Name Designation Affiliation Date Signature
Submittedby:
RPMillenaar ChiefSiteEngineer
SPDO 16/11/11
Acceptedby:
RTSchilizzi Director SPDO 16/11/11
Approvedby:
RTSchilizzi Director SPDO 16/11/11
RFIIMPACTATCANDIDATESKAREMOTESTATIONSITESSOUTHERNAFRICAEDITION
Documentnumber ................................................................. WP3‐050.020.010‐TR‐004Revision ....................................................................................................................... A1Author........................................................................................................ R.P.MillenaarDate ............................................................................................................... 16‐11‐2011Status ....................................................................................................FinalConfidential
![Page 2: RFI Impact at candidate remote station sites - SA 1 · Revision ... 09 Rem11‐13 1881 AFS 27.78721047 ‐31.01321455 10 ... RFI Impact at candidate remote station sites - SA 1.0](https://reader031.vdocuments.pub/reader031/viewer/2022022508/5ad157087f8b9a72118bf417/html5/thumbnails/2.jpg)
WP3‐050.020.010‐TR‐004 Revision:A1
Page2of36
DOCUMENTHISTORY
Revision DateOfIssue EngineeringChange
Number
Comments
‐ 14‐11‐2011 ‐ Firstdraft
A 16‐11‐2011 ‐ Final
A1 23‐11‐2011 ‐ InformationforSouthernAfricaonly,nofurherchanges
A2 23‐11‐2011 ‐ InformationforAustraliaonly,nofurherchanges
DOCUMENTSOFTWARE Package Version Filename
Wordprocessor MsWord Word2007 RFIImpactatcandidateremotestationsites‐SA1.0.docx
Blockdiagrams
Other
ORGANISATIONDETAILSName SKAProgramDevelopmentOffice
Physical/PostalAddress
JodrellBankCentreforAstrophysics
AlanTuringBuilding
TheUniversityofManchester
OxfordRoad
Manchester,UK
M139PLFax. +44(0)1612754049
Website www.skatelescope.org
![Page 3: RFI Impact at candidate remote station sites - SA 1 · Revision ... 09 Rem11‐13 1881 AFS 27.78721047 ‐31.01321455 10 ... RFI Impact at candidate remote station sites - SA 1.0](https://reader031.vdocuments.pub/reader031/viewer/2022022508/5ad157087f8b9a72118bf417/html5/thumbnails/3.jpg)
WP3‐050.020.010‐TR‐004 Revision:A1
Page3of36
TABLEOFCONTENTS
1 INTRODUCTION............................................................................................. 6
2 SCOPE ........................................................................................................ 6
3 METHOD .................................................................................................... 6
4 REMOTESTATIONCONFIGURATION ................................................................... 74.1 Site‐specificconfigurationSouthernAfrica.............................................................................. 7
5 INFORMATIONSUPPLIED ................................................................................. 95.1 SouthernAfrica ........................................................................................................................ 9
6 RESULTS ................................................................................................... 106.1 SouthernAfrica ...................................................................................................................... 11
7 REFERENCES............................................................................................... 36
FIGURESFigure1:Locationsof25remotestations(red) inSouthernAfricanconfiguration.Theinner180km
spirals inblue.Thewhitegrid is5degreesonaside,correspondingtoa fixedN‐S lengthof560km and an E‐W dimension (which varies with latitude) of 510km along the Tropic ofCapricorn(Yellowline). ............................................................................................................... 8
Figure2:SOUTHERNAFRICA,Site01................................................................................................... 11Figure3:SOUTHERNAFRICA,Site02................................................................................................... 12Figure4:SOUTHERNAFRICA,Site03................................................................................................... 13Figure5:SOUTHERNAFRICA,Site04................................................................................................... 14Figure6:SOUTHERNAFRICA,Site05................................................................................................... 15Figure7:SOUTHERNAFRICA,Site06................................................................................................... 16Figure8:SOUTHERNAFRICA,Site07................................................................................................... 17Figure9:SOUTHERNAFRICA,Site08................................................................................................... 18Figure10:SOUTHERNAFRICA,Site09................................................................................................. 19Figure11:SOUTHERNAFRICA,Site10................................................................................................. 20Figure12:SOUTHERNAFRICA,Site11................................................................................................. 21Figure13:SOUTHERNAFRICA,Site12................................................................................................. 22Figure14:SOUTHERNAFRICA,Site13................................................................................................. 23Figure15:SOUTHERNAFRICA,Site14................................................................................................. 24Figure 16: SOUTHERN AFRICA, Site 15. Note that the distance scale is larger than 150km.
