kg 45,000Rp
DAFTAR HARGA BAHAN
STANDAR PEMERINTAH PROVINSI SULAWESI SELATAN
MAKASSAR, Maret 2008
10. Batu Merah Buah 400Rp
11. Paving Blok Mutu A (K 175)Tebal 6 cm m² 36,000Rp Tebal 8 cm m² 40,000Rp
Paving Blok Mutu B (K 175 standar)Tebal 6 cm m² 43,000Rp Tebal 8 cm m² 48,000Rp
Paving Blok Mutu C (K 225 s/d K 300)Tebal 6 cm m² 53,000Rp Tebal 8 cm 60,000Rp
Paving Blok Mutu C (K 400) m² 65,000Rp
Topiuskup (K 225) m² 22,000Rp
Cesting 10 x 25 x 50 biji 12,000Rp
BAHAN KAYUKayu Kelas IBalok Gergaji Sawmil m³ 7,000,000Rp Papan Gergaji Sawmil m³ 7,200,000Rp Balok Gergaji Sansaw m³ 6,000,000Rp Papan Gergaji Sansaw m³ 6,500,000Rp
Kayu Kelas IIBalok m³ 3,000,000Rp Papan m³ 3,500,000Rp
Kayu Kelas IIIBalok m³ 1,700,000Rp Papan m³ 2,000,000Rp
BAHAN LANTAI1. Tegel PC
PC Abu-abu 20 x 20 cm Bh 1,200Rp PC Abu-abu 30 x 30 cm Bh 2,300Rp PC warna 20 x 20 cm Bh 1,800Rp PC Warna 30 x 30 cm Bh 1,900Rp PC Badak 20 x 20 cm Bh 2,200Rp PC Badak 30 x 30 cm Bh 2,500Rp PC Wafel 20 x 20 cm Bh 2,500Rp PC Wafel 30 x 30 cm Bh 2,700Rp Plint PC 15 x 20 cm Bh 1,900Rp Plint PC 15 x 30 cm Bh 2,200Rp Tegel Mozaik 30 x 30 cm Bh 3,000Rp
2. Tegel KeramikPutih 10 x 20 cm Dos 42,000Rp
Warna 10 x 20 cm Dos 52,000Rp Putih 20 x 20 cm Dos 42,500Rp Warna 20 x 20 cm Dos 42,000Rp Putih 20 x 25 cm Dos 41,500Rp Warna 20 x 25 cm Dos 45,000Rp Putih 30 x 30 cm Dos 35,000Rp Warna 30 x 30 cm Dos 44,000Rp Putih 40 x 40 cm Dos 41,500Rp Warna 40 x 40 cm Dos 52,000Rp Putih 50 x 50 cm Dos 52,400Rp Warna 50 x 50 cm (import) Dos 121,500Rp
BAHAN KACAKaca Bening 3 mm m² 60,000Rp Kaca Bening 5 mm m² 80,000Rp Kaca Buram 3 mm m² 100,000Rp Kaca Buram 5 mm m² 130,000Rp Kaca Ryben 3 mm m² 85,000Rp Kaca Ryben 5 mm m² 100,000Rp Rangka Nako Lengkap Terali Set/daun 49,000Rp
BAHAN BESI1. Besi Beton
d = 4 mm btg 15,000Rp d = 6 mm btg 23,600Rp d = 8 mm btg 40,500Rp d = 10 mm btg 65,400Rp d = 12 mm btg 96,000Rp d = 14 mm btg 132,800Rp d = 16 mm btg 175,500Rp d = 19 mm btg 190,000Rp d = 22 mm btg 300,000Rp
2. PakuPaku Biasa Kg 15,000Rp Paku Asbes Kg 19,500Rp Paku Seng (Payung) RRT Kg 16,000Rp Paku Skrup 3½ inci Kg 13,500Rp Paku Skrup 4 inci Kg 14,500Rp Paku Payung Berulir 75 mm Kg 18,000Rp Paku Sirap Kg 13,000Rp Paku Beton Hitam Dos 16,000Rp Paku Beton Putih Dos 8,500Rp
3. KawatBeton Kg 10,000Rp Nyamuk Mtr 9,000Rp Ayakan Kecil Mtr 9,000Rp Duri roll 80,000Rp
4. Besi Plat2 mm = 120 x 240 mm Lbr 388,000Rp 3 mm = 120 x 240 mm Lbr 575,000Rp Besi H 15 cm 12 m Panjang Btg 3,500,000Rp
5. Besi Strep30.3 mm Btg 15,000Rp 35.4 mm Btg 23,000Rp 46.4 mm Btg 25,000Rp 40.6 mm Btg 26,000Rp 50.6 mm Btg 35,000Rp
6. Besi Siku30.30.3 Btg 55,000Rp 40.40.4 Btg 62,000Rp 40.40.3 Btg 55,000Rp 50.50.4 Btg 78,000Rp 50.50.5 Btg 90,000Rp 60.60.6 Btg 75,000Rp 70.70.7 Btg 135,000Rp
7. Beugel 6 mm Mtr 10,000Rp 8. Besi Tipe C (Rangka Baja Ringan) 6 mm
Lebar 10.tebal 1,8 - 2,00 mm Btg 135,000Rp Lebar 12,6 .tebal 1,8 - 2,00 mm Btg 117,000Rp Lebar 15.tebal 1,8 - 2,00 mm Btg 184,000Rp
BAHAN PIPA1. Pipa Besi GIP
Ø ½ inci - 6 m Btg 142,000Rp Ø ⅓ inci - 6 m Btg 179,000Rp Ø 1 inci - 6 m Btg 288,000Rp Ø 2 inci - 6 m Btg 475,000Rp Ø 2½ inci - 6 m Btg 605,000Rp Ø 3 inci - 6 m Btg 800,000Rp
2. Pipa Paralon PVC Air BersihØ ½ inci - 4 m Btg 18,000Rp Ø ⅓ inci - 6 m (Maspion) Btg 20,000Rp Ø 1 inci - 6 m (Maspion) Btg 26,500Rp
Ø ½ inci - 6 m (AW) Btg 18,000Rp Ø 2 inci - 6 m Btg 107,000Rp Ø 2½ inci - 6 m Btg 182,000Rp Ø 3 inci - 6 m Btg 211,000Rp Ø 4 inci - 6 m Btg 311,000Rp Ø 6 inci - 6 m Btg 661,000Rp Ø 8 inci - 6 m Btg 1,020,000Rp Ø 10 inci - 6 m Btg 1,600,000Rp
3. Jenis Btg D untuk SaluranPembuangan AirØ ½ inci - 4 m Btg 19,000Rp Ø ¾ inci - 4 m Btg 22,000Rp Ø 1 inci - 4 m Btg 28,000Rp Ø 1½ inci - 4 m Btg 29,000Rp Ø 2 inci -4 m Btg 35,000Rp Ø 2½ inci - 4 m Btg 45,000Rp Ø 3 inci - 4 m Btg 56,000Rp Ø 4 inci - 4 m Btg 105,000Rp Ø 5 inci - 4 m Btg 138,600Rp Ø 6 inci - 4 m Btg 187,000Rp Ø 10 inci - 4 m Btg 528,000Rp
