Download - SANEAMIENTO BASICO MUYORCCO
Transcript
METRADOSHOJA DE METRADOS(UNIDAD BASICA DE SANEAMIENTO CON
BIODIGESTOR)PROYECTO:"INSTALACION DE UNIDADES BASICAS DE
SANEAMIENTO UBS CON BIODIGESTOR EN 06 COMUNIDADES DEL DISTRITO DE
CHILCAS, PROVINCIA DE LA MAR-AYACUCHO"CONSULTOR:PROYECTISTA:ING.
GROVER VALDEZ CARDENASFECHA:MARZO -
2015PARTIDADESCRIPCIONUNDMEDIDASParcialCant.TotalCant.LargoAnchoAltura2E.-
LETRINAS SANITARIAS DE MUYORCCO45.00UNIDADES2.01TRABAJOS
PRELIMINARES2.0101LIMPIEZA DE TERRENO
MANUALm24.6545.00209.251.003.101.504.652.0102TRAZO Y REPLANTEO
UBSm24.6545.00209.251.003.101.504.652.02MOVIMIENTO DE
TIERRAS2.0201EXCAVACION MANUAL EN MATERIAL
SUELTOm32.5145.00113.13EJE 1-1 Y
2-22.002.300.400.601.104.000.750.650.601.17EJE A-A Y
B-B2.000.500.400.600.242.0202ELIMINACION DE MATERIAL
EXCEDENTEm31.00135.76Excavacion para
cimiento113.13135.76Esponjamiento 20%22.632.03OBRAS DE CONCRETO
SIMPLE2.0301CONCRETO FC=175 KG/CM2 SIN
MEZCLADORAm31.1945.0053.73Cimientos para columnas eje
1-12.000.750.650.600.59Cimientos para columnas eje
2-22.000.750.650.600.59Murete
ducha1.001.200.100.200.022.0302CIMIENTOS CORRIDOS MEZCLA 1:10 (C:H)
+ 30% P.G.m31.3445.0060.48EJE 1-1 Y 2-22.002.300.400.601.10EJE A-A
Y B-B2.000.500.400.600.242.0303SOBRECIMIENTOS MEZCLA C:H 1:8 + 25%
P.M.m30.3145.0013.77EJE 1-11.002.800.150.300.13EJE
2-21.002.000.150.300.09EJE A-A Y
B-B2.001.000.150.300.092.0304ENCOFRADO Y DESENCOF.
SOBRECIMIENTOSm24.9245.00221.40EJE 1-1 ENTRE A-B2.002.800.301.68EJE
2-2 ENTRE A-B2.002.000.301.20EJE A-A ENTRE
1-24.001.000.301.20TAPAS8.000.150.300.36MURETE DE
DUCHA2.001.200.200.482.04OBRAS DE CONCRETO
ARMADO2.0401COLUMNAS2.040101CONCRETO F'C=175 KG/CM2
C/MEZCLADORAm30.3745.0016.772.000.250.152.350.182.000.250.152.620.202.040102ENCOFRADO
Y DESENCOF.PARA COLUMNASm2perim.5.3245.00239.51columna eje
2-21.000.652.351.531.000.502.351.18columnas eje
1-11.000.502.621.311.000.502.621.312.040103ACERO
Fy=4200Kg/cm2kg82.1945.003698.46 1/2", Peso =1.01 Kg/m -
verticales8.003.441.0127.80 1/2", Peso =1.01 Kg/m -
verticales8.003.151.0125.45 1/4", Peso =0.56 Kg/m -
estribos76.000.680.5628.942.0402VIGAS2.040201CONCRETO F'C=175
KG/CM2
C/MEZCLADORAm30.3445.0015.42VS22.002.800.150.220.18VS12.002.140.150.200.13Dintel
sobre la puerta1.000.950.150.100.01Dintel sobre la
ventana1.001.000.150.100.022.040202ENCOFRADO Y DESENCOFRADO PARA
VIGASm22.5845.00115.92VS-24.002.800.101.12VS-12.002.140.100.432.001.840.100.37Base
dintel ventana1.001.000.150.15Laterales dintel
ventana2.001.000.100.20base(puerta)1.000.800.150.122.000.950.100.192.040203ACERO
F'y=4200 KG/CM2 G-60kg70.2545.003161.05VS-2kg/m 1/2", Peso =1.01
Kg/m -longitud.8.003.201.0125.86 3/8", Peso =0.56 Kg/m -
estribos38.000.580.5612.34VS-1 1/2", Peso =1.01 Kg/m
-longitud.8.002.251.0118.18 3/8", Peso =0.56 Kg/m -
estribos22.000.560.566.90Dintel sobre puerta 3/8, Peso = 0.56