Transmittersbeyond150kmshouldnotbeincludedincomparisons. ..................................... 25Figure17:SOUTHERNAFRICA,Site16................................................................................................. 26Figure18:SOUTHERNAFRICA,Site17................................................................................................. 27Figure19:SOUTHERNAFRICA,Site18................................................................................................. 28Figure20:SOUTHERNAFRICA,Site19................................................................................................. 29Figure21:SOUTHERNAFRICA,Site20................................................................................................. 30Figure22:SOUTHERNAFRICA,Site21................................................................................................. 31Figure23:SOUTHERNAFRICA,Site22................................................................................................. 32
![Page 4: RFI Impact at candidate remote station sites - SA 1 · Revision ... 09 Rem11‐13 1881 AFS 27.78721047 ‐31.01321455 10 ... RFI Impact at candidate remote station sites - SA 1.0](https://reader031.vdocuments.pub/reader031/viewer/2022022508/5ad157087f8b9a72118bf417/html5/thumbnails/4.jpg)
WP3‐050.020.010‐TR‐004 Revision:A1
Page4of36
Figure24:SOUTHERNAFRICA,Site23................................................................................................. 33Figure25:SOUTHERNAFRICA,Site24................................................................................................. 34Figure 26: SOUTHERN AFRICA, Site 25. Note that the distance scale is larger than 150km.
Transmittersbeyond150kmshouldnotbeincludedincomparisons ...................................... 35
TABLESTable1:SouthernAfricanremotestations............................................................................................ 7
![Page 5: RFI Impact at candidate remote station sites - SA 1 · Revision ... 09 Rem11‐13 1881 AFS 27.78721047 ‐31.01321455 10 ... RFI Impact at candidate remote station sites - SA 1.0](https://reader031.vdocuments.pub/reader031/viewer/2022022508/5ad157087f8b9a72118bf417/html5/thumbnails/5.jpg)
WP3‐050.020.010‐TR‐004 Revision:A1
Page5of36
Glossary
EMI ElectroMagneticInterferenceITU InternationalTelecommunicationsUnionFoM FigureofMeritPFD PowerFluxDensity(indBWm‐2Hz‐1)PSD PowerSpectralDensity(indBWHz‐1)RAS RadioAstronomyServiceRFI RadioFrequencyInterferenceRQZ RadioQuietZoneSKA SquareKilometreArraySPDO SKAProgramDevelopmentOffice
![Page 6: RFI Impact at candidate remote station sites - SA 1 · Revision ... 09 Rem11‐13 1881 AFS 27.78721047 ‐31.01321455 10 ... RFI Impact at candidate remote station sites - SA 1.0](https://reader031.vdocuments.pub/reader031/viewer/2022022508/5ad157087f8b9a72118bf417/html5/thumbnails/6.jpg)
WP3‐050.020.010‐TR‐004 Revision:A1
Page6of36
1 Introduction
Atanearlystageinthedevelopmentofsite‐specificconfigurationsfortheSKA,theresultofwhichhasbeendescribed in [1], itwasagreedamongst thetwositeproponentsandSPDOtodevelopaFigureofMerit(FoM)forspectrumcrowdingatremotestationlocations.Ofthesethereare25andallofthemaresituatedoutsidetheRadioQuietZone(RQZ)thatwillbeimplementedatthecentrallocation,and thereforedonotbenefit fromoptimal radio interferenceconditions.The locationofeach remote station is a compromise in radio quietness (away from human presence), andaccessibility intermsofroads, fibrehook‐upandpowerdelivery (closetohumanpresence),whilealsooptimisingforscienceimagingquality.Inaprocessstartingfromgenericspecificationstofinallocations the SPDO has worked with the site proponents to design the course locations of theremote stations. Final adjustments of these locations were done by the proponents on theirconfiguration to find thebestcompromise.Partof thisprocesswasadesktopanalysis,evaluatingtheimpactoflicensedradiotransmittersaroundeachofthetargetstationsbycalculatingthepowerspectraldensity(PSD)ofreceivedsignalsatthatlocationoriginatingfromtransmittersinthatarea.The informationgained in thesecalculations ispresented in this report.Thepurpose is toprovideevaluatorsanddesignengineersanoverviewofexpectedRFIimpactattheremotestations.Thiswork is tobecomplementedbyasurveyof theradio interferenceenvironmentatall remotestationsoncesiteselectionhasbeendone.Already,aspartoftheinvestigationsinthesiteselectionprocess, four of these remote site locations for each candidate host have been visited by a localteamtoperformmeasurements,usingtheequipmentdevelopedbytheSPDOandsiteproponentsfortheRFImeasurementcampaignin2010/11.Theresultsfortheseremotesitesarereportedin[2]and[3],inananonymousfashion.Thisreportconnectsthesemeasurementswiththeresultsofthedesktopanalysisforthesefourcaseseach.
