당진항 링크 1030 영문 1 · 2016-01-06 · processing cargo :slag and non-powder slag...
TRANSCRIPT
PORT
OF
DANGJIN
We connect
Korea with
the world!
C
M
Y
CM
MY
CY
CMY
K
당진항_링크_1030_영문_1.pdf 2 2014-10-30 오후 4:53:02
We connect
Korea with
the world! From the center of KOREA to that of the world!
Dangjin Port, with the dream of an unlimited future toward the sea,
shaping today different from yesterday and better tomorrow than today .
OCEANDANGJIN ECONOMY FUTURE+ + +
C
M
Y
CM
MY
CY
CMY
K
당진항_링크_1030_영문_1.pdf 3 2014-10-30 오후 4:53:02
03
CONTENTS
Connecting the land with the ocean04 Status map
06 Basic situation
07 Port operation support center
Connecting the port with the logistics08 Advantages and vision
10 Various statistics
Connecting the economy with values12 Kodae Pier
14 West Pier
16 Songak Pier
17 Dangjin Coal-Fired Power Complex Pier
Connecting the present with the future18 Development plan
20 Integrated industrial complex
22 Associate institutions and companies
C
M
Y
CM
MY
CY
CMY
K
당진항_링크_1030_영문_1.pdf 4 2014-10-30 오후 4:53:03
06
Busan(2 hrs)
Seoul(60 mins)
Cheonan
Daegu
Gwangju
Mokpo(2 hrs)
Daejeon
Dangjinport
Dangjin-Daejeon Expressway
Seohaean (West Coast)
Expressway
Jinju
(70 mins)
(90 mins)
The best geographical situation
the heartland of KOREA
The center of the Pan-Yellow Sea era that boasts
the country's largest logistics volume increase rate
Dangjin Port
Statutory port nameport name: Dangjin·Pyeongtaek Port(Revision of the Enforcement Decree of Port Act on Dec. 30, 2004
Type
Dangjin·PyeongtaekPort
Dangjin Port
Berth
61
35
Unloading
86,319,000tons
61,176,000tons
Note
Dangjin Coal-Fired PowerComplex is excluded
Dangjin Coal-Fired PowerComplex is included
Port typeType 1 designated port (trade port)
RouteSeonggumi, Gagok-ri, Songsan-myeon, Dangjin ~ South of Goon-ri,Woojeong-eup, Hwaseong, Gyeonggi-do (Water area: 97.2㎢)
CourseDistance 30km, Width 0.4~1.0km, Depth 11~18m
Capacity
The center of Northeast Asia, which is near to the large global markets, such as China, Japan and Russia
(Dalian port 482km, Dandong port 454km, Qingdao port 593km)
※Dangjin·Pyeongtaek Port excludes Dangjin Coal-Fired Power Complex; however, in the case that only Dangjin Port is excluded, Dangjin Coal-Fired Power Complex is included
Basic
C
M
Y
CM
MY
CY
CMY
K
당진항_링크_1030_영문_1.pdf 7 2014-10-30 오후 4:53:10
07
Connecting the land with the ocean (Land + Ocean)
Dangjin port
operation support center
Portoperationsupportcenter
LocationKodae Industrial Complex 2-gil, Songak-eup, Dangjin (Shoreward side of Kodaeri 342, landward side of the pier)
Period2013. 06 ~ 2014. 08
SizeBasement-1 floor~Above Ground − 6 floors / Gross area 4,955㎡, Building area 1,060㎡
Expected effects - Establishing the one-stop processing system for export-import, port management, shipping logistics- Enhancing the competitiveness by focusing on inspection, customs, logistics intermediary, administrative support, etc. - Creating the port logistics foundation centering on Dangjin port by establishing the comprehensive town for the port-related facilities
Installed facilities - C.I.Q institution offices, administrative organization branch offices, etc. - Port-related companies : Shipping company, shipping logistics agency, logistics company, loading company, etc. - Work support company : Convenience areas, such as rest area, viewing deck, financial institution
C
M
Y
CM
MY
CY
CMY
K
당진항_링크_1030_영문_1.pdf 8 2014-10-30 오후 4:53:14
Growing into one of Korea’s
five large ports with amazing natural
conditions and high growth potential
increase rate of 23%
201465.79mil ton
Advantagesand vision
C
M