kg/m(longuitudinal)4.001.100.562.46 1/4, Peso = 0.25
kg/m(estribos)6.000.680.251.02Dintel sobre ventana 3/8, Peso = 0.56
kg/m(longuitudinal)4.001.100.562.46 1/4, Peso = 0.25
kg/m(estribos)6.000.680.251.022.0403LOSA DE CONCRETO
ARMADO2.040301CONCRETO F'C=175 KG/CM2 PARA LOSA
C/MEZCLADORAm30.6045.0027.04PAO11.003.502.140.100.75-2.002.800.150.10-0.08-2.002.140.150.10-0.062.040302ENCOFRADO
Y
DESENCOF.PARALOSAm27.1145.00319.86base12.002.140.200.86base21.002.800.411.15base31.002.801.223.42base41.002.800.200.56lateral12.003.500.100.70lateral22.002.140.100.432.040303ACERO
Fy=4200Kg/cm2kg80.9845.003644.18 1/2", Peso =1.01 Kg/m
-longitud.12.003.421.0141.45 1/2", Peso =1.01 Kg/m
-transver.19.002.061.0139.532.0404COBERTURA2.040401COBERTURA DE
TEJA
ARTESANALm27.5045.00337.37Losa1.003.502.147.502.05ARQUITECTURA2.0501MUROS
Y TABIQUES DE ALBAILERIA2.050101MUROS DE SOGA CON LADRILLO DE
ARCILLA 0.09X0.12X0.24 M.m214.5845.00656.19EJE
1-11.002.802.326.50EJE 2-21.002.002.054.10EJE
A-A1.001.002.252.25EJE B-B1.001.001.451.45Muro sobre la
ventana1.001.001.000.150.15Muro sobre la
puerta1.000.800.170.142.0502REVOQUES, ENLUCIDOS Y
MOLURAS(INTERIORES)2.050201TARRAJEO EN
INTERIORESm212.4645.00560.48EJE 1-1 ENTRE A-B
muro1.002.802.476.92EJE 2-2 ENTRE A-B muro1.002.802.236.24-
puerta-1.000.802.10-1.68mayolicas-2.000.901.80-3.24Marco
puerta2.000.152.100.631.000.150.800.12EJE A-A ENTRE 1-2
muro1.001.202.352.82mayolicas-1.001.201.80-2.16EJE B-B ENTRE 1-2
muro1.001.202.352.82menos ventana-1.001.000.45-0.45Laterales
ventana2.000.100.450.09Marco de
ventana2.001.000.150.302.000.150.150.052.050202TARRAJEO PRIMARIO
RAYADOm26.0045.00270.00EJE 1-1 ENTRE A-B2.000.901.803.24EJE A-A
ENTRE 1-21.001.201.802.16MURETE DE
DUCHA1.001.200.500.602.050203CIELO RASO C:A 1:5
E=1.5cmm27.1145.00319.86base12.002.140.200.86base21.002.800.411.15base31.002.801.223.42base41.002.800.200.56lateral12.003.500.100.70lateral22.002.140.100.432.050204TARRAJEO
DE VIGAS C:A, E=1.5 CMm21.2545.0056.36Eje 1-11.002.800.130.36Eje
2-21.002.800.100.28Eje A-A1.002.140.100.21Eje
B-B1.002.140.100.21Base vigas volados ejes A y
B2.000.600.150.182.0503ZOCALOS2.050301ZOCALO DE CERAMICA DE 20 X 30
CM.m26.0045.00270.00DUCHA2.000.901.803.24Murete
ducha1.001.201.802.161.001.200.500.602.0504CONTRAZOCALOS2.050401CONTRAZOCALO
DE CEMENTO PULIDO C:A 1:5 H=0.20 mml8.4045.00378.00Muro
posterior1.003.103.10Muros laterales2.001.503.00Muro
frontal1.002.302.302.0505PISOS Y PAVIMENTOS2.050501PISO DE CEMENTO
PULIDO
S/COLOREARm22.4045.00108.001.001.901.202.281.000.800.150.122.050502PISO
DE CERAMICA 30X30CM
ANTIDESLIZANTEm20.9645.0043.20DUCHA1.000.801.200.962.0506CARPINTERIA
DE MADERA2.050601PUERTA DE MADERA
MACHIHEMBRADAm245.0075.601.000.802.101.682.050602VENTANA MADERA CON
MALLA
MOSQUITEROund45.0020.251.001.000.450.452.0507CERRAJERIA2.050701CERRADURA
