01. History

2003

2007

2009

2015

Specializes in Offshore Projects at DSME & SHI with the name of SAMJIN Offshore Co., Ltd. .

Established ‘KOC’ to specialize in offshore commissioning in line with SAMJIN Offshore Co., Ltd.

Awarded the best vendor of DSME

Performing commissioning / flushing / punch etc. of Drill Rig(Seadrill) & FPU(Total)

WITH OVER

15 YEARS

Experience &

Know-how

2016 Launching ROV & Drilling Business

02. Organization

Head Office Drilling & ROV

Department

Plant

Department

Research

Institute

Logistic

Warehouse

이미찬 고문 이재택 고문

– Toolpusher on the rig

– Manage the rig as Rig Manager

- Manage Rig Repair work in Shipyard

TS Yoon / OP. Manager

JT Lee / VP – Subsea Engineer

– BOP & X-mas Operation

– Commissioning Rig &

FPSO, FPU, FSU

– Rig Operation Manager

GH Jang / Advisor

– Drilling Superintendent

– Drilling Consultant

– Sr. Drilling Engineer

- Drilling Supervisor

- Drilling Manager/Adviser

- Contract : 2015

- Operation: Korea East Sea

- Client : KNOC

b) Time & Depth Curve

a) Well Schematic

c) Well Plug & Abandon 04. References (1)

d) Offshore/Onshore E & P Operation - Korea Block 6, - Vietnam 11-2, Kazkhastan-Kensary, Ada,S.Karporsky - Aleria Bourarhet block (Onshore) - Central Java, Indonesia - Captain Fields, UK (Texaco Chevron) - West Kamchaka offshore, Russia - Vietnam 15-1 Block, Benin block-2, Korea - Ankor Field, Gulf Mexico, USA - Nigeria OPL 321/323, Yemen (Block 4 & 70) - Peru Block-Z, Iraq (Bazian, Sanga South) - Gas Hydrate Drilling in East sea, Korea

01) Drilling Engineering

Client : Rig Doo-sung

Experience on the rig 1) Rig Operation 2) Maintenance & Repair 3) Manpower Supply 4) Drilling Operation 5) Plug & Abandon Works 6) Mooring Works 7) Safety Management 8) Run & Recover BOP & X-mas tree

a) Rig Drilling Operation

b) Rig Maintenance Works

- Exxon, Alaska, USA - Gulf , Alaska, USA - Pedco, East sea, Korea - Marathon, Hadson, Ultramar, Marathon in Korea - CPC, Tawan - B.G.V, PCV, Candian, FINA, T.O.G.I in Vietnam - Conhe, China - CPVL, Unocal, KNOC in Vietnam - Shell, Petronas, SSB, PCSB in Malaysia - Total in Indonesia - Devon in China - VitSovPetro, VietGazProm in Vietnam - PTTIPI, MPRL in Myanmar - KNG, Gazflot, GGR in Russia

02) Rig Operation

c) Cementing Plugging Works on the rig f) Casing Cutting

d) Assembling the Casing Cutter on the rig g) Mooring System

03) Maritime Resources Development

01) Manganese Nodule Collection By

- Ministry of Oceans and Fisheries

- Korea Research Institute of Ships and Ocean Engineering

- Korea Research Institute of Ocean Science and Technology

- & KOC(Korea Offshore Company)

02) Economic Value - 100 Billion USD 03) Mn Nodule Collection

News Release on National Broadcast KBS/YTN

- Client : Halliburton, Canada

- Contract : August 10, 1999

- Completion : February 18, 1999

- Mono Hull : 291m(L) x 45m(W) x 28m(D)

- Operation : Canadian New Found Land

01) TERRA NOVA - Halliburton

Work Scope - Construction engineering - Fabrication - Installation - Test & Pre-commissioning - Piping system - Hydraulic system - E&I works - Internal turret

02) AGBAMI - Chevron

- Client : Chevron

- Contract : July, 2006

- Completion : August, 2007

Work Scope - Preservation - Manpower Supply – 250 - Test & Pre-commissioning - FMS & Helium Leak Test - Tubing Line Installation - High Pressure Test - Punch Killing - E&I works - Remaining Work during Tow - Flushing for Subsea System

05. References (2) 01) FPSO

- Client : TOTAL, France

- Contract : September 20, 2005

- Completion : March 07, 2006

03) DALIA - TOTAL

Work Scope 1) Preservation 2) Pre & Commissioning 3) Manpower Supply -

250

04) PAZFLOR - TOTAL

- Client : TOTAL, France

- Contract : October, 2009

- Completion : January, 2011

Work Scope - Commissioning - Flushing - E&I loop test - High pressure test - Helium leak test - COW - Punch clearing

02) KIZOMBA- ExxonMobil

- Client : ExxonMobil, USA

- Contract : August 19, 2002

- Completion : December 23, 2004

Work Scope - MC & commissioning - E&I loop test - Helium leak test - Punch clearing - Operation & Load test (Subsea Winches)

- Client : British Petrol, UK

- Contract : August 19, 2002

- Completion : July 15, 2004

01) THUNDER HORSE - BP

Work Scope - Commissioning - E&I loop test - Flushing - High pressure test - COW - Punch clearing