4. Jenis Btg C untuk SaluranInstalasi ListrikØ ⅝ inci - 4 m Btg 6,000Rp Ø ¾ inci - 4 m Btg 22,000Rp Ø 1 inci - 4 m Btg 25,000Rp Ø 1½ inci - 4 m Btg 44,500Rp
BAHAN LANGIT-LANGIT1. Eternit 100 x 100 Set 10,000Rp 2. Tripleks
122 x 244 x 0.2 cm Lbr 37,500Rp 123 x 244 x 0.3 cm Lbr 47,500Rp 124 x 244 x 0.6 cm Lbr 80,000Rp 125 x 244 x 0.9 cm Lbr 125,000Rp
3. Tripleks Melamin122 x 244 x 0.3 cm Lbr 78,000Rp
4. Acoustic 40 x 60 Lbr 18,000Rp 5. Teakwood
80 x 244 x 0.3 cm Lbr 95,000Rp 122 x 244 x 0.3 cm Lbr 80,000Rp
6. Hard Board 122 x 244 cm Lbr 50,000Rp 7. Asbes Plat Harfek
200 x 100 x 0.3 cm Lbr 18,000Rp 8. List Profil
2 x 3 cm m' 5,000Rp 3 x 3 cm m' 4,500Rp 4 x 4 cm m' 6,000Rp 4 x 5 cm m' 7,000Rp
9. Gypsum (122 x 244 cm) Lbr 49,000Rp
BAHAN ATAP1. Genteng
Beton Bh 4,700Rp Keramik Bh 7,500Rp Asbes Lbr 18,000Rp Harffles (115 x 85 x 0.5 cm) Lbr 26,500Rp
2. Atap Metal Lbr 50,000Rp 3. Asbes Gelombang Lbr 19,000Rp 4. Sirap ikat 24,000Rp 5. Seng Gelombang
BWG 34" BJLS 0.18 mm kaki 5,500Rp BWG 33" BJLS 0.22 mm kaki 7,000Rp BWG 32" BJLS 0.30 mm kaki 10,000Rp BWG 28" BJLS 0.35 mm kaki 12,000Rp
6. Seng PlatBJLS 0.30 mm Lbr 40,000Rp BJLS 0.28 mm Lbr 52,000Rp
7. Seng Super Deck180 x 70 cm - 10 kaki kaki 12,000Rp
8. Seng Alumunium GelombangSWG 32" 0.27 mm kaki 6,500Rp SWG 30" 0.31 mm kaki 8,000Rp SWG 28" 0.38 mm kaki 9,000Rp
9. Seng Plastik (Fibers) kaki 7,500Rp 10. Fober Semen (Harflex)
Super 240 x 108 x 0.6 cm kaki 63,000Rp Super 180 x 108 x 0.6 cm kaki 44,000Rp Ekonomi 240 x 92 x 0.5 cm kaki 49,000Rp Ekonomi 180 x 92 x 0.4 cm kaki 42,700Rp Mini 240 x 105 x 0.4 cm kaki 42,000Rp Mini 180 x 92 x 0.5 cm kaki 40,000Rp
Super 240 x 105 x 0.4 cm kaki 50,500Rp Super 180 x 105 x 0.4 cm kaki 44,500Rp
11. Nok/BubunganGenteng Beton Bh 5,000Rp Genteng asbes Bh 16,000Rp Genteng Keramik Bh 16,800Rp Alm. SWG 28" - 180 cm Lbr 46,500Rp Alm. SWG 28" - 105 cm Lbr 38,000Rp
12. Nok Steel GelombangSuper - 180 cm Bh 32,000Rp Mini - 105 cm Bh 24,000Rp Ekonomi - 95 cm Bh 18,000Rp
13. Nok Steel RataSuper - 180 cm Bh 27,000Rp Mini - 105 cm Bh 22,500Rp Ekonomi - 95 cm Bh 22,000Rp
14. Nok ½ Lingkaran Bh 38,500Rp 15. Karet Pelapis Genteng Mtr 7,500Rp
Ketebalan Uk. 55 - 90
BAHAN PENGGANTUNG1. Kunci Tanam
SES 1 Slag Bh 227,000Rp Picaso 1 Slag Bh 126,000Rp Grasia 1 Slag Bh 61,000Rp Kuda Terbang Bh 50,000Rp
2. PenggatungHak Angin Kecil Bh 7,000Rp Hak Angin Besar Bh 10,000Rp Grendel Kecil Bh 3,500Rp Grendel Besar Bh 10,000Rp Engsel Pintu Bh 16,000Rp Engsel Jendela Bh 10,000Rp Expanyolet Bh 110,000Rp
BAHAN SANITER1. Kloset Duduk Toto Bh 1,750,000Rp 2. Kloset Jongkok Bh 429,000Rp 3. Wastafel Warna Bh 185,000Rp 4. Wastafel cuci piring logam Bh 280,000Rp 5. Pompa Tangan Terpasang Bh 260,000Rp 6. Union lengkap Bh 1,900,000Rp
7. Bak Mandi Fiber Bh 260,000Rp 8. Reservoir fiber = 1 m³ Bh 900,000Rp 9. Reservoir fiber = 2 m³ Bh 1,800,000Rp
10. Stop Kran Bh 26,000Rp 11. Kran Air Bh 25,000Rp
BAHAN FINISHINGCat Tembok
1. Avitex 5 Kg 52,000Rp Metrolite 5 Kg 57,000Rp Kimex 5 Kg 44,000Rp Vinikex Nippon Paint 5 Kg 56,000Rp Dulux Exterior 2,5 Kg 166,800Rp Dulux Interior 2,5 Kg 118,000Rp
2. Cat KayuGlotex Kg 30,000Rp Avian Kg 31,000Rp Palatone Kg 32,000Rp ICI Kg 30,000Rp Politur Kg 31,000Rp Meni 4 Kg 8,500Rp Minyak Cat Ltr 4,000Rp Cat Atap
3. AGA Kg 17,000Rp Lem Seng Mtr 13,000Rp Plamur 5 Kg 26,000Rp Amplas/Kertas Gosok Lbr 2,500Rp Dempul Kg 20,000Rp Residu 10 Ltr 43,000Rp
BAHAN INTALASI LISTRIK1. Kabel Listrik
Type NYA (full)1½ mm roll 154,000Rp 2½ mm roll 592,000Rp Type NYY 2 x 1½ mm roll 335,000Rp 2 x 2½ mm roll 430,750Rp 2 x 4 mm roll 585,500Rp
2. Lampu TL1 x 20 w bh 70,000Rp 2 x 20 w bh 85,000Rp
1 x 40 w bh 93,000Rp 2 x 40 w bh 120,000Rp
3. Lampu Pijar25 W bh 5,000Rp 40 W bh 6,000Rp 60 W bh 9,000Rp 100 W bh 9,500Rp
4. Lampu Taman Mercury bh 320,000Rp 5. Saklar phase
Tunggal Putih bh 13,500Rp Tunggal Hitam bh 10,000Rp Double Putih bh 14,500Rp Double Hitam bh 14,000Rp
6. Stop KontakHitam bh 10,000Rp Putih bh 11,500Rp
7. Zekering Kast Lokal BiasaLokal 2 Group Automatic bh 75,000Rp Lokal 3 Group Biasa bh 85,000Rp