Y
CM
MY
CY
CMY
K
당진항_링크_1030_영문_1.pdf 9 2014-10-30 오후 4:53:16
200820.56 mil ton
200922.80mil ton
201036.80mil ton
201150.18mil ton
201252.54mil ton
201356.83mil ton
Connecting the port with the logistics (Port + Logistics)
09
Proper cargo transportation with the naturally blessed conditionsDangjin Port is located within the Asan gulf, surrounded by land and it is barely affected by typhoons and tsunamis,moreover, the cargo transportation delays due to adverse climate conditions are rare
The typhoon days at Dangjin port are average 6.8 days and the mist occurrence days are 26.3 days, which is about half of therecords of other ports
The access route is excellent and the pier depth is also deep, enabling the huge ships to enter and go out
The waiting time for the incoming and outgoing ships is short, reducing the cargo transportation cost and realizing thetransportation on time
Providing the advantages to the related industry with the establishment of the steel clusterMaking it convenient for the related industry to be located as the local's famous steel companies, such as Hyundai Steel,Dongbu Steel, Dongkuk Steel, Hyundai Hysco, Seah Steel, Hwanyoung Steel, and Husteel.
Providing a convenient pier to be used by the medium and small cargo ownersDangjin Port operates the two systems for the public pier (one of 50,000 tons, one of 30,000 tons) and one additionalsystem is being constructed
With the latest loading facilities, Dangjin Port reduces the loading time and provides customized loading services
C
M
Y
CM
MY
CY
CMY
K
당진항_링크_1030_영문_1.pdf 10 2014-10-30 오후 4:53:17
With Korea’s No. 1 logistics volume increase,
the unlimited development potential
for Dangjin Port has been provovo evev d
10
Various
Kodae Pier, Songak Pier, West Pier, Dangjin Coal-Fired Power Complex Pier
Type
200920102011201220132014
Increase rate(%)volume (1,000 tons)
22,79836,79950,17752,54356,83265,794
116036 5816
Hyundai Steel commenced Blast furnace 3Bulk cargo transport duration Complete construction of two systems for Songak PierHyundai Steel commenced operations of Blast furmace 3
Note
volume
2009 2010 2011 2012 2013 2014
65,794
22,79836,799
50,17752,543 56,832
C
M
Y
CM
MY
CY
CMY
K
당진항_링크_1030_영문_1.pdf 11 2014-10-30 오후 4:53:18
11
Ship entry and exit recordDangjin
Type
2009201020112012
20142013
Increase rate(%)
Number ofships
4,6965,9457,0607,8707,8097,945
4271911-12
Two systems for cement pier
Large increase in numbers of incoming and outgoing ships Large increase in numbers of incoming and outgoing ships Increase conversion
Note
Kodae Pier, Songak Pier, West Pier, Dangjin Coal-Fired Power Complex Pier
Type
200020032006200820102014
Processingcapacity (1,000 tons)
Increase rate(%)
579
142335
11,92313,24122,57225,25148,61261,176
Hanbo Pier, Dangjin Coal-Fired Power Complex Pier
Dangjin Coal-Fired Power Complex, Hyundai Steel PierDevelopment of Songak Pier and Kodae Pier in full phase
Development of West Pier and Songak Pier
Note
Dangjin·
2010 2011 2012 2013 2014
6.37% 7.31% 7.52% 8.10% 7.10%
2000 2002 2004 2006 2008
3.73% 4.07% 4.27% 4.27% 4.45%
2000 2002 2004 2006 2008 2010 2011 2012 2013 2014
3.73%4.07%
4.27% 4.27%4.45%
6.37%7.31%
7.10%7.52%
8.10%
11,923 13,241
25,25122,572
48,612
61,176
57
9
14
23
35
2000 2003 2006 2008 2010 2014
C
M
Y
CM
MY
CY
CMY
K
당진항_링크_1030_영문_1.pdf 12 2014-10-30 오후 4:53:19
4,6965,945
7,060
7,8707,945
7,809
2009 2010 2011 2012 2013 2014
12
Dangjin Tank TerminalPier
Kodae Pier
Size : Floating pier 2, ships with no more
than 200 tons, and 50 official service ships
Operator : Pyeongtaek Maritime Port Agency,
Port Logistics Dept.
