fdot district 2 express lanes projects -...

20
Stephen Browning, P.E. District 2 Project Development Engineer 15 TH INTERNATIONAL CONFERENCE ON MANAGED LANES FDOT DISTRICT 2 EXPRESS LANES PROJECTS

Upload: lekhuong

Post on 06-Mar-2018

221 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: FDOT DISTRICT 2 EXPRESS LANES PROJECTS - …onlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S2-Browning.pdf · FDOT DISTRICT 2 EXPRESS LANES PROJECTS. AGENDA • FDOT District 2

Stephen Browning, P.E.District 2 Project Development Engineer

15TH INTERNATIONAL CONFERENCE ON MANAGED LANES

FDOT DISTRICT 2 EXPRESS LANES PROJECTS

Page 2: FDOT DISTRICT 2 EXPRESS LANES PROJECTS - …onlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S2-Browning.pdf · FDOT DISTRICT 2 EXPRESS LANES PROJECTS. AGENDA • FDOT District 2

AGENDA• FDOT District 2 Express Lane Projects

• Why Express Lanes

• Challenges– Public Involvement– Analysis– Design– Future Challenges

Page 3: FDOT DISTRICT 2 EXPRESS LANES PROJECTS - …onlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S2-Browning.pdf · FDOT DISTRICT 2 EXPRESS LANES PROJECTS. AGENDA • FDOT District 2

FDOT District 2ExpressLanesinD2

Page 4: FDOT DISTRICT 2 EXPRESS LANES PROJECTS - …onlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S2-Browning.pdf · FDOT DISTRICT 2 EXPRESS LANES PROJECTS. AGENDA • FDOT District 2

FDOT District 2ExpressLanesinD2

Page 5: FDOT DISTRICT 2 EXPRESS LANES PROJECTS - …onlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S2-Browning.pdf · FDOT DISTRICT 2 EXPRESS LANES PROJECTS. AGENDA • FDOT District 2

FDOT District 2ExpressLanesinD2

Page 6: FDOT DISTRICT 2 EXPRESS LANES PROJECTS - …onlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S2-Browning.pdf · FDOT DISTRICT 2 EXPRESS LANES PROJECTS. AGENDA • FDOT District 2

ExpressLanesinD2

Under Construction• I‐295 from SR 13 to I‐95

Start Construction (Summer 2016)• I‐295 from SR 9B to SR 

202

I‐295 West Phase I• Cost ‐ $89 Million• Length ‐ 4.2 Miles

I‐295 East Phase I• Cost ‐ $140 Million• Length – 5.0 Miles

Page 7: FDOT DISTRICT 2 EXPRESS LANES PROJECTS - …onlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S2-Browning.pdf · FDOT DISTRICT 2 EXPRESS LANES PROJECTS. AGENDA • FDOT District 2

ExpressLanesinD2

Project Development / NEPA Study• I‐95 from International 

Golf Parkway to Atlantic Blvd

• I‐10 from I‐295 to I‐95

• I‐295 from SR 202 to Southside Connector 

Page 8: FDOT DISTRICT 2 EXPRESS LANES PROJECTS - …onlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S2-Browning.pdf · FDOT DISTRICT 2 EXPRESS LANES PROJECTS. AGENDA • FDOT District 2

ExpressLanesinD2

Planning Feasibility Study• I‐295 Western Beltway 

Blvd

• I‐10 from CR 125 to     I‐295

Page 9: FDOT DISTRICT 2 EXPRESS LANES PROJECTS - …onlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S2-Browning.pdf · FDOT DISTRICT 2 EXPRESS LANES PROJECTS. AGENDA • FDOT District 2

WhyExpressLanes?• Last Capacity Project

Page 10: FDOT DISTRICT 2 EXPRESS LANES PROJECTS - …onlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S2-Browning.pdf · FDOT DISTRICT 2 EXPRESS LANES PROJECTS. AGENDA • FDOT District 2

WhyExpressLanes?

 ‐

 200,000

 400,000

 600,000

 800,000

 1,000,000

 1,200,000

1980 1990 2000 2010 2020 2030 2040

POPU

LATION

YEAR

Population Growth ‐ 1980 to 2040 Duval St. Johns

571,000

51,000

1,072,000

377,000

864,000

190,000

Source: 1980, 1990, 2000, 2010 Census, 2040 Long Range Transportation Plan

Page 11: FDOT DISTRICT 2 EXPRESS LANES PROJECTS - …onlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S2-Browning.pdf · FDOT DISTRICT 2 EXPRESS LANES PROJECTS. AGENDA • FDOT District 2

WhyExpressLanes?