8. Fitting bh 10,000Rp
BAHAN JALAN1 Minyak Tanah Ltr 5,000Rp 2 Minyak Solar Ltr 4,800Rp 3 Minyak pelumas Ltr 19,650Rp
No Macam Pekerjaan
1. 1 M' Pengukuran dan Pemasangan BouplankKayu 5/7 Kelas III (Balok) 0.012 M3 @Paku Biasa 0.020 Kg @Kayu 3/20 Kelas III (Papan) 0.007 M3 @
Tukang Kayu 0.100 @Pekerja 0.100 @Kepala Tukang 0.010 @Mandor 0.005 @
2. 1 M2 Pembuatan Direksi Keet Dengan Lantai PlesteranKayu Dolken 1.250 Btg @Kayu Kelas II 0.180 M3 @Paku Biasa 0.850 Kg @Besi Strip 1.100 Kg @Semen Portland 0.700 Zak @Pasir Pasang 0.150 M3 @Pasir Beton 0.100 M3 @Batu Pecah 1 x 2 Cm 0.150 M3 @Batu Merah 30.000 Bh @Seng Gelombang 6.667 Kaki @Jendela Nako 2.000 Bh @Kaca 5 MM 0.080 M2 @Kunci Tanam 0.150 Bh @Tripleks 3 MM 0.060 Lbr @
Koef/Satuan
DAFTAR ANALISA HARGA SATUAN PEKERJAANSTANDAR NASIONAL INDONESIA (S N I )
Tukang Kayu 2.000 @Tukang Batu 1.000 @Pekerja 2.000 @Kepala Tukang 0.300 @Mandor 0.300 @
3. 1 M3 Galian Tanah BiasaPekerja 0.400 @Mandor 0.040 @
4. 1 M3 Urugan Tanah KembaliPekerja 0.192 @Mandor 0.019 @
5. 1 M3 Urugan PasirPasir Urug 1.200 M3 @
Pekerja 0.300 @Mandor 0.010 @
6. 1 M3 Pasangan Pondasi Batu Kali Camp. 1 PC : 4 PSBatu Kali 1.100 M3 @Portland Semen @40 kg 3.260 Zak @Pasir Pasang 0.520 M3 @
Pekerja 1.500 @Tukang Batu 0.600 @Kepala Tukang 0.060 @Mandor 0.075
7. 1 M3 Pasangan Pondasi Batu KosongBatu Kali 1.200 M3 @Pasir Urug 0.300 M3 @
Pekerja 0.780 @Tukang Batu 0.390 @Kepala Tukang 0.039 @Mandor 0.039 @
8. 1 m3 Membuat Sloof Beton Bertulang Kayu Kelas III 0.270 M3 @Paku Biasa 2.000 Kg @Minyak Bekisting 0.600 Ltr @Besi Beton 200.000 Kg @Kawat Beton 3.000 Kg @Portland Semen @50 kg 6.460 Zak @Pasir Beton 0.520 M3 @Batu Pecah 1 x 2 Cm 0.780 M3 @
Pekerja 4.850 @Tukang Batu 0.350 @Tukang Kayu 1.560 @Tukang Besi 1.400 @Kepala Tukang 0.331 @Mandor 0.170 @
9. 1 m3 membuat kolom beton bertulangKayu Kelas III 0.500 M3 @Paku Biasa 4.000 Kg @Minyak Bekisting 2.000 Ltr @Besi Beton 300.000 Kg @Kawat Beton 4.500 Kg @Portland Semen @50 kg 6.460 Zak @Pasir Beton 0.520 M3 @Batu Pecah 1 x 2 Cm 0.780 M3 @Tripleks 9 MM 3.500 Lbr @Tiang Dolken . 8 - 10/4 Mtr 20.000 Btg @
Pekerja 7.300 @Tukang Batu 0.350 @Tukang Kayu 3.300 @Tukang Besi 2.100 @Kepala Tukang 0.570 @Mandor 0.250 @
10. 1 m3 Membuat Balok Beton BertulangKayu Kelas III 0.560 M3 @Paku Biasa 3.200 Kg @Minyak Bekisting 1.600 Ltr @Besi Beton 200.000 Kg @Kawat Beton 3.000 Kg @Portland Semen @50 kg 6.460 Zak @Pasir Beton 0.520 M3 @Batu Pecah 1 x 2 Cm 0.780 M3 @Tripleks 9 MM 2.800 Lbr @Tiang Dolken . 8 - 10/4 Mtr 16.000 Btg @
Pekerja 5.960 @Tukang Batu 0.350 @Tukang Kayu 2.800 @Tukang Besi 1.400 @Kepala Tukang 0.445 @Mandor 0.208 @
11. 1 m2 Pasangan Batu Bata 1 : 4Batu Merah 70.000 Bh @Portland Semen 0.134 Zak @Pasir Pasang 0.045 M3 @
Pekerja 0.320 @Tukang Batu 0.100 @Kepala Tukang 0.010 @Mandor 0.015 @
12. 1 m3 Pasangan konstruksi kuda-kudaKayu Kelas I (Balok) 1.100 M3 @Besi Strip 15.000 Kg @Paku Biasa 0.800 Kg @
Pekerja 4.000 @Tukang Kayu 12.000 @Kepala Tukang 1.200 @Mandor 0.200 @
13. 1 m2 Pasangan Rangka AtapKayu Kelas I (Balok) 0.014 M3 @Paku Biasa 0.150 Kg @
Pekerja 0.100 @Tukang Kayu 0.100 @Kepala Tukang 0.010 @Mandor 0.005 @
14. 1 m' Pasangan listplankKayu Kelas I (Papan) 0.0072 M3 @Paku Biasa 0.050 Kg @
Pekerja 0.100 @Tukang Kayu 0.200 @Kepala Tukang 0.020 @Mandor 0.005 @
15. 1 m2 Pasangan Atap Genteng MetalGenteng Metal 1.630 Lbr @Paku Biasa 0.200 Kg @
Pekerja 0.200 @Tukang Kayu 0.100 @Kepala Tukang 0.010 @Mandor 0.001 @
16. 1 m' pasangan Nok Genteng MetalNok Genteng Beton 1.600 Bh @Paku Biasa 0.050 Kg @
Pekerja 0.250 @Tukang Kayu 0.150 @Kepala Tukang 0.015 @Mandor 0.130 @
17. 1 m3 Pasangan Kusen Pintu JendelahKayu Kelas I (Balok) 1.100 M3 @
Pekerja 6.000 @Tukang Kayu 20.000 @Kepala Tukang 2.000 @Mandor 0.300 @
18. 1 m2 Pintu dan Jendelah JalusiKayu Kelas I (Papan) 0.064 M3 @
Pekerja 1.000 @Tukang Kayu 3.000 @Kepala Tukang 0.300 @Mandor 0.300 @
19. 1 m2 Pasangan Kaca MatiKaca 1.100 M2 @
