energy conservation in tumul k’in april 2007 presented by: the flomenites april 2007 presented by:...

20
Energy Conservation in Tumul K’in April 2007 Presented by: The Flomenites

Post on 21-Dec-2015

213 views

Category:

Documents


0 download

TRANSCRIPT

Energy Conservationin Tumul K’in

Energy Conservationin Tumul K’in

April 2007

Presented by: The FlomenitesApril 2007

Presented by: The Flomenites

OverviewOverview

Problem Statement Project Description Background Work MDG’s Work in Belize Results and Implications Recommendations

Problem Statement Project Description Background Work MDG’s Work in Belize Results and Implications Recommendations

Problem StatementProblem Statement

Received subsidized electricity Energy subsidy was cut Accumulating debt to electricity company About $9,000

High Cost of Energy $1200/month

Pressure to perform on already tight budget

Potential for more productive use of money and resources

Received subsidized electricity Energy subsidy was cut Accumulating debt to electricity company About $9,000

High Cost of Energy $1200/month

Pressure to perform on already tight budget

Potential for more productive use of money and resources

Project DescriptionProject Description

Create framework for TK’s path to energy independence Energy Audit Short/long term solutions

Provide renewable alternatives to current energy consumption Environmental sustainability Resource efficiency

Create framework for TK’s path to energy independence Energy Audit Short/long term solutions

Provide renewable alternatives to current energy consumption Environmental sustainability Resource efficiency

Background WorkBackground Work

Preliminary talks with Dr. Filiberto Penados Co-Founder of Tumul K’in

Follow-up conversations with Jeff Frank Peace Corp volunteer in Blue Creek

Literature review on possible alternatives to energy dependence

Preliminary talks with Dr. Filiberto Penados Co-Founder of Tumul K’in

Follow-up conversations with Jeff Frank Peace Corp volunteer in Blue Creek

Literature review on possible alternatives to energy dependence

Millennium Development Goals

Millennium Development Goals

#7 Ensure Environmental Sustainability Renewable energy Reduce energy consumption

#8 Develop a global partnership for development

#7 Ensure Environmental Sustainability Renewable energy Reduce energy consumption

#8 Develop a global partnership for development

Work in Belize (Trip 1)

Work in Belize (Trip 1) Energy Audit

Data Collection Past Energy Bills Appliance Stock

Watt/hour metering Usage patterns

Systems Analysis Identifying inefficiencies Site factors Applications

Financial Analysis Implementation Costs

Break even points Cost Savings

Recommendations

Energy Audit Data Collection

Past Energy Bills Appliance Stock

Watt/hour metering Usage patterns

Systems Analysis Identifying inefficiencies Site factors Applications

Financial Analysis Implementation Costs

Break even points Cost Savings

Recommendations

Audit ResultsAudit Results

Work in Belize (Trip 2)

Work in Belize (Trip 2)

Batch Heater ConstructionBatch Heater Construction

Break Even Point & Savings

0

100

200

300

400

500

600

700

Month

Cu

mu

lati

ve C

ost

s/S

avin

gs

Break Even Point

Costs

Savings

RecommendationsRecommendations

General Reduce unnecessary light usage Install float switch for water reservoir

Install energy meters in every building

Promote energy conservation among the students Develop energy conservation contest among students

General Reduce unnecessary light usage Install float switch for water reservoir

Install energy meters in every building

Promote energy conservation among the students Develop energy conservation contest among students

Recommendations Cont’dRecommendations Cont’d

Staff House Install solar water heater Unplug appliances with “Phantom load” Invest in more efficient refrigerator

Computer Lab Use smaller computer for server Transition to laptops Shade trees rather than air-conditioning

Rearrange room to separate processors into small air conditioned area

Staff House Install solar water heater Unplug appliances with “Phantom load” Invest in more efficient refrigerator

Computer Lab Use smaller computer for server Transition to laptops Shade trees rather than air-conditioning

Rearrange room to separate processors into small air conditioned area

Long Term Recommendations

Long Term Recommendations

Invest in more solar hot water heaters

Biodiesel Generator Solar water project

Invest in more solar hot water heaters

Biodiesel Generator Solar water project

Projected Savings

0.00

5,000.00

10,000.00

15,000.00

20,000.00

25,000.00

30,000.00

35,000.00

40,000.00

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

Year

Savin

gs (

US

D)

1 Heater 4 Heaters

$ 8,820

$ 35,280

$ 18,480

$ 4,620

10 years 20 years

Thank you!Thank you!

Dr. Filiberto Penados Project partner and Timul K’in Co-founder

Jeff Frank Project partner and peace corps volunteer

Gary Flomenhoft Project learning professor and sponsor

Dr. Filiberto Penados Project partner and Timul K’in Co-founder

Jeff Frank Project partner and peace corps volunteer

Gary Flomenhoft Project learning professor and sponsor