  • 7/30/2019 Final Bop Td

    1/79

    WATER TREATMENT PLANT

    PRETREATMENT PLANT

    Cascade Aerator

    No. of Streams oneCapacity (Average) flow M3 /hr/stream 1978

    Capacity (Max.) flow M3 /hr/stream 1978

    Design min. surface flow rate 0.03m2/m

    3/hr

    Size in MM 9450mm (Dia.) x 2250 mm

    MOC RCC

    Stilling Chamber

    No. of Streams one

    Capacity (Average) flow M3 /hr/stream 1978

    Capacity (Max.) flow M3 /hr/stream 1978

    Size in MM3900mm (L) x 4100 mm (W) x

    6100 mm (H)

    MOC RCC

    Parshall flume

    No. of Streams two

    Capacity (Average) flow M3 /hr/stream 1920

    Capacity (Max.) flow M3 /hr/stream 1920

    MOC RCC

    Distribution chamber

    Qty two

    Capacity 8.242 m3

    Volume1700mm (L) x 2000 mm (W) x

    6100 mm (H)

    Clarifier- cum Flocculator

    Holding capacity of reactor clarifier 4000 m3

    Flow rate 1920 m3/hr

    Rated condition of suspended solid of treated water 15 ppm

    Suspended solid at overload condition 20 ppm

    Output capacity at rated condition 1600 m3/hr

    Design min. surface flow rate 2.5 m2/m3/hr

    Detention hood diameter 12200mm

    Draft tube diameter 3200mm

    Total no. of lounder 12

  • 7/30/2019 Final Bop Td

    2/79

    Scraper drive

    Make Nord pvt. Ltd

    warm gear reduction 300;1

    Chained sprocket 1.76:1

    Drive stage 87;1

    Motor

    Make Cromptin greavesPower kw/hp 0 .37 kw

    Voltage 415 v

    speed 1440 rpm

    Impeller drive

    Make Nord pvt. Ltd

    warm gear reduction 5;1

    Chained sprocket 7.69;1

    Drive stage 87;1

    Motor

    Make Cromptin greaves

    Power kw/hp 7.5 kw

    Voltage 415 v

    speed 1440 rpm

    Clarified storage tank

    Qty two

    Capacity 7000 m3 each

    Raw water treatment dose

    chlorine 5 ppmalum 60 ppm

    lime 20ppm

    poly electrolyte 5 ppm

    Sludge pit

    Qty one (twin compartment)

    Capacity 100*2 m3

    Volume width-7mt, length-10mt, height-1.5mt

    Sludge transfer pump

    Make Sam terbo industries pvt. Ltd.