Pekerja 0.015 @Tukang Kayu 0.150 @Kepala Tukang 0.015 @Mandor 0.001 @
20. 1 m2 Plesteran 1 : 4Portland Semen @40 kg 0.104 Zak @Pasir Pasang 0.020 M3 @
Pekerja 0.200 @Tukang Batu 0.150 @Kepala Tukang 0.015 @Mandor 0.010 @
21. 1 m2 Pasangan Tegel lantai Keramik Tegel Keramik 40 x 40 Cm 1.000 Dos @Tegel Keramik 30 x 30 Cm 1.000 Dos @Tegel Keramik 20 x 20 Cm 1.000 Dos @Portlan sement @ 4o kg 0.200 Zak @Pasir pasangan 0.022 M3 @Semen Warna 0.900 Kg @
bahan Tegel Keramik 40 x 40 CmTegel Keramik 30 x 30 CmTegel Keramik 20 x 20 Cm
Pekerja 0.025 @Tukang Batu 0.120 @Kepala Tukang 0.012 @Mandor 0.0125 @
upah Tegel Keramik 40 x 40 CmTegel Keramik 30 x 30 CmTegel Keramik 20 x 20 Cm
jumlah Tegel Keramik 40 x 40 CmTegel Keramik 30 x 30 CmTegel Keramik 20 x 20 Cm
22. 1 m2 Pasang Langit-Langit Eternit 100.100Eternit Tebal 3,5 MM 1.100 Lbr @Paku Eternit 0.010 Kg @
Pekerja 0.030 @Tukang Kayu 0.076 @Kepala Tukang 0.007 @Mandor 0.002 @
23. 1 m2 Pasang Ramgka Langit-langitKayu Kelas III (Balok) 0.012 M3 @Paku Biasa 0.100 Kg @
Pekerja 0.150 @Tukang Kayu 0.250 @Kepala Tukang 0.025 @Mandor 0.075 @
24. Memasang 1 Buah Closet DudukCloset Duduk 1.000 Bh @Perlengkapan 0.060 @
Pekerja 3.300 @Tukang Batu 1.100 @Kepala Tukang 0.001 @Mandor 0.160 @
25. Memasang 1 Buah Bak Mandi Fiber GlassBak Fiber Glass 1.000 Bh @Perlengkapan (Harga Bahan) 0.180 @
Pekerja 1.800 @Tukang Batu 2.700 @Kepala Tukang 0.540 @Mandor 0.110 @
26. Memasang 1 Buah Kran AirKran Air 1.000 Bh @Seal Tape 0.025 Bh @
Pekerja 0.010 @Tukang Batu 0.100 @Kepala Tukang 0.010 @Mandor 0.005 @
27. Memasang 1 Buah Floor DrainFloor Drain 1.000 Bh @
Pekerja 0.010 @Tukang Batu 0.100 @Kepala Tukang 0.010 @Mandor 0.005 @
28. Kunci Tanam 1.000 Bh @
Pekerja 0.010 @Tukang Kayu 0.500 @Kepala Tukang 0.010 @Mandor 0.005 @
29. Memasang 1 buah Kunci TanamEngsel Pintu 1.000 Bh @
Pekerja 0.015 @Tukang Kayu 0.150 @Kepala Tukang 0.015 @Mandor 0.001 @
30. Memasang 1 Buah Engsel JendelahEngsel Jendela 1.000 Bh @
Pekerja 0.010 @Tukang Kayu 0.100 @Kepala Tukang 0.010 @Mandor 0.001 @
31. Memasang 1 Buah Kunci GrendelKunci Grendel 1.000 Bh @
Pekerja 0.010 @Tukang Kayu 0.100 @Kepala Tukang 0.010 @Mandor 0.001 @
32. Memasang 1 buah Hak AnginHak Angin 1.000 Bh @
Pekerja 0.015 @Tukang Kayu 0.150 @Kepala Tukang 0.015 @Mandor 0.001 @
33. 1 m2 penegecetan Bidang KayuCat Meni 0.200 Kg @Plamir 0.150 Kg @Cat Dasar 0.070 Kg @Cat Kayu Palatone 0.260 Kg @
Pekerja 0.070 @Tukang Cat 0.009 @Kepala Tukang 0.006 @Mandor 0.002 @
34. 1 m2 Mengecet Tembok BaruPlamir 0.100 Kg @Cat Dasar 0.100 Kg @Cat Tembok Avitex @5 kg 0.260 Kg @Amplas 0.500 Lbr @
Pekerja 0.020 @Tukang Cat 0.063 @Kepala Tukang 0.006 @Mandor 0.002 @
35. Cat Dasar 0.120 Kg @Cat Penutup 0.180 Kg @
Pekerja 0.028 @Tukang Cat 0.042 @Kepala Tukang 0.004 @Mandor 0.002 @
36. Instalasi Listrikkabel Type NYA 1½ mm 4.000 roll @Lampu Pijar 100 watt 2.000 titik @Lampu Pijar 40 watt 7.000 titik @Lampu Pijar 25 watt 5.000 titik @Saklar Tunggal 5.000 bh @Saklar Double 4.000 bh @Stop Kontak 4.000 bh @
Pemasangan Bola Lampu 14.000 titik @
1,700,000.00Rp 20,400.00Rp 15,000.00Rp 300.00Rp
2,000,000.00Rp 14,000.00Rp bahan 34,700.00Rp
45,000.00Rp 4,500.00Rp 30,000.00Rp 3,000.00Rp 51,000.00Rp 510.00Rp 50,000.00Rp 250.00Rp
upah 8,260.00Rp jumlah 42,960.00Rp
20,000.00Rp 25,000.00Rp 3,000,000.00Rp 540,000.00Rp
15,000.00Rp 12,750.00Rp 15,000.00Rp 16,500.00Rp 35,000.00Rp 24,500.00Rp 80,000.00Rp 12,000.00Rp 95,000.00Rp 9,500.00Rp
200,000.00Rp 30,000.00Rp 400.00Rp 12,000.00Rp
5,500.00Rp 36,668.50Rp 49,000.00Rp 98,000.00Rp 80,000.00Rp 6,400.00Rp 50,000.00Rp 7,500.00Rp 78,000.00Rp 4,680.00Rp
bahan 835,498.50Rp
Harga Satuan
DAFTAR ANALISA HARGA SATUAN PEKERJAANSTANDAR NASIONAL INDONESIA (S N I )
45,000.00Rp 90,000.00Rp 45,000.00Rp 45,000.00Rp 30,000.00Rp 60,000.00Rp 51,000.00Rp 15,300.00Rp 50,000.00Rp 15,000.00Rp
upah 225,300.00Rp jumlah 1,060,798.50Rp
30,000.00Rp 12,000.00Rp 50,000.00Rp 2,000.00Rp
upah 14,000.00Rp
30,000.00Rp 5,760.00Rp 50,000.00Rp 950.00Rp