2 Scope
ThisdocumentreportsonthespectrumcrowdingFoMresultsintheformofplotsofreceivedsignallevelsateachofthe25proposedremotestationlocations.Thisreporthasfoureditions:
• Fullreport(thisreportedition,RevisionA)• SpecificreportforSouthAfrica(RevisionA1)• SpecificreportforAustralia(RevisionA2)• Anonymous version (Revision B), where all references to country/countries and specific
locations have been removed. It uses X and Y to distinguish between proponents andsequencenumbersforremotestations.
3 Method
ThefollowingmethodwasdiscussedandagreedamongstSPDOandsiteproponents:Foreachofthe25remotestationlocations,
• collect information on transmitters in databases selected to provide a complete andaccurate overview of transmitter frequencies, EIRP, bandwidth, antenna height andradiationpattern,distance,
• collectinformationoninterveningterrainfromtransmittertoremotestation,• calculatepropagationattenuation,usingtheterrain informationandantennadistanceand
heightintheITU‐RP.526‐11model,• findreceivedPSD levelsat theremotestation,byapplyingthepropagationattenuationto
theemittedlevelinthedirectionofthestation.
![Page 7: RFI Impact at candidate remote station sites - SA 1 · Revision ... 09 Rem11‐13 1881 AFS 27.78721047 ‐31.01321455 10 ... RFI Impact at candidate remote station sites - SA 1.0](https://reader031.vdocuments.pub/reader031/viewer/2022022508/5ad157087f8b9a72118bf417/html5/thumbnails/7.jpg)
WP3‐050.020.010‐TR‐004 Revision:A1
Page7of36
Theagreedrangeoftransmitterstobeconsideredwasupto150kmfromthelocationoftheremotestation.
4 RemoteStationConfiguration
4.1 Site‐specificconfigurationSouthernAfrica
TheremotestationlocationsintheSouthernAfricanarrayaregiveninTable1.
Sitenumber
RFImeas.sitenr. SiteName
Elevation(m) Country Longitude Latitude
01 X1 Rem11‐5 n/a AFS 21.53410414 ‐32.9849250502 Rem11‐6 1163 AFS 23.6937957 ‐31.8756843503 Rem11‐7 848 AFS 19.31140028 ‐30.8221641704 Rem11‐8 1175 AFS 23.14725858 ‐29.0260136205 Rem11‐9 739 AFS 20.77565861 ‐28.7268261106 Rem11‐10 1383 AFS 24.88321071 ‐32.0470913507 X2 Rem11‐11 n/a AFS 25.06328646 ‐29.8082072408 Rem11‐12 1102 AFS 22.07752611 ‐28.17580509 Rem11‐13 1881 AFS 27.78721047 ‐31.0132145510 Rem11‐14 1205 AFS 23.84196194 ‐26.9769144411 Rem11‐15 928 AFS 30.01260467 ‐28.8951976912 Rem11‐16 1108 AFS 27.22832162 ‐24.6824811813 Rem11‐17 722 AFS 30.078783 ‐22.803420614 Bot11‐0 923 BOT 20.86829107 ‐26.0479988115 Bot11‐1 1061 BOT 22.6191596 ‐24.378337616 Bot11‐2 996 BOT 26.0224916 ‐19.293339617 Mad11‐0 868 MAD 46.28721893 ‐23.4327519218 Mad11‐1 1034 MAD 48.6549825 ‐16.535840719 Moz11‐0 147 MOZ 33.49579803 ‐20.0073534520 Moz11‐1 999 MOZ 34.28486929 ‐15.066674621 X3 Nam11‐0 n/a NMB 18.64243266 ‐25.781133122 X4 Nam11‐1 n/a NMB 16.43452277 ‐22.269875923 Nam11‐2 1777 NMB 17.8 ‐19.624 Nam11‐3 768 NMB 13.1855733 ‐17.022024425 Zam11‐0 1263 ZMB 25.69318065 ‐13.06100257
Table1:SouthernAfricanremotestationsTheremotestationlocationsareplottedonthemapinFigure1,togetherwiththelocationoftheelementsintheinnerareaof180kmradius.