    Qty two

    Flow 110 m3/hr

    Head 40mwc

    Motor

    Make Cromptin greaves

    Power kw/hp 30kw

    Voltage 415 v

  • 7/30/2019 Final Bop Td

    3/79

    speed 1470 rpm

    Current 51 amp

    Chemical used in pre treatment

    Chemical dosing tank Qty Storage capcity

    1-alum 3 9.52m3

    2-lime slaking 2 3.80m3

    3-lime 2 6.25m3

    4-alum 2 1.58m3

    Various chemical dosing pumps

    Chemical dosing pump Make Qty

    1-alum dosing pump V.K. pumps 3

    2-lime transfer pump Mather platt 2

    3-lime dosing pump Roto flow 2

    4-Poly dosing pump V.K. pumps 3

    Water treatment pump house

    Pump Name Qty Flow m3/hr

    1-Ct Make Up 3 850

    2-Dm Plant Feed Pump 3 135

    3-Service Water 3 125

    4-Pws Colony Pump 2 50

    5- Pws Plant Pump 2 6

    6-Misleneous Pump 2 315

    Overhead Clarifired Water Tank Qty-1 Capacity- 80 M3

    Post TreatmentDual Media FilterQty- 2

    Size Dia- 4mt , Length- 2.2 Mt

    Surface Flow Rate 100 M2/M3/Hr

    Suspended Solid At Inlet 20 Ppm

    Suspended Solid At Outlet

  • 7/30/2019 Final Bop Td

    4/79

    Qty 2

    Make Kulkarni

    Capcity 605 M3/Hr

    Type Twin Lobe

    Design Pressure 4.5 Kg/Cm2

    Activated Carbon Filter :-

    Qty 2Size Dia-3.2mt , Length- 2.5 Mt

    Surface Flow Rate 100 M2/M3/Hr

    Filter Media Activated Carbon

    Medium Anthracite

    Bulk Density >400 Kg/Mt3

    Carbon Content >90%

    Moisture Content 5%Max

    Ash Content 8%Max

    Depth Min 1200 Mm Activated Carbon

    Weak Acid ExchangerQty 2

    Size Dia- 2mt , Length- 2mt

    Flow- 100m3/Hr

    Surface Flow Rate 90 M2/M3/Hr

    WAC Resin Cross Linked Polyacrylic Acid Contained Carboxylic

    Depth Min 150 Mm At Top Of Effective Bed

    Re Generation By HCL

    Mode Co Current

    Time Between Consecutive Regeneration 18 Hr

    Vol. Of Treat Water 1620 M3/HrEffective Bed Depth Min 1000 Mm

    Strong Acid Exchanger

    Qty 2

    Size Dia- 2mt , Length- 2.3mt

    Flow 100m3/Hr

    Surface Flow Rate 90 M2/M3/Hr

    SAC Resin Cross Linked Polystyrene Matrix Sulfonic Acid Grou

    Depth Min 150 Mm At Top Of Effective Bed

    Re Generation By 30-33% W/V Of HCL

    Mode Co CurrentTime Between Consecutive Regeneration 18 Hr

    Vol. Of Treated Water Between Consecutive Regener 1620 M3/Hr

    Effective Bed Depth Min 1000 Mm

    Degasser Tower

    Qty 2

    Size Dia- 1.6mt , Length- 3.6mt

    Flow 100m3/Hr

  • 7/30/2019 Final Bop Td

    5/79

    Surface Flow Rate 90 M2/M3/Hr

    Degasser Blower Qty 4(2w-2s)

    Capacity 2865 M3/Hr

    Head 150 Mmwc

    Co2 Content

  • 7/30/2019 Final Bop Td

    6/79

    Product area 100 M2

    Operating Temp. 45 0C

    Max. feed pr. 1.5-2 KG/CM2

    Max. back pr. 2-2.5 KG/CM2

    Flow 100m3/Hr

    Type dual basket type strainer

    Size 100 micronUltra filter tank

    Qty 1

    Capacity 200 M3

    DM storage tank

    Qty 2

    Capacity 1000 M3

    Plant blowers

    Qty 6 (2-for mixed bed, 2-for pws colony, 2- for pws pla

    Make Kulkarni

    Air Flow 255m3/HrPressure 450mbar (vaccum)

    Power 7.5 kw (CG)

    DM plant Pumps

    Make

    1-DM transfer pump 3 WPIL

    2-Degasswer water transfer pump 4 Mather-platt

    3-Ultrafilter Feed pump 2 Mather-platt4-Dm regeneration pump 2 Mather-platt

    5-Ultrafilter backwash pump 2 Mather-platt

    Regeneration system equipments

    Acid storage tank (HCL)

    Qty 2

    Capacity 43.3 M3

    Size Dia- 3.2mt , Length- 5.5mt

    Alkli storage tank (NAOH)Qty 2

    Capacity 26 M3

    Size Dia- 3.2mt , Length-5.5mt

    Acid measuring tank A (HCL)

    Qty 1

    Capacity 350 lt

    Size Dia- 0.9mt , Length- 1.0mt

    Pump Name Qty

  • 7/30/2019 Final Bop Td

    7/79

    Acid measuring tank B & C (HCL)

    Qty 2

    Capacity 2100 lt

    Size Dia- 1.5mt , Length- 1.6mt

    Acid measuring tank D (HCL)

    Qty 1

    Capacity 1000 ltSize Dia- 1.5mt , Length- 1.0mt

    Alkali measuring tank A (NAOH)

    Qty 1

    Capacity 350 lt

    Size Dia- 0.9mt , Length- 1.0mt

    Acid measuring tank B & C (NAOH)