DE PERILLA PARA PUERTA DE BAOpza45.0045.001.001.002.050702BISAGRA
ALUMINIZADA CAPUCHINA DE 3 1/2" x 3
1/2"und45.00135.003.003.002.06INSTALACIONES SANITARIAS2.0601SISTEMA
DE AGUA FRIA2.060101Excavacin Manual en material
sueltom30.3045.0013.40Excavacin Tubera 1/2" Lprom= 1.1
mt.1.001.100.400.600.26Excavacin caja de paso 20x35
cm.1.000.450.300.250.032.060102Relleno y apisonado de zanjas con
material propiom30.2245.009.901.001.100.400.500.222.060103Tubera
PVC SAP de 1/2"m45.00891.001.0019.819.802.060104Salida de agua fra
de 1/2"pto45.00180.004.004.002.060105Tee PVC SAP de
1/2"Und45.00135.003.003.002.060106Niple de PVC de
1/2"Und45.00180.001.004.004.002.060107Union Universal PVC de
1/2"Und45.0090.001.002.002.002.060108Adaptador PVC de
1/2"Und45.0090.001.002.002.002.060109Grifo de bronce de
1/2"Und45.0045.001.001.001.002.06011Caja de paso de concreto simple
prefabricado de 20 x 35 medida interior, incluye tapa metlica
estriada de 8"x14"Und45.0045.001.001.001.002.060111Llave de paso de
1/2"und45.0090.002.002.002.0602SISTEMA DE DESAGUE Y
VENTILACION2.060201Excavacin Manual de zanjas en material
sueltom31.5445.0069.11Excavacin Tubera 2" y
4"1.0018.600.300.251.40Excavacin caja de registro con tapa de
12"x24"1.000.800.440.400.142.060202Relleno y apisonado de zanjas
con material
propiom31.1245.0050.221.0018.600.300.201.122.060203TUBERIA PVC SAL
DE 2"ML45.00613.801.0013.6413.642.060204TUBERIA PVC SAL DE
4"ML45.00358.201.007.967.962.060205SALIDA DE DESAGUE EN PVC
2"pto45.00135.003.003.002.060206SALIDA DE DESAGUE EN PVC
4"pto45.0045.001.001.002.060207CODO PVC SAL
4"x45pza45.0090.002.002.002.060208CODO PVC SAL
2"x45pza45.0090.002.002.002.060209YEE DE P.V.C. SAL DE
2"und45.0090.002.002.002.06021YEE DE P.V.C. SAL CON REDUCCION DE
4"-2"und45.0045.001.001.002.060211SOMBRERO VENTILACION PVC DE
2"und45.0045.001.001.002.060212REGISTRO ROSCADO DE BRONCE EN PISO
DE 4"und45.0045.001.001.002.060213SUMIDERO DE BRONCE DE 2"
(DUCHA)und45.0045.001.001.002.060214TRAMPA PVC SAL DE
2"und45.00135.003.003.002.060215COLOCACION DE
SANITARIOSpza45.00135.003.003.002.060216INSTALACION DE ACCESORIOS
SANITARIOS -DUCHAund45.0045.001.001.002.060217CAJA DE REGISTRO
PREFABRICADA DE DESAGUE 12" X 24", INCLUYE TAPA METALICA ESTRIADA
DE 12"X24"und45.0045.001.001.002.0603SUMINISTRO E INST. ACCESORIOS
SANITARIOS2.060301INODORO (Incluye
accesorios)pza45.0045.001.001.002.060302LAVATORIO DE PARED BLANCO 1
LLAVE (Inc. Accesorios)pza45.0045.001.001.002.060303DUCHAS CROMADAS
DE CABEZA GIRATORIA Y LLAVE
MEZCLADORApza45.0045.001.001.002.060304URINARIO DE
LOSApza45.0045.001.001.002.07INSTALACIONES ELECTRICAS2.0701Puntos
de Luz (Incluye interruptor y
luminaria)Pto45.0045.001.001.002.0702Tablero de distribucin de 02
llaves termomagnticas + llave de 2x10
AUnd1.001.0045.0045.002.0703Lnea de la vivienda hasta el tablero de
