![Page 1: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/1.jpg)
![Page 2: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/2.jpg)
![Page 3: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/3.jpg)
Insinyur Pendidik,Perguruan Tinggi Teknik,
Insinyur Riset, Litbang, Proses scale up,
Insinyur Konsultan,Survey,Kontraktor, EPC, Audit
Insinyur Operator Industri, Pemeliharaan,
Insinyur Budidaya Komoditi, Eksplorasi Mineral
Insinyur Bisnis, Pengembang, Investasi Keteknikan
Insinyur di Birokrasi, Parlemen, Kelembagaan, Militer
Yang mengabdi di bidang PendidikanTinggi danPelatihanTeknik/Teknologi;
Yang melakukan Penelitian,Pengembang-an, Pengkajiandi berbagai Lembaga Riset
Praktisi yang bekerja di bidang Konsultansi, Rancang Bangun dan Konstruksi;Forensik
Praktisi yang bekerja di Manufaktur, Pengolahandan Proses;Substritusi bahan baku,modifikasi
Praktisi di sektor Penambangan dan Pertanian meliputi Penggalian, Penanaman, Peningkatandan Pemulia-an Sumber Daya Alami;
Yang bergerak di Pengelolaan Usaha (Manajemen) dan Pemasaran Teknik maupun pemilikan sebagai Entrepreneur, Developer, Investor;
Yang menggeluti pembentukan Kebijakan Pengembang-an, Pembangunan, Pembentukan, PemeliharaanAsset Nasional
1 2 3 4 5
SEBARAN KARIR INSINYUR (ENGINEER)(Sumber : Slide Profil Organisasi PII 2012-2015)
Yang tercakup dalam PII meliputi Insinyur yang berlatar belakang berbagai disiplin keilmuan dan berkiprah di berbagai bidang kegiatan dan sektor, mereka adalah:
![Page 4: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/4.jpg)
INDUSTRI
BISNIS
SISTEM PEMBANGKIT
GARDUSTEP-UP
SISTEM TRANSMISI SISTEM DISTRIBUSI
GARDUSTEP DOWN
RUMAH
SOSIAL/PUBLIK
PLTAPLTDPLTPPLTGPLTUPLTGULain-lain
KONSUMEN
TRAFOSTEP DOWN
Sistem Tenaga Listrik (Pembangkit s/d Konsumen)(Sumber : Slide Materi Kuliah Umum APEI - Kondisi & Permasalahan Ketenagalistrikan di Indonesia 2)
![Page 5: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/5.jpg)
Proyek Pembangunan GedungBertingkat
Perencanaan
Pelaksanaan dan Pengawasan
Serah Terima Pekerjaan
![Page 6: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/6.jpg)
PerencanaanProyek Pembangunan Gedung Bertingkat
Gambar Rencana
Rencana Kerja dan Syarat-syarat (RKS) dan SpesifikasiTeknis
Rencana Anggaran Biaya (RAB)
![Page 7: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/7.jpg)
Gambar RencanaProyek Pembangunan Gedung Bertingkat
Arsitektur
Struktur
MEP (Mekanikal, Elektrikal & Plumbing)
![Page 8: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/8.jpg)
Lingkup Pekerjaan
Gambar Rencana MEP(1) Mekanikal Plumbing : Suplai dan Distribusi Air Bersih (Dingin dan Panas) Perpipaan Air Bekas dan Air Kotor Instalasi Pembuangan Air Limbah (IPAL) Saluran Air Hujan AC dan Ventilasi Mekanik Pemadam Kebakaran (Hydrant dan Sprinkler) Transportasi Dalam Gedung (Lift dan Eskalator) Gas Medis (Gas Bius, Gas Pembantu Pernafasan, Udara Tekan dan
Vakum) Kitchen dan Laundry
![Page 9: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/9.jpg)
