~W[JD~An ISO 9001:2000CertJtled CO!T1EB"Y _ ~ _. _
RAJASTHAN RAJYA VfDYUT PRASARAN NIGAM LIMITED.ICorporate ldcntitv Number (CIN ):LJ40I09R.I2000SGCO 164851
(Regd. Office: Vidyut Bhawan . Jan Path . Jyoti Nagar, Jaipur - 302 005)OFFICE OF THE SLPERINTENDING ENGI"IEER (PROJECT & PLANl\'ING)
r +91-141-2740623.fax:+91-141-2740794:e -rn a i I: ~"~~!2r_!!.j_I.:J2ll_~~_Qjl)_;_~~~r_;;__UC\~~\1.:rJ:pn, C (), in
No, RVPNISEJP&P)/.KEN (Proj.)/AE-IVI F, 2881D
The Chief Engineer (T&C),The Chief Engineer (Civil),The Chief Engineer (Procurement/Contract),RVP,N, Limited, Jaipur/Jodhpur /Ajmer.
Sub: Revised Annual Plan 2017-18 and Annual Plan 2018-19 (Proposed).Ref: This office letter no. 1851 dated 17.03.2017.
Kindly refer this office letter no, 1851 dated 17,03,2017 vide which Annual Pan 2017-18
for capital works was circulated having outlay ceiling of Rs. 2700 crore. The Plan size for FY
2017-18 was revised by Govt. of Rajasthan to Rs. 2052.54 crore. The proposed Annual Plan for
FY 2018-19 is of Rs. 1500,00 crore including all the schemes approved by BoDIWTD, after last
Plan circulated vide this office letter no, 1851 dated 17.03.2017.
In view of above, a copy of the revised Annual Pan for FY 2017-18 and FY 2018-19
(Proposed) along with its enclosure (Annexure-A), is enclosed herewith for your kind reference
and further necessary action, The execution of various schemes is to be done as per plan targets
and plan provisions indicated in the enclosed Annexure- A of the Annual Plan, It is to be noted
that the earlier Annual Plan circulated vide this office letter no. 1851 dated 17.03.2017 have
now been replaced by this new Annual Plan.
Ene! As above. ~~{\~(Kanika Sharma)
Chief Engineer (PP&D)
Copy along with enclosures submitted I forwarded to the following for intimation and n/a. .J ~
1. The Chief Engineer (MPT&S I NPP-Reforms I LDI IT), RVPN, Jaipur.
2 The Chief Controller of Accounts, RVPN, Jaipur.
3, The Chief Engineer (Rajasthan Urja Vikas Nigam Ltd.), Shed No, 5/5, Vidyut Bhawan,
Janpath, Jaipur,Rajasthan
4 The Add!. Chief Engineer (Communication), RVPN, Jaipur.
5 The Add!. Chief Engineer (MPT&S), RVPN, Ajmer I Jodhpur,
6 The Add!. Chief Engineer (Civil), RVPN, Jaipur I Ajmer I Jodhpur,
7 The Superintending Engineer (MIS), RVPN, Jaipur for immediate publication on RVPN
website.
8. The Superintending Engineer (Procurement-I I Procurement-II I Contract- I I Contract- III
Designl Automation I QC-Insp. I HRDI NPP-Reforms I SO-LD, RVPN, Jaipur.
9. The Superintending Engineer Communication, RVPN, Jaipurl Ajmer I Jodhpur.
10. The Superintending Engineer (Protection), RVPN, Jaipur I Kota I Ajmer I Udaipur I
Jodhpur I Bikaner.
11. The Superintending Engineer (T&C), RVPN, Ajmerl Alwarl Babail Barmerl Bhadla/
Bharatpur/ Bikanerl Bhilwara I Chittorgarhl Hanumangarh I Hindaun IJaipur city/Jaipur
Rural I Jaisalmer I Jodhpur /Kankani / Kota / Merta I Ratangarh I Ramgarh /
Swaimadhopur I Sikar I Sirohi I Udaipur
12. The Superintending Engineer (765KV GSS), RVPN, Anta (Baran)1 Phagi (Jaipur).
13 The Superintending Engineer (Planl PPM), JWNLI AWNLI Jd.WNL, Jaipur/ Ajmer/
Jodhpur
14 The CAO (Accounts- Budget-Insp I P&F-Cont.), RVPN, Jaipur.
15 The COlA, RVPN, Jaipur.
16 The RCAO, RVPN, Jaipur I Ajmer I Jodhpur
17. The Sr. Accounts Officer (B&R I Accounts I LD),RVPN, Jaipur.
18. The Executive Engineer- II (P&P), RVPN, Jaipur.
19. TA to Hon'ble CMD, RVPN, Jaipur.
20 The PS to Director (Tech/Operations), RVPN, Jaipur.
21. The PA to Chief Engineer (PP&D), RVPN, Jaipur.
End As aboveChief Engineer (PP&D)
\i\i1Li'lI I' Iii" .'ij I 7- i S i "'31 ( i< I 8: :::uI S·I ') (1') iViulCh , .,O! S, .\ls
-~----,.-------.-.....-------------_,----1------------------ 00£00£~VI\V'J)fuegJOll:ledeJ -------:----II\)f(:£~/0(:(:/0017
OOS~OOS~VI\V'JIUOqelu8w6nvI
1---
S~9~'soN_J ------.-.------!
I
SL£SL17VI\V'JSISI\)f(:H l-----~-----------------_.-L~£917£sV'J)f:lS8U1ll\)f(:H.._-
£Z'soN
01790(:£VI\V'JI
SISI\)fOU ---.---.-.----------~----------,-----i------------.-~--.-.----.-------------1----
O~£(:9£sV'J)f:lS8U1ll\)fOU --------------------1--------------------1---
Z£'soN --------------------------_...--._---
0£9~0£9£VI\V'JSISI\)f0017-
017Los.~sV'J)f:lIS8U1lI\)f0017 ----------------------------_._----_._-_.__....._-_._---._--'soN --_-_------_._------------_._------------VI\V'JSISI\)fS9L-----sV'J)f:lS8U!ll\)fS9L--
(al\!lelual)6~-8~OZ(pas!I\a~)la6Jelpasodorg8~-HOZla6Jell!Un__L_______~Jel~?!lJe_c:J_L?
9--------I
LI---I9S
[-
(pasodorg)6~-B~Q(~
Aennoueld---(SoJOJ:JUI'S~
(pas!Aa~)B~-HOl
Aennoueld
(pasodoJd)6~-S~OZ'B(paS!l\a~)S~-l~OZNdA~JOueldlenuuV
Transmission - -I I __L~__ I I I I _ J __ J Annexure-A
De~t~l_s~QL~~I~"-Provisions~&Phvsical1an!ets fpLAnnual Plan 2~m7-l8(Revised) ~ 2-Q_18~1~JtDosedll_l I I Rs. In lacs
I
SAP codeS.No. Name of the WorklProject Line Capacity Estimated Working Annual Plan 2017-18 (Revised) Annual Plan 2018-19Length (in MVA) cost Target I t-:P:-r-ov--=i--=si:-o-n..---=P=h-y-si:-c-a=-'IT=a-r-g-et-s-'-i-p=r-o-v"-is-'-io-n-'--:p::Ch--:y-s"-ic-a-1T=a':"rg-e-ts---l
(Ckt. kM) (with Dt. of Plan PlanIDC) Comm. (Tentative) Revised (Tentative) Proposed
Lc.ktKm IMVAINo< Ckt IMVAlNos
Category
765kV Schemes
New start 2017-18--
2 4
--- -+-----t~-- l-:-----_ ..._-----
Installationof 3x500 MVA, 765/400kV Power transformer (ICT-3) at 765kV GSS at Phagi CGSSII7.02in place of already approved scheme of 2x500MVA, 765/400kV Transformer at 765kVGSS Phagialingwith associated bays.
---
~I._Tolal 1765k'y.l _ ~.I!._ _ __ . ~kV - W.orkin_!!
_______ ._..AI!.!l.ual P!al1_t'H!!ejII 400kV Schemes
~-On-going schemes
t-- --tc~~posi;;_p~~_;:_~ Evacuation System (Chhabra Super Critical TPS (2x660MW)&Kalisindh TPS (2x600 MW)jf-, 400 kV D/C (Twin Moose) Phagi (Jaipur 765 kV) - Ajmer Line (2 I3ckM)
1000
--_. -, --- .~-~
ES 1500 7509.4 2019-20
~'-r------
.-
-- ..-1000 -r- IL_ _..!L_ ~
.-_.II __t----"-O--+ _-- _..!L -_O"_--l__
I·
-- t-- r-1---
- ---~~--jl------+-----+-
~-~-- CLIN/09 01 ! ---'E::cS"'----ir--:2=-=1-::3-+--- -2000- 213
- -~---- f--------j-----+
300
Delinked Power Evacuation schemes of Banswara Super Critical TPS ( IPP Unit-___ 1&2)(2)(~O__"!"'L _ _ _ __ ~. _ _. ~_,-=-- _
2 400/220 kV, Ix500 MVA, Ix315 MVAGSS at Jodhpur (New) alongwith 400kV, lx80 CGSS/09 06MVARBusReactor. IRc\ hed!
14@kV l~terc()nnecti~g_Li!1~e~~IDelink~.ur~1IIBanswara SU_II_erCritical T!'Sl~_400 kV D/C Chittorgarh-Bhilwara (Twin Moose) Line CLIN/09 04
~-4- 400kV D/C i3"ilwara-Ajmer (Twin M~-;;se)Line CLIN/09 061- -~~---~~~.~~--- --. ~--..- -~----- ---I- ----___ Power Ev_a~u_a_tio_nSche_l!!eof Sur"tg>ll'h Super Critical TPS(Unit 7~8) (2x6~.M_\\'l_ __
5 400/220 Kv,2x315 MVA GSS at Babai (Jhunjhunu) alongwith 400kV, Ix80 MVAR Bus CGSS/09 07Reactor and 2x80MVAR Line Reactors at Babai end of 400kv DIC Suratgarh TPS-Babai(Jhunjhunu) line.