    Qty 2

    Capacity 350 lt

    Size Dia- 0.9mt , Length- 1.0mt

    Acid measuring tank D (NAOH)Qty 1

    Capacity 1000 lt

    Size Dia- 1.5mt , Length- 1.0mt

    Dilution hot water tank

    Qty 1

    Capacity 9.2 M3

    Size- Dia- 2.2mt , Length- 2.5mt

    Neutralization pit

    Qty 1

    Capacity 275M3

    Volume width-10mt, length-12mt, height-2.5mt

    Brine preparation tank

    Qty 1

    Capacity 10500 lt

    Size- Dia- 3.0mt , Length- 2.0mt

    Ultra filtration chemically enhanced backwash tank

    Solution type Hypo

    Qty 1

    Capacity 1000 lt

    Ultra filtration chemically enhanced backwash dose tank

    Solution type NAOH solution

    Qty 1

    Capacity 500 lt

    Clean in place tank

    Qty 1

    Capacity 10M3

    Clean in place cartridge filter

  • 7/30/2019 Final Bop Td

    8/79

    Type spiral wound

    Qty 1

    Flow 110 m3/Hr

    Make

    1-acid unloading pump 2 Mather-platt

    2-neturalization effulent disposal pump 2 Mather-platt

    3-chemical cleaning pump 1 Mather-platt

    4-clean in place pump 2 Mather-platt

    RAW WATER CHLORINATION SYSTEM

    Chlorine ton container

    QTY 8(2W+6SB)

    Capacity 900kgs each

    Design pr. 19.9kg/cm2

    Chlorine Gas Strainer

    QTY 2(1W+1SB)

    Chlorinator

    QTY 2(1W+1SB)

    Capacity 10 Kg/cm2

    TypeVaccum solution

    Chlorinator water supply booster pump

    Qty2(1w+1sb)

    TypeHorizontal Booster

    Chlorinated Water Diffuser

    Device for injection of chlorinated water

    LEAKED CHLORINE ABSORPTION SYSTEM

    Exhaust Fan

    Type Bifurcate Type

    BLOWER

    Qty 2(1w+1sb)

    Make Data air system

    Chlorine Absorption Tower

    Pump Name Qty

  • 7/30/2019 Final Bop Td

    9/79

    Qty1

    Caustic solution recirculation pumps

    Qty2(1w+1sb)

    TypeHorizontal Centrifugal

    Make AnticoHead 10 M

    Discharge 15 m3/hr

    Motor KW 2.2

  • 7/30/2019 Final Bop Td

    10/79

  • 7/30/2019 Final Bop Td

    11/79

  • 7/30/2019 Final Bop Td

    12/79

    Head Type Flow Motor KW

    20mwc +ve displacement type 1544 lpm ABB 0.75

    20 mwc Centrifugal type 20m3/hr ABB 5.5

    20 mcw Screw type 950 lph Bharat 1.1

    20 mcw +ve displacement hydraulic 246 lph ABB 0.37

    Head

    MWC

    Motor Kw Motor Rpm Voltage Current

    25 90 1480 415 146

    60 37 1475 415 68

    110 30 1470 415 51

    110 30 1470 415 51

    57 5.5 1455 415 11.44

    77.73 110 1485 415 176

    Location- Top Of Ptp Chemical Chemical House

  • 7/30/2019 Final Bop Td

    13/79

    cid

    p

  • 7/30/2019 Final Bop Td

    14/79

    roup Attached To

    in Resistant To Organic Fouling

  • 7/30/2019 Final Bop Td

    15/79

    t)