Lingkup Pekerjaan
Gambar Rencana MEP(2) Elektrikal : Sumber Listrik PLN - Tegangan Menengah dan Tegangan Rendah Sumber Listrik Emergency (Genset Diesel) Distribusi Listrik Dalam Gedung Penerangan Umum dan Darurat Dalam Gedung Penerangan Jalan Umum Power Outlet (Kotak Kontak) Fire Alarm (Pendeteksi Kebakaran) Tata Suara (Sound System) Telepon dan Komunikasi Data Master Antenna Television (MATV) CCTV dan Security System Nurse Call System Proteksi Petir Builiding Automation System (BAS)
![Page 10: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/10.jpg)
Kemudian, Gambar Elektrikal
Dikelompokkan menjadi1. Skedul Beban Listrik (Perhitungan Beban)2. Distribusi Listrik & Tray Kabel (Lokasi-lokasi Panel Listrik,
Trafo & Genset)3. Penerangan4. Kotak Kontak5. VAC (Pengkabelan)6. Fire Alarm7. Sound System8. Telepon
![Page 11: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/11.jpg)
Kemudian, Gambar Elektrikal
Dikelompokkan menjadi9. Data & Wifi10. MATV11. CCTV12. Proteksi Petir & Grounding
![Page 12: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/12.jpg)
![Page 13: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/13.jpg)
PERANCANGAN SISTEM ELEKTRIKAL PROYEK PEMBANGUNAN HOTEL BERTINGKAT DI YOGYAKARTA
OLEH :AMRULLAH SAMEKTOWIBOWO
![Page 14: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/14.jpg)
RENCANA FASAD ARSITEKTUR HOTEL(by ARSITEK)
![Page 15: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/15.jpg)
DENAH ARSITEKTUR HOTEL(by ARSITEK)
LT. BASEMENT
Parkir Security Storage Engineering Pump House Power House
![Page 16: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/16.jpg)
DENAH ARSITEKTUR HOTEL(by ARSITEK)
Lobby Ruang Meeting Tenant Storage Ruang Trafo PLN Fasilitas Umum
LT. LOBBY
![Page 17: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/17.jpg)
DENAH ARSITEKTUR HOTEL(by ARSITEK)
Kitchen-Resto Swimming Pool Bedroom Fasilitas Umum
LT. 2
![Page 18: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/18.jpg)
DENAH ARSITEKTUR HOTEL(by ARSITEK)
Bedroom
LT. 3
![Page 19: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/19.jpg)
DENAH ARSITEKTUR HOTEL(by ARSITEK)
Bedroom
LT. 5, 6, 7, 8 (TIPIKAL)
![Page 20: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/20.jpg)
DENAH ARSITEKTUR HOTEL(by ARSITEK)
Skylounge Satelite Kitchen Rooftank
LT. ATAP
![Page 21: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/21.jpg)
DENAH ARSITEKTUR HOTEL(by ARSITEK)
Atap Ruang Mesin Lift
ATAP
![Page 22: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/22.jpg)
SISTEM ELEKTRIKAL
LISTRIK & MEKANIK Distribusi Listrik (lengkap
dengan tray kabel) Pencahayaan (Iluminasi) Penangkal Petir
ELEKTRONIK Fire Alarm Sound System Jaringan Telepon Data & Wifi MATV (Master Antenna
Television) CCTV (Closed-Circuit
Television)
![Page 23: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/23.jpg)
DISTRIBUSILISTRIK
KEBUTUHAN:
PENCAHAYAAN
KOTAK KONTAK