-- ---
4_()()kVIn_terconnectil!.~_Li.nes(Suratzarh Suner Critical TPS Evacu'!tionl:400 kV D/C Suratgarh TPS- Babai (Jhunjhunu)(Quad Moose) Line CLIN/09 24 - ES6
1---1--- -----. -. - c - -- _ _ _ __
Transmission System for New Solar and Wind Power Plants in Jaisalmer, Barmer &,-~ ----------- --- -------.. . _.- ._---
7 (i) 400/220 kV, 3 X 500 MVA Pooling Sub-Station GSS at Ramgarh (Jaisalmer)alongwith400kV, 1x 125MVAR, 400kV Shunt Reactor (Bus type) and 2x50 MVAR ShuntReactor (line type) for 400kV ole Ramgarh-Bhadla line
----I--cc_ --. ---- -- ------, ------~ --- -----:--.--(ii) 2201132kV,3x160 MVA with 132/33kV, 2x40/50 MVA (RVPN scope) alongwith 4nos. 220kV feeder bays,(RVPN scope) (220/132 Kv, 1x160MVA Transformer comm.on 8.5.(5)
ES
ES
ES
I-Ix500,lx315
+----t--------
99
320
- . --- - -- ------~- ------
---1- - -- --- ---~ 4644.14 2017-181
-- I- --,--:--c- - 2Q JB~9- 13923_6 24.01.18
700
1000
99
~6 I---
1'(2400--m,'---"---
+------- --- --- 1- 1-
-r----:48;c;0c--i---_ - 4357658'1-2018-19-t--
3700
300
300
630 300
()_()_o
--
-I -- -
--
---
480
- -- -- ------
----- 1500
CGSS/09 13
------ - -.-- -------- 1--- -t-- ---I--~~I_---__I---__l
-ES"~-r--::---- ~500 - "31527-:71 t-i5,ii~i7- 7200-- --- -- 1500 -- --0--- 1---
Annual Plan 2017-18 Final (R) & 2018-19 (P) March 2018Annexure-A (March,18)3/15/2018
- - ----
3x160,2x40/50
2017-18 1- 100 -1--- o
o --j) -o -
------
- -
---
I- ---
-
- -
S.No. Name of the Work/Project
~~ --- ------~~--~~~---
15 400 kV O/C Ramgarh(Jaisalmer)-Akal (Jaisalmer) line (Twin Moose) (ADB TR-I)
f------ - --- ---- - ------- ...--. -~-8 (i) 400/220 kV, 3 X 500 MVA Pooling Sub-Station GSS at Bhadla (Jodhpur) alongwith
400kV, Ixl25 MVAR Shunt Reactor (Bus type) and 4x50 MVAR, 400kV Shunt Reactors(Line type) for Bhadla ends of 400kV O/C Bhadla-Bikaner line, 400kV LILO JodhpurMella at Bhadla line and 400kV O/C Rarngarh-Bhadla line. (ADB TR-I)
f__- GSS comm_oll22.07.2O_I7 _ __ __ ___(ii) 220/132kV, 3xl60 MVA with 132/33kV,2x40150MVA (RVPN scope) alongwith 6nos. nOkV feeder bays..(RVPN scope) 2201132 Kv, lxl60 MVA Transformer comm.
1--=--t0",-"n~9~.8.1_4__? 9 (i) Augmentation of 400kV GSS Akal by installation of 400/220 kV, I X500 MVATransformer (RVPN Scop)(ii) alongwith 400kV, lx125 MVAR Bus Reactor and 400kV, 2x50 MVAR ShuntReactor (line type) for proposed 400kV Akal-Jodhpur (New) line. (ADB)
._lQ_ _ Auenrcntauonat 400kV_GSSBlill1_,,,r _1-__-I':'-1i),.lxI25MVAR, 400kV Shunt Reactor (Blls type) at 400kV GSS BarmerI-_--+'-('-'-ii)__400kV bays for 400k\f_Q1CBaflll~r::_Elhinmal(PG_l."li,_.,n,"-e ~
II AUl!menJ.aliQ!lat4QOkVGSS BikaneUADBIf__- ill_ Ix125MVAR~400kYBus ReactQr :lHOOkVGSS BikanerGSS ... __1-_-t'-'il'l_)_4Q.OkYElavsfor_1QOkV_Q/C_Shlldla-Bikanerline and 400kV O/C Bikaner-Sikax
(iii) 2 Nos. 220kV feeder bays alongwith 220kV O/C linking transmission line for charging1-_-j"",400""k_'V,Bhadla-Bikaner.line.on 220kY. .~__________ ..
12 Augmentation o["OOkV_Q_S_SJodhpur (New) _(i) 2x50 MVAR, 400kV Shunt Reactor (line type) at 400kV GSS Jodhpur (New) for
__ 4_QOkVO/CAkal-Jodhnun.Newj.line.... ..(ii) 400kV bays at Jodhpur (New) for ULO of one ckt. of 400kV O/C Raj West LTPS
f------ Jodhnur line.400kV InterconnectingJ,.ig~~_( New Solar &_,!W!Ji",n"d--,P--,la",n",t~sIL:~ _
13 400 kVO/C Rarngarh-Bhadla line (Twin Moose) (Revised)f------ --14 400 kV O/CBhadla-Bikaner line (Quad Moose)
-~--.- .. -."-."
(iii) 400 kV SIC line extension from 765/400 kV Anta GSS to PGCIL's 400/220 kV Kotat---c-:-- GSS __- .----- -----20 PSDf funded schemes
SAP code Category
2017-18
CGSS/09 13 3x500
CGSS/09. 15 f
--1----
CLIN/09 10
nrN/O 9.12- -
CLIN/09 14
CLIN/09.15
CLIN/10.01
CBAY/10 01
CLIN/10 .02
Line Capacity EstimatedLength (in MVA) cost
(Ckt. kM) (with!DC)
ES
3x160,2x40150
Annual Plan 2017-18 (Revised)WorkingTarget IDt. ofComm.
Annual Plan 2018-19
o
o
o
- t-------- f-------
400
100
500
1000
- -1----.- f-
-f-45
--1--
Plan(Tentative)
Provision Physical Targets Provision Physical Targets
L36234.37
_1_22.07.17
ES 1----r~lx-5~00~~8-832.4g_ (i) 100 --1-- _-t- --
8200
500
500
1000
500
PlanRevised (Tentative) Proposed
kt Km. MVAlNos. i-n""k"":"":"t=i!M=V:::'A,-lNn-l.
----
--
-_-_~ ------1- -I-
1500
--
--
Annual Plan 2017-18 Final (R) & 2018-19 (P) March
--
--
ES--f-- ES
-- -
ESESES
Transformercomm. on
5.3.15... (ii) 2017·)8
3177.51- --
3701.39
2018-19
-
- -- e--
- -- .
-- ----
360
200 o-- I- 7000- ~() ...--~-
--- -
ES 280- f---- -- - - 800 -- I-- - r-13902.43 2018-19--480 -- ----- ------:--:- --ES 56784.04 2018-19 10200
- -- r----- - f--. ---13200- t-- - f---
--t--- --I-- -1------ --~
ES -I~f---_---- -'n,65-- 2017-181
ES-+---.- .- f----
2018Annexure-A (March.18)3/15/2018
f---
-- 1----- 1--
l-r2018-19
1811.54 2017-1812018-19
1-2686:801--20i ~ ..
.._J8i2.OJ.&..12
-- -1---
r- 45----1--
t----
I--------I-.--------~----~.
--1--------+---- -
7000 280. - - 4200 480
of----- t---+t- 300
320
---
1l6""" 4CiOkY-OiCline from 400/220k V Pooling Station B-hadlato LILO point at 400kYSICJodhpur-Merta line (Twin Moose) (ADB TR-I) (Revised)
ru- 460kY-OiC Banmer-Bhinmal (PGCIL) line (Twin Moose) (KfW)-------- ------ ---~- -_ ..__ .- -------18 (i) 400kY D/C Akal-Jodhpur (New) line (Quad Moose) RVPN SCOPE
f------ (ii)-(ii~~ conductor for 400kV O/C Akal-Jodhpur (New) line (Quad Moose) is i~ the - I---l--~pS",c.,ollio",-enf.AD8) . -~-- --~ ---~---.. __ __f----.- __19_ . Inter- con_n~l:tRVPN's 7~5/4.!!.QJ<._YAn_1_aGSS_!Q_PGCIL's400/220 kYJ(ota GSS
(i) LlLOof2°" circuit of 400 kV O/C Chhabra TPS-Oahra section at 765/400 kV Anta__ GSS_____ _ ... .___ __ __..__ _ _
(ii) 400kV bay equipments work at 765/400kV Anta GSS
ES
ES -------
.---~-f__
ES 320 15887.78 2018-19 3000--3-79- I--
42589.27I- --
ES 15.04.17 1500
--CZOO..1----ES 9931.72 15.12.17 2400
ES . 390~ f------- 'l9362.14 I-2018-19 2600
---J-- -.-1---- - --4968.21 }_Q_[7-_1Jl_
_....,1---_._1--- _2017-18616.15 2017-18
- --~ -- --_-2018-19 --- 200 --
f--------- ---
S.No. Name of the Work/Project SAP code Category Line Capacity Estimated Working Annual Plan 2017-18 (Revised) Annual Plan 2018- I9Length (in MVA) cost Target I Provision Physical Targets Provision Physical Targets
(Ckt.kM) (with Dt.of Plan PlanIDC) Comm. (Tentative) Revised (Tentative) Proposed
!CktKm. MVAINos. Ckt MVAlNns--------------- 2 4
(i) Installation of one no. each new 400kV , [2SMVAR Bus type Shunt Reactor at 400KV SS 2396 2018-19 3200 4000GSS Hindaun and 400KV Merta city alongwith shifting of 400KV , SOMVAR Bus typeShunt reactor from 400KV GSS Merta city to 400kV GSS Bhilwara and assoicated 400KVBays at tese 400kv GSSs
c--- ---_"_------ -------- ------------ --- --_ .._----- - ._-- ----- 1- - -(ii) Scheme of Renovation and Up-gradation ofall RVPN substations of220kV and 400kV SS 898S.6 2018-19to rectify protection related deficiencies (PSDF granted schemes).
--- _------ -r-f-' ------Supplementary Transmission System for Power Evacuation Scheme of Solar Power Projects inJaisalmer, Harmer, Jodhpur and Bikaner Districts (KfW funded schemes)
rsr -~-.-.- ----
CGSS/08--- -
4001220kV, 2 X 500 MVA GSS atlaisalmer-2 alongwith Ix I2SMVAR , 400kV Bus 02 ES 2 XSOO 19379.76 2018-19 5000 4000 1000Type Reactor
22 400 kV D/C Jaisalmer-2 -Barrner line CLIN/ll 09 ES 260 13498.12 2018-19 600 6000 -- t-260 ---
23 400kV Terminal Bay Equipment at 4001220kVGSS Barmer (for termination of 400 kV CGSS/09 16 ES 3619.2[ 2018-19- - 200----- ---
500D/C Jaisalmer 2 - Barmer line at Barmer end)
24 400kV Terminal Bay Equipment at 400/220kV GSS Akal I(for termination of 400 kV SIC CGSS/09. 17 ES 1820.11 2018·19 100- ---- f--
400Akal-I - Jaisalmer 2 line at Akal-l end)
- -
- ---
-100ES 20 2691.71 2018-19 1000 20
- --- ----20[8-19ES 871.76 100 300
2020-21-- --18 ES 2x500 3912_7 100 SOO26 Augmentation at existing 400 kV GSS Akal [400/220kV, (+) 2x500MVA & (-) 2x315 CBAY/16
MVA 1 (KfW) (Revised)
Newstart 2017-181-2=--4c-1-=-L=IL'CO=-0-f-one ckt. Of under construction 400kV D/C Akal- Jodhpur line at 400 kV GSS .--
Jaisalmer-2 (KfW funded schemes)
25 Ino. 400kV Quad moose bay at Jaisalmer -2 ( Half Dia) with additional hardware forconversion of one no. 400kV Twin Moose bay to Quad Moose bay (KfW)
Annual Plan tan~_tll---
--------- --- ..- ....-.-. '1-___ ...__..l.t, .J'mal(400 kY11--- #REF'!Taraet 400 kV - Workin!!