Management Pier Dongbu Steel Pier Government-Operated Pier (Zone 1 )Government-Operated Pier (Zone 1 )Government-Operated Pier
Size : Six systems (One for 5,000 tons, three
for 50,000 tons, and two for 30,000 tons)
Processing cargo : steel
Operator : Dongbu Dangjin Port Operator
Size : One for 30,000 tons
Processing Cargo : Goods
Operator : Dangjin Port Operator
C
M
Y
CM
MY
CY
CMY
K
당진항_링크_1030_영문_2.pdf 1 2014-10-30 오후 4:54:32
Connecting the economy with the values (Economy + Values)
13
ManagementPier
Dongbu Steel Pier
Government-OperatedPier (1 Zone)
Government-OperatedPier (Zone 2)
Dongkuk Steel Pier
Supporting the
high-value-added industry with the
steel cluster support
Size : 1 for 50,000 tons
Processing Cargo : Goods
Operator : Dangjin Port Operator
Size : 1 for 50,000 tons
Processing Cargo : Steel
Operator : Dongkuk Steel
Size : One for 50,000 tons
Processing Cargo : Liquid Cargo
Operator : Dangjin Tank Terminal
Government-Operated Pier (Zone 2) Dongkuk Steel Pier Dangjin Tank Terminal Pier
l Area of Kodae Complex 2-gil, Songak-eup, Dangjin l
C
M
Y
CM
MY
CY
CMY
K
당진항_링크_1030_영문_2.pdf 2 2014-10-30 오후 4:54:33
Taeyoung GrainTerminal Pier
Plant the destination
Animal feed plant ofCargill Inc.
Logistics site
Logistics site
Managementpier
14
West Pier
Hanil Cement Pier Youngjin Global PierManagement Pier
l Area of Dangjin Port in Sinpyeong-myeon, Dangjin l
Size : Floating pier 2, ships with no more than
200 tons, and 50 official service ships
Operator : Pyeongtaek Maritime Port Agency,
Port Logistics Dept.
Size : One for 30,000 tons
Processing cargo : Slag and non-powder slag
Operator : Yongjin Global
Size : One for 30,000 tons
Processing cargo : Slag and non-powder slag
Operator : Hanil Cement
C
M
Y
CM
MY
CY
CMY
K
당진항_링크_1030_영문_2.pdf 3 2014-10-30 오후 4:54:36
Tank terminal(Youngjin TNM, West Pyeongtaek)
Managementpier
Pyeongtaek Dangjin Pier
Pyeongtaek Dangjin Central Pier HyundaiㆍSampyo
Pier
Youngjin GlobalPier
Hanil CementPier
Connecting the economy with the values (Economy + Values)
15
The base for processing ofvarious cargoes, such as cement,
grain, and goods
Pyeongtaek Dangjin Central Pier
Pyeongtaek Dangjin Pier Taeyoung Grain Terminal Pier
Hyundai·Sampyo Pier
Size : 1 for 30,000 tons
Processing cargo : Slag and non-powder slag
Operator : Hyundai Cement,
Sampyo Basic Materials
Size : Two for 30,000 tons
Processing cargo : Goods
Operator : Pyeongtaek Dangjin Pier
Size : Two for 50,000 tons
Processing cargo : Grains
Operator : Taeyoung Grain Terminal
Size : Two for 30,000 tons
Processing cargo : Goods
Operator : Pyeongtaek Dangjin Central Pier
C
M
Y
CM
MY
CY
CMY
K
당진항_링크_1030_영문_2.pdf 4 2014-10-30 오후 4:54:38
Hyundai Steel Pier
Public Pier
Hyundai Steel Pier
Under construction
16
SongakPier
Establishing the one-stopsteel cluster, covering ingredient
adoption and steel production
Hyundai Steel Pier
Public Pier l Area of north industrial road, Songak-eup, Dangjin l
Size : One for 50,000 tonsProcessing cargo : Steel Operator :
Size : twelve 30,000 tons ~200,000 tons Processing cargo : Steel, coal, iron ore Operator : Hyundai Steel
C
M
Y
CM
MY
CY
CMY
K
당진항_링크_1030_영문_2.pdf 5 2014-10-30 오후 4:54:43
17
Dangjin Coal-FiredPower Complex Pier 4 mil.
