Specializes in Offshore Projects at DSME & SHI with the name of SAMJIN Offshore Co., Ltd. .
Established ‘KOC’ to specialize in offshore commissioning in line with SAMJIN Offshore Co., Ltd.
Awarded the best vendor of DSME
Performing commissioning / flushing / punch etc. of Drill Rig(Seadrill) & FPU(Total)
WITH OVER
15 YEARS
Experience &
Know-how
2016 Launching ROV & Drilling Business
02. Organization
Head Office Drilling & ROV
Department
Plant
Department
Research
Institute
Logistic
Warehouse
이미찬 고문 이재택 고문
– Toolpusher on the rig
– Manage the rig as Rig Manager
- Manage Rig Repair work in Shipyard
TS Yoon / OP. Manager
JT Lee / VP – Subsea Engineer
– BOP & X-mas Operation
– Commissioning Rig &
FPSO, FPU, FSU
– Rig Operation Manager
GH Jang / Advisor
– Drilling Superintendent
– Drilling Consultant
– Sr. Drilling Engineer
- Drilling Supervisor
- Drilling Manager/Adviser
Total Offshore
Service Provider
03. Business Strategy – 3P
Progressive
People-oriented
Professional
- Contract : 2015
- Operation: Korea East Sea
- Client : KNOC
b) Time & Depth Curve
a) Well Schematic
c) Well Plug & Abandon 04. References (1)
d) Offshore/Onshore E & P Operation - Korea Block 6, - Vietnam 11-2, Kazkhastan-Kensary, Ada,S.Karporsky - Aleria Bourarhet block (Onshore) - Central Java, Indonesia - Captain Fields, UK (Texaco Chevron) - West Kamchaka offshore, Russia - Vietnam 15-1 Block, Benin block-2, Korea - Ankor Field, Gulf Mexico, USA - Nigeria OPL 321/323, Yemen (Block 4 & 70) - Peru Block-Z, Iraq (Bazian, Sanga South) - Gas Hydrate Drilling in East sea, Korea
01) Drilling Engineering
Client : Rig Doo-sung
Experience on the rig 1) Rig Operation 2) Maintenance & Repair 3) Manpower Supply 4) Drilling Operation 5) Plug & Abandon Works 6) Mooring Works 7) Safety Management 8) Run & Recover BOP & X-mas tree
a) Rig Drilling Operation
b) Rig Maintenance Works
- Exxon, Alaska, USA - Gulf , Alaska, USA - Pedco, East sea, Korea - Marathon, Hadson, Ultramar, Marathon in Korea - CPC, Tawan - B.G.V, PCV, Candian, FINA, T.O.G.I in Vietnam - Conhe, China - CPVL, Unocal, KNOC in Vietnam - Shell, Petronas, SSB, PCSB in Malaysia - Total in Indonesia - Devon in China - VitSovPetro, VietGazProm in Vietnam - PTTIPI, MPRL in Myanmar - KNG, Gazflot, GGR in Russia
02) Rig Operation
c) Cementing Plugging Works on the rig f) Casing Cutting
d) Assembling the Casing Cutter on the rig g) Mooring System
03) Maritime Resources Development
01) Manganese Nodule Collection By
- Ministry of Oceans and Fisheries
- Korea Research Institute of Ships and Ocean Engineering
- Korea Research Institute of Ocean Science and Technology
- & KOC(Korea Offshore Company)
02) Economic Value - 100 Billion USD 03) Mn Nodule Collection
News Release on National Broadcast KBS/YTN
- Client : Halliburton, Canada
- Contract : August 10, 1999
- Completion : February 18, 1999
- Mono Hull : 291m(L) x 45m(W) x 28m(D)
- Operation : Canadian New Found Land
01) TERRA NOVA - Halliburton
Work Scope - Construction engineering - Fabrication - Installation - Test & Pre-commissioning - Piping system - Hydraulic system - E&I works - Internal turret
02) AGBAMI - Chevron
- Client : Chevron
- Contract : July, 2006
- Completion : August, 2007