4 220 kV Revised Interconnections
III 220kV SCHEMES
I_l_ hl!!!I_r (:ity EHVlIetw!lrk stre_!1!~therri!1_!!_~c"-gll1e-L___ ... ----------. 1-=,(i) Up-gradation of existing 132 kV (SIC & D/C Sections) Line to 220 kV ole Line CLIN/08. 01Between 220 kV Heerapura to 220 kV Nallah Power House
Transmission System for New Solar and Wind Power Plants in Jaisalmer, Barmer &---::-__ Jodhpur Districts . .... . _2_ 220~Y Inter<:Q_nll_ectingLinesaj 4(>0_ky__g_s_s_JQ(!Il1J_lJ_r(New) . . _ . _
(i) 220 kV D/C Jodhpur (New) - Jhalamand CLIN/09 22--- iii) 220 kV D/C JQ(jhp~r(New) . Barli . - -- -- CLIN/O 9 43
- =~~~:W~;Ey~~;~ti~n Sy~t!'!!l_ill!J1_..~t!!!l_r_"--S_u_Qer_Critical T_I'S. . _3 220 kV Interconnections at 400/220 kV GSS Babai(Jhunjhunu)
(i) LILaof existing 220 kV SIC Khetri-Heerapura line at 400kV GSS Babai (Jhunjhunuj--1C::LIN/0 9.44
------- .-~---- .. -~---- ------ '--1--
)----- -r- .------~
----+-----SS 10
-
--f-- ...854 81 Target to be
finalised
77700--
50 --
100 ... - 40)--.--
92
---- -f-----10 6
----c-
1238 3630_ilJlI_. 363Q/3
1180 JiiJ.0/3
___H9OQ 2230 1815 ..._____ -+~2""2"'3"_0--l__~
740 1630/~..
)-.------_.---
---~ -- -.-f- ----
100- ---)--
---)--- ---1---- ------1-- -- ---------
--
c----.-10-- -- -- 1------
---
Annual Plan 2017-18 Final (R) & 2018·19 (P) March
--------_.
ES 40
ES 92
-------
ES 6--
2018Annexure--A (March 18)3/15/2018
2043.68 2017-18
2017-18--f------ . .--- I---- - --I-
------ 4():8S- 2017-181___ 2018-19
SAP code
Plan Plan
Annual Plan 2018-19
. --+----1
-.---+---.--1
Category Line Capacity Estimated WorkingLength (in MVA) cost Target I
(Ckt. kM) (with Dt. ofIDC) Comm.
Annual Plan 2017-18 (Revised)Provision Physical Targets Provision Physical Targets
1450 2017-1812018-19
S.No. Name of the Work/Project
(i) Extensiopn of220 kV SIC VKIA· Kukas LlLO line up to 220kV GSS Manoharpur CLIN/09 46
(Tentative) Revised (Tentative) ProposedICkt Km I\1VA/Nos. I--C:-=-kt.:..:y.M~VA=-VN"'-lIs~
CBAY/09 08
_2_ .... _ __1ES 80 2052.12 30.12.17 100 80
ES-_._. f· .- --- ------_. .-
---- r- --:c- 1 500 -- _ •....
SS,LC 2x160, 4351.64 31.3,20172x50
SS 2 35.52 16.3.2017
_. -
LR,SS._. -_ . - -
54 945.79 2017-18 100 54
LR,SS... ---
- _.
. f-- .-.-
ES 641.81 2017-18 59
-- 1 .. - r- .I·
ES
32 902.54 2017-18
34 128.93 2017-18'- -
30 ES II 408.5 2017-1812018-19
.
(ii) I no.bays at 220kV GSS Sirohi~ ..-- ... -- .. --
(iii) 1 no.bays at 220kV GSS PindwaraI·.-.. - .--.-.
II (i) 2201132kV GSS at Amberi (Distt. Udaipur)
1 - - MLiLOor"220 kV SIC Kankroli(PG)-Debari line~t220kV (iss Amberi-
12 lloiVS/CDhod .D;':~i~·R;U;;garhIi~e
CLIN/ll 05 SS 25------ -~--
CBAY/11 06
CBAY/11 07......
-. LR,SS......
CGSS/11. 10 IX160,._----_. -36 rszs
CLIN/11 29-----~- ... _ ..
CLIN/ll 12 LR,SS 31-'"
500
.-
.. - _.50
400
400
7
.-
25
-.--~--~------
-.+---~-.--.------
--l---I---~
--+---~------
----
----t--4---50"-~----+-------
I--- -- -.. -.--I------j--- - .....-- f--._-
100-- -.--I-----j
_...
160
.._._--_. -
-. -- 1---=-- --.--
.._._-
50
500
200
100
--'--- .-
--
...... __ .. -
.... _._ ... -
'-'---
f- .... -
"1--' .-
... -.-
.. -
... -
(ii) 2 No. bays at 220kV GSS Manoharpur.
c" JODHPUR CITY EHV NA_TWORKSTRENTHENjNG SCHEME-IIJDENS5-1J5 (I) 220 kV GSS at Jhalamand (Up-gradation) (Dlstt Jodhpur) (1x160MVA transformer CGSS/O 9 25
comm. on 31.3.2017), _. ._-+=-:::-:
(ii) LlLO of220kV Jodhpur (400kV GSS)·Jodhpur (220kV GSS) interconnector-I at CLIN/O 9 29Ihalamand (I st ckt comm. on 27.10.2016)Normal develoDmeJ!1W()r~ . __ .
6 220 kV interconnec.tionsat 400122()_k'v'GSSat Neemrana(~_G)(i) 220 kV D/C line from PGCIL's 400/220 kV Neemrana(PG) to 8ehror(220kVGSS) CLIN/10 03Line charged on 132kVon 17.6.15.(ii) 2 No bays at Behror CBAY/10 02
Supplementary Transmission System for Power Evacuation Scheme of Solar PowerProi-t. ;n Iaisalmer Barmer.jlndhnur.and. Rik"ner IliSlri~ts___ . +_._RVPN scone schemes
7 LILOof both circuits of220kV D/C Ramgarh GTPS· Dechu line at 400kV Ramgarh. Line CLIN/11 30completed
8ADB loan schemes. . ._ _. _. .Optical Fibre Cable System for 220kV & 132kV Schemes already approved under MainITransmissilln..SystemiorNe.w.Solar& Wind Power Plants .& SmartGrid.AnlnLlwic""awtillonws"--c_-1I_·'C_(i) 220kV Transmission Lines already approved under Main Transmission System for Solar CLIN/11&Wind Pow..erJ>la.n.ts.JTotalRQuteleneth 140kM)iii) Software ().e".iopment forInte!(rationllnnovation,.SmartGrid_Applic.atiQnsetc. CLIN/11Composite Power Evacuation System [ChhabraSuper Critical TPS(2x660MW) andIIl.I;.;ndh T1'S12x600 MWII .. ,,---- I---LILO220kV Ajmer-Kishangarh Line at 400kV Ajmer GSS. Line completed CLIN/O 99
j_ ...Normal development works \
10 (i) 220 kV SIC Sirohi- Pindwara line
.!'lrn'erEyacuation System fur Proposed Wind Prniect ill Banswj!ra and PratMlgjlrh_.13 (i) 2201132kV,lxI60MVAGSS atPratapgarh (Up-gradatation) CGSS/ll 12
_.- -
(ii) 2 Nos bays at 220kV GSS Chittorgarh CBAY/ll 10--- -
(iii) 2 Nos bays at 220kV GSS Nimbahera CBAY/ll 11
4180.77 28.2,17
f---. -
-- 1---. --
1-. -.-. -- - ...28.02.17
705:07- 2017-Tsi· 200 31701R_IO
LR,SS
LR,SS
-_._-- .2635.20 16,06.17 1000160
LR,SS
Annual Plan 2017-18 Final (P) & 2018-19 (P) March 2018Annexure-A (March 18)3/15/2018
f--
1---.._--
SAP code Category
2793.49
Line Capacity EstimatedLength (in MVA) cost
(Ckt. kM) (withIDC)
WorkingTarget IDt. ofComm.
Annual Plan 2017-18 (Revised) Annual Plan 2018-19Provision Physical Targets Provision Physical TargetsP~n P~n
(Tentative) Revised (Tentative) ProposedCkt Km MVAINos. Ckt MVAINo,
48
S.No. Name of the Work/Project
CLIN/11 13(iv) 220 kV D/C Pratapgarh-Chittorgarh (400 kV GSS) line with one circuit via 220 kVGSS Nimbhahera (81 Ckm has been comm. on 16.6.17)
_ .._----,,-,,--- - .--
Norma] pevelooment Works _14 (i) 220/132kV,2x160MVA GSS atNPHJodhpur (Up-gradation) CGSS/ll.13
(ii) 220 kVD/C ove~;;ctl;~e fr~m Z20kV-GSSBasni (Jodhpur) to 220 kVGSSNPH-- fciIN)11 i4(U/C), Jodhpur in existing RoW using 2Z0kVTOWERS, 220kV Tubler Monopoles&!tnnp.t:9"r(\II_"_d?20k-V (':~hlptbr(lJlo-h thf"_AUMS oremises(iii) 2 Nos. 220kV bays at 220kV GSS basni (Jodhpur)
15 220kVD/C Ajmer(400 kV GSS)-Jethana(220kV GSS) line
16 (i) 220/132kV, Ixl60MVA GSS at Bherunda (Distt. Nagaur)
1- - - -- 'cBAV-;11:12CLIN/ll.16
----- 'cGsS/13 . 02
SS.LC,LR
LR,LC
SS,LC.LR
LR.SS
LR,SS
LR,SS
(i) 2201132 kV, Ixl60 MVA GSS at Halasar , Kushlana Johara, (Sardarshabar)(Distt CGSs/16.-26f-SS. LC, LR 1---19 Churu)
--'---------.---- - - ----- ------ ---- - - 1---(ii) LlLO of one circuit of220 kV D/C STPS- Ratangarh line at proposed 220 kV GSS CLIN/16. 40 SS.LC, LR
Kushlana(Sard1ll"~h~ar)__ __ ;{. _~ __ _ .__20 (i) 220 KV D/C Chatrail-Rarngarh (U/C 400 KVGSS) line (RVPN) Lin~ charged on low c- ES
I- -------- f-c-"-------- 1---CLIN/13 . 02 SS,LC,LR
ES
c---c--
-
242
II
120
80
35
48
200
7_6
.--""f---90
150
1 ""-- -
Ixl601--
1----
1---
2x160
Ix160,lx20/25---- --
Ix160
Ix160
411182 _L_ - t----+--::-~+----+----,-+_-__+--~22.02.18 242
----------
3213.46 2018-19
231400 2018-19--
227.22 2018-19
719.45 +---- ---2477.41
21.12.2017 2002017-18 2000
1894.78 -2017-18--- -----+----
353438 7.3.17
500
1000
1000
--------945.71 2017-18
-----~
1296.15 7.3.17----+------
3016 2018-19 500
900
--r---'-1-----
200
-
-I- -
200
1200 II
1-""
200
7
26
--1---
--1--- ---
f--- -- .-320
120 - c--. -f- 160 1000
""- - ------
. -f----
---------
---._--
--
----
160-- ----
----160
f-- --
I-- ---.