![Page 8: RFI Impact at candidate remote station sites - SA 1 · Revision ... 09 Rem11‐13 1881 AFS 27.78721047 ‐31.01321455 10 ... RFI Impact at candidate remote station sites - SA 1.0](https://reader031.vdocuments.pub/reader031/viewer/2022022508/5ad157087f8b9a72118bf417/html5/thumbnails/8.jpg)
WP3‐050.020.010‐TR‐004 Revision:A1
Page8of36
Figure1:Locationsof25remotestations(red)inSouthernAfricanconfiguration.Theinner180kmspiralsinblue. The white grid is 5 degrees on a side, corresponding to a fixed N‐S length of 560km and an E‐Wdimension(whichvarieswithlatitude)of510kmalongtheTropicofCapricorn(Yellowline).
![Page 9: RFI Impact at candidate remote station sites - SA 1 · Revision ... 09 Rem11‐13 1881 AFS 27.78721047 ‐31.01321455 10 ... RFI Impact at candidate remote station sites - SA 1.0](https://reader031.vdocuments.pub/reader031/viewer/2022022508/5ad157087f8b9a72118bf417/html5/thumbnails/9.jpg)
WP3‐050.020.010‐TR‐004 Revision:A1
Page9of36
5 Informationsupplied
The site proponents have carried out the collection of transmitter details and have done thecalculations for received PSD levels. The information was supplied to the SPDO in either of twoforms,describedinthefollowingsections.
5.1 SouthernAfrica
RawdatafilesweresuppliedwithinformationrequiredtogeneratetheplotsofreceivedPSDlevels.ThelatterwasdonebytheSPDO.Thefollowingdetailshavebeenprovidedbycorrespondence:“1. All transmitters within 150km of a site were used, with a minimum predicted level of ‐100dBuV/m(…)2.Thedatabasesusedarethefollowing:i.GSMdatabaseprovidedbythetwolargestcellularphoneoperatorsinSouthAfrica,whoaccountforapproximately95%ofmarketshare.Otheroperatorsgenerallyonlyoperateinmajortownsandcities.Thedatabasewasinitiallyobtainedin2005,andrecentlyupdatedinthelast12month.ii. ICASA (Independent Communications Authority of South Africa) Broadcasting Frequency Plan,updated 2009 ‐ effectively television and radio transmitters. I would note, however, that thebroadcastingenvironmentwillchangeinthenext24months.iii.ICASALand‐Mobiledatabase(transmittersformobilecoverageie.VHFmobile)iv.ICASAFixedLinkdatabase(ie.microwavelinksetc.)v.ICASASelfhelpdatabase(selfhelpdatabaseincludesalllowpoweredtransmittersestablishedbysmalltownstoprovidelocalcommunitycoverageoftelevisionsignals)vi.In2005,theSouthAfricanSKAProjectOfficeobtainednotonlytheICASAdatabase,butalsothedatabasesofindividualoperatorstoconfirm,andsupplementtheICASAdatabase.Thiswastocoverthegapfornationaloperators,whoobtainnationallicensesandwillgenerallyonlysendupdatestoICASAinbatches.Thisdatabasewasalsousedtocoveranygaps.FortheAfricancountries,thedatabasesusedwerenotascompleteasforSouthAfrica.However,LSof South Africa does television and radio network planning for the various African SKA partnercountries.Weused the information on the television and radio networks as principle inputs. Thenetwork plan always uses themaximum possible EIRP ‐ so,worst case scenario. Regarding GSM,transmittersaregenerallyONLYlocatedintownsandcities.However,giventhatwecouldonlyusethe televisionand radionetworkplans,wehaveestablishedvariousagreementswith thepartnercountries,whowillimposethenecessaryprotectionschemesforeachoftheremotestations.“
