COPYRIGHT ©2010 BOEING SHANGHAI AVIATION SERVICES CO., LTD. 400.0 600.0 800.0 Waste quantity per 1000 hours 0.0 Man hours analysis 废电池 Waste batteries 42-废有机溶液 42 - waste organic solution Week No. labour hour COPYRIGHT ©2010 BOEING SHANGHAI AVIATION SERVICES CO., LTD. 表面处理污泥 Surface treatment sludge 废矿物油 Waste mineral oil 沾染危废的清洗杂物及废包装 Cleaning sundry and the packaging polniumed hazardous waste Week No. 有机树脂废物 Organic resin waste Waste quantity per 1000 hours

TRANSCRIPT

COPYRIGHT © 2010 BOEING SHANGHAI AVIATION SERVICES CO., LTD.

COPYRIGHT © 2010 BOEING SHANGHAI AVIATION SERVICES CO., LTD.

Hazardous waste treatment reportWeek No.

沾染危废的清洗杂物及废包装Cleaning sundry and the packaging

polniumed hazardous waste废矿物油

Waste mineral oil

42-废有机溶液42 - waste organic

solution涂料染料废物

Coating dye waste有机树脂废物

Organic resin waste表面处理污泥

Surface treatment sludge废电池

Waste batteries We e k No. la bour hourWaste quantityper 1000 hours

week3 1500 5 week3 6591.5 228.3week4 4700 3600 week4 7113 1166.9week5 480 week5 484 991.7week7 2000 week7 4155 481.3week8 1800 2000 week8 7293 521.0Week10 2400 Week10 7863 305.2Week11 1000 1600 Week11 6795.5 382.6Week12 1100 600 Week12 6916.5 245.8Week13 611 680 100 100 Week13 6798 219.3Week14 420 1100 1150 20 Week14 4867.5 552.6Week15 686 Week15 6725 102.0GrandTotal(KG) 14697 11580 1150 120 100 5 average 472.4

Man hours analysis

Waste quantity per 1000 hours

0.0

200.0

400.0

600.0

800.0

1000.0

1200.0

1400.0

week3 week4 week5 week7 week8 Week10 Week11 Week12 Week13 Week14 Week15

Waste quantityper 1000 hours

Average is 472.4 kgs per 1000 hours

COPYRIGHT © 2010 BOEING SHANGHAI AVIATION SERVICES CO., LTD.

Waste oil recovery report

COPYRIGHT © 2010 BOEING SHANGHAI AVIATION SERVICES CO., LTD.

0

5000

10000

15000

20000

25000

30000

35000

FW01 FW02 FW03 FW04 FW05 FW06 FW07 FW08 FW09 FW10 FW11 FW12 FW13 FW14

Gas Consumption---m3

Gas AnalysisGas Analysis-- By WeekBy Week

Max

Mean

Min

FW 14 consumption is more than FW13, boiler is running about 2 Hours everyday to supply hot water to locker RM.

FW09 & FW03 was painting in Bay4.

COPYRIGHT © 2010 BOEING SHANGHAI AVIATION SERVICES CO., LTD.

0

10000

20000

30000

40000

50000

60000

70000

80000

90000

FW01 FW02 FW03 FW04 FW05 FW06 FW07 FW08 FW09 FW10 FW11 FW12 FW13 FW14

Electricity Consumption---KWH

Electricity AnalysisElectricity Analysis-- By WeekBy Week

Max

Mean

Min

FW 05 is Spring Festival holiday.

FW09 & FW03 was painting in Bay4.

COPYRIGHT © 2010 BOEING SHANGHAI AVIATION SERVICES CO., LTD.

Cost percentage Cost percentage From Jan. 11 to Mar. 11From Jan. 11 to Mar. 11

Utility Cost Percent Mar 2011

36%

1%14%

49%

Electricity (RMB)

Water (RMB)

Natural Gas TTL (RMB)

Utility Total Cost (RMB)

Utility Cost Percent Jan 2011

48%

1%1%

50%

Electricity (RMB)

Water (RMB)

Natural Gas Kitchen (RMB)

Natural Gas Boiler (RMB)

Utility Cost Percent Feb 2011

70%

2%1%27%

Electricity (RMB)

Water (RMB)

Natural Gas Kitchen (RMB)

Natural Gas Boiler (RMB)

Utility Cost Item Jan. Feb. Mar.

Electricity (RMB) 344040 424560 449820

Water (RMB) 8723 9265 8284

Natural Gas TTL (RMB) 370196 170328 173357

Utility Total Cost (RMB) 722959 604153 631461