90 50 -
- - -- ----- I-- ------
I--- ---
--f---
-1---
---
(ii) 220 kV D/C , Ajmer (400kV) - Bherunda line
5411.44----_----2018-19 400
- I--
80t- -
---
--
--
1 n (i) 220/-1321:-", IXI60MV;;;_GSS at Bhawanimandi (New Location) withmmk-Y, CGSS/14 0420/25 MVA capacity Transformer
(ii) 220 kV SIC Kalisindh- Bhawanimandi line (R ) CLIN/14 .01r-sS,LC,LR
CLIN/14 . 02r-sS.LC,LR
---t--.-------f-------- CGSS/~05 r-- ES, LR
CLIN/16 091- ES. LR
1-(iii) 220 kV SIC Modak- Bhawanimandi line (R )
r--Normal developmellt worksf-
18 (i) 2201132kV, 160 MVA GSS at Chhatargarh (Upgradation) KfW funded
(ii) 220 kV D/C line from 220 kV GSS Gajner to proposed 220 kV GSS Chhatargarh
voltage 13.6.2016-----------
(ii) 220 KVD/C PS_II Bajju ·Bhadla(U/C 400 KVGSS) lineLine charged on 33kV on 08.02.16.
f--
1---- 1--.- .--r-------1----- - t--Newstart 2017-18
~-----------------
Power Evacuation System from new Solar & Wind Power Plants in WesternRajasthan. (KfW funded)
------------_------_-_,
(i) 220kV ole Aka] (400kV)- Jaisalmer-2 (400kV) line ------- -+-- ES
-----. -t-- ES21
- - --- --"-------------
(ii) 2 Nos. 220kV bays at Jaisalmer-2 (400kV)-1--
I---Normal Development works
--------------------- ---
22 220kV D/C Jodhpur (400kV GSS)- Banar line [completion of balance work of220kV D/CJodhpur (400kV GSS)- Banar line)
-------------
(i) 220 kV D/C line on Narrow Base/conventional towers from Jodhpur(400 kV GSS) toproposed 220 kV AIS sub-station Banar
Annual Plan 2017-18 FInal (P) & 2018-19 (P) March 2018Annexure-A (March.1S)3/lS/201S
-- ...-----1-_._--3360.23 2018-19
448.63 ~018-19
35 200-- l-:
----
--
1000
1500
1--1200
200
I20~ - 50--1--- 90 50
2095 12 --i017-18 50
1-----·_---
- - r---- .-- I-4574.25 2018-191 1001876-- 2019-20
I----t-- -I--
I ....1714.76 2018-191
2019-20
1000 150I--- I--
1--
/-----
1--
t
-- --------800
Name of the Work/ProjectS.No.
-- "-(ii) 220 kV D/C XLPE Cable for termination of proposed 220 kV D/C Jodhpur(400 kVGSS)·Banar line at proposed 220 kV AIS sub-station Banar
-- _._--2 (i) 220/132kV,Ixl60MVAGSS at Aklera (New location)
(ii) L1LOof 220 kV SIC Jhalawar- Chhabra line at 220kV GSS Aklera (Proposed)
B. New400 kV & 220 kV Schemes (to be identified) (Including land cost for land bank &PPP schemes and their priliminary boundary wall works etc)
C. 220 kV Bus Bar Protection SchemeD. Carried Over Liabilities (Civil-w-o-;rk-s-=&-=B=-al=-.C=E:--Ie-'ct-:.Works - 220kV & 400kV)of Sub
Stations& Lines Commissioned in last 3 years only--_-_ ----
(a) CE (T&C), Jaipur Zone--_ .. -_. ---- ---~~~~~-
(b) CE (T&C), Jodhpur Zone--~--~-- -------------------(c) CE (T&C),Ajmer Zone
-- --- ----- .-~- -- -- ~~~---~-(d) CE (Civil), Jaipur
(e) CE (Civil), Jodhpur. - ------- ~~~~--
--
__ 1l1__TQtal (220 kY) .~#~R~E~F~!---t------jr--Tareet 220 Ii,\, .-WOBK{N_G
. Annl!ll! PJa_ntare~t"--c---
'=:IY I~_I,-y S.CHEMESA _ On~goinl! sCII~me~__
Normal Deve!!l.llmentSchem.~e,,-s _(i) 132kVGSS at Bijaipur (Chittorgarh)
(ii) I No. 132kV bay at 220kV GSS Nimbahera
(iii) 132kV SIC Nimbahera - Bijaipur line-- -----.--c----::-::-~~-:c-:-:---_:_-
2 (i) I32/33kV, 20125MVAGSS at Kanera (Chittorgarh)--------------
(ii) 132kVNimbahera - Kanera line
-- (iii) I No. 132kV bay at 132kVGSS Bijaipur3 (i) 132kV,2x50 MVA GIS SIS at New Jhotwara (Jaipur) (Turnkey)
---------~~~-(ii) L1LOof 132kV VKI- Vaishali Nagar line to New Jhotwara (Turnkey) by 132kV
~ __,1200_SgD1mXLP§_ca~_ _ _~~~_.4 (i) 132kVGSS at Bapini (District - Jodhpur
1- -'(iii I32-k'VS/Ci.:;;;e fro;;-';2201132kV GSS A~-~-Bapini1- - ~---.--- ..----- ..----
(iii) 132kV Feeder bay at 220/132 kV GSS Aau
1-" S- (i)132/33kV, :lO/25MVA GSS atM~kt.ampura(p-;:-~tapga~h)
(ii) L1LOof 132kV SIC Pratapgarh - Dalot line at Mokhampura (Pratapgarh).--1--:- - - - --------- . - ----6 (i) I32/33kV, 20/25MVA GSS at Joojhpura (Udaipur)
Annual Plan 2017-18 FInal (PI & 2018-19 (PI March
CBAY/ll 15 L~SS
.- - ._----
----- --
1- --
-- - --- f-- -----
1-
5---
-- - -582.44 4.3.17
5154 4.3.17-
Annual Plan 2017-18 (Revised)Provision Physical Targets
Plan(Tentative) Revised
ICktKm MVAINos.
Annual Plan 2018-19Physical TargetsProvision
Plan(Tentative) Proposed
t-(=k:-'--'-TM:"::::-:V.A~IN__j)S:--l
200---
1000
c--- 1--- ---
80
1000-
2000 -
2200
500
600
500
200. - - -
200
16069
----
1000
-- --
300
300
200._-
100
100--
30.4.17
1041 320.---t---,:,l 0,,::,4~1____r--::3"2_Qa
362 32012
500
---1---~
25 - ---
_ 1451Q__ _475~110
25.3.17
~- I-- -
----:5~OO~----r~---'--- --I-- ----
--I- ....- r-59~:,,-+---:-::-:-::---+-- 2x50-- 698043 28.10.17
r----~1------
1-----1--_._-
1000-,-- - - ~100 ---
--
- ---
1--
--c-- -.- --- ---"-
1'-
---c---' - --
- --~
---
. -f----..-I--
-----
--
--- _._-25 1190.48
597(j-
39 -I- ~r-49Q57-
-=1: 25] ~-22~.2_8_--;-;:;-;-::-;-;;:-11--'1=-=2-- 345.88
2018Annexure-A (March 1813/15/2018
-- ---t--------t-C'G~;::S;::S:-/··:l·=-l-.=-1=-5+--;L-;;~--:S:-;::S-t-------
CGSS/14 16 V~ LR, LC---- -_-=-t------+-----::-:---lCLIN/14 .03 V~ LR, LC 34
CBAY/14 01 VR, LR, LC
,---
-
1- - --
,-- -
--
--
--- ---
-
-
-~- .-
__ 800 __800/4
_ Ji40ii':::
-
---
1-- --
1---- -'
- c-- -
-~ .-
CGSS/14 .10 1-----+---- ..+ -25--~76.95f--.-7.l.i7- -2-00-1--- ---~-j-------- ~- t--- -VR, L~LC
CLIN/14 09 r------ --- . 17V~LR.LC
CGSS/14 12 ----~- ---fVR, LR, LC
- I' 17.1.17---f-
25 1595.72 27.1.17 200
t--------
--- -
r----- ----_.- - ---- --
----
S.No. Name of the WorkIProject
- -- 1-·-:-:-:-=-:--=-=-=c-:-;-(ii) 132kVSIC Joojhpura (Udaipur)· Bhinder (132kV GSS) line
(iii) 132kVbay at Bhinder
7 (i) 132/33kV, 20/25MVA GSS at Balicha (Udaipur)
~i) LlLOof 132kVSIC Mad~i. Jawar mine-s-lC-in-e-a-t-B-alC-C-icC-h-a-(U--daipur)
8 (i) 132/33kV, 20/25MVA GSS at Desuri (Dist!. Pali)
(ii) 132kVSIC Bali- Desuri line
(iii) INo. 132kVbay at 220 kV GSS Bali
9 (i) I32/33kV, 20/25MVA GSS at Mamoni (Dist!. Baran)
(ii) 132kVSIC Kelwara- Mamoni line
(iii) I No. 132kVbay at 132 kV GSS Kelwara
- 10 iz;') 132133kV, 2-oi:is-MVAsubstation at Dadabari--f'-'-- --------- - -----------
(ii) LlLO of 132kV Sakatpura- I/A ·11line on Narrow Base and Monopole Towers
I- -'--II (i) 132/33 kV, 20/25 MVAGSS at Water Works Sanwali Road, Sikar
---(iij'LlLOofI32kV-sic Sikar=Ranoliline
r-----12 (i) 132/33 kV, 20/25 MVA substation at Saogarh
- --I-(ii)LlLO of 132kV Jaisalmer-Sheo line at Sangarh
-- - --------
13 (i) 132133kV, 20125 MVA substation at Kitasar-- -->,- -------
(ii) LlLOof 132 kV Sri Dungargarh-Ratangarh liner--I- -------
14 (i) 132/33 kV, 20125MVA GSS at Tatarsar- -- - -- --------
(ii) LlLO of 132kV Padampur-Sri Ganganagar line--I-15 (i) 132/33 kV, 20125 MVAGSS at Mareoa
---1---
(ii) LlLO of Dholpur-Rajakhera line--I--16 (i) 132133kV, 20125 MVA GSS at Chouth Ka Barwara
--1--- ----.- --.-(ii) LlLOof 132kV Sawai Madhopur-Tonk line
---I-17 (i) 132133kV, 20125 MVA GSS at Nanta
-----
(ii) LlLOof 132 kV SIC Sakatpura-Talera Line
Annual Plan 2017-18 Final (R) & 2018-19 (P) March
Category Line Capacity Estimated WorkingLength (in MVA) cost Target I
(Ckt.kM) (with Dt. ofIDC) Comm.
