NAME:MOHAMMAD FAZIL MOUINUDDIN. Date of Birth.. 04/03/1987. Qualification : B.E., Electronics and communication Engineering. Year of Passing : April 2010. Address : JEDDAH Nationality : INDIAN Religion : ISLAM Email ID : [email protected] Contact NO : 00966-535434041 DESIGNATION: TESTING & COMMISSIONING LEAD ENGINEER. WORK EXPERIENCE: YEAR 2008 – worked as junior testing engineer for BHEL india. YEAR 2010 – to date IN QM (QUALITY MAKERS - JEDDAH) working as Testing and Commissioning lead engineer for the Sub Station projects of National Grid SA and SEC (West). Tested and commissioned all types of schemes staring from 13.8 KV /110KV /380KV Switchgears their Protection and Functional relays along with Supervision and coordination of all other related activities. Worked with almost all types off protection relays with different contractors that the field could offer. Have acquired approval from Saudi electrical company for testing and commissioning in the kingdom. Worked with installation teams in 13.8kv/110kv/380kv switchgears. TESTING ACTIVITIES: 13.8/110/380 KV Switchgear and protection panels scheme testing. 13.8/110 KV Breaker/Isolators timing testing. All types of CT/VT testing for 13.8/110/380 KV. Secondary loop testing for all types of CT/VT for 13.8/110/380 KV. Contact resistance for 13.8/110/380 KV Switchgear.

Upload: fazil-mouinuddin

Post on 17-Jan-2017

253 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: FAZIL PASHA CV 3.6.2015

NAME:MOHAMMAD FAZIL MOUINUDDIN.Date of Birth.. 04/03/1987.

Qualification : B.E., Electronics and communication Engineering.Year of Passing : April 2010.Address : JEDDAHNationality : INDIANReligion : ISLAM

Email ID : [email protected] NO : 00966-535434041

DESIGNATION: TESTING & COMMISSIONING LEAD ENGINEER.

WORK EXPERIENCE:

YEAR 2008 – worked as junior testing engineer for BHEL india. YEAR 2010 – to date IN QM (QUALITY MAKERS - JEDDAH) working as Testing and Commissioning

lead engineer for the Sub Station projects of National Grid SA and SEC (West). Tested and commissioned all types of schemes staring from 13.8 KV /110KV /380KV Switchgears

their Protection and Functional relays along with Supervision and coordination of all other related activities.

Worked with almost all types off protection relays with different contractors that the field could offer.

Have acquired approval from Saudi electrical company for testing and commissioning in the kingdom.

Worked with installation teams in 13.8kv/110kv/380kv switchgears.

TESTING ACTIVITIES:

13.8/110/380 KV Switchgear and protection panels scheme testing. 13.8/110 KV Breaker/Isolators timing testing. All types of CT/VT testing for 13.8/110/380 KV. Secondary loop testing for all types of CT/VT for 13.8/110/380 KV. Contact resistance for 13.8/110/380 KV Switchgear. High voltage bus bar and cables testing 13.8 KV. All types of device test Transducer, digital/analog meters, AMR meters. Tested all types of AC/DC MCCB. Commissioned all 13.8KV/110 KV switchgear and their protection relays. Tested all the functions for ABTS/AVR/ACCS/LOAD SHEADING relays. Tested all types of over current/earth fault relays. Configured and tested all types of BCU for 13.8 KV/110 KV Switchgears. Tested transformer diff. relays (ABB/SIEMENS/SEL/AREVA).

Page 2: FAZIL PASHA CV 3.6.2015

Tested line distance/diff. relays (ABB/SIEMENS/SEL/AREVA). Tested transformer stability. Tested line stability with and without load. End to end tests. Final close loop tests with WRCC. Final trip tests.