distribucin Dprom.= 10 m. (2-1x2.5mm THW), incluye la
tuberaMl.10.0010.0045.00450.002.08OTROS2.0801BIODIGESTOR1.002.080101EXCAVACION
MANUAL EN MATERIAL SUELTO PARA POZO
BIODIGESTORm345.0058.321.00Area0.791.651.302.080102Refine y
nivelacin de
terrenom26.7245.00302.54Base1.00Area1.541.54Paredes1.00Long3.141.655.182.080103Relleno
con material propio compactada (mojado)m30.3545.0015.69Area del
tringulo por el dimetro promedio (parte
cnica)1.00Area0.071.570.11Paredes laterales e=0.20
m.1.003.140.061.250.242.080104ELIMINACION DE MATERIAL EXCEDENTE
Dprom= 30 m.m3ESPONJ45.0051.151.000.951.201.142.080105Losa de
cemento arena 1:5 para la base del
biodigestorm345.000.811.000.600.600.050.022.080106Acero Fy=4200
Kg/cm2 para la losa de
baseKg45.00100.808.000.500.562.242.080106Biodigestor de 600
Lt.Und45.0045.001.001.001.002.0802CAJA DE REGISTRO DE
LODOS2.080201EXCAVACION MANUAL PARA CAJA DE REGISTRO DE
LODOSm345.008.621.000.740.740.350.192.080202CONCRETO FC=175 KG/CM2
MUROSm30.0945.004.222.000.740.070.500.052.000.600.070.500.042.080205ENCOFRADO
Y DESENCOFRADOm21.2045.0054.004.000.600.501.202.080203TARRAJEO
INTERIOR C/IMPERMEABILIZANTE MEZCLA 1:5 , E=1.5
CM.M21.2045.0054.004.000.600.501.202.080204TAPA METALICA ESTRIADA
DE 65X65 CMUnd1.0045.0045.001.001.002.0803POZO DE
INFILTRACION2.080301LIMPIEZA DE TERRENO
MANUALM21.002.602.606.7645.00304.202.080302TRAZO Y
REPLANTEOM21.002.602.606.7645.00304.202.080303EXCAVACION MANUAL
PARA POZO DE
INFILTRACIONm345.00488.161.00Area4.522.4010.852.080304REFINE,
NIVELACION Y
COMPACTACIONm245.00203.401.00Area4.524.522.080305ELIMINACION DE
MATERIAL
EXCEDENTEm3ESPONJ45.00585.791.0010.851.2013.022.080306CIMIENTOS
CORRIDOS MEZCLA C.H 1:10 + 30%
P.G.m30.8045.0036.051.005.340.300.500.802.080307MURO DE LADRILLO
CON JUNTA DE
ARENAm29.6145.00432.601.00Long5.341.809.612.080308CONCRETO
F'C=210Kg/cm2m30.3145.0014.17Losa
techo1.00Area3.140.100.31-1.000.600.600.10-0.04Tapa1.000.700.700.080.042.080309ENCOFRADO
Y DESENCOFRADO
TAPAm26.7845.00305.10cimientos2.00Long5.340.505.34Techo1.00Area1.541.54Menos
tapa-1.000.600.60-0.36Tapa4.000.650.100.262.08031ACERO
Fy=4200Kg/cm2Kg19.3345.00869.90 3/8, Peso = 0,56
kg/m8.001.650.567.39 3/8, Peso = 0,56 kg/m4.001.130.562.53 3/8,
Peso = 0,56 kg/m4.001.600.563.58 3/8, Peso = 0,56
kg/m8.000.600.562.69 3/8, Peso = 0,56 kg/m4.000.400.560.90Tapa 3/8,
Peso = 0,56 kg/m6.000.600.562.02Asa de
tapa1.000.400.560.222.080311RELLENO DE GRAVA DE
2"m34.5845.00206.12Base de pozo1.00Area1.540.300.46Laterales de
pozo1.00Area2.171.904.122.080312CODO DE PVC SAL 4"
X90pza1.001.0045.0045.00
METRADO DE OBRAS PROVISIONALESHOJA DE METRADOS(OBRAS
PROVISIONALES)PROYECTO:"INSTALACION DE UNIDADES BASICAS DE
SANEAMIENTO UBS CON BIODIGESTOR EN 06 COMUNIDADES DEL DISTRITO DE
CHILCAS, PROVINCIA DE LA MAR-AYACUCHO"CONSULTOR:PROYECTISTA:ING.