Kw High-efficiency Advanced Power Plant
Dangjin Coal-Fired Power Complex Pier
Dangjin Coal-Fired PowerComplex Pier
DangjinCoal-Fired
PowerComplex
Pier
l Area of KyKyK oro-gil, Seokmun-myeon, Dangjin l
Size :Processing cargo : Bituminous coal Operator : Korea East-West Power Development
Three(One for 150,000 tons, One for 170,000 tons, One for 200,000 tons)
C
M
Y
CM
MY
CY
CMY
K
당진항_링크_1030_영문_2.pdf 6 2014-10-30 오후 4:54:49
18
Considerations for the 3rd National Trade Port Basic Plan
Type (berths)
Dangjin•PyeongtaekPorts total
Dangjin Port 27 5 7 39
Pyeongtaek Port 24 7 9 40
51 12 16 79
Dangjin Coal-FiredPower Complex Port 2 - 1 3
In progress Future plan Total Completed(~2014.9)
Develop-mentplan
Dangjin Port
enjoying a resurgence
in development as
it grows into a
global trade
base port base port
Reducing the distance between West Port and Inner Port with theconstruction of the access road for Sinpyeong- Inner Port
3.7km bridge, 2.2km road (About 300 billion KRW of business expenses)Promoting the joint development of Dangjin and Pyeongtaek Ports by reducingthe logistics cost and supplementing the port functions
Creation of the conditions for the new pier construction via theexpansion of harbor limit
East of Seonggumi port, Songsan-myeon → expansion of Seonggumi port andchange to Sea gate of Seokmun tide embankmentThe conditions for the material pier for Hyundai Steel (250,000 tons) and harborfacilities in Songsan Zone (228,000㎡) are expected to be constructed
With the docking system, the increasing logistics volume can beprocessed effectively
By 2020, 42 berth systems - an increase of 12 - will be established, such asHyundai Steel's 250,000 tons pier, Kodae Pier, and West Pier
Expansion of access road to West Port6.4km from the No.38 National Highway junction to West Port, expanding into four lanes1st phase is to be constructed in 2015 (34 billion KRW of total construction cost)
C
M
Y
CM
MY
CY
CMY
K
당진항_링크_1030_영문_3.pdf 1 2014-10-30 오후 4:56:03
19
Current Status of Each pier at Dangjin Port
Current Status of Each pier at Pyeongtaek Port
NotesName of Piers Host The number of berth The size of the pier Major freights
Eastern pier Private management 15 50,000*5, 30,000*10 Vehicle, container
Dolphin pier Private management 7 20,000~130,000 oil and gas
Passenger pier Private management 2 260,000*2 passenger
Name of pier Oper ng company
The size of the Wharf Current status of developmentMajor
freights NotesNumber of berth
Ability of coming into
the pier
Length of the berth
Minimumdepth of water
Host Year and Month
Current status
Songak (Hyundai
Steel) pier
Hyundai Steel Co., Ltd
1 5,000 110 6.5 Private management completed Slag
private pier of Hyundai Steel Co., Ltd
2 3,000 110 6.5 Private management completed tar
3 5,000 120 22.5 Private management 2009.12 completed
iron ore4 200,000 390 22.5 Private management 2009.04 completed
5 100,000 330 20 Private management completed
6 50,000 280 14 Private management 2006.12 completed coal
7 30,000 240 12 Private management 2007.05 completed steel
8 20,000 220 11 Private management 2012 in progress steel
9 50,000 240 14 government-owned 1996 completedsteel
common use