![Page 10: RFI Impact at candidate remote station sites - SA 1 · Revision ... 09 Rem11‐13 1881 AFS 27.78721047 ‐31.01321455 10 ... RFI Impact at candidate remote station sites - SA 1.0](https://reader031.vdocuments.pub/reader031/viewer/2022022508/5ad157087f8b9a72118bf417/html5/thumbnails/10.jpg)
WP3‐050.020.010‐TR‐004 Revision:A1
Page10of36
6 Results
Theresultsarepresentedintwoseriesof25plots,eachwiththreesubpanels,fromthetop:1.ReceivedPSDlevelsindBW/Hzforthefrequencyrangeof300to25000MHz.Thelowerboundaryissetto300MHzbecausethisisthelowestforeseeablefrequencyinuseattheremotestations(dishonly).ThiswastheagreedlowerfrequencyforthisFoManalysis.Itmustbenotedinfactthatintheplots provided by Australia the lower boundary appears to be at 400MHz. The informationprovided by South Africa included much lower frequencies (<100MHz) but the plots that wereproducedbySPDOandpresentedhere,duplicatethefrequencyscale.Evaluatorsshouldthereforedisregardsignalsbelow400MHzwhenmakingcomparisons.Thesubpanelalsodisplays,inred,thethresholdPSDlevel(ΔPindBW/Hz)specifiedbyITU‐RRA.769‐2forVLBI,see[4],alsoreferredtoas‘Recommendation769’.InthisreferencethethresholdinterferencelevelsforVLBIobservationsaregivenasspectralpfd levels (SH indBWm‐2Hz‐1) inTable3.Toconvertthese levelstothesamePSDunitsasusedforthereceivedlevelsthefollowingexpressionisused(asperexpression5in[4]):
ΔP769VLBI = SH − 20 log( f ) −10 log( c2
4π) = SH − 20 log( f ) −158.5(dBWHz−1) ,
wherefistheobservingfrequencyinRec.769Table3.Thisequationfollowsfromtherelationshipofantennagainandeffectivearea,wherethegainissetto0dBi,asspecifiedinRec.769.Itisusefultoplotthisthresholdleveltoassessthereceivedinterferencefromlicensedtransmitters,but it should be noted that Rec. 769 sets protection levels for the bands reserved for the ‘RadioAstronomy Service’ (RAS) only. Here a plot with linearly interpolated levels between specifiedobservingfrequenciesisused.ReceivedlevelshigherthantheRec.769levelsaretobeexpectedforfrequenciesoutsidetheprotectedbands,asisdemonstratedintheseplots.2.ReceivedPSD levels indBW/Hz(as in1)withautomaticscalingtoallowaccuratedisplayof levels,versusdistanceinkm.Itmustbenotedthatthedistanceoftransmittersinsomecasesismorethantheagreed150km.Itisnot clear how complete the survey is for the larger distances and therefore evaluators shoulddisregardsignalsbeyond150kmwhenmakingcomparisons.3.ReceivedPSDlevelsindBabovetheRA.769‐2thresholdlevelforVLBIasdescribedunder1,versusbearingindegrees,where0°isNorth.
![Page 11: RFI Impact at candidate remote station sites - SA 1 · Revision ... 09 Rem11‐13 1881 AFS 27.78721047 ‐31.01321455 10 ... RFI Impact at candidate remote station sites - SA 1.0](https://reader031.vdocuments.pub/reader031/viewer/2022022508/5ad157087f8b9a72118bf417/html5/thumbnails/11.jpg)
WP3‐050.020.010‐TR‐004 Revision:A1
Page11of36
6.1 SouthernAfrica
Plotsgeneratedfromrawdatasupplied.
