ernst bolt, rijkswaterstaat

38
15 February 2012 Offshore Windfarm Planning Learning by doing in the Netherlands… Ernst Bolt Ministry of Infrastucture and Environment Rijkswaterstaat Centre for Shipping andTransport

Upload: joost-f-boers

Post on 26-Dec-2014

489 views

Category:

Documents


0 download

DESCRIPTION

Ernst Bolt of the Center for Shipping and Transport addressed wind farm planning. It is surprising to many how very busy the North Sea has become and how difficult it is to find suitable locations for the many thousands of Megawatts required to reduce the national dependancy on fossil fuels.

TRANSCRIPT

Page 1: Ernst Bolt, Rijkswaterstaat

15 February 2012

Offshore Windfarm Planning Learning by doing in the Netherlands… Ernst Bolt Ministry of Infrastucture and Environment Rijkswaterstaat Centre for Shipping andTransport

Page 2: Ernst Bolt, Rijkswaterstaat

Rijkswaterstaat Offshore wind farm planning 2 15 February 2012

Contents

•  Spatial plans •  First offshore windfarms •  Second round applications •  Preparing the third round

Page 3: Ernst Bolt, Rijkswaterstaat

Rijkswaterstaat Offshore wind farm planning 3 15 February 2012

Spatial plans

•  National Spatial Strategy (Nota Ruimte) •  Structure plan of Military Areas (Structuurschema Militaire Terreinen) •  Policy statement Water Management (Nationaal Waterplan)

–  water quality management, fresh water –  safety against flooding –  anticipating climate changes –  recreation –  inland water transport

•  Integral Management Policy North Sea (IBN)

Page 4: Ernst Bolt, Rijkswaterstaat

Rijkswaterstaat Offshore wind farm planning 4 15 February 2012

National Spatial Strategy

Spatial planning policy •  Vision statement for spatial development into

2020/2030. •  North Sea: key area of the National Ecological

Network. –  strengthening the economic significance,

linked to –  preservation and development of nature

and landscape values

Page 5: Ernst Bolt, Rijkswaterstaat

Rijkswaterstaat Offshore wind farm planning 5 15 February 2012

National Spatial Strategy Principal spatial structure: Water, Nature and Landscapes

Page 6: Ernst Bolt, Rijkswaterstaat

Rijkswaterstaat Offshore wind farm planning 6 15 February 2012

National Water Plan

National Spatial Strategy

Structure scheme Military Areas

Spatial planning policy

Spatial policy for water areas

EU guidelines à National legislation

Functions of National Waters Integrated Management

Plan North Sea

(elaboration of the North Sea paragraph)

Page 7: Ernst Bolt, Rijkswaterstaat

Rijkswaterstaat Offshore wind farm planning 7 15 February 2012

Integrated Management Plan North Sea (IBN) •  Elaboration of North Sea paragraph of the Water Plan •  Coproduction of Ministries of

–  Transport, Public Works and Water Management 1

–  Agriculture, Nature and Food Quality 2

–  Housing, Spatial planning and Environment3

–  Economic Affairs4

–  Defense 2,4):Ministry of Economic Affairs, Agriculture and Innovation

1,3):Ministry of Infrastructure and the Environment •  Functions:

–  shipping –  oil and gas –  sand –  fishing –  nature –  renewable energy

Page 8: Ernst Bolt, Rijkswaterstaat

Rijkswaterstaat Offshore wind farm planning 8 15 February 2012

Water quality

Page 9: Ernst Bolt, Rijkswaterstaat

Rijkswaterstaat Offshore wind farm planning 9 15 February 2012

Shipping

Clearways •  corridors free of obstacles

for the passage of ship traffic.

•  Logical routes, connecting the existing TSSs.

•  All oil&gas rigs have to stay out of these areas.

Page 10: Ernst Bolt, Rijkswaterstaat

Rijkswaterstaat Offshore wind farm planning 10 15 February 2012

Wind energy areas

•  Existing •  Permits •  Prospect areas

Page 11: Ernst Bolt, Rijkswaterstaat

Rijkswaterstaat Offshore wind farm planning 11 15 February 2012

Clearways and traffic density

Page 12: Ernst Bolt, Rijkswaterstaat

Rijkswaterstaat Offshore wind farm planning 12 15 February 2012

Egmond aan Zee / NoordzeewindQ7 / Amalia

Egmond aan Zee / NoordzeewindFirst offshore windfarms

•  Egmond aan Zee (2006) 36 x 3 MW = 108 MW

•  Q7 Amalia (2008) 60 x 2 MW = 120 MW

Page 13: Ernst Bolt, Rijkswaterstaat

Rijkswaterstaat Offshore wind farm planning 13 15 February 2012

Second Round Wind farms

•  Boundary condition: no constructions in the clearways •  No turbines within 12 nm from coastline •  Financial support for maximum 1000 MW •  Invititation to apply for financial support:

–  Apply for permit –  Environmental impact study

- including shipping safety effects - SAMSON model had to be used

•  Ministry of Economic Affairs would choose the most cost-effective initiatives that received a permit

•  Result: 80 applications!