GROVER VALDEZ CARDENASFECHA:MARZO
2015PARTIDADESCRIPCIONUNDMETRADOSPARCIALTOTALVecesCant.LargoAnchoAltura1OBRAS
PROVISIONALES1.01OBRAS PROVISIONALES1.0101CARTEL DE IDENTIFICACION
DE LA OBRA DE 3.60X2.40MUND11.001.001.0102ALQUILER DE LOCAL PARA
ALMACEN Y OFICINAMES44.004.001.0103MOVILIZACION Y DESMOVILIZACION
DE EQUIPO LIVIANOVJE11.001.00Transporte de Mezcladora y
Vibradora1.0104FLETE TERRESTREGLB1.001.00Ver Calculo de Flete
Terrestre11.001.0105FLETE RURALKG91023.8391,023.83Ver Calculo de
Flete Terrestre191023.831.02SEGURIDAD Y SALUD1.0201ELABORACION,
IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y SALUD EN EL
TRABAJOGLB11.001.001.0202EQUIPOS DE PROTECCION
INDIVIDUALUND2020.0020.001.0203EQUIPOS DE PROTECCION
COLECTIVAGLB11.001.001.0204SEALIZACION TEMPORAL DE
SEGURIDADGLB11.001.001.0205CAPACITACION EN SEGURIDAD Y
SALUDMES11.001.001.0206RECURSOS PARA RESPUESTAS ENTE EMERG. EN
SEGUR. Y SALUD DURANTE EL TRABAJOGLB11.001.00
METRADO DE FLETESCALCULO DEL COSTO DEL FLETE _
TERRESTRETRANSPORTE:AYACUCHO - MUYO ORCCODISTANCIA230KMPROYECTO
:"INSTALACION DE UNIDADES BASICAS DE SANEAMIENTO UBS CON
BIODIGESTOR EN 07 COMUNIDADES DEL DISTRITO DE CHILCAS, PROVINCIA DE
LA MAR-AYACUCHO"FECHA :MARZO 2015A.- POR KILOSCALCULO DE FLETE
TERRESTRE POR PESOVEHICULOVOLQUETE 10 M3MODELOVOLVO O
SIMILARCAPACIDAD14.00TNPOTENCIA330.00HPVELOCIDAD CON
CARGA30.00KM/HVELOCIDAD SIN CARGA40.00KM/HTIEMPO CON
CARGA7.67HorasTIEMPO SIN CARGA5.75HorasTIEMPO CARGA Y
DESCARGA1.00HorasTIEMPO TOTAL14.42HorasCOSTO POR HORA DEL ALQUILER
DE VEHICULO160.00Nuevos SolesCOSTO POR VIAJE2306.67Nuevos
SolesCOSTO DE FLETE / KG0.165Nuevos
SolesDESCRIPCIONUNDCANTIDADPESOPESO (Kg)UnitarioTotalCEMENTO
PORTLAND TIPO I (42.5KG)BOL1,845.0042.5078,412.50YESO ( BOLSA DE 25
KG)BOL5.0025.00125.00IMPERMEABILIZANTE
SIKAKg32.001.0032.00PEGAMENTO PARA PVCGLN10.005.8858.80PINTURA
LATEXGLN2.005.8811.76ALAMBRE NEGRO # 08KG154.001.00154.00CLAVOS CON
CABEZA PROMEDIOKG253.001.00253.00ALAMBRE NEGRO
N16KG756.001.00756.00FIERRO CORRUGADO PROMEDIO (fy=4200
kg/cm2)KG11,819.001.0011,819.00MADERA
TORNILLOP25,885.000.502,942.50LADRILLO DE ARCILLA CORRIENTE 9x12x24
CMUND44,864.002.50112,160.00TEJA ARTESANAL DE