SAP code
CGSS/14 . 17
CLIN/14 18
CBAY/14 08
25- 1865.43-~---
VR,LR,LC1---+--- - _.
Annual Plan 2017-18 (Revised)
Plan
Annual Plan 2018-19
-- -1---
-------
___127.I.I7
27.I.I7
14.3.17 600
14.3.17
28.2.17 100
28.2.17
28.2.17
30.3.17 1-- 7001---
30.3.17
30.3.17
Plan
800
600
---+.- ---1---
-------r--- - --
I~ ---- -,
,r- ---
-
1
--
----
---- ----
-- -'-
---
-- - - ~ --- ---1----1-
--r---12
25--+--- -r-
------ ~- ------1----
--
---If -------1---- 1--
1-------1-
10
---1----- ---
--
Provision Physical Targets Provision Physical Targets
(Tentative) Revised (Tentative) ProposedICkt Km MVAINos. I--C-Ik----'rt!;.;M1-"'V;.;;:.Al-,INO.~
CGSS/15 02CLIN/15 02
LC,LR -zs- - 1443.58 30.3.17-t----=3--+---- 716_52 30.3.17
2CLIN/14 11 VR,LR,LC 20
CBAY/14 05 VR,LR,LCCGSS/14 13 VR,LR,LC 25 1507.42
CLIN/14 12 VR,LR,LC 18
CGSS/14 15 25 1766.5
CLIN/14 17 VR,LR,LC 30
CBAY/14 07
LC,LR
CGSS/15 07 25LC.LR
CLIN/15 07.--- --- ----
LC,LR 2
CGSS/16 _06VR,LR,LC
CLIN/16 11_._-
4VR,LR,LC
CGSS/16 .08VR,LR,LC
-CLIN/16 _13
-
6VR,LR,LC
CGSS/16 09 I--VR,LR,LC
CLIN/16 14 VR,LR,LC 12---- r---CGSS/16 13 VR,LR,LC
1443.58 31.3.17--900
1439.4
30.49 - 31.317-
-- ----
26.2,17 60025
CLIN/16 16 VR,LR,LC-- --------------
CGSS/16 17 YR.LR.LC
CLIN/16 _18 VR,LR,LC
CGSS/16 20 VR,LR,LC
CLIN/16 20 VR,LR,LC
10
17.0I.l8
IS.12.17 -(;00
152.59- -05,09.17 --I()O
6103
25- 1439A
-- - -- -',-91.55,
25 1439_4---
183.11
25 1439.4
26.2.17 - 10
25.2.17
25.2.17-
25
17.0I.lS --'000
1 ------ 25- 14394 29.3.17 600
10 ----'52_59
----25 -1439.4 1--29:3.17 r---500
4
2018Annexure-A (March,18)3/15/2018
6104
+----1-------
-- r-
S.No. Name of the Work/Project SAP code Category Line Capacity EstimatedLength (in MVA) cost
(Ckt. kM) (withIDe)
WorkingTarget IDt. ofComm.
Annual Plan 2017-18 (Revised) Annual Plan 2018-19Provision
Plan(Tentative)
Physical Targets Provision Physical TargetsPlan
Revised (Tentative) Proposedk Km. 1MVA/Nos. I--O-k":"":";t"'M"::";'V:":"A,::"llN-os-l
2 <425 1439.4 12.10.17
1--14 213.63
-25 1386.7 03.01.2018
f---18 (i) 132133kV, 20/25 MVAGSS at Keshoraipatan
(ii) L1LOof Kota-Lakheri-Sawai Madhopur Ckt-I linef---
19 (i) 132/33 kV, 20125 MVA GSS at BhopalsagarI---- 1-
(ii) 132kV SIC Kapasan-Bhopalsagar line
CGSS/16 22YR, LR, LC
CLIN/16 22 YR, LR, LC
CGSS/16 23 YR, LR, LC
CLIN/16 ~S YR, LR, LC
CBAY/16. 13 YR, LR, LC
CGSS/IS 30 YR, LR, LC
CLIN/IS 24 IYR, LR, LC
CGSS/16 04 YR, LR, LC
900 251---
100 14--1-----
1000 25
15
-----
251-
15-
25
8
-I
---- --- --- -
257.95 2017-181------
52.7 2017-18--~----4----- -----
25 1443.58 29.01.20181------ ---
441.61------ -- ---1- -
25 1439.4 10.11.17------ ---- ---
122.07
15 100
10
1500
1-----(iii) 132kV feeder bay at 132 kV GSS Kapasan
I--- - --20 (i) 132/33 kV, 20125 MVA GSS at Bhamatsar (Distt. Bikaner)f--- ----- -- - --- - --- --~- ---~----
(ii) L1LOof 132 kV SIC Deshnok- Nokha line1-----21 (i) 132kV GSS at RIICO Growth Centre, Hamirgarh (Distt. Bhilwara)f-- - - -------
(ii) L1LOof existing 132kV Harnirgarh-Nitin Spinners line upto 132 kV GSS RIICO CLIN/16 08GrowthCentre, Hamirgarh (4 kM)
1-------~ Work ~ss!!!:iated_",ttl! 220KV _G_SSsc--l-L J.QPlI!,UR CITY EJIV NETWQRK STRENTl:IF:~ING SCHEME-I IJDENS_S-II
Linesassociated with 220 kV GSS Barli.
16
1200
8YR, LR, LC
---f----+ --- - i-------l--.--+-.- -- i--- ---
------ - --- ---
--
SS,LC
~---
(i) L1LOof existing 132 kV SIC Jodhpur-PS8 line at Barlif--- - ------- -----
(ii) LlLO of existing 132 kV CIIB-Soorsagar line at Barli
1--- (iii)-iILO.;c~~isting 132 kY SIC Tinwari-Soo;sagar Ii~e-at400kV GSS Jodhpur.-
------- 1------ -----I-42.20 2017-18
-----ll-------- l-144.97 14.1.17
CLIN/09.32 SS,LC
CLIN/09 33 SS,LC
CLIN/09 34 SS,LC
SS,LCCLIN/09. 3S SS
3 100 3 300I------f---14
1-__ll__ StrenJrthnin~s!,-"emeof existinu 132kVChopasani Housing Board (CHB) GSS
(i) Upgradation of existing 132kV SIC Jodhpur-CHB-Soorsagar Line to 220 kV DICNarrowbaseTowers (to be charged on 132 kV)
-- --- - - ------ __----(ii) Construction of 132kV Bus coupler bay at 220kV GSS Jodhpur.
1---- -- ---.24 (i) L1LOof 132 kV SIC Beawar-Nasirabad line at proposed 220 kV GSS Jethana
(10.98ckM commissioned) ,-- --- -------------
(ii) 132kV SIC line from 220 kV GSS Jethana to 132 kV GSS Saradhana (15.86 ckM
--
969.47 2018-19--1----1---40016 400 16
CBAY/09 09 SS 64.51 2017-18------ ---.-.~--- f-- II - l-II 107.16 28.06.2017 200
~,.
----';- --- -~
15 2026.59 15.06.2017 15--- ----- -- I---- --
11.38 19.08.2017
----- ----- -- 1---- -11.38 30.05.2017
--- - 1----- -3 105.35 04.08.2017 50 3
--- I---3 105.35 05.08.2017 3
--1--- -
18 254.32 08.02.2017 100 18
118.7612 199.82 22.09.2017 100 12
-- --~I-CLIN/ll 22 LR,LC
-_CLIN/ll.23 LR,LC
1- commissioned.i.. - - -- - - _25 (i) L1LOof existing 132 kV SIC Mandalgarh- Begun line at proposed 220 kV GSS CLIN/I0 . IS
Mandalgarh(0.76 ckM commissioned)-------_- ------ -- -----------_---
(ii) L1LOof existing 132 kV Bijolia-Beegod line at proposed 220 kV GSS Mandalgarh CLIN/I0 . 16(O.5ckM:ommissioned)_ _ _ _ _ __ ___ _ _ _
26 (i) L1LOof 132 kV SIC Debari-Sukher line at proposed 220 kV GSS Arnberi (2.932ckM CLIN/ll . 24commissioned)
-1--1---LR,SS
LR,SS
LR,SS
CLIN/ll---
.2S LR,SS
CLIN/13 .OSYR, LR, LC
CBAY/13. 02 YR, LR, LC
CLIN/09 38 ES
1----- --(ii) L1LOof 132 kV SIC Sukher-Seesarma line at proposed 220 kV GSS Amberi (2.968ckM commissioned)
27 (i) 132kVDIC line from 220kV GSS Niwana to 132kV GSS Govindgarh (28.286ckMC:OMM.)(ii) 2 No 132kV bay at 132kVGSS Govindgarh
28 (i) 132kV SIC PS2 - Kanasar (To be erected on DIC towers) (28.286ckM Comm.)
1-
-- -
50
Annual Plan 2017-18 Flnal (P) & 2018-19 IP) March 2018Annexure-A (March.18)3/1S/2018
LR,SS-----
LR,SS
---_._---------_.- +----+-_._. ..-..CBA'l'/14 . 09
S.No. Name of the Work/Project
LR,YR
ES
SS
SAP code Category Line Capacity Estimated WorkingLength (in MVA) cost Target I
(Ckl. kM) (with Dt. ofIDC) Comm.
Provision Physical TargetsPlan
(Tentative) Revised
ICkt Km MYA/Nos.
ProvisionPlan
(Tentative) 1-_.:..P:.:r07p::::o:::se:::d~-ICkt IMY AlNos
200
75
500
1000
400
500
500
50
23
Physical Targets
-'-----
._---
-----
6
-_- --_.-
--J---- -
Annual Plan 2018-19
._--_.-
.- -- --
Annual Plan 2017-18 (Revised)
-~-- 423 231.54 2017-181
2018-1934 504.24 2018-19
6 229.22 2018--19
-- -
CLIN/10 17 LR,SS
-_.-
2017-18-SS 7.2
CLIN/08 05 SS 16.09_.