10 30,000 240 12 government-owned 1996 completedonly for Hyundai Steel Co., Ltd
11 30,000 230 12 government-owned 1996 completed Scrap iron
12 5,000 120 7.5 Private management 2012 in progress steel
private pier of Hyundai Steel Co., Ltd
13 5,000 120 7.5 Private management 2012 in progress steel
14 5,000 120 Private management 2020 completedsteel
15 5,000 120 Private management 2020 completed
250,000 420 Private management 2020 completed iron ore
Kodae pier
Dongbu Steel Co., Ltd
1 5,000 120 7 Private management 1996 completed
steel private pier of Dongbu Steel Co. Ltd
2 50,000 280 14 Private management 2009.10 completed
3 50,000 280 14 Private management 2009.10 completed
4 50,000 280 14 Private management 2009.10 completed
5 30,000 240 12 Private management 2011.10 completed
6 30,000 240 12 Private management 2011.10 completed
Dangjin Port Co. 7 30,000 240 12 government-owned 2011.05 completed miscellaneous TOC TOC pier
Dong Kuk Steel Co., Ltd Consosium
8 50,000 280 14 government-owned 2013.07 in progress miscellaneous TOC TOC pier
Intergis Co. 9 50,000 280 14 Private management 2009.08 completed steel private pier of Dongkuk Steel Co., Ltd
Dangjin Tank Terminal 10 50,000 280 14 Private management 2013 in progress liquid
Western Pier at outerpier
Hanil Cement Co., Ltd 1 30,000 240 12 Private management 2010.07 completed cement
exclusiveYoungjin Global Co. Ltd 2 30,000 240 12 Private management 2010.09 completed cement
Hyundai Cement Co., LtdSampyo Co., Ltd
3 30,000 240 12 Private management 2012.04 completed cement
Pyeongtaek-Dangjin Joongang pier Corpora n
4 30,000 240 12 government-owned 2007.06 completedmiscellaneous TOC TOC pier
5 30,000 240 12 government-owned 2007.06 completed
Pyeongtaek Dangjin Port Co.6 30,000 240 13 government-owned 2001.08 completed
miscellaneous TOC TOC pier7 30,000 240 13 government-owned 2001.08 completed
Western Pier at inner pier
Taeyoung Grain Terminal8 50,000 280 14.5 Private management 2011.07 completed
grain exclusive9 50,000 280 14.5 Private management 2011.07 completed
10 30,000 240 Private management 2020 completed
miscellaneous TOC The Third Basic Plan for Port in Korea11 30,000 240 Private management 2020 completed
12 30,000 240 Private management 2020 completed
13 30,000 240 Private management 2020 completed
Dangjin Firepower
pierKorea East-West Power Co., Ltd
1 150,000 Dolphin 22 Private management 1998 completed bituminous coal
power plant producing 4 million KWs2 170,000 Dolphin 22 Private management 2006 completed bituminous coal
3 200,000 Dolphin Private management 2014 completed bituminous coal
C
M
Y
CM
MY
CY
CMY
K
당진항_링크_1030_영문_3.pdf 2 2014-10-30 오후 4:56:04
Providing the best company establishment
conditions with the effective integration between
Dangjin Port and the
hinterland industrial complex
20
Integratedindustrialcomplex
Seokmun National Industrial ComplexLocationArea of Seongsan-ri, Kodae-myeon, Tongjeong-ri, Seokmun-myeon, Dangjin
Size12,018,189㎡
Period1992~2013
DetailsIndustrial complex (industry, logistics, tourism, relaxation, housing, etc.)
Industries to be coveredautomobile and trailer, other equipment and device combination,and chemical products, metal processing products, etc.
