excellent tech and equipment co.,ltd. - etec - thailand profile update 03_2014.pdf• drilling area...

17
Excellent Tech and Equipment Co.,Ltd. Introduction

Upload: phamnguyet

Post on 23-Apr-2018

216 views

Category:

Documents


3 download

TRANSCRIPT

Excellent Tech and Equipment Co.,Ltd.

Introduction

Index

• Capability

• Vision

• Organization

• Trading Information

• Job References

• Project on hand

Capability

• Turn Key Project Management, Design, Manufacture, Installation & Commissioning.

• Specialist HVAC, Refrigeration & Chiller Design and Manufacture for Hazardous Area.

• Turn Key VRV, VRF System for Building and Factory.

• Specialist Pump and Piping system work.

• Equipment and Spare Parts Supply.

• Equipment Repair & Campaign Maintenance.

• Drilling Area Local Exhaust Ventilation (LEV) Survey & Upgrades.

• Electrical and Control System Design and Upgrades.

• Architecture for Marine & Offshore.

• Duct Cleaning, Duct Leakage Test.

Vision & Organization of ETEC

• Vision

We will be a number one in the Engineering work under safety & quality policy.

• Organization

Banlue T.Managing Director

Sittichai J.Sales Manager

Sales support Team (2 Person)

TechnicianTeam (15 Person)

SalesTeam (5 Person)

SafetyTeam (1 Person)

Kunat P.Service Manager

AccountTeam (2 Person)

PurchaseTeam (1 Person)

Nawabhand S.Admin Manager

EngineeringTeam (5 Person)

SafetyTeam (2 Person)

Watanyoo B.Project Manager

Trading Information by ETEC

• Trading Product information

• Air conditioning and chiller.

• Copper Tube and fitting Products.

• HVAC and Electric materials.

• NEW!!! ETEC Refrigerant.

• Tooling and equipments.

• Piping Equipment and tooling.

Trading Information by ETEC

• Trading Product information

• Service and Projects Department.TOA GROUP

Last project

‐ Re‐Installation water piping PVC to PB around factory.

‐ Renovate Admin Building at Captain paint factory.

‐ Installation cable link for network system.

Hitachi (THECO)

Last project

‐ Re‐installation water chiller pipe Black steel to PPR Piping.

‐ Re‐Installation Chiller packet Air cool 60TR, Admin building.

‐ New‐Installation Chiller system packet Air cool 100TR, V14.

‐ Construction steel structure room and platform for installation new machine. 

Taksin Hight School. 

Last project

‐ Installation A/C system in Taksin International school 

Burapha Univecity

Last project

‐ Installation AC system for Expansion Area for Laboratory

• Service and Projects Department. 

Thai Oil GROUP(Operated through Main Contractor.)

Last project

‐ Installation A/C system in CCG HDS Project with a partner company.

‐ Reinstallation A/C at Sub station 100 at TOP with TS engineering.

DOW chemical(Operated through Main Contractor.)

Last project

‐ Installation A/C system in Hydrogen Project with a partner company.

‐ Installation PLC system in Hydrogen Project with a partner company.

GLOW SPP3(Operated through Main Contractor.)

Last project

‐ Installation CTW for temporary 700 MW Project with a partner company.

ESSO Sriracha

Last project

‐ Installation A/C system in Subsep Building Project with a partner company.

‐ Reinstallation A/C at Subseb Building at ESSO Sriracha with Cofely(Thailand).

SPRC

Last project

‐ Installation A/C system in DCS Project with a partner company.

‐ Re‐Installation A/C system in SPRC House.

TAC

Last project

● Installation Air condition system at new building TAC.

• Service and Projects Department.PTT Group

Last project

‐ Installation A/C system in Ware House PTT ME Project with a partner company.

‐ Installation A/C system in Loading area PTT AR Project with a partner company.

EGCO Group(Operated through Main Contractor.)

Last Project

‐ Installation A/C at Egco Cogeneration with a partner company.

‐ Supply Copper coil.

Ship yard and near shore project(Operated through Main Contractor.)

Last project

‐ Remove old chiller  and boiler in a Oakwell shipyard with a partner company.

‐ Installation A/C in sea fox rig with a partner company.

Hospital and Hotel(Operated through Main Contractor.)

Last project

‐ Installation CTW 250 RT Project with at Grand jomtien palace hotel.

New Building Vinythai Project.

Last project

‐ Installation Air condition system at new building Vinythai Mataput.

• Service and Projects Department.‐ FIRE PUMP and Controller installation at ABLE HI‐TECH

● Installation Fire Pump Engine.

● Installation Jockey Pump.

● Installation Controller system.

‐ FIRE PUMP installation at Navanakorn Hospital.

● Installation Fire Pump Engine.

● Installation Fire Pump Motor

● Installation Transfer Pump.

● Installation Controller system.

‐ FIRE PUMP installation at Thai ‐ Nichi.

● Installation Fire Pump Engine.

● Installation Fire Pump Motor

● Installation Transfer Pump.

● Installation Controller system.

• Service and Projects Department.‐ Air Condition installation at IRPC (RAYONG) (Operated through Main Contractor.)

● Installation Air Condition System

‐ Air Condition VRV system Daikin VRV III and Daikin VRV II installation.

● at DTAC Office (อาคารจตุรัส จามจุรี).● at BHUMJAITHAI PARTY Building 1‐4

● at ศูนยปฏิบัติธรรมวัดพระธรรมกาย.● at บานพักสโมสรบุรีรัมยการไฟฟา PEA&FC.

● at บริษัท ฮิตาชิ เมททอล(ประเทศไทย)จํากัด.● at มูลนิธิศึกษาพระคัมภีรไบเบ้ิล.● at DHT CLINIC.

● at บริษัท วาโก ซังโย (ประเทศไทย)จํากัด.● at มหาวิทยาลัย มหิดลศาลายา.(Operated through Main Contractor.)

‐ Dealer Authorize of Media VRF (THAILAND)

• Project on hand 2013(Update 03/2014)‐M&E Work at MD Building Project.

● Turnkey system of EE HVAC FF SANI and Communication. 

● Project schedule 1 Year

● About 14 M.(THB)

● Start Oct 2013 – Oct 2014 (Progress 15%)

• Project on hand 2013(Update 06/2013)

‐ HVAC Work at ESSO Sriracha

● Award 6 Project for Re‐Installation AC system.

● Total about 6.7 M.(THB)

● Award PM Contact 4 Year.

● Total about 5 M.(THB)

‐ HVAC Work at Star petroleum refining public Co.,Ltd.

● Award 2 Project 

● CCB Project

● MWB Project

• Project on hand 2013(Update 06/2013)‐ HVAC Work at โรงไฟฟา หนองแซง สระบุรี● Installation HVAC System for SINO‐THAI Main Contractor.

‐ CCB Building.

‐Water Tenement.

‐ Switch Yard.

‐ Laboratory.

● Project schedule 1 Year

(Hand Over Document Process right now)

• Project on hand 2014(Update 01/2014)‐ HVAC Work at International Building.

● Connect VRV system

● Control switch

● Electrical from MDB.  to VRV CDU. and start up.

Project on hand 2014(Update 01/2014)‐Mechanical Work at MP‐MCA‐C771 Project.

● Overhaul chlorine compressor C771.

• Project on hand 2014(Update 01/2014)‐ HVAC Work at KD Project SUZUKI FACTORY.

● Design and Installation HVAC system