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

1980 1990 2000 2010

% IN

CREA

SE

YEAR

National Highway Statistic, 1980‐2010Vehicle Miles Traveled Lane Miles Added

Source:  U.S. Department of Transportation, Federal Highway Administration, Highway Statistics

98 % Increase

8 % Increase

Page 12: FDOT DISTRICT 2 EXPRESS LANES PROJECTS - …onlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S2-Browning.pdf · FDOT DISTRICT 2 EXPRESS LANES PROJECTS. AGENDA • FDOT District 2

WhyExpressLanes?

Secretary's Express Lane Vision:In an effort to better manage congestion and provide choices to drivers, Express Lanes must be considered for additional capacity on urban, limited-access facilities on the State Highway System.

Page 13: FDOT DISTRICT 2 EXPRESS LANES PROJECTS - …onlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S2-Browning.pdf · FDOT DISTRICT 2 EXPRESS LANES PROJECTS. AGENDA • FDOT District 2

WhyExpressLanes?• Express Lanes in Miami

– Well Received• 71 % ‐ Satisfied or very satisfied with I‐95 Express Lanes1

– Before Express Lanes (Peak Period Speed, 2008)2

• Northbound ‐ 20 MPH, Southbound ‐ 15 MPH– After Express Lanes (Peak Period Speed, 2014)2

• Northbound – 63 MPH in Express Lanes / 55 MPH in General Use Lanes

• Southbound ‐ 64 MPH in Express Lanes / 56 MPH in General Use Lanes

1  Source: Commuter Survey – October 20102  Source: 95 Express Annual Report, 2014‐2015

Page 14: FDOT DISTRICT 2 EXPRESS LANES PROJECTS - …onlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S2-Browning.pdf · FDOT DISTRICT 2 EXPRESS LANES PROJECTS. AGENDA • FDOT District 2

Challenges• 1950’s – 1988 – Toll

Booths

• 1988 – Tolls eliminated– Sales Tax increase on

taxable sales

• Since No Tolls in District 2

The booths took the “Express” out of the “Expressway”

Page 15: FDOT DISTRICT 2 EXPRESS LANES PROJECTS - …onlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S2-Browning.pdf · FDOT DISTRICT 2 EXPRESS LANES PROJECTS. AGENDA • FDOT District 2

Challenges• Opposition to Tolls

– Tolls– Congestion associated with Toll Booths

• SunPass

Page 16: FDOT DISTRICT 2 EXPRESS LANES PROJECTS - …onlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S2-Browning.pdf · FDOT DISTRICT 2 EXPRESS LANES PROJECTS. AGENDA • FDOT District 2

Challenges• Planning Process

– Master Plans– Long Range Transportation Plans

No Express Lanes

Page 17: FDOT DISTRICT 2 EXPRESS LANES PROJECTS - …onlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S2-Browning.pdf · FDOT DISTRICT 2 EXPRESS LANES PROJECTS. AGENDA • FDOT District 2

Challenges• Analysis

– Express Lanes – oversaturated traffic conditions– Static vs. Dynamic Assignment– Time Period– Unmet Demand– Comparison of Alternatives – Microsimulation Calibration– Minimum Toll Rate

Page 18: FDOT DISTRICT 2 EXPRESS LANES PROJECTS - …onlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S2-Browning.pdf · FDOT DISTRICT 2 EXPRESS LANES PROJECTS. AGENDA • FDOT District 2

Challenges• Design

– One vs Two Express Lanes– Shoulder Widths (6’, 8’, 10’ or 12’)– Delineators or Barrier Walls– Delineator Separation/Sight Distance– Toll Gantry Locations– Weave vs Direct Connects– Project Phasing

Page 19: FDOT DISTRICT 2 EXPRESS LANES PROJECTS - …onlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S2-Browning.pdf · FDOT DISTRICT 2 EXPRESS LANES PROJECTS. AGENDA • FDOT District 2

FutureChallenges• Continuous Public Involvement

– Enforcement & Education

• Operation and Maintenance

• TMC Staffing

Page 20: FDOT DISTRICT 2 EXPRESS LANES PROJECTS - …onlinepubs.trb.org/onlinepubs/Conferences/2016/ML/S2-Browning.pdf · FDOT DISTRICT 2 EXPRESS LANES PROJECTS. AGENDA • FDOT District 2

www.NorthFloridaExpress.com

Thank you, Stephen Browning, P.E., FDOT District 2 Project Development Engineer

[email protected]