    Flow Head MAKE Motor

    Current

    M3/Hr Mwc amp

    27 63 9.3 CG 17

    120 52 37 ABB 65.5

    110 35 18.5 ABB 3420 30 5.5 ABB 10.8

    220 30 30 ABB 54

    Motor Kw

  • 7/30/2019 Final Bop Td

    16/79

  • 7/30/2019 Final Bop Td

    17/79

    Flow Head Make Motor

    Voltage

    M3/Hr Mwc v

    15 10 3.7 ABB 415

    50 40 11 CG 415

    480 lph 50 415

    110 30 15 ABB 415

    Motor Kw

  • 7/30/2019 Final Bop Td

    18/79

  • 7/30/2019 Final Bop Td

    19/79

  • 7/30/2019 Final Bop Td

    20/79

  • 7/30/2019 Final Bop Td

    21/79

    speed amp. Voltage

    1425 1.66 415

    1460 10.8 415

    1430 2.35 415

    1390 0.5 415

    Pump Type Pump

    make

    motor make

    Vertical Centrifugal PumpWPIL Crompton geaves

    Vertical Centrifugal PumpWPIL Crompton geaves

    Vertical Centrifugal Pump WPIL Crompton geaves

    Vertical Centrifugal PumpWPIL Crompton geaves

    Vertical Centrifugal PumpWPIL Crompton geaves

    Vertical Centrifugal PumpWPIL Crompton geaves

  • 7/30/2019 Final Bop Td

    22/79

  • 7/30/2019 Final Bop Td

    23/79

  • 7/30/2019 Final Bop Td

    24/79

    Motor Voltage

    v

    415

    415

    415415

    415

  • 7/30/2019 Final Bop Td

    25/79

    TECHNICAL DAIRY ON ASH HANDLING SYSTEM

    Different constituents in our coal quality

    1-Evaporation Kg/hr 865000

    2-Fuel Worst coal

    3-HHV Of Coal Kcal/kg 3000

    4-Ash In Coal 48%

    5-Sulpur In Coal 0.50%

    6-Total Ash Produced Kg/hr 105504

    7-Fuel Fixed Kg/hr 219800@BMCR

    Ash percentage in different section in boiler

    1-Max. Ash Collection % 20 5

    2-Max Ash Collection Kg/Hr Rate 21100 5275

    3-Gas Side Pr. Mmwc -20 -65

    4-Gas Side Temp. 1000 350

    Coal analysis

    1- Proximate analysis

    Constituents of coal Design coal Range

    1-Gross Heating Value Kcal/Kg 3400 3000-2000

    2-Total Moisture % 7 6-Aug

    3-Ash % 44 35-48

    4-Fixed Carbon 29

    5-Volaitle Matter % 20

    2- Ultimate analysis

    1-Carbon 36%2-Hydrogen 2.70%

    3-Sulpher 0.50%

    4-Ash 44%

    5-Grindibility Index -50

    ANALYSIS OF FLY ASH

    1-Silica 58-62%

    Ash data in different forms Furnace bottom hopper Eco hopper

  • 7/30/2019 Final Bop Td

    26/79

    2-Alumina 23-62%

    3-Iron Oxide 7-10%

    4-Titanium Oxide-Silica 1.5-3 %

    5-Calcium Oxide 3-5%

    6-Magnisium Oxide 1.5-3%

    7-Sulphuric Anhydride (SO3) 0.15-0.4%

    8-Magnesea 0.02-0.04%

    BOTTOM ASH HANDLING SYSTEM

    Economizer hopper - qty 4 nos

    Bottom ash hopper-qty 1nos.(divided in to 2 hopper)

    Clinker grinder- qty 4 nos. (2 w+2s)

    No. of jet pumps- qty 4nos.

    BA Generation rate (each) 21.1008 tph

    Eco Ash Generation rate 5.2752 tph

    BA Hopper storage capacity 8 hrs.BA cleaning time 95 min(Including down ti

    Mode of operation BA cleaning simultaneou

    Bottom ash bulk density ( for volume calculation) 0.65ton/m3

    2 Nos.

    No. of working jet pump stream per unit 2 Nos.

    Dimension of BA hopper (Inside) 15740mm x 3574mm

    BA Temperature 1050C

    Eco Ash temperature 350C

    BA Overflow water temperature 60C

    Bottom Ash SYSTEM CAPACITY

    In 8 hrs accumulation of (BA + Eco) Ash

    Cleaning time (including flushing)

    Considered 11 min flushing time, net cleaning time

    Selected capacity of each Jet pump stream

    HOPPER DRAW-DOWN RATE

    Bottom ash collection in 8 hours 168.80 Ton

    Bottom ash volume collection 259.702 M3

    Eco ash collection in 8 hours 42.202 Ton

    Eco ash volume collection 56.268 M3

    Total (BA+ECO) ash collection (Dry) in 8 Hr. 315.97 M3

    Water volume above ash level 16.876 M3

    Total HP water requirement for BAH 350 M3

    VARIOUS PUMPS SPECIFICATION IN Bottom Ash HANDLING SYSTEM

    Pumps Qty Flow (M3/Hr)