Figure2:SOUTHERNAFRICA,Site01
![Page 12: RFI Impact at candidate remote station sites - SA 1 · Revision ... 09 Rem11‐13 1881 AFS 27.78721047 ‐31.01321455 10 ... RFI Impact at candidate remote station sites - SA 1.0](https://reader031.vdocuments.pub/reader031/viewer/2022022508/5ad157087f8b9a72118bf417/html5/thumbnails/12.jpg)
WP3‐050.020.010‐TR‐004 Revision:A1
Page12of36
Figure3:SOUTHERNAFRICA,Site02
![Page 13: RFI Impact at candidate remote station sites - SA 1 · Revision ... 09 Rem11‐13 1881 AFS 27.78721047 ‐31.01321455 10 ... RFI Impact at candidate remote station sites - SA 1.0](https://reader031.vdocuments.pub/reader031/viewer/2022022508/5ad157087f8b9a72118bf417/html5/thumbnails/13.jpg)
WP3‐050.020.010‐TR‐004 Revision:A1
Page13of36
Figure4:SOUTHERNAFRICA,Site03
![Page 14: RFI Impact at candidate remote station sites - SA 1 · Revision ... 09 Rem11‐13 1881 AFS 27.78721047 ‐31.01321455 10 ... RFI Impact at candidate remote station sites - SA 1.0](https://reader031.vdocuments.pub/reader031/viewer/2022022508/5ad157087f8b9a72118bf417/html5/thumbnails/14.jpg)
WP3‐050.020.010‐TR‐004 Revision:A1
Page14of36
Figure5:SOUTHERNAFRICA,Site04
![Page 15: RFI Impact at candidate remote station sites - SA 1 · Revision ... 09 Rem11‐13 1881 AFS 27.78721047 ‐31.01321455 10 ... RFI Impact at candidate remote station sites - SA 1.0](https://reader031.vdocuments.pub/reader031/viewer/2022022508/5ad157087f8b9a72118bf417/html5/thumbnails/15.jpg)
WP3‐050.020.010‐TR‐004 Revision:A1
Page15of36
Figure6:SOUTHERNAFRICA,Site05
![Page 16: RFI Impact at candidate remote station sites - SA 1 · Revision ... 09 Rem11‐13 1881 AFS 27.78721047 ‐31.01321455 10 ... RFI Impact at candidate remote station sites - SA 1.0](https://reader031.vdocuments.pub/reader031/viewer/2022022508/5ad157087f8b9a72118bf417/html5/thumbnails/16.jpg)
WP3‐050.020.010‐TR‐004 Revision:A1
Page16of36
Figure7:SOUTHERNAFRICA,Site06
![Page 17: RFI Impact at candidate remote station sites - SA 1 · Revision ... 09 Rem11‐13 1881 AFS 27.78721047 ‐31.01321455 10 ... RFI Impact at candidate remote station sites - SA 1.0](https://reader031.vdocuments.pub/reader031/viewer/2022022508/5ad157087f8b9a72118bf417/html5/thumbnails/17.jpg)
WP3‐050.020.010‐TR‐004 Revision:A1
Page17of36
Figure8:SOUTHERNAFRICA,Site07
![Page 18: RFI Impact at candidate remote station sites - SA 1 · Revision ... 09 Rem11‐13 1881 AFS 27.78721047 ‐31.01321455 10 ... RFI Impact at candidate remote station sites - SA 1.0](https://reader031.vdocuments.pub/reader031/viewer/2022022508/5ad157087f8b9a72118bf417/html5/thumbnails/18.jpg)
WP3‐050.020.010‐TR‐004 Revision:A1
Page18of36
Figure9:SOUTHERNAFRICA,Site08
![Page 19: RFI Impact at candidate remote station sites - SA 1 · Revision ... 09 Rem11‐13 1881 AFS 27.78721047 ‐31.01321455 10 ... RFI Impact at candidate remote station sites - SA 1.0](https://reader031.vdocuments.pub/reader031/viewer/2022022508/5ad157087f8b9a72118bf417/html5/thumbnails/19.jpg)
WP3‐050.020.010‐TR‐004 Revision:A1
Page19of36
Figure10:SOUTHERNAFRICA,Site09
![Page 20: RFI Impact at candidate remote station sites - SA 1 · Revision ... 09 Rem11‐13 1881 AFS 27.78721047 ‐31.01321455 10 ... RFI Impact at candidate remote station sites - SA 1.0](https://reader031.vdocuments.pub/reader031/viewer/2022022508/5ad157087f8b9a72118bf417/html5/thumbnails/20.jpg)
WP3‐050.020.010‐TR‐004 Revision:A1