upah 6,710.00Rp
60,000.00Rp 72,000.00Rp bahan 72,000.00Rp
50,000.00Rp 15,000.00Rp 50,000.00Rp 500.00Rp
upah 15,500.00Rp jumlah 87,500.00Rp
85,000.00Rp 93,500.00Rp 35,000.00Rp 114,100.00Rp 80,000.00Rp 41,600.00Rp
bahan 249,200.00Rp
30,000.00Rp 45,000.00Rp 45,000.00Rp 27,000.00Rp 51,000.00Rp 3,060.00Rp 50,000.00Rp 3,750.00Rp
upah 78,810.00Rp jumlah 328,010.00Rp
85,000.00Rp 102,000.00Rp 60,000.00Rp 18,000.00Rp
bahan 120,000.00Rp 30,000.00Rp 23,400.00Rp 45,000.00Rp 17,550.00Rp 51,000.00Rp 1,989.00Rp 50,000.00Rp 1,950.00Rp
upah 44,889.00Rp jumlah 164,889.00Rp
2,000,000.00Rp 540,000.00Rp 15,000.00Rp 30,000.00Rp 19,650.00Rp 11,790.00Rp
8,000.00Rp 1,600,000.00Rp 10,000.00Rp 30,000.00Rp 43,750.00Rp 282,625.00Rp 95,000.00Rp 49,400.00Rp
200,000.00Rp 156,000.00Rp bahan 2,699,815.00Rp
30,000.00Rp 145,500.00Rp 45,000.00Rp 15,750.00Rp 45,000.00Rp 70,200.00Rp 45,000.00Rp 63,000.00Rp 51,000.00Rp 16,881.00Rp 50,000.00Rp 8,500.00Rp
upah 319,831.00Rp jumlah 3,019,646.00Rp
2,000,000.00Rp 1,000,000.00Rp 15,000.00Rp 60,000.00Rp 19,650.00Rp 39,300.00Rp
8,000.00Rp 2,400,000.00Rp 9,500.00Rp 42,750.00Rp
43,750.00Rp 282,625.00Rp 95,000.00Rp 49,400.00Rp
200,000.00Rp 156,000.00Rp 97,500.00Rp 341,250.00Rp 20,000.00Rp 400,000.00Rp
bahan 4,771,325.00Rp 30,000.00Rp 219,000.00Rp 45,000.00Rp 15,750.00Rp 45,000.00Rp 148,500.00Rp 45,000.00Rp 94,500.00Rp 51,000.00Rp 29,070.00Rp 50,000.00Rp 12,500.00Rp
upah 519,320.00Rp jumlah 5,290,645.00Rp
2,000,000.00Rp 1,120,000.00Rp 15,000.00Rp 48,000.00Rp 19,650.00Rp 31,440.00Rp
8,000.00Rp 1,600,000.00Rp 9,500.00Rp 28,500.00Rp
43,750.00Rp 282,625.00Rp 95,000.00Rp 49,400.00Rp
200,000.00Rp 156,000.00Rp 97,500.00Rp 273,000.00Rp 20,000.00Rp 320,000.00Rp
bahan 3,908,965.00Rp 30,000.00Rp 178,800.00Rp 45,000.00Rp 15,750.00Rp 45,000.00Rp 126,000.00Rp 45,000.00Rp 63,000.00Rp 51,000.00Rp 22,695.00Rp 50,000.00Rp 10,400.00Rp
upah 416,645.00Rp jumlah 4,325,610.00Rp
400.00Rp 28,000.00Rp 35,000.00Rp 4,690.00Rp 80,000.00Rp 3,600.00Rp
bahan 36,290.00Rp
30,000.00Rp 9,600.00Rp 45,000.00Rp 4,500.00Rp 51,000.00Rp 510.00Rp 50,000.00Rp 750.00Rp
upah 15,360.00Rp jumlah 51,650.00Rp
6,000,000.00Rp 6,600,000.00Rp 15,000.00Rp 225,000.00Rp 15,000.00Rp 12,000.00Rp
bahan 6,837,000.00Rp 30,000.00Rp 120,000.00Rp 45,000.00Rp 540,000.00Rp 51,000.00Rp 61,200.00Rp 50,000.00Rp 10,000.00Rp
upah 731,200.00Rp jumlah 7,568,200.00Rp
6,000,000.00Rp 84,000.00Rp 15,000.00Rp 2,250.00Rp
upah 86,250.00Rp 30,000.00Rp 3,000.00Rp 45,000.00Rp 4,500.00Rp 51,000.00Rp 510.00Rp 50,000.00Rp 250.00Rp
upah 8,260.00Rp jumlah 94,510.00Rp
6,000,000.00Rp 43,200.00Rp 15,000.00Rp 750.00Rp
bahan 43,950.00Rp 30,000.00Rp 3,000.00Rp 45,000.00Rp 9,000.00Rp 51,000.00Rp 1,020.00Rp 50,000.00Rp 250.00Rp
upah 13,270.00Rp jumlah 57,220.00Rp
50,000.00Rp 81,500.00Rp 15,000.00Rp 3,000.00Rp
bahan 84,500.00Rp 30,000.00Rp 6,000.00Rp 45,000.00Rp 4,500.00Rp 51,000.00Rp 510.00Rp 50,000.00Rp 50.00Rp
upah 11,060.00Rp jumlah 95,560.00Rp
38,000.00Rp 60,800.00Rp 15,000.00Rp 750.00Rp
bahan 61,550.00Rp
30,000.00Rp 7,500.00Rp 45,000.00Rp 6,750.00Rp 51,000.00Rp 765.00Rp 50,000.00Rp 6,500.00Rp
upah 144,615.00Rp jumlah 206,165.00Rp
6,000,000.00Rp 6,600,000.00Rp bahan 6,600,000.00Rp
30,000.00Rp 180,000.00Rp 45,000.00Rp 900,000.00Rp 51,000.00Rp 102,000.00Rp 50,000.00Rp 15,000.00Rp
upah 1,197,000.00Rp jumlah 7,797,000.00Rp
6,500,000.00Rp 416,000.00Rp bahan 416,000.00Rp
30,000.00Rp 30,000.00Rp 45,000.00Rp 135,000.00Rp 51,000.00Rp 15,300.00Rp 50,000.00Rp 15,000.00Rp
upah 195,300.00Rp jumlah 611,300.00Rp
43,460.00Rp 47,806.00Rp bahan 47,806.00Rp
30,000.00Rp 450.00Rp 51,000.00Rp 7,650.00Rp 51,000.00Rp 765.00Rp 50,000.00Rp 50.00Rp
upah 8,915.00Rp jumlah 56,721.00Rp
35,000.00Rp 3,640.00Rp 80,000.00Rp 1,600.00Rp
bahan 5,240.00Rp 30,000.00Rp 6,000.00Rp 45,000.00Rp 6,750.00Rp 51,000.00Rp 765.00Rp 50,000.00Rp 500.00Rp
upah 14,015.00Rp jumlah 19,255.00Rp
48,300.00Rp 52,000.00Rp 49,000.00Rp 35,000.00Rp 45,000.00Rp 42,500.00Rp 35,000.00Rp 7,000.00Rp 80,000.00Rp 1,760.00Rp 10,000.00Rp 9,000.00Rp
