erp: mfg plan’g and control(mpc) 에 근거하여 snu mai lab just in time

14
ERP: Mfg Plan’g and Control(MPC) 에 에에에에 SNU MAI LAB Just In Time

Post on 21-Dec-2015

215 views

Category:

Documents


0 download

TRANSCRIPT

ERP: Mfg Plan’g and Control(MPC) 에 근거하여

SNU MAI LAB

Just In Time

SNU MAI LAB / 132

JIT in MPC JIT in MPC

Contents for MRP

JIT ExampleJIT Example

JIT ApplicationJIT Application

Non-repetitive JITNon-repetitive JIT

JIT SoftwareJIT Software

Managerial ImplicationsManagerial Implications

SNU MAI LAB / 133

Zero-x: inventory, transaction, disturbance,…

Mainly suitable for high volume, repetitive manufacturing

Physical Changes: SMED, improved quality, TPM, Poka-yoke, continual improvement, worker

involvement

JIT in MPC: Major Elements

SNU MAI LAB / 134

JIT Orientation includes several action plans:-Reduction of set-up and lot size-No defects in production-Continual improvement-Worker involvement-Cellular manufacturing

Impact on MPC: JIT can eliminate standard shop floor reporting systems, reduce costs of detailed shop scheduling, reduce WIP and Lead Time, support better vendor scheduling

Hidden Factory: One factory makes product and the other factory processes transactions on papers and computer systems

Ex) Ordering, execution and confirmation of materials moving from on location to next, costs of receiving, shipping, expediting, data entry and processing, accounting and error follow up

Logistical Transactions, Balancing Transactions, Quality Transactions, Change Transactions,…

JIT in MPC

SNU MAI LAB / 135

We need a factory having large bandwidth( flexible to volume and variety change)

JIT in MPC

SNU MAI LAB / 136

JIT Example

SNU MAI LAB / 137

JIT Example

SNU MAI LAB / 138

JIT Example

SNU MAI LAB / 139

JIT Example

SNU MAI LAB / 1310

JIT Example

SNU MAI LAB / 1311

JIT Applications

SNU MAI LAB / 1312

JIT Applications

Inventory is like water, as it goes down, the problem becomes visible

SNU MAI LAB / 1313

JIT Software

SNU MAI LAB / 1314

Managerial Implications