VAC (VENTILATING & AIR CONDITIONING)
MESIN LIFT
POMPA AIR BERSIH & KOLAM RENANG
PENGOLAHAN LIMBAH
POMPA PEMADAM KEBAKARAN
PERALATAN KITCHEN
![Page 24: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/24.jpg)
DISTRIBUSI LISTRIKTEGANGAN RENDAH
![Page 25: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/25.jpg)
TRAY KABEL
![Page 26: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/26.jpg)
KELENGKAPAN:
SMOKE & HEAT DETECTOR
INDICATING LAMP
ALARM BELL
MANUAL CALL POINT c/w FIREMAN’S INTERCOM JACK
MODULE & TERMINAL BOX
CONTROL PANEL (MCP-FA)
FIREALARM
![Page 27: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/27.jpg)
FIRE ALARM – SEMI ADDRESSABLE
![Page 28: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/28.jpg)
KELENGKAPAN:
CEILING SPEAKER
VOLUME CONTROL
WALL SPEAKER
HORN SPEAKER
MIXER
ZONE SELECTOR
POWER AMPLIFIER
MICROPHONE
DVD PLAYER
RADIO TUNER
SOUNDSYSTEM
![Page 29: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/29.jpg)
SOUNDSYSTEM
![Page 30: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/30.jpg)
SOUNDSYSTEM
![Page 31: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/31.jpg)
KELENGKAPAN:
OUTLET TELEPON (DINDING & LANTAI)
TERMINAL BOX
MDF (MAIN DISTRIBUTION FRAME)
PABX
BILLING SYSTEM
AUTOMATIC ATTENDANT CONSULE
JARINGANTELEPON
![Page 32: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/32.jpg)
JARINGANTELEPON
![Page 33: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/33.jpg)
KELENGKAPAN:
OUTLET DATA
WIFI ACCESS POINT
SWITCH HUB
SERVER
DATA &WIFI
![Page 34: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/34.jpg)
DATA &WIFI
![Page 35: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/35.jpg)
KELENGKAPAN:
OUTLET TV
TAP
SPLITTER/COUPLER
AMPLIFIER
HEADEND
ANTENNA PARABOLA (UHF/VHF)
MATV
![Page 36: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/36.jpg)
MATV
![Page 37: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/37.jpg)
KELENGKAPAN:
KAMERA DOME CCTV
KAMERA BOX CCD INFRARED
DVR
MULTI SCREEN COLOR MONITOR
CCTV
![Page 38: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/38.jpg)
CCTV
![Page 39: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/39.jpg)
PENYALURPETIR
![Page 40: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/40.jpg)
![Page 41: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/41.jpg)
PENYALURPETIR
![Page 42: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/42.jpg)
SKEDUL BEBANLVMDP
SKEDUL BEBAN LVMDP
NO PANEL LOKASI FUNGSIARUS (AMPERE) ESTIMASI BEBAN NORMAL
FK %BEBAN MAX BEBAN MX NORMAL
R S T TERSAMBUNG (KVA) NORMAL (KVA) EMERGENCY (KVA)
1 PP HYDRANT RUMAH POMPA POMPA PEMADAM KEBAKARAN 186.1 186.1 186.1 122.9 - - 122.92 PP LIFT ATAP POWER LIFT 53.7 53.7 53.7 35.4 1.0 35.4 35.43 PP PRESS FAN ATAP POWER PRESSURIZED FAN 65.0 64.9 64.9 42.9 - - 42.94 SDP POMPA RUMAH POMPA POMPA AIR BERSIH DAN STP 114.7 114.7 114.7 75.7 0.5 37.9 -5 LP OL LT. BASEMENT PENERANGAN LUAR 7.8 6.1 6.3 4.4 1.0 4.4 -6 LP B LT. BASEMENT LAMPU DAN KOTAK KONTAK 16.2 14.5 14.8 10.0 0.7 7.0 -7 PP VAC B LT. BASEMENT POWER VAC 11.3 11.0 10.9 7.3 0.8 5.8 -8 LP LB LT. LOBBY LAMPU DAN KOTAK KONTAK 22.3 22.3 21.1 14.4 0.7 10.1 -9 PP VAC LB LT. LOBBY POWER VAC 103.0 101.3 100.3 67.0 1.0 67.0 -