  • 7/30/2019 Final Bop Td

    27/79

    HP water pump 3 500

    LP water pump 4 400

    Eco water pump 2 45

    Seal water pump 2 86

    Recovery seal water pump 2 27

    BA over flow transfer pump 2 250

    Transfer water pump(from ash water sump) 2 925

    Ash slurry pump 3 620

    VARIOUS DRAIN PUMPS

    Make

    Ash slurry drain pump 2 SAM TURBO

    Ash water drain pump 2 SAM TURBO

    Silo area drain pump 2 SAM TURBO

    Fly ash drain pump 4 SAM TURBO

    DIFFERENT SUMP CAPACITY

    Sump type Capacity M3

    Ash water sump 875

    Seal water sump 80

    BA over flow sump 42

    Sludge sump 540

    Sludge pit 40

    Ash slurry sump 52Clarifier Flow Rate 2700 M3

    EQUIPMENT BUILDING INSTRUMENT

    LP water pump Qty 4nos.

    Hp water pump Qty 3nos.

    Instrument air compressor Qty- 2nos.

    Mill reject compressor Qty 3nos.

    Seal water pump Qty 2nos.

    Ttansport air screw compressor . Qty 6nos

    Ash slurry pump Qty 2nos.

    FLY ASH HANDLING SYSTEM

    Fly Ash (ESP) Generation Rate 89.67 TPH.

    Fly Ash (APH) Generation Rate 5.27 TPH.

    Fly Ash (DUCT HOPPER) Generation Rate 2.637TPH

    Fly Ash Cleaning Time 4.5 Hr (Including 9 Min P

    Pumps Qty

  • 7/30/2019 Final Bop Td

    28/79

    No. Working Fly Ash (Vaccum) Stream Three

    Capacity Of Each Stream(Vaccum) 60 TPH

    Total HP Water Requirement For Wet Fly Ash System 435 M3

    Vaccum pump

    Make Kakati pvt. Ltd.

    Qty.