Conditions- 20km from Songak IC of West Coast Expressway, within one hour from Seoul metropolitan area- The No. 38 National Highway is to be expanded and Seokmun Pier is also to be constructed, thereby facilitating the land and maritime transportation - Industrial complex and housing complex are to be created, facilitating the nearby regional development
Area of Seongsan-ri, Kodae-myeon, Tongjeong-ri, Seokmun-myeon, DangjinArea of Seongsan-ri, Kodae-myeon, Tongjeong-ri, Seokmun-myeon, Dangjin
C
M
Y
CM
MY
CY
CMY
K
당진항_링크_1030_영문_3.pdf 3 2014-10-30 오후 4:56:08
Connecting the present with the future (Present + Future)
21
Songsan General Industrial ComplexLocationArea of Yugok-ri, Donggok-ri, Gagok-ri, Songsan-myeon, Dangjin
Size5,605,395㎡
Period1992~2013Industries to be covered1st metal manufacturing, metal processing, other equipmentand device manufacturing, etc.
Conditions10km from Songak IC of West Coast Expressway, within onehour from Seoul metropolitan area
Ⅱ
Hapdeok Industrial Park LocationArea of Seokwoori, Hapdeok-eup, Dangjin
Size636,793㎡
Period2010~2014Industries to be coveredMedical materials and medical product manufacturing,and seven other industries Conditions13km from Songak IC of West Coast Expressway,within one hour from Seoul metropolitan area
C
M
Y
CM
MY
CY
CMY
K
당진항_링크_1030_영문_3.pdf 4 2014-10-30 오후 4:56:13
Improving port competitiveness
with the quick administrative service provision for
Dangjin port users
22
Associateinstitutions
andcompanies
Pyeongtaek Maritime Port Agency, Port Logistics Dept.Maritime transportation system operation, port facility security,safety and counter-terrorism, ship entry and exit TEL 82-31-680-7230 FAX 82-31-680-7239
Daesan Maritime Port Agency, Port Logistics Dept. Maritime transportation system operation, port facilitysecurity, safety and counter-terrorism, ship entry and exit TEL 82-41-660-7651 FAX 82-41-663-0348
National Quarantine Station, Incheon, Pyeongtaek Branch Ship and airplane inspection, anti-epidemic inspection,epidemiologic survey, internationally certified vaccination TEL . 82-31-682-5213 FAX 82-31-682-5326
National Plant Quarantine Service, Jungbu,Pyeongtaek BranchInspection and testing of import and export plants, inspectionand testing of local plants, research and development TEL 82-31-8053-7701~6 FAX 82-31-8053-7714
National Fisheries Products Quality InspectionService, Pyeongtaek BranchInspection of fisheries for local consumption and import andexport fisheries (ingredients, simple processing products),quarantine of transported fisheries TEL 82-31-8053-7711~3 FAX 82-31-683-2789
National Veterinary Research and Quarantine Service,Jungbu, Pyeongtaek BranchInspection of import animals and livestock products, sanitaryinspection and safety test TEL 82-31-8053-7700 FAX 82-31-8053-7707
Pyeongtaek Customs, Inspection Dept.General export and import work, Pyeongtaek port entry andexit, port and landing site TEL 82-31-8054-7220 FAX 82-31-8054-7224
Ministry of Justice, Suwon Immigration Office,Pyeongtaek BranchImmigration inspection and ship search at Pyeongtaek andDangjin ports TEL 82-31-683-6938 FAX 82-31-682-1794
Company name T E L F A X Work
Hyundai Steel
Dongbu Steel
Dongkuk Steel
Hu Steel
Korea East-West Power Co., Ltd(EWP) Dangjin Coal-Fired PowerComplex Development Division
Manufacturing of steel products 2nd phase processing of cold strip and steelHeavy section processing and salesHeavy section for broad ship-building purpose, TMCP heavy section production
Power generation
82-41-680-011482-41-351-811482-41-351-498482-41-350-8114