ARCILLAUND7,085.002.0014,170.00OTROSGLB1.003000.003,000.00PESO
TOTAL223,894.56B.- POR VOLUMENDISTANCIA230KMAYACUCHO -
CHILCASMATERIALES110KMSAN MIGUEL (CANTERA) - RETAMAAGREGADOSCALCULO
DE FLETE TERRESTRE POR VOLUMENVEHICULOVOLQUETE 15
M3CAPACIDAD15.00M3VELOCIDAD CON CARGA30.00KM/HVELOCIDAD SIN
CARGA40.00KM/HTIEMPO CON CARGA7.67HorasTIEMPO SIN
CARGA5.75HorasTIEMPO CARGA Y DESCARGA1.00HorasTIEMPO
TOTAL14.42HorasCOSTO POR HORA DEL ALQUILER DE VEHICULO160.00Nuevos
SolesCOSTO POR VIAJE2306.67Nuevos SolesCALCULO DE FLETE TERRESTRE
POR VOLUMEN - PARA AGREGADOS - DESDE CANTERAVEHICULOVOLQUETE 15
M3CAPACIDAD15.00M3VELOCIDAD CON CARGA30.00KM/HVELOCIDAD SIN
CARGA40.00KM/HTIEMPO CON CARGA3.67HorasTIEMPO SIN
CARGA2.75HorasTIEMPO CARGA Y DESCARGA1.00HorasTIEMPO
TOTAL7.42HorasCOSTO POR HORA DEL ALQUILER DE VEHICULO180.00Nuevos
SolesCOSTO POR VIAJE1335.00Nuevos Soles* EN
AGREGADOSMATERIALESUnd.CANTIDADARENA FINAM342.00ARENA
GRUESAM387.00PIEDRA CHANCADA 1/2" PULGADAM380.00GRAVA 2
PULGADASM3212.00PIEDRA MEDIANAM354.00HORMIGONM398.00VOLUMEN
TOTAL573.00NUMERO DE VIAJES38.20NUMERO DE VIAJES REDONDEADO39.00*EN
TUBERIAS:(Und: 2.20mx3.00m de carrocera-con H=1.50m)CAPACIDAD DEL
CAMION EN TUBOS / VIAJEMLNo. TUBOSNo. VIAJESTuberas de
1/2"C-108540Und.891.001780.02TUBERIA PVC NTP ITINTEC 399.002 1/2"
C-108540Und.396.00790.01Tuberas de 1"3360Und.0.0000.00TUB. PVC SAP
P/INST. ELECT. DE 3/4"6720Pza180.001800.03Tuberas PVC SAL
2"994Und.270.00900.09Tuberas PVC SAL
2"x3m470Pza209.002090.44Tuberas PVC SAL
4"x3m259Pza122.001220.47TUBO DE ABASTO REFORZADO DE
1/2"8540Pza45.00450.01Tuberias de 8" : PVC65Und.00.00NUMERO DE
VIAJES1.07NUMERO DE VIAJES REDONDEADO1.00COSTO DEL FLETE
TERRESTRE:COSTO POR PESO:Peso total x Flete por Kg.S/.36889.29COSTO
POR VOLUMEN:No. De viajes x Costo por
viajeTUBERIASS/.2306.67AGREGADOSS/.52065.00COSTO
TOTALS/.91,260.96COSTO TOTAL SIN IGV S/.77,339.80CALCULO DEL COSTO
DEL FLETE RURALA.- POR KILOSTRANSPORTE:ESCCANA AANEXOSDISTANCIA
PROMEDIO1KMPROYECTO :"INSTALACION DE UNIDADES BASICAS DE
SANEAMIENTO UBS CON BIODIGESTOR EN 06 COMUNIDADES DEL DISTRITO DE
CHILCAS, PROVINCIA DE LA MAR-AYACUCHO"FECHA:OCTUBRE - 2012CALCULO
PARA FLETE EN ACEMILA POR KILOSACEMILASE USARAN BOLSAS DE
