SOME PICTURESOF PROJECTS
YASHAR POURANG INVOLVED
Tenandra Irrigation Scheme Macquarie Valley, NSW June 2012-Present
Tenandra Irrigation Scheme - Macquarie Valley, NSW
Bulk earthworks, Cut and overcut
Tenandra Irrigation Scheme - Macquarie Valley, NSW
Bulk earthworks, Cut and overcut, adding water to get the optimum moisture
Tenandra Irrigation Scheme - Macquarie Valley, NSW
Trimming Batters, Nuclear Density meter and compaction test
Tenandra Irrigation Scheme - Macquarie Valley, NSW
Nuclear Density meter and compaction testPermeability tests
Tenandra Irrigation Scheme - Macquarie Valley, NSW
Concrete pipes laying & installing headwalls
Tenandra Irrigation Scheme - Macquarie Valley, NSW
Installing double barrel headwalls
Tenandra Irrigation Scheme - Macquarie Valley, NSW
Traffic control and Detour road to install 1800mm road crossing pipes
Tanavob General Contractor (TGC)Earthworks, drainage, concreting and foundation
2008-2011
Tanavob General Contractor (TGC)
Bulk earthworks and excavation; totally: 170,000 m³
Tanavob General Contractor (TGC)
Drainage System to control and conduct underground water, before commencing construction of Foundation
Tanavob General Contractor (TGC)
Completed Drainage System; 2000 m²
Tanavob General Contractor (TGC)
Cleaning concrete and construction of Foundation (Reinforcement and Frame works)
Tanavob General Contractor (TGC)
Construction of Foundation (Reinforcement and Frame works) and commencing of concreting
Tanavob General Contractor (TGC)
Construction of Foundation , concreting
Tanavob General Contractor (TGC)
Construction of Foundation involving Bulk earthworks (170,000 m³), Drainage system, Reinforcement (600 ton) and Concreting (7000 m³) ; completed in 6 month
Tanavob General Contractor (TGC) Roads and Pavement 2008-2011
Primary excavation and earthworks
Tanavob General Contractor (TGC)
Embankment, road bases and sub-bases, Side walk, pavements and drainage
Tanavob General Contractor (TGC)
Embankment, road bases and sub-bases, Side walk, pavements
Tanavob General Contractor (TGC)
Completion of project involves: Dual layer Asphalt & Spraying (17,000 m³)
Earthworks, excavation and embankment (120,000 m³)Pavement and Sidewalks ( 4,000 m²)
Tanavob General Contractor (TGC)Roads and Pavement
Satellite pictures of the project (by Google Earth); before commencing the project and 6 month after
Tanavob General Contractor (TGC)Roads and Pavement
Satellite pictures of the project (by Google Earth); 6 month after commencing the project
Tanavob General Contractor (TGC)Construction of a 2800 m² Car park
Tanavob General Contractor (TGC) Concrete Structures and Landscaping
Tanavob General Contractor (TGC)
Setting out the foundation and center of columns
Foundation and Columns , Embankments
Tanavob General Contractor (TGC)
Reinforcements of columns
Concrete structure, landscaping and stone works
Persian Gulf Oil CompanyBulk earth work and Oil tank construction 2007-2008
Excavation
Persian Gulf Oil CompanyBulk earth work and Oil tank construction
Embankment and leveling
Persian Gulf Oil CompanyBulk earth work and Oil tank construction
Drainage and compaction
Persian Gulf Oil CompanyBulk earth work and Oil tank construction
Welded above-ground oil tank construction
Persian Gulf Oil CompanyBulk earth work and Oil tank construction
Satellite pictures of the project (by Google Earth) June 2007 ~ September 2008
AAC Group 2004-2007
Construction of 52 piles , 24 meter depth each to increase bearing capacity of the soil
AAC Group 2004-2007
Construction of two 16-floor & two 9-floor residential towers
Forming of columns and floors
AAC Group
On-site concrete batching plant & tower cranes
AAC Group
Earthwork and excavation, early 2004 General site view, late 2006Satellite pictures of the project (by Google Earth)