Greening Iwilei and Kapalama
July 14, 2017
Public Meeting #2 – charrette progress report
IntroductionWhy study Iwilei and Kapalama?
Kapalama/Iwilei AreaExisting
Kapalama/Iwilei AreaHypothetical buildout (80%)For illustrative purposes only
2
IntroductionWhy study Iwilei and Kapalama?• Integrating complete streets and “green”
development and infrastructure strategies into future TOD can:– Improve sustainability and climate
resiliency– Improve access and safety for all: people
cycling, walking, driving, or on transit– Create, connect to, and catalyze healthier,
more livable places– Sites where chosen because the solutions
and strategies can be replicable in other areas of the city
Implementation Projects/Studies Underway
• Iwilei/Kapalama Infrastructure Master Plan
• Infrastructure Financing Strategies• Kapalama Canal Catalytic Project• Iwilei Drainage Study• Affordable Housing Strategy• EPA Greening America’s
Communities • EPA Brownfields Grant Program
3
5
4
5
6
Sea level rise and groundwater vulnerability scenario for year 2100
LegendBlue Marine waterGreen: Groundwater
Rail guidewayRail station
Source: Chip Fletcher 2016
Honolulu Office of Climate Change, Sustainability, and Resiliency
7
Site 1: Workshop Comments
• Truck access and loading• Parking reduction• Mitigate flooding• Balance between public and
private improvements• Too much permeable paving?• Tool boxes:
– Design elements– Implementation methods
Kalani St. – from Puuhale Rd. to Kalihi St.Nimitz
Dillingham
Kalani
Site 1: Already a shared street
• Let’s make it better
Kalani St. – from Puuhale Rd. to Kalihi St.
Kalani St. – from Puuhale Rd. to Kalihi St.Already a shared street – It can be better
8
Site 1: Already a shared street
• Let’s make it better
Kalani St. – from Puuhale Rd. to Kalihi St.
INSERT SOME PHOTOS OF HOW BEING USED NOW
Kalani St. – from Puuhale Rd. to Kalihi St.Already a shared street – It can be better
Site 1: Kalani Street between Puuhale Road and Mokauea Street – Location A
• Works for truck access• Clearances for maneuvering• Yield street for loading• Slow speeds for safety
double parking parking on drive ‘apron’
9
Site 1: Kalani Street between Mokauea Street and Kalihi Street – Location B
• Green infrastructure where it fits• Focus on where it
• Floods• Fits• Slow speeds
• Focus on reducing flow from properties• Direct downspouts to GI• Permeable paving• Green roofs for new development
• Green infrastructure where it fits• Focus on where it
• Floods• Fits• Slow speeds
• Focus on reducing flow from properties• Direct downspouts to GI• Permeable paving• Green roofs for new development
10
Site 1: Opportunistic ImplementationEnhance existing landscape and trees
Photo Source: Google
Photo Source: Google
Site 1: Opportunistic ImplementationEnhance existing landscape and trees
Photo Source: Google
Photo Source: Google
• Combined private property and street right-of-way
• Combined private property and street right-of-way
• Extend private landscape into the street right-of-way
• Extend private landscape into the street right-of-way
11
Site 1: Opportunistic ImplementationGreen infrastructure where it is needed and fits
Site 1: Opportunistic ImplementationGreen infrastructure where it is needed and fits
• Paint and planters ‘test’
• Bioinfiltrationplanter
• Pervious concrete, asphalt, or pavers
• Paint and planters ‘test’
• Bioinfiltrationplanter
• Pervious concrete, asphalt, or pavers
• Boardwalk or grate over infiltration trench
• Pervious pavers
• Boardwalk or grate over infiltration trench
• Pervious pavers
• Pervious concrete, asphalt, or pavers
• Pervious concrete, asphalt, or pavers
12
Site 1: Kalani Street between Puuhale Road and Mokauea Street – Location A
•Opportunities to serve community
•Additional uses for vacant parcels –neighborhood park
Site 1: Implementation ConceptsAddress funding for planning and design, construction, and operations
Funding Options Planning and Design Construction Operations and
MaintenanceGrants – public and foundations
General funds (City and County)