82-41-351-0871 82-41-351-1214
82-41-680-119982-41-351-811582-41-351-469182-41-357-4625
Icheon Basic Material
Cargill Agri Purina
Slag and non-powder slag logistics Livestock feed production
82-41-357-254182-31-669-9024
82-41-357-5229 82-31-668-6458
Shipowners
C
M
Y
CM
MY
CY
CMY
K
당진항_링크_1030_영문_3.pdf 5 2014-10-30 오후 4:56:15
Connecting the present with the future (Present + Future)
23
Port operators
Company name TEL FAX Work
Dangjin Shipping Chungcheong ShippingDaeju Heavy Industries
Korea Express, Chungnam branch Sebang
Dangjin PierDongbu Express
Intergis
Port loading (Songak Pier)
Port loading (Kodae Pier)
82-41-356-8703 82-41-358-3132 82-41-354-3875 82-41-680-7853 82-41-353-3919 82-41-357-5300 82-41-359-3300 82-41-351-4961
82-41-356-8708 82-41-357-2369 82-41-354-3880 82-41-680-7854 82-41-353-3915 82-41-357-5431 82-41-359-3306 82-41-359-1565
Loading companies
Company name TEL FAX Work Dangjin Pier transportation trade union
Hyundai Steel transportation trade union
Dangjin Coal-Fired Power Complex transportation trade union
Dongbu Steel transportation trade union
Dongkuk Steel transportation trade union
United labor union for Hyundai, Dangjin, Dongbu, Dongkuk,
Improving the working conditions for laborers andmanaging their wages
82-41-354-1994 82-41-356-8717 82-41-352-7500 82-41-357-6670 82-41-359-1579
82-41-354-1996 82-41-356-7188 82-41-352-6564 82-41-357-1574 82-41-359-1574
Port transportation trade unions
Company name TEL FAX Work Seopyeongtaek Tank Terminal
Youngjin TNMCargill Agri Purina
Import, storage and logistics of liquid cargo
Animal feed production
82-31-683-510182-31-628-755782-31-669-9024
82-31-683-510582-31-682-866882-31-668-6458
West Pier Background companies
Company name TEL FAX Work Asan Shipping
Western ShippingSeojin Shipping
SangKorea Shipping
Agency work relating to ship entry and exit
82-41-357-2220 82-41-358-4994 82-41-352-3322 82-41-358-2501
82-41-357-2224 82-41-358-4445 82-41-352-2300 82-41-358-2505
Agencies
Company name TEL FAX Work
Operation of Songak Pier Operation of 1-6 berths of Kodae Pier
Operation of 7 berth of Kodae PierOperation of 8 berth of Kodae PierOperation of 9 berth of Kodae Pier
Operation of 10 berth of Kodae PierOperation of 1 berth of West PierOperation of 2 berth of West Pier
Operation of 3 berth of West Pier
Operation of 4-5 berths of West PierOperation of 6-7 berths of West PierOperation of 8-9 berths of West Pier
Operation of Dangjin Coal-Fired Power Complex Pier
82-41-680-011482-41-351-8114 82-41-357-530082-41-351-4984 82-41-351-4984 82-41-358-0570 82-31-683-0460 82-31-686-6711 82-31-681-4526 82-31-684-9452 82-31-684-9211 82-31-680-7421 82-31-684-5564
82-41-351-0871
82-41-680-011482-41-351-811482-41-357-530082-41-351-498482-41-351-498482-41-358-057082-31-683-046082-31-686-671182-31-681-452682-31-684-945282-31-684-921182-31-680-742182-31-684-5564
82-41-351-0871
Hyundai Steel Dongbu Dangjin Pier Operator
Dangjin Port Dangjin Kodae Pier Operator
Dongkuk Steel Dangjin Tank Terminal
Hanil Cement Youngjin Global Hyundai Cement
Sampyo Basic Material Pyeongtaek Dangjin Central Port
Pyeongtaek Dangjin PortTaeyoung Grain Terminal
Korea East-West Power Co., Ltd (EWP), DangjinCoal-Fired Power Complex Development HQ
C
M
Y
CM
MY
CY
CMY
K
당진항_링크_1030_영문_3.pdf 6 2014-10-30 오후 4:56:17
We connect Korea with the world!
Cityhall 1ro-1 Dangjin, Chungcheongnam-do, Republic of Korea 31773 (1002, Sucheong-dong)T : 82-41-350-4090~3 F : 82-41-350-4619
www.dangjin.go.kr
C
M
Y
CM
MY
CY
CMY
K
당진항_링크_1030_영문_1.pdf 1 2014-10-30 오후 4:53:02