Tegel Keramik 40 x 40 Cm 69,760.00Rp Tegel Keramik 30 x 30 Cm 52,760.00Rp Tegel Keramik 20 x 20 Cm 60,260.00Rp
30,000.00Rp 750.00Rp 45,000.00Rp 5,400.00Rp 51,000.00Rp 612.00Rp 50,000.00Rp 625.00Rp
Tegel Keramik 40 x 40 Cm 7,387.00Rp Tegel Keramik 30 x 30 Cm 7,387.00Rp Tegel Keramik 20 x 20 Cm 7,387.00Rp
Tegel Keramik 40 x 40 Cm 77,147.00Rp Tegel Keramik 30 x 30 Cm 60,147.00Rp Tegel Keramik 20 x 20 Cm 67,647.00Rp
10,000.00Rp 11,000.00Rp 17,000.00Rp 170.00Rp
bahan 11,170.00Rp 30,000.00Rp 900.00Rp 45,000.00Rp 3,420.00Rp 51,000.00Rp 357.00Rp 50,000.00Rp 100.00Rp
upah 4,777.00Rp jumlah 15,947.00Rp
2,000,000.00Rp 24,000.00Rp 15,000.00Rp 1,500.00Rp
bahan 25,500.00Rp 30,000.00Rp 4,500.00Rp 45,000.00Rp 11,250.00Rp 51,000.00Rp 1,275.00Rp 50,000.00Rp 3,750.00Rp
upah 20,775.00Rp jumlah 46,275.00Rp
1,750,000.00Rp 1,750,000.00Rp 105,000.00Rp 6,300.00Rp
bahan 1,756,300.00Rp 30,000.00Rp 99,000.00Rp 51,000.00Rp 56,100.00Rp 51,000.00Rp 51.00Rp 50,000.00Rp 8,000.00Rp
upah 163,151.00Rp jumlah 1,919,451.00Rp
260,000.00Rp 260,000.00Rp 46,800.00Rp 8,424.00Rp
bahan 268,424.00Rp 30,000.00Rp 54,000.00Rp 45,000.00Rp 121,500.00Rp 51,000.00Rp 27,540.00Rp 50,000.00Rp 5,500.00Rp
upah 208,540.00Rp jumlah 476,964.00Rp
25,000.00Rp 25,000.00Rp 5,000.00Rp 125.00Rp
bahan 25,125.00Rp 30,000.00Rp 300.00Rp 45,000.00Rp 4,500.00Rp 51,000.00Rp 510.00Rp 50,000.00Rp 250.00Rp
upah 5,560.00Rp jumlah 30,685.00Rp
19,000.00Rp 19,000.00Rp bahan 19,000.00Rp
30,000.00Rp 300.00Rp 45,000.00Rp 4,500.00Rp 51,000.00Rp 510.00Rp 50,000.00Rp 250.00Rp
upah 5,560.00Rp jumlah 24,560.00Rp
227,000.00Rp 227,000.00Rp bahan 227,000.00Rp
29,000.00Rp 290.00Rp 40,000.00Rp 20,000.00Rp 50,000.00Rp 500.00Rp 50,000.00Rp 250.00Rp
upah 21,040.00Rp jumlah 248,040.00Rp
16,000.00Rp 16,000.00Rp bahan 16,000.00Rp
30,000.00Rp 450.00Rp 51,000.00Rp 7,650.00Rp 51,000.00Rp 765.00Rp 50,000.00Rp 50.00Rp
upah 8,915.00Rp jumlah 24,915.00Rp
5,460.00Rp 5,460.00Rp bahan 5,460.00Rp
30,000.00Rp 300.00Rp 51,000.00Rp 5,100.00Rp 51,000.00Rp 510.00Rp 50,000.00Rp 50.00Rp
upah 5,960.00Rp jumlah 11,420.00Rp
10,000.00Rp 10,000.00Rp bahan 10,000.00Rp
30,000.00Rp 300.00Rp 51,000.00Rp 5,100.00Rp 51,000.00Rp 510.00Rp 50,000.00Rp 50.00Rp
upah 5,960.00Rp bahan 15,960.00Rp
13,125.00Rp 13,125.00Rp bahan 13,125.00Rp
30,000.00Rp 450.00Rp 51,000.00Rp 7,650.00Rp 51,000.00Rp 765.00Rp 50,000.00Rp 50.00Rp
upah 8,915.00Rp jumlah 22,040.00Rp
8,500.00Rp 1,700.00Rp 31,000.00Rp 4,650.00Rp 30,000.00Rp 2,100.00Rp 32,000.00Rp 8,320.00Rp
bahan 16,770.00Rp 30,000.00Rp 2,100.00Rp 45,000.00Rp 405.00Rp 51,000.00Rp 306.00Rp 50,000.00Rp 100.00Rp
upah 2,911.00Rp jumlah 19,681.00Rp
31,000.00Rp 3,100.00Rp 44,000.00Rp 4,400.00Rp 52,000.00Rp 13,520.00Rp
2,000.00Rp 1,000.00Rp bahan 22,020.00Rp
30,000.00Rp 600.00Rp 45,000.00Rp 2,835.00Rp 51,000.00Rp 306.00Rp 50,000.00Rp 100.00Rp
upah 3,841.00Rp jumlah 25,861.00Rp
44,000.00Rp 5,280.00Rp 52,000.00Rp 9,360.00Rp
bahan 14,640.00Rp
30,000.00Rp 840.00Rp 45,000.00Rp 1,890.00Rp 51,000.00Rp 204.00Rp 50,000.00Rp 100.00Rp
upah 3,034.00Rp jumlah 17,674.00Rp
154,000.00Rp 616,000.00Rp 9,500.00Rp 19,000.00Rp 6,000.00Rp 42,000.00Rp 5,000.00Rp 25,000.00Rp
13,500.00Rp 67,500.00Rp 14,500.00Rp 58,000.00Rp 11,500.00Rp 46,000.00Rp
bahan 873,500.00Rp 50,000.00Rp 700,000.00Rp
upah 700,000.00Rp jumlah 1,573,500.00Rp
P E K E R J A A N: Bangunan Rumah tinggal Sederhana Type 85/120 m²
L O K A S I : -
NO VOLUME SATUAN HARGA SATUAN JUMLAH
I. PEKERJAAN PENDAHULUAN
1. Pekerjaan Persiapan/Direksi keet 0.000 Ls 1,060,798.50Rp 1,060,798.50Rp
2. Pekerjaan Pengukuran & Bouwplank 0.000 Ls 42,960.00Rp 42,960.00Rp
Sub Total I 1,103,758.50Rp
II. PEKERJAAN PONDASI
1. Galian Pondasi 45.850 M3 14,000.00Rp 641,900.00Rp
2. Urugan Kembali 11.470 M3 6,710.00Rp 76,963.70Rp
3. Urugan Pasir Bawah Pondasi 2.210 M3 87,500.00Rp 193,375.00Rp
4. Pekerjaan Batu Kosong 6.610 M3 164,889.00Rp 1,089,916.29Rp
5. Pek. Pondasi Batu Kali 1 : 4 15.320 M3 328,010.00Rp 5,025,113.20Rp