Page20of36
Figure11:SOUTHERNAFRICA,Site10
![Page 21: RFI Impact at candidate remote station sites - SA 1 · Revision ... 09 Rem11‐13 1881 AFS 27.78721047 ‐31.01321455 10 ... RFI Impact at candidate remote station sites - SA 1.0](https://reader031.vdocuments.pub/reader031/viewer/2022022508/5ad157087f8b9a72118bf417/html5/thumbnails/21.jpg)
WP3‐050.020.010‐TR‐004 Revision:A1
Page21of36
Figure12:SOUTHERNAFRICA,Site11
![Page 22: RFI Impact at candidate remote station sites - SA 1 · Revision ... 09 Rem11‐13 1881 AFS 27.78721047 ‐31.01321455 10 ... RFI Impact at candidate remote station sites - SA 1.0](https://reader031.vdocuments.pub/reader031/viewer/2022022508/5ad157087f8b9a72118bf417/html5/thumbnails/22.jpg)
WP3‐050.020.010‐TR‐004 Revision:A1
Page22of36
Figure13:SOUTHERNAFRICA,Site12
![Page 23: RFI Impact at candidate remote station sites - SA 1 · Revision ... 09 Rem11‐13 1881 AFS 27.78721047 ‐31.01321455 10 ... RFI Impact at candidate remote station sites - SA 1.0](https://reader031.vdocuments.pub/reader031/viewer/2022022508/5ad157087f8b9a72118bf417/html5/thumbnails/23.jpg)
WP3‐050.020.010‐TR‐004 Revision:A1
Page23of36
Figure14:SOUTHERNAFRICA,Site13
![Page 24: RFI Impact at candidate remote station sites - SA 1 · Revision ... 09 Rem11‐13 1881 AFS 27.78721047 ‐31.01321455 10 ... RFI Impact at candidate remote station sites - SA 1.0](https://reader031.vdocuments.pub/reader031/viewer/2022022508/5ad157087f8b9a72118bf417/html5/thumbnails/24.jpg)
WP3‐050.020.010‐TR‐004 Revision:A1
Page24of36
Figure15:SOUTHERNAFRICA,Site14
![Page 25: RFI Impact at candidate remote station sites - SA 1 · Revision ... 09 Rem11‐13 1881 AFS 27.78721047 ‐31.01321455 10 ... RFI Impact at candidate remote station sites - SA 1.0](https://reader031.vdocuments.pub/reader031/viewer/2022022508/5ad157087f8b9a72118bf417/html5/thumbnails/25.jpg)
WP3‐050.020.010‐TR‐004 Revision:A1
Page25of36
Figure 16: SOUTHERN AFRICA, Site 15. Note that the distance scale is larger than 150km. Transmittersbeyond150kmshouldnotbeincludedincomparisons.
![Page 26: RFI Impact at candidate remote station sites - SA 1 · Revision ... 09 Rem11‐13 1881 AFS 27.78721047 ‐31.01321455 10 ... RFI Impact at candidate remote station sites - SA 1.0](https://reader031.vdocuments.pub/reader031/viewer/2022022508/5ad157087f8b9a72118bf417/html5/thumbnails/26.jpg)
WP3‐050.020.010‐TR‐004 Revision:A1
Page26of36
Figure17:SOUTHERNAFRICA,Site16
![Page 27: RFI Impact at candidate remote station sites - SA 1 · Revision ... 09 Rem11‐13 1881 AFS 27.78721047 ‐31.01321455 10 ... RFI Impact at candidate remote station sites - SA 1.0](https://reader031.vdocuments.pub/reader031/viewer/2022022508/5ad157087f8b9a72118bf417/html5/thumbnails/27.jpg)
WP3‐050.020.010‐TR‐004 Revision:A1
Page27of36
Figure18:SOUTHERNAFRICA,Site17
![Page 28: RFI Impact at candidate remote station sites - SA 1 · Revision ... 09 Rem11‐13 1881 AFS 27.78721047 ‐31.01321455 10 ... RFI Impact at candidate remote station sites - SA 1.0](https://reader031.vdocuments.pub/reader031/viewer/2022022508/5ad157087f8b9a72118bf417/html5/thumbnails/28.jpg)
WP3‐050.020.010‐TR‐004 Revision:A1
Page28of36
Figure19:SOUTHERNAFRICA,Site18
![Page 29: RFI Impact at candidate remote station sites - SA 1 · Revision ... 09 Rem11‐13 1881 AFS 27.78721047 ‐31.01321455 10 ... RFI Impact at candidate remote station sites - SA 1.0](https://reader031.vdocuments.pub/reader031/viewer/2022022508/5ad157087f8b9a72118bf417/html5/thumbnails/29.jpg)