TYPES OF RELAYS TESTED :

REF/REC/RED/REB (ABB) MICOM SERIES (AREVA/ALSTOM) KCGG (AREVA/ALSTOM) 7SD,7SJ,7SA SERIES (SIEMENS) SEL SERIES

RELAY SOFTWARES :

PCM 600 (ABB) DIGSI (SIEMENS) STUDIO (AREVA) SEL COMPASS (SEL)

PROJECT EXPERIENCE:

1

BATHAQHURAISH 110/13.8KV S/S, MAKKAHContractor: ABBRank: Testing and Commissioning EngineerResponsibilities:

• Scheme check for 110KV Bus Bar Protection Panels• Scheme check for 110KV Line feeder Protection Panels.• Scheme check for 110/13.8KV Transformer Protection Panels.• Scheme check of 13.8kv switchgear• Scheme check of 110 KV GIS.• Auxiliary relays, MCB’s , METERS, testing.• Testing of over current, AVR, ABTS, thermal overload relays testing.• Transformer parallel operation test• 13.8KV Bus Bar stability Test.• 110KV Bus bar stability Test.• 110/13.8 KV Transformer Stability Test.• 110KV Line Differential Stability Test• Trip test for Transformer, Line and 110KV Bus Bar.• Internal and external close loop test• Managed and cleared punch list points.• U/V,U/F function and scheme test.

2TAIF 2, TAIF 110/13.8KV S/S,

Page 3: FAZIL PASHA CV 3.6.2015

Contractor: ABBRank: Testing and Commissioning EngineerResponsibilities:

• Scheme check for 110KV Bus Bar Protection Panels• Scheme check for 110KV Line feeder Protection Panels.• Scheme check for 110/13.8KV Transformer Protection Panels.• Scheme check of 13.8kv switch gear• Scheme check of 110 KV GIS.• Testing of over current, AVR, ABTS,ACCS thermal overload relays

testing• Transformer parallel operation test.• 13.8KV Bus Bar stability Test.• 110KV Bus bar stability Test.• 110/13.8 KV Transformer Stability Test.• Testing and modification of schemes required at remote ends.• 110KV Line Differential Stability Test• 110KV Line END TO END Test• Trip test for Transformer, Line and 110KV Bus Bar.• Internal and external close loop test• Managed and cleared punch list points.• Energaization of the substation.

3

SALAMA 110/13.8KV S/S,JEDDAH.Contractor: ABBRank: Testing and Commissioning EngineerResponsibilities:

• High voltage test 13.8kv bas bar and cables.• Transformer testing.• Scheme check of Power transformer• Scheme check of 110kv line feeder protection panels.• Scheme check of transformer protection panels• Testing of over current relays REF615

4

110KV LINE PROTECTION REPLACEMENT,MAKKAH.Contractor: SIEMENS.

Prepared and modified the existing schemes as per the requirement and tested line distance and differential relays with final settings for the following sub stations.

• MESFILAH S/S• HARAM -2 S/S• HARAM -3 S/S• AJYAD S/S

5

KEC 1 110/13.8KV S/S, MADINA .

Page 4: FAZIL PASHA CV 3.6.2015

Contractor: AREVARank: Team lead Testing and Commissioning EngineerResponsibilities:

• Organizing equipment and testing activities at site.• Preparing schedules for testing and commissioning activities.• Involved in following relays testing and commissioning activities.• Testing of over current, AVR, ABTS, ACCS thermal overload relays testing.• Transformer parallel operation test.• 13.8KV Bus Bar stability Test.• 110KV Bus bar stability Test.• 110/13.8 KV Transformer Stability Test.• 110KV Line Differential Stability Test.• 110KV Line END TO END Test.• Trip test for Transformer, Line and 110KV Bus Bar.• Internal and external close loop test.• 13.8kv scheme test.• Final setting overcurrent relays.• High voltage test for cables 13.8kv

6

CAPACITOR BANKS PROJECT(20 SUBSTATIONS ),WESTREN REGION, ABBContractor: ABBRank: Team lead Testing and Commissioning EngineerResponsibilities & Activities:

.• Designing Interlocks of the new system with the existing system.• Testing of all the Main protection relays e.g. C70, SPAJ.MICOM & REU.• Testing of all the Auxiliary relays.• Testing for 13.8 KV SWGR Circuit Breakers.• VT testing• CT testing• HV test 13.8 KV Bus bar.• HV test for 13.KV cables.• 13.8KV CT Secondary Injection.• 13.8KV CT Primary Injection.• Scheme check for 13.8 KV Capacitor protection panels.• Scheme check for 13.8 KV SWGR.• Scheme check for Annunciation panel.• Interlock Test• VT Loop.• ACCS rely test.• Internal & External Close Loop.