Sub Total II 7,027,268.19Rp
III. PEKERJAAN BETON
1. Pekerjaan Sloef Beton 15 x 20 2.216 M3 3,019,646.00Rp 6,691,535.54Rp
2. Pekerjaan Kolom Beton 15 x 15 2.673 M2 5,290,645.00Rp 14,141,894.09Rp
3. Pekerjaan Ring Balok 15 x 15 1.540 M' 4,325,610.00Rp 6,661,439.40Rp
Sub Total III 27,494,869.02Rp
IV. PEKERJAAN BATU MERAH
1. Pekerjaan Pas.Batu Merah 1 : 5 275.330 M² 51,650.00Rp 14,220,794.50Rp
Sub Total IV 14,220,794.50Rp
V. PEKERJAAN KAP DAN RANGKA ATAP
1. Kuda-kuda/Gording 5/10 kayu kls I 0.657 M³ 7,568,200.00Rp 4,972,307.40Rp
2. Rangka Atap 109.015 M2 94,510.00Rp 10,303,007.65Rp
3. Pasangan Lisplank papan 3/20 13.600 M' 57,220.00Rp 778,192.00Rp
4. Penutup Atap Genteng 109.015 M2 95,560.00Rp 10,417,473.40Rp
5. Pasangan Nok Genteng Metal 8.400 M' 206,165.00Rp 1,731,786.00Rp
Sub Total V 28,202,766.45Rp
VI. PEKERJAAN KUSEN, PINTU, DAN DAUN JENDELAH
1. Kusen Pintu dan Jendelah Kayu Kls I 1.630 M³ 7,797,000.00Rp 12,709,110.00Rp
2. Daun Pintu dan Jendelah Kayu Kls I 7.036 M2 611,300.00Rp 4,301,106.80Rp
3. Pasangan Kaca 9.679 M2 56,721.00Rp 549,002.56Rp
Sub Total VI 17,559,219.36Rp
VII. PEKERJAAN PLESTERAN
1. Plesteran Pasangan Dinding 1 : 4 606.750 M2 19,255.00Rp 11,682,971.25Rp
Sub Total VI 11,682,971.25Rp
NO VOLUME SATUAN HARGA SATUAN JUMLAH
URAIAN PEKERJAAN
URAIAN ANALISA SATUAN PEKERJAAN
URAIAN PEKERJAAN
VIII.PEKERJAAN LANTAI
1. Pengerjaan Keramik 40/40 48.140 M2 77,147.00Rp 3,713,856.58Rp
2. Pengerjaan Keramik 30/30 6.640 M2 60,147.00Rp 399,376.08Rp
3. Pengerjaan Keramik 20/20 1.550 M2 67,647.00Rp 104,852.85Rp
Sub Total VIII 4,218,085.51Rp
IX. PEKERJAAN PLAFON
1. Pasangan Plafon Eternit 100.100 56.330 M2 15,947.00Rp 898,294.51Rp
2. Rangka Plafon 56.330 M2 46,275.00Rp 2,606,670.75Rp
Sub Total IX 3,504,965.26Rp
X. PEKERJAAN SANITASI
1. Closet duduk 2.000 bh 1,919,451.00Rp 3,838,902.00Rp
2. Bak Mandi fiber 2.000 unit 476,964.00Rp 953,928.00Rp
3. Kran air 5.000 bh 30,685.00Rp 153,425.00Rp
4. Floor drain 2.000 bh 24,560.00Rp 49,120.00Rp
5. Pipa PVC Ø ½" 10.000 btg 20,000.00Rp 200,000.00Rp
6. Socket 7.000 bh 2,500.00Rp 17,500.00Rp
7. Tee 5.000 bh 3,500.00Rp 17,500.00Rp
8. Elbow 10.000 bh 4,000.00Rp 40,000.00Rp
Sub Total X 5,270,375.00Rp
XI.
1. Kunci Tanam 2.000 bh 248,040.00Rp 496,080.00Rp
2. Engsel pintu 16.000 bh 24,915.00Rp 398,640.00Rp
3. Engsel jedelah 10.000 bh 11,420.00Rp 114,200.00Rp
4. Kunci grendel 5.000 bh 15,960.00Rp 79,800.00Rp
5. Hak angin 5.000 bh 22,040.00Rp 110,200.00Rp
Sub Total XI 1,198,920.00Rp
XII. PEKERJAAN CAT
1. Pengecetan Bidang Kayu 1.630 M2 19,681.00Rp 32,080.03Rp
2. Pengecetan Tembok Baru 606.750 M2 25,861.00Rp 15,691,161.75Rp
3. Pengecetan Plafon 56.330 M2 17,674.00Rp 995,576.42Rp
Sub Total XI 16,718,818.20Rp
XIII.PEKERJAAN INSTLASI LISTRIK
1. Pek.Pemasangan Instalasi Listrik 1.000 unit 1,573,500.00Rp 1,573,500.00Rp
Sub Total XI 1,573,500.00Rp
PEKERJAAN KUNCI-KUNCI
Galian Tanah 0.45 48.24 21.708
Pondasi 0.24 48.24 11.578
Bt. Kosong 0.14 48.24 6.754
Pasir Bwh Pondasi0.07 48.24 3.377
10.413
#REF!
#REF!
#REF!
#REF!
P E K E R J A A N : Bangunan Rumah tinggal Sederhana Type 85/120 m²L O K A S I : -
I. PEKERJAAN PENDAHULUAN 1,103,758.50Rp
II. PEKERJAAN PONDASI 7,027,268.19Rp
III. PEKERJAAN BETON 27,494,869.02Rp
IV. PEKERJAAN BATU MERAH 14,220,794.50Rp
V. PEKERJAAN KAP DAN RANGKA ATAP 28,202,766.45Rp
VI. PEKERJAAN KUSEN, PINTU, DAN DAUN JENDELAH 17,559,219.36Rp
VII. PEKERJAAN PLESTERAN 11,682,971.25Rp
VIII. PEKERJAAN LANTAI 4,218,085.51Rp
IX. PEKERJAAN PLAFON 3,504,965.26Rp
X PEKERJAAN SANITASI 5,270,375.00Rp
XI. PEKERJAAN KUNCI-KUNCI 1,198,920.00Rp
XII. PEKERJAAN CAT 16,718,818.20Rp
XIII. PEKERJAAN INSTLASI LISTRIK 1,573,500.00Rp
139,776,311.24Rp
139,776,000.00Rp
13,977,600.00Rp
153,753,600.00Rp
Makassar, Juni 2008Penyusun
Kelompok I
NO. URAIAN PEKERJAAN JUMLAH
REAL COST
DIBULATKAN
Terbilang : " Seratus Lima Puluh Tiga Juta Tujuh Ratus Lima Puluh Tiga Ribuh Enam Ratus Rupiah "
PPn 10 %
JUMLAH
REKAPITULASI
RENCANA ANGGARAN BIAYA ( R A B)
#REF!