10 LP 2 LT. 2 LAMPU DAN KOTAK KONTAK 19.3 18.8 18.6 12.5 0.7 8.7 -11 PP VAC 2 LT. 2 POWER VAC 55.9 57.0 55.1 37.0 0.8 29.6 -12 PP POOL LT. 2 LAMPU DAN POMPA KOLAM RENANG 18.1 18.2 18.2 12.0 0.7 8.4 -13 PP KITCHEN LT. 2 POWER EQUIPMENT KITCHEN 47.6 47.6 47.6 31.4 0.8 25.1 -14 LP 3 LT. 3 LAMPU DAN KOTAK KONTAK 32.1 33.4 32.2 21.5 0.7 15.1 -15 PP VAC 3 LT. 3 POWER VAC 48.8 48.4 50.9 32.6 0.7 22.8 -16 SDP LT. 5 LT. 5 LISTRIK LANTAI 5, 6, 7, DAN 8 323.7 327.2 332.7 216.4 0.7 151.5 -
17 SDP ATAP ATAP POWER LAMPU DAN VAC ATAP; POWER POMPA BOOSTER, DAN WATER HEATER 148.4 147.4 145.9 97.2 0.8 77.7
-
969.3 967.9 969.3 639.4 506.6 201.1
TOTAL KEBUTUHAN DAYA LVMDPT K VA 506.6T K watt (DARI PENJUMLAHAN BEBAN, SUDAH DG FAKTOR KESEREMPAKAN) 404,8
COSΦ (RATA-RATA KESELURUHAN) 0.80
![Page 43: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/43.jpg)
COSΦ
LP = 0.85 PP VAC = 0.75 SDP Pompa, PP Pool, PP Water Heater, PP Booster
Pump, PP Kitchen = 0.7 PP Lift = 0.7
Rata-rata Keseluruan = 0,8
![Page 44: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/44.jpg)
PERBAIKANFAKTOR DAYA
KOREKSI FAKTOR DAYA GEDUNG cos Φ Rata-rata Keseluruhan = 0,8 cos Φ Yang Diinginkan = 0,99
![Page 45: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/45.jpg)
PERBAIKANFAKTOR DAYA
Nilai yang didapat dari Tabel= 0,61
Total beban dalam watt= 404,8 kW
Perhitungan Kapasitor= 404,8 kW x 0,61= 246,93 kVAr
Dibulatkan= 250 kVAr
![Page 46: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/46.jpg)
DIAGRAM SINGLE LINESISTEM LISTRIK
![Page 47: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/47.jpg)
KESIMPULAN
Cos Φ Rata-rata Keseluruhan = 0,8 Beban terpasang = 639,4 kVA Beban maksimal dengan faktor keserempakan sebesar 80% = 506,6
kVA
Agar cos Φ instalasi naik menjadi 0,99; dipasang Capacitor Bank dengan kapasitas = 250 kVAr
Total beban maksimal setelah dipasang kapasitor bank = 408,8 kVA Maka, daya tersambung PLN = 415 kVA (TM, 3Φ, 50Hz)
Beban maksimal tidak boleh melebihi 75% dari kapasitas trafo dangenset, maka menyesuaikan kapasitas yang ada di pasaran:
Kapasitas Trafo = 630 kVA (75%-nya = 472,5 kVA) Kapasitas Genset = 600 kVA (75%-nya = 450 kVA)
![Page 48: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/48.jpg)
TERIMA KASIH
OLEH :AMRULLAH SAMEKTOWIBOWO
![Page 49: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/49.jpg)
![Page 50: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/50.jpg)
- GAMBAR CAD -
![Page 51: SEBARAN KARIR INSINYUR (ENGINEER) · PDF fileKonsultan, S. urvey, Kontraktor, EPC, Audit. ... Rencana Anggaran Biaya (RAB) ... Instalasi Pembuangan Air Limbah (IPAL)](https://reader037.vdocuments.pub/reader037/viewer/2022100302/5a7562487f8b9a1b688c5f6c/html5/thumbnails/51.jpg)