04) Semi Rig – 12 Rigs

- Client : British Petrol, UK

- Contract : August 19, 2002

- Completion : February 25, 2005

03) ATLANTIS- BP

Work Scope - Commissioning - E&I loop test - Flushing - High pressure test - Punch clearing (Drilling system)

- Client : Seadrill at HSHI

- Completion : September, 2015

- Flushing Unit On-board

- Equipment Operation

04) WEST MIRA - Seadrill

Work Scope

01 Commissioning

02 Flushing

03 Punch Clearing (AKMH & HSHI)

Drilling system

- Heave Compensator

- Riser Tensioner

- Drawworks

- Roughneck

- Pipe Racking

- DDM

- VPR Mud system

- C&K Manifold

- Mud Pump

- Mud Mixing System

- Bulk Control

- Centrifugal Pump

- Mud Solid Control

- Etc.

Subsea system

- BOP

- LMRP

- X mas Elevator

- Diverter

- MRT

- Etc. Deck system

- Dynamic Positioning System

- Power Management System

- Bilge System

- Fire Fighting System

- Foam Deluge System

- Sea Water Cooling

- Etc.

Punch Team

BOP CRANE OPERATION

Real Time Report

16

BOP Crane Roughneck Shale Shaker Riser G. Crane Driller’s Chair

05) Preservation & Maintenance(1)

KOC staffs take great pride in operating all drilling

equipment by themselves without vendors and the

fact that we can contribute to shipyard’s cost

reduction in this serious global recession. In fact, KOC

is conducting Rig maintenance at half price compare

to foreign vendors.

BOP Maintenance

Scissor Lift

17

Windlass

BOP Blue A BOP Check Pressure Check

HP Air Comp. X-mas Trolley

Test Ram Open

Knuckle B. C.

05) Preservation & Maintenance(2)

Riser F. Machine

DDM

- Client : KNOC(Korea National Oil Company)

- Contract : January 2007

- Completion : June 2008

# DOOSUNG-HO

01. Wing Deck Installation During Drilling

02. Dust Collector System Installation

03. Mud Dryer Installation with Conveyor

04. Under Deck Installation

05. Bilge System Modification

00. Deck Installation(640m2)

Dust Collector Installation & Bulk System Modification

06) Conversion

09) R&D / Training

Won 45M nation R&D project from

Korean Ministry of Land

- POSCO

- DSME

- Seoul National University

- KIGAM

- KIMM

01) Subsea Tree System

02) Offshore Unit Model - Korea Maritime and Ocean University

A. FPSO B. Drill Rig C. Drillship

Mud Mixing Hopper

LMRP Overhead C.

Mud Mixing Tank

C&K Manifold

Compensator

To help easy understanding without

on-boarding experience on offshore

unit

Trainees can have equipment

operation experience with Rig

Model

In Korea Maritime and Ocean University

Designed & Produced by KOC

PDPH Cylinder Cleaning & Exchange of West Mira /

Seadrill.

PDPH - Cylinder Exchange

06. Punch Clearing

Real Time Report

Clients are to be reported with the detailed pictures of before & after as soon as the work is done.

01

Clients are to be kept informed of the ordered works’ progress week by week as well.

02

1) Real Time Report

Cylinder

dismantling

from PDPH 01

02

03

05

04 Cylinder

cleaning

Cylinder

cleaning &

exchange

requested

Cylinder re-

installation

Cylinder cleaning

& exchange

completion

2) PDPH – Cylinder Exchange

3) VPR – Motor Exchange(A)

4) VPR – Motor Exchange(B)

06. Other Service

Accommodation

Logistics

Customs Clearance

Moving

Pick up & Car

Besides above direct project work, KOC offers various service for clients’ convenience and safety in local. Clients will be available to make good use of KOC’s diverse service and concentrate on their project only in comfortable surroundings like home. From entry to departure, KOC can help clients with great communication and qualified service such as Accommodation, Office, Logistics, Customs Clearance, Moving and Pick-up etc. while they’re residing in Korea.

KOC - Marine Park Bld. (#2010/2008/1507)

We, KOC, are here!!

We are located in Marine City in Haeundae as below where most popular place for foreigners in Korea and close from all shipyard, SHI, DSME and HHI. Clients are welcome at any time, and we look forward to offering our qualified service as soon as possible.

07. If YOU with KOC

01. Rich Experience

1) FPSO / RIG / Drillship / Sea Crane

2) Rig Conversion

3) Helium Leak & High Pressure Test

4) Ten(10) X-mas Tree Installation

5) Turret Installation & Mooring System

6) Offshore Drilling & Production

7) Maritime Resources Development

02. Actual Experience & Training

1) Subsea Engineer (17 years @ KNOC)

2) Barge Master (15 years @ KNOC)

3) Hydraulic Expert (3 years @ GE)

4) In-house Training with

- System Integration Diagram Dwg.

- Hyd. System Dwg.

- Offshore Rule & Regulation

03. Cost Saving to Customer

1) Equipment Operation during Sea Trial

2) Anchor Chain Installation & Mooring

3) Urgent Action in Emergency

Thank You

In offshore drilling, constant wave

movement incurs heaving