No. Volume Bahan Upah
I
1. Pengukuran dan Pemasangan Bouplank ls 34,700.00Rp 8,260.00Rp
2. Pembuatan Direksi Keet steran ls 835,498.50Rp 225,300.00Rp
II
1. Galian Tanah Biasa 45.85 - 14,000.00Rp
2. Urugan Tanah Kembali 11.47 - 6,710.00Rp
3. Urugan Pasir 2.21 72,000.00Rp 15,500.00Rp
4. Pasangan Pondasi Batu Kali 1 PC : 4 PS 15.32 249,200.00Rp 78,810.00Rp
5. Pasangan Pondasi Batu Kosong 6.61 120,000.00Rp 44,889.00Rp
III
1. Pekerjaan Sloef Beton 15 x 20 2.22 2,699,815.00Rp 319,831.00Rp
2. Pekerjaan Kolom Beton 15 x 15 2.67 4,771,325.00Rp 519,320.00Rp
3. Pekerjaan Ring Balok 15 x 15 1.54 3,908,965.00Rp 416,645.00Rp
IV PEKERJAAN BATU MERAH
1. Pasangan 1/2 Batu Bata Camp. 1 PC : 5 PS 275.33 36,290.00Rp 15,360.00Rp
V PEKERJAAN KAP DAN RANGKA ATAP
1. Pasangan Konstruksi Kuda-Kuda Kayu 0.66 6,837,000.00Rp 731,200.00Rp
2. Pasangan Rangka Atap 109.02 86,250.00Rp 8,260.00Rp
3. Pasangan Lisplank Papan 3/20 13.60 43,950.00Rp 13,270.00Rp
4. Pasang Atap Genteng Metal 109.02 84,500.00Rp 11,060.00Rp
5. Pasang Nok Genteng Metal 8.40 61,550.00Rp 144,615.00Rp
No. Volume Bahan Upah
VI PEKERJAAN KUSEN, PINTU, DAN DAUN JENDELAH
1. Pas. Kusen Pintu dan Jendela Kayu Kls I 1.63 6,600,000.00Rp 1,197,000.00Rp
2. Pas. Pintu dan Jendela kayu kelas I 7.04 416,000.00Rp 195,300.00Rp
3. Pasang Kaca Mati 9.68 47,806.00Rp 8,915.00Rp
VII PEKERJAAN PLESTERAN
1. Plesteran 1 PC : 4 PS Tebal 15 MM 606.75 5,240.00Rp 14,015.00Rp
VIII PEKERJAAN LANTAI
1. Pasangan Tegel Lantai Keramik 40 X 40 48.14 69,760.00Rp 7,387.00Rp
2. Pasangan Tegel Lantai Keramik 30 X 30 6.64 52,760.00Rp 7,387.00Rp
3. Pasangan Tegel Lantai Keramik 20 X20 1.55 60,260.00Rp 7,387.00Rp
Macam pekerjaan
PEKERJAAN PENDAHULUAN
PEKERJAAN PONDASI
PEKERJAAN BETON
LAMPIRAN URAIAN ANALISA SATUAN PEKERJAAN
Macam pekerjaan
IX PEKERJAAN PLAFON
1. Pasang Langit-Langit Eternit 100 x 100 56.33 11,170.00Rp 4,777.00Rp
2. Pasangan Rangka Langit-Langit 56.33 25,500.00Rp 20,775.00Rp
X PEKERJAAN SANITASI
1. Closet duduk 2.00 1,756,300.00Rp 163,151.00Rp
2. Bak Mandi fiber 2.00 268,424.00Rp 208,540.00Rp
3. Kran air 5.00 25,125.00Rp 5,560.00Rp
4. Floor drain 2.00 19,000.00Rp 5,560.00Rp
5. Pipa PVC Ø ½" 10.00 20,000.00Rp -
6. Socket 7.00 2,500.00Rp -
7. Tee 5.00 3,500.00Rp -
8. Elbow 10.00 4,000.00Rp -
No. Volume Bahan Upah
XI PEKERJAAN KUNCI-KUNCI
1. Kunci Tanam 2.00 227,000.00Rp 21,040.00Rp
2. Engsel pintu 16.00 16,000.00Rp 8,915.00Rp
3. Engsel jedelah 10.00 5,460.00Rp 5,960.00Rp
4. Kunci grendel 5.00 10,000.00Rp 5,960.00Rp
5. Hak angin 5.00 13,125.00Rp 8,915.00Rp
XII PEKERJAAN CAT
1. Pengecetan Bidang Kayu 1.63 16,770.00Rp 2,911.00Rp
2. Pengecetan Tembok Baru 606.75 22,020.00Rp 3,841.00Rp
3. Pengecetan Plafon 56.33 14,640.00Rp 3,034.00Rp
XIII PEKERJAAN INSTLASI LISTRIK
1. Pek.Pemasangan Instalasi Listrik 1.00 873,500.00Rp 700,000.00Rp
JUMLAH
TOTAL
Macam pekerjaan
∑ bahan ∑ upah jml analisa total
34,700.00Rp 8,260.00Rp 42,960.00Rp 1,103,758.50Rp
835,498.50Rp 225,300.00Rp 1,060,798.50Rp
- 641,900.00Rp 641,900.00Rp 7,027,268.19Rp
- 76,963.70Rp 76,963.70Rp
159,120.00Rp 34,255.00Rp 193,375.00Rp
3,817,744.00Rp 1,207,369.20Rp 5,025,113.20Rp
793,200.00Rp 296,716.29Rp 1,089,916.29Rp
5,982,790.04Rp 708,745.50Rp 6,691,535.54Rp #############
12,753,751.73Rp 1,388,142.36Rp 14,141,894.09Rp
6,019,806.10Rp 641,633.30Rp 6,661,439.40Rp
9,991,725.70Rp 4,229,068.80Rp 14,220,794.50Rp #############
4,491,909.00Rp 480,398.40Rp 4,972,307.40Rp #############
9,402,543.75Rp 900,463.90Rp 10,303,007.65Rp
597,720.00Rp 180,472.00Rp 778,192.00Rp
9,211,767.50Rp 1,205,705.90Rp 10,417,473.40Rp
517,020.00Rp 1,214,766.00Rp 1,731,786.00Rp
∑ bahan ∑ upah jml analisa total
10,758,000.00Rp 1,951,110.00Rp 12,709,110.00Rp #############
2,926,976.00Rp 1,374,130.80Rp 4,301,106.80Rp
462,714.27Rp 86,288.29Rp 549,002.56Rp
3,179,370.00Rp 8,503,601.25Rp 11,682,971.25Rp #############
3,358,246.40Rp 355,610.18Rp 3,713,856.58Rp 4,218,085.51Rp
350,326.40Rp 49,049.68Rp 399,376.08Rp
93,403.00Rp 11,449.85Rp 104,852.85Rp
629,206.10Rp 269,088.41Rp 898,294.51Rp 3,504,965.26Rp
1,436,415.00Rp 1,170,255.75Rp 2,606,670.75Rp
3,512,600.00Rp 326,302.00Rp 3,838,902.00Rp 5,270,375.00Rp
536,848.00Rp 417,080.00Rp 953,928.00Rp
125,625.00Rp 27,800.00Rp 153,425.00Rp
38,000.00Rp 11,120.00Rp 49,120.00Rp
200,000.00Rp - 200,000.00Rp
17,500.00Rp - 17,500.00Rp
17,500.00Rp - 17,500.00Rp
40,000.00Rp - 40,000.00Rp
∑ bahan ∑ upah jml analisa total
454,000.00Rp 42,080.00Rp 496,080.00Rp 1,198,920.00Rp
256,000.00Rp 142,640.00Rp 398,640.00Rp
54,600.00Rp 59,600.00Rp 114,200.00Rp
50,000.00Rp 29,800.00Rp 79,800.00Rp
65,625.00Rp 44,575.00Rp 110,200.00Rp
27,335.10Rp 4,744.93Rp 32,080.03Rp #############
13,360,635.00Rp 2,330,526.75Rp 15,691,161.75Rp
824,671.20Rp 170,905.22Rp 995,576.42Rp
873,500.00Rp 700,000.00Rp 1,573,500.00Rp 1,573,500.00Rp
108,258,392.79Rp 31,517,918.45Rp ##############
139,776,311.24Rp