2648----=-=-_ ... _.2017-18
- - . - ~2oT7-1-8CBAY/08 06 SS
CLIN/08 06 SS 28.7 2017-18
(ii) 132 kV DIC PS3 - Kanasar line CLIN/09 39
36
25---
2006--:46 2017-1'8/2018-19
34
6
---.
25
36._-
-
25
54
50
- .
81._-
-
25
32
--
_.- -
23
200
-
100
300
200
400
100
400
400
200
-- _.
------
---
.- .-
29 132kV DIC line from nOkV Chonkarwada to 132kV GSS Bhusawar (Revised)
3()'- iJLO of I32kVS/cBans~;:::Narainpur line at 220 kV GSS Bansur alon~ith 2 No. 132kV CLIN/10 24 LR,SS,LCterminal bays at 220kY GSS Bansur (RevisedO
--.-----------e-.-NQrmal Development W.Qrks
31 (i) 132/33kY, Ix25 MYA GSS Mandrayal (Karauli) CGSS/09 23----- -- -- - -- ---- ...---~-
(ii) 132 kV SIC Karauli-Mandrayalline with 132 kV GSS Mandrayal (Karauli) CLIN/09 25
--------------- .~
CBAY/09 11(iii) I No. 132kV bay at Karauli- _---- _._--
32 (i) 132/33 kY, 20125 MYA GSS Chhatargarh (Distt. Bikaner)c-.----------(ii) 132kV SIC Khajuwala- Chhatargarh line (comm. 53.953 ckM)
(iii) I No. 132kV bay at 132kV GSS Khajuwala
33 (i) 132kV SIC Galifa - Sata line-1-'-'-------
(ii) I No. 132kY bay at 132kY GSS Galifa
(iii) I No. 132kV bay at 132kV GSS Sata
34 (i) Construction of 132kV SIC Nokha Daiya - Khajuwala line
(ii) I No. 132kV bay al 132kV GSS Nokha Daiya
- (;if) 1 No. 132kV bay at 132kV GSS Khajuwala- -- ------------ ._-
35 (i) I32/33kV, 20/25MYA GSS at Gogelaw (Nagaur)
CGSS/13 05VR, LR, LC
CLIN/13 07VR, LR, LC
--- ----------
CBAY/12 13 VR, LR, LC--.- ..-~---.-
CLIN/13 08 VR, LR, LC.. _----_.
CBAY/13 05 VR, LR, LC-_._--------- ._.__ . ._- --- ._-
CBAY/13 06 VR, LR, LC_._-_._-_.- ---- -
CLIN/12 20 SS,LC~---- ..-----.-.- -----
CBAY/12 12 SS,LC
CBAY/12 13 SS,LC---------
CGSS/14 06VR, LR, LC
CLIN/14.05(ii) LlLOof 132kV Nagaur - Khinvsar line:-1-:-:-:' ----- .-- ---.--.-- -.---------
36 LlLO 132kV Jodhpur-Baori line for 132 kV Jhalamand with 132kV GSS at Jalamand(Jodhpur) .
VR, LR, LC
LC,LRCLIN/14.14
-- ---n_ Jaiour City EHY Network Streng!!t~lruz. Schem~lY_Lr!!aM~_lJZ kYl!!1erconnJ:.!:lkln(i) 132 kV Hybrid GIS Bay at Jawahar Nagar (Jaipur)
(ii) 132 kV SIC Cable system between 132 kV MNIT and 132 kV Substation Jawahar CLIN/14 16Navar __Interconne~tiQ_ns for 220J ..Y GSS Nawalearh_(RYI'N..Scooe) _ ... _
38 (i) 132kV DIC Nawalgarh (220kV GSS) - Nawalgarh (132kV GSS) line with 2 Nos. CLIN/08 041~2kVfeeder_bax~a_l_132kV GSS Nawalllarh _(ii) 132kV DIC portion of above line emanating from 220kV GSS Nawalgarh
39 (i) 132 kV SIC Nawalgarh(220 kV) - Kumawas line
-- - ----- ----(ii) INo. 132kV bay at Kumawas.
40 (i) 132 kV SIC Nawalgarh(220 kV) - Gudagorji line
Annual Plan 2017-18 Final (R) & 2018-19 (P) March 2018Annexure-A (March 18)3/15/2018
_._-
54
25 1224.06 15.02.2018---- ----
852.61
59.38----
2018-19._- -----.--~
997.72 2018-19- ~---
2018-19
955.99 2017-18
59.85 2017-18.
59.85 2017-18
25 1705.21 2017-18/
- -2018-19
50
81
32
4 25'- -C-1OC:-:7=-=8cc.8=-=3-t-U=-=p-gr-a--=d-ed:-to-t-
220kV GSSJhalamand31.3.17
.-.----~-.
6
269.84 2018-19;-- 200.-- 2251.67 2019-20
-----------_._--
624.73 2017-18 50023
Loonkaransar
S.No. Name of the Work/Project SAP code Category Line Capacity EstimatedLength (in MVA) cost
(Ckt. kM) (withIDC)
(ii) INo.132kVbayatGudagorji CBAY/OS 07
41 (i) 132kV DIC portion of line emanating from 220 kV GSS Nawalgarh CLIN/OS 07
--- CBAy/68:Ds-_._--------(ii) INo. 132kV bay at Nawalgarh
-1-------42 Optical Fibre Cable System for 132kV Schemes already approved under Main
Transmission System for New Solar & Wind Power Plants (as per Appendix-liB) & SmartGrid.Annlications (ADR) _ _ _(i) 132kVTransmission Lines already approved under Main Transmission System for Solar CLIN/11 33&Wind Power Plants (Total Route length 22kM)
Normal Develooment works _Interconnecting line of 220KV GSS C!t_hatal1!,arh
-- -------
-CLIN/16 10--- ES.LR132 kV DIC line from proposed 220 kV GSS Chhatargarh to existing 132 kV GSS
43
SS
SS
SS
ES
ES
44 (i) 132/33 kV, 20125 MVA substation at Bana Ka BasCLIN/16 12
r--CGSS/16 . 07 VR,LR,LC
(ii) L1LOof 132 kV SIC Tinwari-Osian line
45 132 kV SIC line (2nd circuit) be~een220 kV GSS VKIAand 132 kVGSS VKIA, Jaipuron Tubular Monopoles (Inplace of earlier scheme of Extension of Existing 132 kVSIC VKIA - Pratap Steel line upto 220 kV GSS VKIAI
CLIN/15.01
YR.LR.LC
46 (i) 132/33 kV, 20125 MVA GSS at Nathrau
(ii) 132kV SIC Dechu (220 kVGSS)-Nathrau line
(iii) 132kV feeder bay at 220 kVGSS Dechu
47 (i) 132/33 kV, 20125 MVA GSS at Gangdhar PS Dug
--- ---~ r--CGSS/16 . 10 VR,LR,LC
- - CLIN/16. 15 1 VR,LR,LC
(ii) 132kV SIC Dug- Gangdhar line
(iii) 132kV feeder bay at 132 kVGSS Dug
48 (i) 132/33 kV, 20125 MVA GSS at Bera-
(ii) 132kVSIC interconnection from 220kV GSS Bali C:LIN/16. 3S VR,LR,LC-- CBAY/16-~11 --vR:'LR:LC
._--_._---------_._-CGSS/16 . 19 VR,LR,LC
(iii) 132 kVti:_,,?_e~_bayatE._2-,,_\!GSS~01erpur
49 (i) 132/33 kV, 20125 MVA GSS at Baba Ram Mohan Temple-- ------- -- ---
(ii) LlLOof 132 kV Bhiwadi-Khushkhera line CLIN/16 19 VR,LR,LC
(ii) 132kV SIC Khanpur- Sarola Kalan line
CGSS/16 . 21 VR,LR,LC
CCiN>16. 21- -v~~~LCCBAY/16.12 --VR,LR,LC
50 (i) 132133 kV, 20125 MVA GSS at Sarola Kalan PS Khanpur
(iii) 132kV feeder bay at 132 kVGSS Khanpur
51 (i) 132/33 kV, 20125 MVA GSS at Chordi-----_ .._-
CGSS/
CLIN/15 26(ii) LlLO 132kVSIC Bagidora-Mahi Ph-2 line
Annual Plan 2017-18 Final (P) & 2018-19 (P) March
VR,LR,LC
VR,LR.LC
LC,SS
2018Annexure-A (March.lS)3/15/2DI8
7.2
154
40
3
20
26
30
3
19
20
25 - - 1439.4
25
--
25 --
-T--$...
2sl
25
25
25
WorkingTarget I01. ofComm.
2 _1.2017-18
2017-18
2017-18,------
Annual Plan 2017-18 (Revised) Annual Plan 2018-19Provision Physical Targets Provision Physical Targets
P~n P~n(Tentative) Revised (Tentative) Proposed
ICkt Km IMVA/Nos. Ckt !\IVA/Nos
2017-18 1000
610.38 2017-18
---52.7 2017-18 2513867 2::c0"'1-=7_--:1-=-8-+----:1-=-20-=c0:--+
52.7 2017-181386.7-- 201-7-=-181
-----
1386.7 2017-18- - ---
349.53 2017-18
2017-1852.7
1443.58 2018-19
353.51
1200
------
500----------
100 1925 -r----
--- ---500
f---40
I--26--
1- 25
25 -
25
_. ---------
lncl in220kVscheme
25
25-
-
25 --
600
300
200
200
300
200
300
600
154
20
CBAY/16.10 VR,LR,LCf------- -
CGSS/16 . 16 VR,LR,LC--- -.----- i---
CLIN/16 17 VR,LR,LC- ------ - - -'- -
CBAY/16 09 VR,LR,LC-- CGSS/16 .-18 -
VR,LR,LC
-~4L83 --=-20-=-lcc7:--_ccI8:--t----:I:--n--:eI--:i-n--
220kV___ __ ... __.scheme __
--- ---------- ----- - ----
2554.69'- 2018-19 -500- -- -
551~9 2018-19 - 400---30-- -52:7-·~ -25------.