Development requirements
Improvement district
Stormwater fee
Property tax
13
Site 1: ImplementationIncremental and strategic
Site 1: ImplementationIncremental and strategic
14
Site 1: ImplementationIncremental and strategic
Site 2: Workshop Comments
• Like constructed wetlands concept
• Preserve Community College parking during light rail construction
• Realign connection to Nimitz• Sea level rise – invest or
retreat?• Activate the space
Kapalama drainage channel
Nimitz
Dillingham
Alak
awa
Kapa
lama C
anal
15
Site 2: Kapalama Drainage Channel, to Alakawa Street–existing condition
Site 2: Kapalama Drainage Channel, to Alakawa Streetnear-term: multi-use path, pedestrian lighting, & connections
16
Site 2: Kapalama Drainage Channel, to Alakawa Streetnear-term: multi-use path, pedestrian lighting, & connections
Site 2: Kapalama Drainage Channel, to Alakawa Streetnear-term: multi-use path, pedestrian lighting, & connections
17
Site 2: Implementation ConceptsAddress funding for planning and design, construction, and operations
Funding Options Planning and Design Construction Operations and
MaintenanceGrants – public and foundations
General funds (City and County, and State)
Development requirements
Improvement district (adjacent and watershed)
Stormwater fee
Property tax
Site 2: Kapalama Drainage Channel, to Alakawa Streetnear-term: multi-use path, pedestrian lighting, & connections
18
Site 2: Kapalama Drainage Channel, to Alakawa Streetnear-term: multi-use path, pedestrian lighting, & connections
Site 2: Kapalama Drainage Channel, to Alakawa Streetnear-term: multi-use path, pedestrian lighting, & connections
19
Site 3: Workshop Comments
• Range of opinions on appropriate density
• Affordable housing• Public open space• Eco-district / Eco-block• Active uses on ground floor
that support residents• More trees!• Need
– detailed topography of area– drainage plan that accounts for
sea level rise
Redevelopment and retrofit of parcels – Iwilei Rd. and Pacific St.
Alak
awa
Nimitz
Pacific
Iwile
i
Site 3: Iwilei Road and Pacific Streeteco-block, public park, and connected streets
INSERT SIMPLE PLAN DIAGRAM FOR FULL SITE
20
Site 3: Iwilei Road and Pacific Streeteco-block, public park, and connected streets
Site 3: Building ElementsConstructed wetlands
Source: REDI
21
Site 3: Building ElementsPhotovoltaics and roof gardens
Source: http://blogs.ei.columbia.edu
Source: www.casestudies.uli.org
Site 3: Iwilei Road and Pacific Streetstreet-building relationship sections
A B C
CA B
22
Site 3: Implementation ConceptsAddress funding for planning and design, construction, and operations
Funding Options Planning and Design Construction Operations and
MaintenanceGrants – public and foundations
General funds (City and County)
Development requirements
Improvement district (adjacent and watershed)
Stormwater and other utility fees
Property tax
Site 4: Workshop Comments
• Align street design with TOD opportunity
• Improve bicycle access and safety• Maintain truck access to port • Makai side for trucks and through
traffic• Mauka side for multi-modal
movement and access to TOD district
• Need traffic assessment study
North Nimitz Highway
Pacific
Iwilei
King
23
Site 4: North Nimitz Highway – Existing condition
Site 4: North Nimitz Highway – Short-term Improvementsraise bicycle lanes to make flexible multi-use pathways
24
Site 4: North Nimitz Highway – Long-termNorth Nimitz Main St. and Highway / “Truck” Street, two-way travel
Site 4: North Nimitz Highway – Long-termNorth Nimitz Main St. two-way travel, protected bike lane, landscape
25
Site 4: Implementation Concepts for TransportationAddress funding for planning and design, construction, and operations
Funding Options Planning and Design Construction Operations and
Maintenance
Grants – public and foundations
General funds (City and County, and State)
Development requirements
Improvement district
Let’s discuss Charrette results and where things
go from here
Thank you!
Greening Iwilei and KapalamaDiscussion at the progress report “boards”