WP3‐050.020.010‐TR‐004 Revision:A1
Page29of36
Figure20:SOUTHERNAFRICA,Site19
![Page 30: RFI Impact at candidate remote station sites - SA 1 · Revision ... 09 Rem11‐13 1881 AFS 27.78721047 ‐31.01321455 10 ... RFI Impact at candidate remote station sites - SA 1.0](https://reader031.vdocuments.pub/reader031/viewer/2022022508/5ad157087f8b9a72118bf417/html5/thumbnails/30.jpg)
WP3‐050.020.010‐TR‐004 Revision:A1
Page30of36
Figure21:SOUTHERNAFRICA,Site20
![Page 31: RFI Impact at candidate remote station sites - SA 1 · Revision ... 09 Rem11‐13 1881 AFS 27.78721047 ‐31.01321455 10 ... RFI Impact at candidate remote station sites - SA 1.0](https://reader031.vdocuments.pub/reader031/viewer/2022022508/5ad157087f8b9a72118bf417/html5/thumbnails/31.jpg)
WP3‐050.020.010‐TR‐004 Revision:A1
Page31of36
Figure22:SOUTHERNAFRICA,Site21
![Page 32: RFI Impact at candidate remote station sites - SA 1 · Revision ... 09 Rem11‐13 1881 AFS 27.78721047 ‐31.01321455 10 ... RFI Impact at candidate remote station sites - SA 1.0](https://reader031.vdocuments.pub/reader031/viewer/2022022508/5ad157087f8b9a72118bf417/html5/thumbnails/32.jpg)
WP3‐050.020.010‐TR‐004 Revision:A1
Page32of36
Figure23:SOUTHERNAFRICA,Site22
![Page 33: RFI Impact at candidate remote station sites - SA 1 · Revision ... 09 Rem11‐13 1881 AFS 27.78721047 ‐31.01321455 10 ... RFI Impact at candidate remote station sites - SA 1.0](https://reader031.vdocuments.pub/reader031/viewer/2022022508/5ad157087f8b9a72118bf417/html5/thumbnails/33.jpg)
WP3‐050.020.010‐TR‐004 Revision:A1
Page33of36
Figure24:SOUTHERNAFRICA,Site23
![Page 34: RFI Impact at candidate remote station sites - SA 1 · Revision ... 09 Rem11‐13 1881 AFS 27.78721047 ‐31.01321455 10 ... RFI Impact at candidate remote station sites - SA 1.0](https://reader031.vdocuments.pub/reader031/viewer/2022022508/5ad157087f8b9a72118bf417/html5/thumbnails/34.jpg)
WP3‐050.020.010‐TR‐004 Revision:A1
Page34of36
Figure25:SOUTHERNAFRICA,Site24
![Page 35: RFI Impact at candidate remote station sites - SA 1 · Revision ... 09 Rem11‐13 1881 AFS 27.78721047 ‐31.01321455 10 ... RFI Impact at candidate remote station sites - SA 1.0](https://reader031.vdocuments.pub/reader031/viewer/2022022508/5ad157087f8b9a72118bf417/html5/thumbnails/35.jpg)
WP3‐050.020.010‐TR‐004 Revision:A1
Page35of36
Figure 26: SOUTHERN AFRICA, Site 25. Note that the distance scale is larger than 150km. Transmittersbeyond150kmshouldnotbeincludedincomparisons
![Page 36: RFI Impact at candidate remote station sites - SA 1 · Revision ... 09 Rem11‐13 1881 AFS 27.78721047 ‐31.01321455 10 ... RFI Impact at candidate remote station sites - SA 1.0](https://reader031.vdocuments.pub/reader031/viewer/2022022508/5ad157087f8b9a72118bf417/html5/thumbnails/36.jpg)
WP3‐050.020.010‐TR‐004 Revision:A1
Page36of36
7 References
[1] ArrayConfigurationsforCandidateSKASites:DesignandAnalysis,R.P.Millenaar,R.C.Bolton,J.
Lazio,Rev.C,SPDO,4‐11‐2011[2] SKA Site SpectrumMonitoring Sites: X1‐X4 and Y1‐Y4,MeasurementMode:MaxHoldMode
(MH),Rev.1.0,A.J.Boonstra,R.P.Millenaar,30‐9‐2011[3] SKASiteSpectrumMonitoringSites:X1‐X4andY1‐Y4,MeasurementMode:RuralMode(RM),
Rev.1.0,A.J.Boonstra,R.P.Millenaar,28‐9‐2011[4] Protectioncriteriausedforradioastronomicalmeasurements,RecommendationITU‐RRA.769‐
2,2003