CEMENTOCAPACIDAD42.50KGVELOCIDAD CON CARGA6.00KM/HVELOCIDAD SIN
CARGA9.00KM/HTIEMPO CON CARGA0.17HorasTIEMPO SIN
CARGA0.11HorasTIEMPO TOTAL0.28HorasCOSTO POR HORA DE
PEON11.93Nuevos SolesCOSTO POR VIAJE DE 01 PEON3.31Nuevos
SolesCOSTO DE FLETE / KG0.078Nuevos
SolesDESCRIPCIONUNDCANTIDADPESOPESO (Kg)UnitarioTotalCEMENTO
PORTLAND TIPO I (42.5KG)BOL1845.0042.5078412.50YESO ( BOLSA DE 25
KG)BOL5.0025.00125.00IMPERMEABILIZANTE
SIKAGLN32.005.88188.16PEGAMENTO PARA PVCGLN10.005.8858.80PINTURA
LATEXGLN2.005.8811.76ALAMBRE NEGRO # 08KG154.001.00154.00CLAVOS CON
CABEZA PROMEDIOKG253.001.00253.00ALAMBRE NEGRO
N16KG756.0011.008316.00FIERRO CORRUGADO PROMEDIO (fy=4200
kg/cm2)KG11819.001.0011819.00MADERA
TORNILLOP25885.000.502942.50LADRILLO DE ARCILLA CORRIENTE 9x12x24
CMUND44864.002.50112,160.00TEJA ARTESANAL DE
ARCILLAUND7085.002.0014,170.00OTROSGLB1.005000.005000.00ARENA
FINAM342.001500.0063000.00ARENA GRUESAM387.001500.00130500.00PIEDRA
CHANCADA 1/2" PULGADAM380.001450.00116000.00GRAVA 2
PULGADASM3212.001450.00307400.00PIEDRA
MEDIANAM3208.001450.00301600.00HORMIGONM398.001500.00147000.00PESO
TOTALTOTAL1,299,110.72B.- POR VOLUMENDISTANCIA1KMCALCULO PARA FLETE
RURAL TUBERIASACEMILASE USARAN BOLSAS DE CEMENTOCAPACIDADSEGN
DIAMETRO DE TUBERIAVELOCIDAD CON CARGA4.00KM/HVELOCIDAD SIN
CARGA6.00KM/HTIEMPO CON CARGA0.25HorasTIEMPO SIN
CARGA0.17HorasTIEMPO TOTAL0.42HorasCOSTO POR HORA DE
PEON11.93Nuevos SolesCOSTO POR VIAJE DE 02 PEONES9.942Nuevos
Soles*EN TUBERIAS:(Und: 2.20mx3.00m de carrocera-con
H=1.50m)CAPACIDAD DE CARGA PEONES/ VIAJEMLNo. TUBOSNo.
VIAJESTuberas de 1/2"C-108540Und.445.50890.01TUBERIA PVC NTP
ITINTEC 399.002 1/2" C-108540Und.198.00400.00Tuberas de
1"3360Und.0.0000.00TUB. PVC SAP P/INST. ELECT. DE
3/4"6720Und.90.00180.00Tuberas PVC SAL 2"994Und.135.00450.05Tuberas
PVC SAL 2"x3m470Und.104.50350.07Tuberas PVC SAL
4"x3m259Und.61.00200.08TUBO DE ABASTO REFORZADO DE
1/2"110Und.22.5050.04Tuberias de 8" : PVC3Und.0.0000.00NUMERO DE
VIAJES0.26NUMERO DE VIAJES REDONDEADO1.00COSTO DEL FLETE
RURAL:COSTO POR PESO:Peso total x Flete por Kg.S/.101296.67COSTO
POR VOLUMEN:No. De viajes x Costo por viajeTUBERIASS/.9.94COSTO
TOTAL FLETE RURALS/.101,306.61COSTO TOTAL SIN IGV
S/.85,853.06