Page 14: Ernst Bolt, Rijkswaterstaat

Rijkswaterstaat Offshore wind farm planning 14 15 February 2012

2nd round applications

Page 15: Ernst Bolt, Rijkswaterstaat

Rijkswaterstaat Offshore wind farm planning 15 15 February 2012

Finally, 12 permits

Key issues: •  Ecological impact •  Safe helicopter flight paths •  Shipping safety

Page 16: Ernst Bolt, Rijkswaterstaat

Rijkswaterstaat Offshore wind farm planning 16 15 February 2012 16

Permits round 2

Page 17: Ernst Bolt, Rijkswaterstaat

Rijkswaterstaat Offshore wind farm planning 17 15 February 2012

Ecological impact Natura 2000

•  Distance to lesser seagull colony •  Underwater noise

–  Disturbance of seals and fish larvae –  No pile driving January - July

Page 18: Ernst Bolt, Rijkswaterstaat

Rijkswaterstaat Offshore wind farm planning 18 15 February 2012 Wind op Zee 18 13-09-2011

Helicopter-approach availability of the platform

Page 19: Ernst Bolt, Rijkswaterstaat

Rijkswaterstaat Offshore wind farm planning 19 15 February 2012 Wind op Zee 19 13-09-2011

Shipping safety / efficiency

Page 20: Ernst Bolt, Rijkswaterstaat

Rijkswaterstaat Offshore wind farm planning 20 15 February 2012

Shipping safety – points of discussion

•  Does SAMSON produce representative figures? –  Influence on radar image –  Influence of ‘complex traffic situations’ –  Visual disorientation in combination with anchorage area and on-

shore lights •  Minimum safe distance between shipping route and wind farm? •  Which accident probability can be accepted

–  Political damage –  Economical consequences –  Casualties

•  Legal procedures

Page 21: Ernst Bolt, Rijkswaterstaat

Rijkswaterstaat Offshore wind farm planning 21 15 February 2012 21

BARD/TYPHOON BUITENGAATS 300 MW

BARD/TYPHOON ZEE-ENERGIE 300 MW

ENECO Q10 120 MW

AND THE € WINNERS ARE…

Page 22: Ernst Bolt, Rijkswaterstaat

Rijkswaterstaat Offshore wind farm planning 22 15 February 2012

3rd Round

•  Political goal: 6000 MW to be created by 2020 •  Indicate possible areas in Integral Management Plan North Sea

•  Coastal area determined by clearways •  Modification of shipping routes affects granted permits of 2nd round

Page 23: Ernst Bolt, Rijkswaterstaat

Rijkswaterstaat Offshore wind farm planning 23 15 February 2012

Variant 2a

Page 24: Ernst Bolt, Rijkswaterstaat

Rijkswaterstaat Offshore wind farm planning 24 15 February 2012

Variant 4a

Page 25: Ernst Bolt, Rijkswaterstaat

Rijkswaterstaat Offshore wind farm planning 25 15 February 2012

Variant 5a

Page 26: Ernst Bolt, Rijkswaterstaat

Rijkswaterstaat Offshore wind farm planning 26 15 February 2012

Variant 6a

Page 27: Ernst Bolt, Rijkswaterstaat

Rijkswaterstaat Offshore wind farm planning 27 15 February 2012

Routes variant 2a

Page 28: Ernst Bolt, Rijkswaterstaat

Rijkswaterstaat Offshore wind farm planning 28 15 February 2012

Routes variant 5a

Page 29: Ernst Bolt, Rijkswaterstaat

Rijkswaterstaat Offshore wind farm planning 29 15 February 2012

Routes variant 6a

Page 30: Ernst Bolt, Rijkswaterstaat

Rijkswaterstaat Offshore wind farm planning 30 15 February 2012

Current routes Maas

Page 31: Ernst Bolt, Rijkswaterstaat

Rijkswaterstaat Offshore wind farm planning 31 15 February 2012

Routes Maas variant 5a

Page 32: Ernst Bolt, Rijkswaterstaat

Rijkswaterstaat Offshore wind farm planning 32 15 February 2012

Cost – effectiveness (subsidies for production)

Page 33: Ernst Bolt, Rijkswaterstaat

Rijkswaterstaat Offshore wind farm planning 33 15 February 2012

Formal Safety Assessment

•  Navigational Risk Review –  Hazard workshop –  SAMSON

•  Variant 5 favourable –  Less complex traffic pattern in Maas Junction –  Accident frequency (SAMSON) no significant change –  Combined with new TSS IJmuiden

Page 34: Ernst Bolt, Rijkswaterstaat

Rijkswaterstaat Offshore wind farm planning 34 15 February 2012

Cost – effectiveness (shipping)

Page 35: Ernst Bolt, Rijkswaterstaat

Rijkswaterstaat Offshore wind farm planning 35 15 February 2012

Total costs

Page 36: Ernst Bolt, Rijkswaterstaat

Rijkswaterstaat Offshore wind farm planning 36 15 February 2012

Current proposal for IMO approval

Page 37: Ernst Bolt, Rijkswaterstaat

Rijkswaterstaat Offshore wind farm planning 37 15 February 2012

Current state

•  Modification of shipping routes – proposal to IMO •  Modification of granted round 2 plan •  New government since 2010 •  No funds/subsidy for round 3 •  New energy policy expected 2014/15

Page 38: Ernst Bolt, Rijkswaterstaat

Rijkswaterstaat Offshore wind farm planning 38 15 February 2012

To be continued…