- - 1439A 2017-"18 - ---900 ----- 45:75 2017:-18- - 3
996Ts rTargeiyet ------w-o- - -to be
decided
1386.7 . 2017-18 1200 I-
367.93-- 2017-18 200-- r- 20 -----
-- -._---
--
----
--+------1
-------~
-----
----
--
----- .-
---._-
------
----
---
--
_i
-----
----- ---
--
. _.-
------
f----
25
SAP code Category
(ii) I No. 132kV bay at 132kV GSS Sawa
VR, LR, LC
S.No. Name of the Work/Project Line Capacity EstimatedLength (in MVA) cost
(Ckt. kM) (withIDC)
-----------------~
52 Interconnection of2~OKV GSS Kushlana______ :---;-c- f----(i) 132 kV O/C line from proposed 220 kV GSS Halasar Kushlana (Sardarshahar) to 132 CLIN/16. 41 VR, LR, LCkV GSS Patlisar Fanta
- --1------ -----. ------ --(ii) LlLO of existing 132 kV SIC Sardarshar - Rajiasar line at proposed 220 kV GSS CLIN/16. 42Kushlana (Sardarshahar) Halasar VR, LR, LC
53 (i) 132/33 kV, 40150 MVA GSS at Dhanodi Industrial Area (Distt. Jhalawar) VR, LR, LC-----
(ii) LlLO of existing 132 kV SIC Jhalawar - Aklera line VR, LR, LC
54 (i) 132/33 kV, 20125 MVA GSS at Kuwa Khera(Distt Chittorgarh)
1- lii) LlLO of existing 132 kV SIC RAPP- Gandhi Sagar at Kuwa Kl1era (Distt. Chittorgarh)
55 (i) 132/33 kV, 40150 MVA GSS at RIICO Dholpur (Distt. Dholpur)
(II) LICOof existing 132-kV SIC Dholpur--Minialine at -132kV RHCa Dholpur(DisttDholllllI)
56 _iiL132/3~kV 20/25_MYA GSS at Dablana P.S. Hindoli (BundiL_.uuIJ;2kVS1C Hindoli- Dablana line
(jji) 132kV Bav at 132kV GSS Hindoli
VR, LR, LC
__ -+-V_:_:R,,,,-,,L,,,,R,,_,L,,,C,-+-_ 10
VR, LR, LC
VR, LR, LC-
VR, LR, LC__ -t_-='V"'R,"'L...R,C"-"L"'C-+----"24- -
VR, LR, LC 1_
57 Up-rating and Refurbishment of existing 132kV Lines using HTLS Conductor (PSDF
~nded ~c~emes)
(a) 132kV HPR-VKIA with LlLO at Vaisali Nagar- -I-- - ----------------
(b) 132kV VKIA - 220kV VKIA interconnection1- .-1-
(c) I32kVMansarovar- Chamballine- - - - ---- -------------------
New start 2017-181-- -1-- ------------
58 (i) 132/33 kV, 20125 MVA GSS at Nahargarh (Distt. Baran)
(ii) I No. 132kV bay at 132kV GSS Atru
ss
--~VR, LR, LC
(iii) 132 kV SIC Atru-Nahargarh line (22ckM) VR, LR, LC---_~9 (i) 132/33 kV, 20125 MVA GSS at Bari (Distt. Dholpur) •
56
18
3
6
(ii) LlLO 132kV Dholpur-Baseri line at Bari (26ckM)1- -----. ---
60 (i) 132/33 kV, 20125 MVA GSS at Bamanwas (Distt. Sawaimadhopur).._- ------------(ii) INo. 132kV bay at 132kV GSS Gangapurcity
VR, LR, LC-------------------f--------I-_:___:_-I--=-:--+_
VR,LR, LC 26
VR, LR, LC
1---(iii) 132kV SIC Gangapurcity (220kV) - Bamanwas line (23 ckM)
. -- -- -- - -- ------------- ----61 (i) 132/33 kV, 20125 MVA GSS at Kotri (Distt. Bhilwara)
-- r---- -·-+---=2-=-3-tVR, LR, LC
VR, LR, LC1-
(ii) 132kV SIC Bigod - Kotri line (20 ckM) VR, LR, LC- 1--- . ,--- .62 (i) 132/33 kV, 20125 MVA GSS at Dhonya Churaha (Olstt. Chittorgarh)- -1-- --- ----
(ii) LlLO of 132 kV Nimbahera - Mangalwar line at Dhoriya Churaha (6 ckM)---- ---- ------s-VR, LR, LC
63 (i) 132/33 kV, 20125 MVA GSS at Chohtan (Distt. Banner) VR, LR, LC
Annual Flan 2017-18 Final (R) & 2018-19 (F) March 2018Annexure-A (March 18)3/15/2018
1--
20---
823.34
--
25-
1516.56
2
2018-19
Working I-::A:::n:::n~u.::a:clP:cI::;a.::n-:2~0.:_17:c-,.:.1.::8~(::,:R.:_ev:_:i:::se:::d:!_)+__:A,.:.:::nn:::u::ay:I,.:.P_::la::n:_::20:::1::.8:_-:._19::'_--lTarget 1 Provision Physical Targets Provision Physical TargetsDt. of Plan PlanComm. (Tentative) Revised (Tentative) Proposed
Irkt Km MVA/No,_ Ckt MVAlNos4
-
--f---.-- -100 -
1- -200 56
---- - I-100 18
200I --
1---
1 -
400
1--
200 - I--
-- - ~--- c---26541 2018-19 100
--
50 1549.52 2017-18 1300 50-- 1-----
2017-18 3
25 1987.13 2017-181--1200
25
2017-18
2017,18 _1i}__2017-18 1000 25
6----
2L_ 1841.95 _ ?QI8-19_ _1Qlll::l9
2018-19
25 1735.85---11----- --
--
25 176344---
--- ---
.--f-25 1654.8
--
--e--
2018-1912019-20
2018-1912019-20
1---200
--- I- -- - e---38.552 2480 2018-19 100
-
5.718 2018-19--
7.546 2018-19-- I-- ..- - --- -- I-
--- - 1----25 1746_97 2018-191 200
-- 2019-20~
22
2018-191. - 2019-20
25--I-- 1-
1465.69 2018-191 200- 2019-20
-
25 1878.73 2018-191- 1- 2019-20
1000 500 I--- 25
__24 -f-
-1---
.. - - ---]----1000 38.552
5.718 t-
7.5461------
----II-----j--.----
7001 -- - ---
22.. - - 25
-----]-----26
. -]----200 700
----1-----
---1---- -I--- - -------
700- f----
25t--~ --- t--
~I-
1----· - -1---25200 700
200
---- --
20----l- . -I ---- ]-----
700 251------ 1--
6
700- f--25
-- I- 1-----
I -1--
25
SAP code Category LineLength
(Ckt.kM)
Capacity Estimated(in I\IVA) cost
(withIDC)
Working Annual Plan 2017-18 (Revised) Annual Plan 2018-19Target I I-::p-ro-v-,is-,i-on---.----:p'"'h-y-si'"'c-al:-':T=-a-'-r-g.:..et:..:.s-'-t-p-r-o..:.v.:..;s':";o':"n:..:r':"p:'-h':"y':"si:"c':"al:":"-ra:':rg-et-s-lDt. of Plan PlanComm. (Tentative) Revised (Tentative) Proposed
k Km,IMVAJNo.s. I---C""k":"':':t1"M';:;'V:'::'A::"'l,/l-N---Ios
S.No. Name of the Work/Project
-----,--' --(ii) 132kV SIC Sawa- Chohtan line (30ckM)
2564 (i) 132/33kv, 20125MVAGSS at Fatehgarh(Distt Hanumangarh)
(ii) Ln.oor I32j<V SIC Suratgarh ,Pilibanga- Hanurnanzarh line ,atFatehuarh (20ckM)65 (i) 132/33 kV, 20125MVAGSS at RD 710 (Dist.Bikaner )
- ---C~----:C--~~---:-(ii) LlLO of 132kVNokha Daiya- KhajuwaJa line at RD 710 (16ckM)
66 (i) 132133kV, 20/25 MVAGSS at Bakra(Distt JaJore)
(ii) LlLO of 132 kV Jalore- Sayla line at Bakra (14ckM)
----,---- ---~c---=-~---,~----:~~-67 (i) 132/33kV, 20125MVAGSS at Patan (Ajmer)
---
(ii) INo, 132kV bay at 132kVGSS Dudu
(iii) 132kVSIC Dudu- Patan line(50ckM)
--~~---,,----' -~-
68 8 Nos. 132kVbays at various existing RVPN's GSSs required for PPP projects
-"-==---c~----:---=----:-:-(i) I No, 132kV bay at 132kV GSS at Malpura for 132kV Malpura - Peeplu lineassociated with 132kVGSS Peeplu executing on PPP mode
(ii) I No, 132kV bay at 132kV GSS at SaJumber for 132kV Bambora . Salumber lineassociated with 132kVGSS Bambora executing on PPP mode
VR, LR, LC
vn,LR, LC= _VR, LR, LC
VR, LR, LC--~~+--1C'CC6--
VR, LR, LC
VR, LR, LC
VR, LR, LC
VR, LR, LC-,,-~----
- -'--~~+---=5C:::0-vn,LR, LC
"
1---- ,20
30
2Q _
14
6
25
25
25
-
4
1654,8 2018·191 25
-
--
1600,71
1573,75
1796.38
-
2019-20
2018-191---- - 2019-20
2018·1912019-20
2018-19';2019-20
'"
~ 2018-19
-
--
70
70
I 2018-19
2018-19
"'~ 2018-19
2018-19
70
271.24
2018·19
2018-19
25 1465,(;9 2018-1912019-20
200
200
-~-+~~-I--
200 - --:-- --------- --700
---+-~--+~-70-0 - -
'-'-+-~~--l
--I----+---~f-
65 - --:-- ---- 1---5
60---~~~~~~---
60 - ----- --- 10
60
60--_----+----+---:10 -t- _
- - "--- --"'--60 -
60
60 --
Incl. in220kVAklera100
--II---~~----10
_---t-~--~+---:I 0-
28 Incl. in220kV
____ ~.lI800
700
700
10
10
10
30
20
16
14
50
-c-
6
-
25-
25 --
-
- --
----
(iii) I No, 132kV bay at 132kVGSS at Undoo for 132kVBaytu - Undoo line associatedwith 132kVGSS Baytu executing on PPP mode
(iv) I No, 132kV bay at 220kV GSS at Dhorimanna for 132kV Ramji Ki Gal -Dhorimanna (220KV) line associated with 132kV GSS Ramji Ki Gol executing on PPP
.s: mode _ __ '" , ' __ ~_ _,(v) I No, 132kV bay at 220kV GSS at Jalore (220kV) for 132kV SIC Jalore (220KV)Ahore ( 132kV) line associated with 132kV GSS Ahore executing on PPP mode
--------_(vi) I No, 132kV bay at 132 kV GSS at Loonkaransar for 132kV SIC Shekhsar-Loonkaransar line associated with 132kVGSS Shekhsar executing on PPP mode
--------
(viii) 1 No, 132kV bay at 220 kV GSS at Phalodi for 132kV SIC Phalodi - Bengtikalanline associated with 132kVGSS bengtikalan executing on PPP mode
69 LlLOof 132 kV SIC Aklera- Manohar Thana line at 220kVGSS Aklera (Proposed)
70 (i) 132/33kV, 20125MVAGSS at Bahadurpur
(ii) LlLOof 132kVKishangarh Bas-Alwar line at Bahadurpur
- ----r---- -
'~ 2018-19
-- -
,-
,_
--
-
-
--
25
Annual Plan 2017-18 Final (P) & 2018-19 (P) March
- --~~--t----- -
--~-+--- ---
-~--I--
"-1---
--~----
----c--
--,,--+---
VR, LR, LC
VR, LR, LC
2018Annexure-A (March,18)3/15/2018
S.No. . Name of the Work/Project SAP code Line Capacity EstimatedLength (in MYA) cost
(Ckt. kM) (withIDC)
Category \VorkingTarget IDt, ofComm.
