PELINDO IIIPORT DEVELOPMENT

1DJARWO SURJANTO – President Director

KUMAI, Pangkalan Bun, Sukamara, Bumiharjo;SAMPIT, KualaPembuang, Samuda, Pagatan-Mendawai, Bagendang, Kuala Kapuas, Bahaur .

1. CENTRAL KALIMANTAN : 2. SOUTH KALIMANTAN :

BANJARMASIN , Basirih, Pulang Pisau;KOTABARU, Pagatan, Gunung Bt Besar, Batulicin,Satui, Stagen, Mekar Putih.

6. EAST NUSA TENGGARA :

TENAU/KUPANG,Kalabahi, Waingapu,MAUMERE, Ende,Ippi

5. WEST NUSA TENGGARA :

LEMBAR,BIMA, Badas

BENOA,CELUKAN BAWANG.

7. BALI :

3. CENTRAL JAWA :

TG. EMAS,TG.INTAN,TEGAL

4. EAST JAWA :

TG. PERAK,GRESIK, Kalianget,TG. WANGI, Banyuwangi,TG. TEMBAGA, Pasuruan, Panarukan

PORTS UNDER MANAGEMENTOF PELINDOIII (SURABAYA HQ)

PORT IMPROVEMENT STRATEGY

MAJOR PORTSReconfiguration toDedicated Terminal(cargo segmented)Ex : Tg Perak, Tg Emas,Banjarmasin

MINOR/ MARGINAL PORTSDeploy small/medium equipmentstrengthening infra structureEx : Lembar, Maumere

BERLIAN TERMINAL DEVELOPMENT

Page 2: Session2 mr djarwo surjanto pelindo iii

11-10-2011

2

JAMRUD TERMINAL DEVELOPMENT

WAREHOUSEDEMOLITION

TANJUNG PERAK RECONFIGURATION

MAUMERE AND LEMBAR PORTBENOA MARINA PORT

Page 3: Session2 mr djarwo surjanto pelindo iii

11-10-2011

3

PORT EXPANSION ANDSTRATEGIC LOCATION FOR NEW PORT

FOR EXAMPLE :Low-density : Samarinda to Palaran , Balikpapan (Semayang to Kariangau) , Sampit to

Bagendang, Sorong, Jayapura, AmbonHigh-density : Lamong Bay

Alongriverside

(in central city)

Seaside/Waterfront

Island Port(Open Sea)

SAMARINDA RELOCATION

SAMARINDA VICINITYSAMPIT DEVELOPMENT

TO BAGENDANG

Bagendang

Sampit

Page 4: Session2 mr djarwo surjanto pelindo iii

11-10-2011

4

CONTAINER TERMINALKARIANGAU

KAMPUNG BARU

PELABUHAN SEMAYANGBALIKPAPAN

BALIKPAPAN RELOCATIONPORT EXPANSION

LAMONG BAY (ISLAND PORT)

WHARFPhase I 500x50 m2,Phase II 500x50 m2,ultimate dev. (1.280 x 80m2)

CONTAINER YARDPhase I 20 ha,Phase II : 50 ha,Ultimate Dev : 200 Ha

THROUGHPUTPhase I : 500 .000 Teu’s,Phase II : 1 millionTeu’s,Ultimate Dev 3 million Teu’s

DRY BULK, LIQUID BULKINDUSTRIALBUFFER SPACE300 ha at Ultimate Dev.

DEPTHMinimal -14 LWS to -16 LWS

PILING WHARF (PACKAGE A) JULI 2011

Gresik View

OVERVIEW ERECTION SLAB & CASTING SEPTEMBER 2011

Page 5: Session2 mr djarwo surjanto pelindo iii

11-10-2011

5

LAMONG BAY DEVELOPMENT

SURABAYA WEST ACCESSCHANNEL (SWAC)

- DEPTH : -14 m LWS.

- WIDTH : 200 m

(two way traffic).

- Ship size : > 50.000 DWT

(Post Panamax).