    4(3w+ 1sb)Type Liquid Ring

    CapacityAt Inlet 4500m3/hr

    Vaccum At Rated Capacity 12 Inch Of Hg

    Shut-Off Vaccum 24 Inch Of Hg

    Speed Of Machine 570 Rpm

    Min Speed Of Machine 400rpm

    MaximumDust Inlet At Continuous Basis 500-600 Ppm

    Maximum Gas Inlet Temp. 150 C

    Maximum Seal Water Temp. 40 C

    MotorMake Marathon pvt ltd

    Power 110 KW

    Current 183 amp

    Speed 1485 rpm

    Voltage 415V

    TRANSPORT AIR COMPRESSORMAKE ATLUS COPCO

    TYPE OIL FREE SCREW TYPE

    QTY 3*2 FOR PHASE 1

    Volumetric efficiency 85%Discharge temp. 180-190 C

    Total cooloing water req. 1.8 l/sec

    Cooling water inlet and outlet temp. 33/41 C

    I/p KW req. at shaft at design load 209 kw

    I/p KW req. at shaft at unload condi. 139 kw

    Cooling water req. pr. Kg/cm2 2.5

    CAPACITY OF EACH COMPRESSOR 3085 CFM

    WORKING PR.. 2.25 bar

    DISCHARG E PRESSURE 1.5 BAR

    MAXIMUM PR. 33 BAR

    COMPRESSOR SPEED 4531 RPM

    DISCHARGE TEMP. 180-190 C

    Mtor

    Make Marathon pvt ltd

    Power 300 KW

    Speed 1489 rpm

    Voltage 6.6KV

  • 7/30/2019 Final Bop Td

    29/79

    Instrument air Compressor

    MAKE ATLUS COPCO

    TYPE Water cooled OIL FREE SCREW TYPE

    QTY 2 FOR PHASE 1

    Discharge temp. 45 C

    Total cooloing water req. 2.17 l/sec

    Cooling water inlet and outlet temp. 33/41 C

    Cooling water req. pr. Kg/cm2 2.5

    DESIGN CAPACITY OF EACH COMP. 14.03 m3/hr

    DISCHARG E PRESSURE 7.5 Kg/cm2

    MAXIMUM PR. 33 BAR

    COMPRESSOR SPEED 4531 RPM

    DISCHARGE TEMP. 180-190 C

    Motor

    Make Marathon pvt ltd

    Power 90 KW

    Speed 2980 rpmVoltage 415 V

    Filter

    Type Dry type cartridge

    Filtering media Paper

    FLUIDING BLOWER

    TYPE QTY CAPACITY(M3/Hr)

    ESP/BUFFER HOPPER 2(1W+1S) 1000

    SILO 3(1*2 W+1S) 1200

    SILO

    Qty 2nos.

    Holding Capacity 1830 Ton.(Each)

    Volume 2440 M3 (Each)

    Height 36.143mt

    Relief Valve 2 Nos . (Each)

    Telescopic Spout With Scavenger Fan 2 Nos. (For Closed Tanker Unloading)(Each)

    Rotating Conditioner Cum Unloader 1no. (For Open Tank Unloading)(Each)

    650 Sq. Opening For Hcsd 1 No.(Each)

    Vent Filter 1 No.(Each)

    Manually Discharge Valve 1 No (Each)

    HCSD PumpMake GEHO Weir Miniral Neatherland B.V.

    Hcsd System Capacity 195 Tph

    Slurry(Ash:Water ) 65:35 By Wt.

    Hcsd Pump Capacity 250 M3/Hr.

    Discharge Pr. 7000 Kpa

  • 7/30/2019 Final Bop Td

    30/79

    Power KW 519

    Head 6.50 Bar

    Hcsd Booster Pump

    Make GEHO Weir Miniral Neatherland B.V.

    Rated capacity 227.5 M3/hr

    Shut up head 34.7 mwc

    Head 33mwc

    Speed 813 rpm

    Motor

    Make Marathon pvt ltd

    Power 110 KW

    PLANT COMPRESSOR

    Quantity 3 Nos

    Make Atlas Copco

    Type 3 Stage CentrifugalDischarge 1749 Ltr/Sec.(Each)

    Machine Speed 2980 Rpm

    Maximum Power 853 Kw

    Motor

    Make BHEL Bhopal

    Kw 630kw

    Volt 6.6kv

    Current 65 Amp

    Rotary Gear Pump

    Discharge 44lpm

    Pr. 2.1kg/Cm2Lube Oil Heater

    Power 2 Kw

    Heat Flux 2w/Cm2 .

    Lube Oil

    Required 220 Lit.

    Type Roto H +

    Working Hour 1600hr.

    Air Receiver

    Qty 3nos.(2nos. For Service Air + 1no. Instument Air)Capacity 20 M3(Each)

    Maximum Pr.- 10kg/Cm2

    Air Drier

    Make Atlas Copco

    Qty 2 Nos.

    Power Consumption- 17 Kw(Each)

  • 7/30/2019 Final Bop Td

    31/79

    Refrigerant Used R404a(15kg)

    Compressed Air Maximum Pr.- 13 Bar.

    Maximum Temp. 55 C

    Ambient Maximum Temp 45 C

    Minimum Temp 0 C

    Compressed Air Requirement for one unit(270 MW)

    continuous

    1 TG & Boiler & auxilaries 35

    2 DM Plant 0

    3 Ash Handling Plant 0

    4

    TG area cleaning &

    maintanance 0

    5Boiler area cleaning &

    maintanance 0

    6 Fule Oil System 0

    7 CW/ACW System 0

    8 DM Make up pump 0

    Total 35

    TECHNICAL DAIRY ON LDO SYSTEM

    UNLOADING BAY

    10 Unloading Bay (8+2)

    One Tanker Capacity- 20 Kl

    Loading Time 2 Hr

    DUPLEX BASKET TYPE STRAINER 3 nos. (.08 mm)