Annual Plan 2017-18 (Revised) Annual Plan 2018-19
4
25--~ -----
71 (i) 132/33 kV. 20125 MVAGSSatTelcoCircle-- (ii) L1LOof 132kVAlwar- Bansur line a-t-T-el-co--cCc-ir-cc-le--------
---- - --_- "------~--
72 (i) 132/33 kV, 20125 MVA GSS at Khairthal
(ii) L1LOof 132kVSIC Kishangarhbas- Mundawar line at Khairthal--- --- -
73 New 132kV Schemes (to be identified) (Including land cost for land bank & PPPI-_-+~sc:~hemesandth_eirprilim_inllrybo_undaryw_~a_"_w_o_r_k_s_et_c,_) _
74 Carried Over Liabilities (Civil works & Bal.Elect. Works - 132kV) of Sub Stations & Lines
I--Commissioned(a) CE (T&C), Jaipur Zone
(b) CE (T&C), Jodhpur ZoneI--- .--
(c) CE (T&C),Ajmer Zone~-
(d) CE (Civil), JaipurI---- --
(e) CE (Civil), Jodhpur
______ ---'-'IY'-'-.TQtal (I321<Y l~~J_l!J]!&ill~kY_ - W.QRKING______~___ Annulllfil!!! tarzet
II--~~1----1------ -----
Y Capacitor banks (MYAR)
(a) CE (T&C), Jaipur Zone
(b) CE (T&C), Jodhpur Zone1--1-
(c) CE (T&C),Ajmer Zone
(d) CE (Civil), Jaipur1---- - --------
(e ) CE (Civil), JodhpurI--- - -- -~~-~~- ---~--e-YL ~m~tjQn_{f:bP & Plan)/(lJj)~datiolll_ ~ ____ i~_Irill1sfortll~r§ capacity (IVlV&_ ~. ~ _~ _
_ ii__1Q()I220/U2j33I<_V Feeder b~rllll§[orDlerbavs. Bus-coupler bays etc.I---- i_ii____2JkYJi~l)ays_~_!ll:!requi!em~nt_of l_)i'iCOmL _1_ iv _Qther _\V()l~ a[lprov~c.IunderAug!1ent~tjol1 ~_ _ _
(a) CE (T&C), Jaipur Zone1----1- -
(b) CE (T&C), Jodhpur Zone1----
(c) CE (T&C),Ajmer Zone1----- ~~-~ -
(d) CE (Civil), JaipurI--+-----~
(e) CE (Civil), Jodhpur-- ..~VII Replacement of Plant and Machinery/ Equipment in Transmission system under various
conditionsrviz.failure/damaue End.of.Iifezahsolescence.of.technolozv etc)(a) CE (T&C), Jaipur Zone
- --------- ----
(b) CE (T&C), Jodhpur Zone--- - --- -
(c) CE (T&C),Ajmer Zone---- -
VIII Automation/ SCADA solutions, RTU'sl BCU's, related primary equipments upgradations,r-ommunir-atinn in','rf"cp</ r-hannr-lc(unripr III [)(' un oradation ofpxi<'in~ SIS)
Annual Plan 2017-18 Final (P) & 2018-19 (P) March 2018Annexure-A (March.18)3/1S/201S
VR, LR, LC 25.~c -- ---I- ~ "'6-1----YR. LR, LC
_. f-VR. LR, LC
VR, LR, LC
-~ -
--
-
- -
-I-
I-- !--
!
-- --I-
~-
~~!
-t--
-1---
l
I-
--1--
--1---
~
25---~--
---+---- .-~~--4
---+-------
-
--- -
-
- ----1----- I.~
----1--- --1--
---+-------.~_ _f_--~-I_----
~---I----~ ----1------.~-
---l----~--I_----l-----~--
---~--.~-~---1------- l-
~------4---_+_
~.~.-----+-----1-
-- I
4_2018-191 100 8002019-20 1- - 1------
2018-191 100 8002019-20 1----
~-~---- f-----~500 1000
~~- 1---
1465.69
143868
- --1--------
~---I__--.--I -~-----
~-~- -
.~----~----~-- -------
----I---
r----I---
- ------1---
--------
~--
--
----
Provision Physical Targets ProvisionPlan Plan
(Tentative) Revised (Tentative) ProposedI(kt Km IMYAlNos_ I--n-k-"-'-t:'<M='V-=-Al-Nr---los
Physical Targets
25
--- I-- _.- - - 1----- - ~-
1600 1600
1800----~ -~I-- ---
1600---- 1--- - f---- - - -~~---
1600 1600-~ --- 1--
2000 1500
I-- --- 1-- ------400400
600
400
200
400
37685
- 1---
---
600
400~--~-- ----------
200- -----~__li__----+----+
400------jl----~-- -- ---
20825 612.82 J75~... _(i~ _",_7;;!l5
__ 1_~3,,-,1,-,7-+.J]~I_5--
77$.29 __6()Q__778.29 _ 6()O_flj)__J46 475/16
-~----+------__l------I-
-I---300
1400
300
250
250
400
800- f--
400..~ I---~-- ---- .~~~
200-1---- ~----------- ---
200
- ~-
-I-- ---~b-----I----'---'- l-r- - -~i--I- -- --.- _~-I- -- --- ---;-.--I-- ----1-- - ~~-~----- l-- 1---- .-- -~
7400 4800- --~
7400 4900~~7400 4800
- 1--- ---- 1---300 200
~-I----- --~ I-400 200~~~~ -I-
Annual Plan 2018-19Annual Plan 2017-18 (Revised)Category Line Capacity Estimated WorkingLength (in MVA) cost Target /
(Ckt. kM) (with Dt. ofIDe) Comm.
SAP codeName of the Work/ProjectS.No.Provision Physical Targets
PlanProvision
PlanPhysical Targets
(Tentative) Revised (Tentative) ProposedIrk! Km. MVA/No<. I-C""lk"":"":"t'1"M:'::::::V'::'A--/N,o-l
2 4IX (i) Supply, installation. implementation, c~;omlzation and in;~b'fation-;;rsAP ERP..... solutionin RVPN -- ---.-- ..
(ii) Purchase of IT hardwares, associated standard software, Computer furniture,__ nerworkineeouinment. internet connectivitv.etc.
(iii) Creation of Data Centre ( Slm stogg_e_2 . Racks. Serve_r.Civil works. Networking(iv) Capital cost on IT/non-IT goods for Integrated MIS & Computerisation in RVPN
--- (v) Creation ~TIT~entre a;-Ch~~,bal including civil, electrical works, IT&_. ._ Conunonicanonrelated works.ifumiture andallied works,...X RMU of equipments & protection schemes of RVPN (Scheme -II & Ill)
-~-----
;'-- ---f__---- - -
11652300As ongoing
~__t- -t-.s.Cheme.--- ~----'- ~.-
As ongoing 500____+ -+__scheme_ _
200
500
-
200XI Replacementof old, obsolete and unserviceable PLCC equipment installed in RVPN systemand installationof earner set for dedicated data link for upcoming RTU under RMU and
_ Augmentation sscheme. ( RMU- PLCC stag~:IIscheme)XII Supply, installation, & commissioning of ABT& TOD energy meters (Metering Schemes
for Acquisition of Data from New and Existing ABT and TOD Energy Meter and itsCommunication / Transmission and Integraton with various data centers, GSSs and officesf"D'ffilo.
200--+-----"- --------- - -- 10491---- 500
~o~o--+---+---1500
--- f__- --- f-24001500
---- _.
XIII Old miscelleneous worksXIV ~ocation by-CC:OA(For Admn. & Residential builings, T&P, purchase ofvahicl~s& oiher
- -
administrative works etc.)f---- --------- -XV Other works (excluding deposit works)f-- .-. ---
PSDF funde<Lsc_hemes_
-----+----t- ..----.--..-- e---f---
1- -f__
------ -
~_- ~-f--iOI8-19 1 100~58687 2018-191 30000
150Q25000
(i) Smart Transl}1l~>iQnQperation.Managemenl~ystem (SIQ"M=--S)'-----c- .,...,- _(ii) Communication Back Bone - Smart Transmission Network and Asset ManagementSystem (Part-B)~TNAM(iiii) Renewable Energy Integration - Real Time Data Acquisition System for Monitoring& Control of Transmission Grid under Smart Transmission Network and AssetManagement SYstem(Part-A I)
-t-~--II---- ..--- - I·
2019-202018-1912019-20
---- 19172'-- 7000 --- 1---- ._
o
2018Annexure-A (March 1813/15/2018Annual Plan 2017-18 Final (RI & 2018-19 (P) March
·,
Category Line Capacity Estimated WorkingLength (in MVA) cost Target I
(Ckt. kM) (with Dt. ofIDC) Comm.
Name of the Work/Project SAP code
1--
248819
-_±_2018-19/2019-20
Annual Plan 2017-18(Revised) Annual Plan 2018-19Provision
Plan
o
Physical Targets
5000
66265
(Tentative) Revised (Tentative) Proposedrkt Km. MVAINos. I--Cl-k-"-t-'-'l"IM..:..:..:c'V-=-Al/-Nos-l
203254
S.No.
(iv) Renewable Energy Integration - Reactive Compensation Elements/ Equipments forReactive Power Management and Voltage Control for Transmission Grid under SmartTransmi_ssionNetwork and Asset Managelllent~stem (P_art-A2)
Total (V to XV) --- r--------- -70800
Provision Physical TargetsPlan
Total of Transmission Works 148000
Abbreviation Used :-V/I : Volraze Regulation {fI1jJroV(!IIJ_enf_Schefl1e~__1"('__: Load Catering Schemg..'IS : Svstem Strenvthenin ' Scheme.
j(IW : _(J_f1!J_ancinginstitution ofGermanv_==1- __'':':I'.';JJF : Power Svstem develooment Svstefl1___ MJg._: !-vktgrmg_un: :flesult Framework Document IAII' .Auemen! Ilion
- f--- ------- ------~
Annual Plan 2017-18 Final (PI & 2018-19 iP! March 201SAnnexure-A iMarch.1S)3/IS/201S