e.t. design study harald lück. 3 main noise sources thermal noise seismic shot noise
Embed Size (px)
TRANSCRIPT

E.T. Design StudyE.T. Design Study
Harald LückHarald Lück

1st generation2nd generation3rd generation
1 10 100 1000 1000010
-25
10-24
10-23
10-22
10-21
10-20
10-19

1st generation2nd generation3rd generation
1 10 100 1000 1000010
-25
10-24
10-23
10-22
10-21
10-20
10-19
3 main noise sources3 main noise sources
Thermal Noise
Seismic
Shot Noise

ET: Baseline ConceptUnderground location– Reduce seismic noise
– Reduce gravity gradient noise– Eases low frequency suspensions
Cryogenic
Overall beam tube length ~ 30km
Possibly Δ instead of L geometry

ConceptualConceptual Design Study Design Study Start Feb. / March 2008Start Feb. / March 2008
Working Packages:Working Packages:
11 Site and infrastructureSite and infrastructure22 Thermal noise of mirrors and Thermal noise of mirrors and suspensions / cryogenicssuspensions / cryogenics33 Optical configurationOptical configuration44 Astrophysics issuesAstrophysics issues55 ManagementManagement
Jo Van den Brand
P. Rapagnani
A. Freise
B. Sathyaprakash
M. Punturo

DS ManagementDS Management
Project Coordinator
Scientific Coordinator
WP1 coordinator
WP4 coordinator
WP3 coordinator
WP2 coordinator
Task responsible
Task responsible
Task reponsible
Task responsible
Task responsible
Task responsible
Task responsible
Task responsible
Secretary
Promote and verify scientific achievements
Administrative, financial, EU contact

Project Coordinator
5 WP coordinators
Scientific Coordinator
GEO and Virgo representatives
1 each
Science Team representative
Executive Board

The Governing Council
A Governing Council will be formed by the authorised representatives (one per institution) appointed by the participating contractors + scientific coordinator. Chair = Project Coordinator.Chair = Project Coordinator.
Participant no.
Participant organization name Country
1 European Gravitational Observatory Italy
2 Istituto Nazionale di Fisica Nucleare Italy
3 Max-Planck-Gesellschaft zur Foerderung der Wissenschaften e.V., acting through Max-Planck-Institut fuer Gravitationsphysik
Germany
4 Centre National de la Recherche Scientifique France
5 University of Birmingham United Kingdom
6 University of Glasgow United Kingdom
7 Vereniging voor christelijk hoger onderwijs, wetenschappelijk onderzoek en patiëntenzorg
The Netherlands
8 University of Cardiff United Kingdom

Science TeamScience Team
Initially co-chaired byInitially co-chaired by– GEO spokesperson GEO spokesperson (Karsten Danzmann)(Karsten Danzmann)– Virgo spokesperson Virgo spokesperson (Benoit Mours)(Benoit Mours)– Virgo-EGO Scientific Forum (VESF) coordinator Virgo-EGO Scientific Forum (VESF) coordinator (Francesco (Francesco
Fidecaro)Fidecaro)
MembersMembers– Open to all members of GW community willing to contribute to Open to all members of GW community willing to contribute to
the DSthe DS– Initial members will be the coordinators of the research groups
participating in the project and the main scientists of the European gravitational wave community, indicated by the three co-chairpersons
Meetings:Meetings:– must meet at least once a year, during the annual project
plenary meeting

Results to be achieved within the Results to be achieved within the next three yearsnext three years
Site selection: scientific, operative, legal, Site selection: scientific, operative, legal, financial, administrativefinancial, administrativeSeismic isolation, suspension, substrates, Seismic isolation, suspension, substrates, coatings compatible with cryogenic coatings compatible with cryogenic operationoperationGeometry, topology, configuration of IFO Geometry, topology, configuration of IFO with sensitivity < SQL; high power effectswith sensitivity < SQL; high power effectsOptimize scientific output and define DA Optimize scientific output and define DA requirementsrequirements

Contract number: RII3-CT-2004-506222

Information flow inside the ProjectInformation flow inside the Project
Executive board
GoverningCouncil
Science Team
Institutions Scientific community
Project