Page 5: FAZIL PASHA CV 3.6.2015

7

TAIF 380/110 KV S/S,TAIF.CLIENT: ABBRank: Testing and Commissioning Engineer

Involved in following testing and commissioning activities along with the coordinationwith different departments.

• 110kv Line feeder stability• CT loop• VT loop• interlocks with new and existing feeders• Final settings for both set ½ line prot.relays.• 110kv Line END TO END test• 110kv protection Trip test.

8

BANIMALIK 2 110/13.8KV S/S.Contractor: ABBRank: Team Lead Testing and Commissioning EngineerResponsibilities & Activities:

• Making 3-Week schedules for testing & Commissioning Activities.• Managing all the site expanses &co-ordination with different departments of

NCC for witnessing the scheduled activities & subcontractors.• Supervising all activities for 13.8KV SWGR.• HV test 13.8KV Bus bar.• HV test for 13.8kv cables.• All Transformer tests• Testing all prot .relays with final settings.• 110kv bas bar protection scheme test• U/V , U/F ,ACCS ,ABTS function test• Tested SEL Relays for capacitor protection..• Line protection Distance and diff relay testing RED670• Transformer diff relay testing REC670• Close loop testing with WRCC.• Conducted all the required tests for the remote ends.• Energaization of the substation.

Page 6: FAZIL PASHA CV 3.6.2015

9

AL LEATH 380/110/13.8KV S/S : Contractor: SSEM.Rank: Team Lead Testing and Commissioning EngineerResponsibilities & Activities:

• Tested all protection relays for 380kv. Power transformers.• Tested and made final settings for all protection relays 380kv power transformer.• Tested over current, Earth fault relays for reactors.• Final settings for 380kv line feeders with auto recloser.• Final settings for over head line 110kv line feeders with auto recloser.• Line stability for 110kv feeders.• End to end for both 380kv and 110kv feeders.• Energaization of the substation.• On load line stability for 380kv fedders.

10

SHOAIBA POWER PLANT 380/110/13.8KV S/S : Contractor: SSEM.Rank: Team Lead Testing and Commissioning EngineerResponsibilities & Activities:

• Final settings for 380kv line feeders with auto recloser.• Final settings for over head line 110kv line feeders with auto recloser.• Line stability for 110kv feeders.• End to end for both 380kv and 110kv feeders.• Energaization of the substation.• On load line stability for 380kv fedders.

11

KAYA JEDDAH 380/110/13.8KV S/S : Contractor: SSEM.Rank: Testing and Commissioning EngineerResponsibilities & Activities:

• Final settings for 380kv UG line feeders.• Final settings for UG 110kv line feeders.• Line stability for 110kv feeders.• End to end for both 380kv and 110kv feeders.• Energaization of the substation.

Page 7: FAZIL PASHA CV 3.6.2015

12

MAKKAH NORTH POWER PLANT 380/110/13.8KV S/S : Contractor: SSEM.Rank: Testing and Commissioning EngineerResponsibilities & Activities:

.• Final settings for UG 110kv line feeders.• Line stability for UG 110kv feeders.• End to end for both UG 110kv feeders.• Energaization of the substation with final close loop.• line stability for 380kv fedders.

13

SERVICES MAKKAH 110/13.8KV S/S : Contractor: SSEM.Rank: Testing and Commissioning EngineerResponsibilities & Activities:

• Final settings for UG 110kv line feeders.• Line stability for 110kv feeders.• End to end for 110kv feeders.• Energaization of the substation withfinal close loop.

TEST EQUIPMENT OPERATED :

• VIOLA• Severker(750,760,780)• Freja 300c• Breaker Timer• CT Analyzer• ODEN• CPC-100• Mat lab• OMICRON CMC• PLC programming (ladder programming)• MS office(WORD,EXCEL,POWER POINT)

Presently working with ABB TEAM AT king abdullah economic city ON 110/15 KV SS

Mohamed Fazil Mouinuddin…