Work Scope - Preservation - Manpower Supply – 250 - Test & Pre-commissioning - FMS & Helium Leak Test - Tubing Line Installation - High Pressure Test - Punch Killing - E&I works - Remaining Work during Tow - Flushing for Subsea System
05. References (2) 01) FPSO
- Client : TOTAL, France
- Contract : September 20, 2005
- Completion : March 07, 2006
03) DALIA - TOTAL
Work Scope 1) Preservation 2) Pre & Commissioning 3) Manpower Supply -
250
04) PAZFLOR - TOTAL
- Client : TOTAL, France
- Contract : October, 2009
- Completion : January, 2011
Work Scope - Commissioning - Flushing - E&I loop test - High pressure test - Helium leak test - COW - Punch clearing
- Client : Chevron, USA
- Contract : October 01, 2003
- Completion : February 28, 2005
01) BENGUELA BELIZE - Chevron
02) SABLE - ExxonMobil
- Client : ExxonMobil, USA
- Contract : January 2006
- Completion : April 2006
Work Scope - MC & commissioning - Instrument loop test - Fiber cable connection - N2 leak test - Punch clearing
Work Scope - Mechanical completion - Electrical test - Loop test at oil field - Package equipment test Sewage treatment sys. Sea water strainer sys. Emergency D/G
- Fuel gas package test
02) Platform
- Client : Reading & Bates
- Contract : July 02, 1999
- Completion : September 11, 1999
- Derrick : 66m(H) x 15m x 14m
- Conveyor : 19m(L) x 2.2m x 2.5m
01) R&B NAVIS Explorer No.1
Work Scope A. Fingerboard - Fabrication - Installation - Vertical pipe test B. Pipe Conveyor - Modification - Refurbishment
03) Drillship – 6 Ships
02) KIZOMBA- ExxonMobil
- Client : ExxonMobil, USA
- Contract : August 19, 2002
- Completion : December 23, 2004
Work Scope - MC & commissioning - E&I loop test - Helium leak test - Punch clearing - Operation & Load test (Subsea Winches)
- Client : British Petrol, UK
- Contract : August 19, 2002
- Completion : July 15, 2004
01) THUNDER HORSE - BP
Work Scope - Commissioning - E&I loop test - Flushing - High pressure test - COW - Punch clearing
04) Semi Rig – 12 Rigs
- Client : British Petrol, UK
- Contract : August 19, 2002
- Completion : February 25, 2005
03) ATLANTIS- BP
Work Scope - Commissioning - E&I loop test - Flushing - High pressure test - Punch clearing (Drilling system)
- Client : Seadrill at HSHI
- Completion : September, 2015
- Flushing Unit On-board
- Equipment Operation
04) WEST MIRA - Seadrill
Work Scope
01 Commissioning
02 Flushing
03 Punch Clearing (AKMH & HSHI)
Drilling system
- Heave Compensator
- Riser Tensioner
- Drawworks
- Roughneck
- Pipe Racking
- DDM
- VPR Mud system
- C&K Manifold
- Mud Pump
- Mud Mixing System
- Bulk Control
- Centrifugal Pump
- Mud Solid Control
- Etc.
Subsea system
- BOP
- LMRP
- X mas Elevator
- Diverter
- MRT
- Etc. Deck system
- Dynamic Positioning System
- Power Management System
- Bilge System
- Fire Fighting System
- Foam Deluge System
- Sea Water Cooling
- Etc.
Punch Team
BOP CRANE OPERATION
Real Time Report
16
BOP Crane Roughneck Shale Shaker Riser G. Crane Driller’s Chair
05) Preservation & Maintenance(1)
KOC staffs take great pride in operating all drilling
equipment by themselves without vendors and the
fact that we can contribute to shipyard’s cost
reduction in this serious global recession. In fact, KOC
is conducting Rig maintenance at half price compare
to foreign vendors.
