    y Definition.

    y ERP Legacy.

    y ERPs elements and subsystems.y How can ERP system improve a business system?!

    y What does drive ERP approach?!

    y ERP implementation.

    y ERP vendors.

    y ERP pros & cons.

    y Summary.

  • 8/8/2019 ERP (YASIR SAYEED)

    3/12

    y An ERP is a company-wide computer softwaresystem, and functions of a business from shared

    data stores.y An ERP system has a service-oriented architecture

    with MODULARhardware and software units and"services" that communicate on a local area

    network.y Enterprise Resource Planning software, or ERP,

    doesn't live up to its acronym.

  • 8/8/2019 ERP (YASIR SAYEED)

    4/12

    y The advent of E-Business and the need to leveragemultiple sources of information within an

    enterprise.y Back-office enterprise software has its roots in the

    1960s and 1970s.

    y MRP, short for Material Requirements Planning,

    was developed in the early 1960s at IBM.y MRP II, the next generation of manufacturing

    software.

    y ERP, the enhancement of these before

  • 8/8/2019 ERP (YASIR SAYEED)

    5/12

  • 8/8/2019 ERP (YASIR SAYEED)

    6/12

    y A single software program that serves the needs ofpeople in finance along with human resources and inthe warehouse.

    y Integrated software program that runs off a singledatabase so that the various departments can moreeasily share information and communicate with eachother.

    y No lounging (Imagine a customer order TRIP out ofan ERP System).

    y Interconnectivity (for example, to get into thewarehouse's computer system).

  • 8/8/2019 ERP (YASIR SAYEED)

    7/12

    y Businessy CustomerSatisfaction.

    y

    BusinessD

    evelopment - new areas, products, services.y Ability to face competition.

    y Efficient processes required to push the company to top gear.

    y ITy Present Software does not meetbusiness needs.

    y Legacy systems difficult to maintain, Y2K Problem , Eurocurrency.

    y Obsolete hardware/softwaredifficult to maintain.

  • 8/8/2019 ERP (YASIR SAYEED)

    8/12

    y Producing ERP software systems are typically complex andusually impose significant changes on staff work practices.

    y It is desirable and highly advised to hire outside consultants who

    are professionally trained to implement these systems.y Three types of services that are provided by of an ERP vendor orof third-party consulting companies, these firms typicallyprovide three areas of professional services: consulting,customization and support.

    y ERP systems are modular, so they don't all need be implemented

    at once. It can be divided into various stages, or phase-ins.y The length of time to implement an ERP system depends on the

    size of the business, the number of modules, the extent ofcustomization, the scope of the change and the willingness ofthe customer to take ownership for the project.

  • 8/8/2019 ERP (YASIR SAYEED)

    9/12

    y The typical project is about 14 months and requiresaround 150 consultants, a small project (e.g., acompany of less than 100 staff) may be planned and

    delivered within 3-9 months; however, a large, multi-site or multi-country implementation may take years.y Main success factor of an ERP implementation, Data

    Migration, which comes almost as the last phaseimplementation & requires.

    1. Identifying the data to be migrated2. Determining the timing of data migration3. Generating the data templates4. Deciding on migration related setups5. Deciding on data archiving

  • 8/8/2019 ERP (YASIR SAYEED)

    10/12

    y It is therefore crucial that organizations perform athorough business process analysis before selecting an ERPvendor and setting off on the implementation track.

    y Neglecting to map current business processes prior tostarting ERP implementation is a main reason for failure ofERP projects.

    y Configuring an ERP system is largely a matter of balancingthe way you want the system to work with the way thesystem lets you work.