BOP Maintenance
Scissor Lift
17
Windlass
BOP Blue A BOP Check Pressure Check
HP Air Comp. X-mas Trolley
Test Ram Open
Knuckle B. C.
05) Preservation & Maintenance(2)
Riser F. Machine
DDM
- Client : KNOC(Korea National Oil Company)
- Contract : January 2007
- Completion : June 2008
# DOOSUNG-HO
01. Wing Deck Installation During Drilling
02. Dust Collector System Installation
03. Mud Dryer Installation with Conveyor
04. Under Deck Installation
05. Bilge System Modification
00. Deck Installation(640m2)
Dust Collector Installation & Bulk System Modification
06) Conversion
# MOLIKPAQ Project
1. Drilling Rig & Space Barge See-mating
2. HVAC Repair
3. Production System Conversion
- Client : CHONHAIJI
- Contract : January, 2011
- Completion : May, 2011
Work Scope
1) Pre-erection
2) Accuracy
3) Painting
4) Wire Rigging
07) Sea Mating 08) Sea Crane
09) R&D / Training
Won 45M nation R&D project from
Korean Ministry of Land
- POSCO
- DSME
- Seoul National University
- KIGAM
- KIMM
01) Subsea Tree System
02) Offshore Unit Model - Korea Maritime and Ocean University
A. FPSO B. Drill Rig C. Drillship
Mud Mixing Hopper
LMRP Overhead C.
Mud Mixing Tank
C&K Manifold
Compensator
To help easy understanding without
on-boarding experience on offshore
unit
Trainees can have equipment
operation experience with Rig
Model
In Korea Maritime and Ocean University
Designed & Produced by KOC
PDPH Cylinder Cleaning & Exchange of West Mira /
Seadrill.
PDPH - Cylinder Exchange
06. Punch Clearing
Real Time Report
Clients are to be reported with the detailed pictures of before & after as soon as the work is done.
01
Clients are to be kept informed of the ordered works’ progress week by week as well.
02
1) Real Time Report
Cylinder
dismantling
from PDPH 01
02
03
05
04 Cylinder
cleaning
Cylinder
cleaning &
exchange
requested
Cylinder re-
installation
Cylinder cleaning
& exchange
completion
2) PDPH – Cylinder Exchange
06. Other Service
Accommodation
Logistics
Customs Clearance
Moving
Pick up & Car
Besides above direct project work, KOC offers various service for clients’ convenience and safety in local. Clients will be available to make good use of KOC’s diverse service and concentrate on their project only in comfortable surroundings like home. From entry to departure, KOC can help clients with great communication and qualified service such as Accommodation, Office, Logistics, Customs Clearance, Moving and Pick-up etc. while they’re residing in Korea.
KOC - Marine Park Bld. (#2010/2008/1507)
We, KOC, are here!!
We are located in Marine City in Haeundae as below where most popular place for foreigners in Korea and close from all shipyard, SHI, DSME and HHI. Clients are welcome at any time, and we look forward to offering our qualified service as soon as possible.
07. If YOU with KOC
01. Rich Experience
1) FPSO / RIG / Drillship / Sea Crane
2) Rig Conversion
3) Helium Leak & High Pressure Test
4) Ten(10) X-mas Tree Installation
5) Turret Installation & Mooring System
6) Offshore Drilling & Production
7) Maritime Resources Development
02. Actual Experience & Training
1) Subsea Engineer (17 years @ KNOC)
2) Barge Master (15 years @ KNOC)
3) Hydraulic Expert (3 years @ GE)
4) In-house Training with
- System Integration Diagram Dwg.
- Hyd. System Dwg.
- Offshore Rule & Regulation
03. Cost Saving to Customer
1) Equipment Operation during Sea Trial
2) Anchor Chain Installation & Mooring
3) Urgent Action in Emergency