    LDO TANK

    Capacity 1500 M3

    Height 14.1 Mt

    Dia 12 MtHSD TANK

    Capacity 1500 M3

    Height 14.1 Mt

    Dia 12 Mt

    LDO UNLOADING PUMP SPECIFICATION

    Make TUSHACO

    RPM 2960

    Pr. 3.5 Kg/Cm2

    S.NO. Area includeInstrument Air (N

  • 7/30/2019 Final Bop Td

    32/79

    Power 15 Kw

    Flow 734 Lpm

    Motor

    Make CG

    Rpm 2920

    Volt 415v

    Power 15 Kw Or 20 Hp

    Current 26 Amp

    LDO TRANSFER PUMP SPECIFICATION

    Make TUSHACO

    Rpm 2980

    Pr 30 Kg/Cm2

    Power 15 Kw

    Flow 519-584 Lpm

    Motor

    Make Bharat Bijlee

    Rpm 2920

    Volt 415v

    Power 55 KWCurrent 89 Amp

    DRAIN WELL TANK

    Tank capacity 2 M3

  • 7/30/2019 Final Bop Td

    33/79

    Aph hopper Esp hopper Duct hopper4 no. (8*8=54) 2 no.

    5 85 2.5

    5275 89678 2637

    -180 -260 -200

    150 150 150

    Worst coal

    3000

    8

    48

    26

    18

  • 7/30/2019 Final Bop Td

    34/79

    me 11 min)

    sly from two units followed by simultaneous FA cleaning from two units.

    (21.1008+5.2752) ton x 8 = 210.26 ton

    95 min

    84 min

    75 Tph

    Head (Mt.) Shut Off Head Mt. Stage Motor Kw Current Speed

  • 7/30/2019 Final Bop Td

    35/79

    90 98 Single 200

    60 67.5 Single 110 183amp

    20 22.5 Single 5.5

    160 186 3 stage 75 124 amp 2970 rpm

    110 132 4 stage 18.5

    25

    15

    3 Stage

    Flow Head Motor make

    M3/Hr Mt.

    50 10 17 single 5.5 Marathon ltd.

    30 10 13 Single 3.7 Marathon ltd.

    30 35 38.5 Single 11 Marathon ltd.

    25 12 14.6 Single 3.7 Marathon ltd.

    urging Time)

    Motor

    Kw

    Shut Off Head

    Mt.

    Stage

  • 7/30/2019 Final Bop Td

    36/79

  • 7/30/2019 Final Bop Td

    37/79

    PRESSURE

    4500 mmwc

    7000 mmwc

  • 7/30/2019 Final Bop Td

    38/79

  • 7/30/2019 Final Bop Td

    39/79

    intermittent continuous Intermittent

    0 0 0

    1 0 0

    0 0 0

    0 0 5

    0 0 20

    2 0 10

    0.4 0 0

    1.1 0 0

    4.5 0 35

    M3/min) Service Air (NM3/min)

  • 7/30/2019 Final Bop Td

    40/79

  • 7/30/2019 Final Bop Td

    41/79

  • 7/30/2019 Final Bop Td

    42/79

    Motor make Pump make

  • 7/30/2019 Final Bop Td

    43/79

    Marathon ltd. Mather+Platt

    Marathon ltd. Mather+Platt

    Marathon ltd. Mather+Platt

    Marathon ltd. Mather+Platt

    Marathon ltd. Mather+Platt

    Marathon ltd. Mather+Platt

    Marathon ltd. Mather+Platt

    Marathon ltd. Mather+Platt

  • 7/30/2019 Final Bop Td

    44/79

    C.W SYSTPump Qty Make Head

    Cooling Water(CW) 5 WPIL 25MWC

    Auxilary Cooling Water(ACW) 3 WPIL 45.2MWC

    COOLING TOWER

    Make Paharpur

    No. of cooling tower /unit 1

    Type Induced Draft Counter Flow

    Fills PVC Corrugated (double layer)

    Drift Eliminator (single layer)

    No. of cells/C.T 11w+1sb

    Range 9.4 0 C

    Approach 4 0 C

    Effectiveness 70.14%Cold water temp. 33 0 C

    Hot water temp. 42.4 0c

    Hold up volume of CT basin between mn & max 3600m3

    Make up water 767 m3/hr

    C.T FAN

    Make Paharpur

    Qty 12 (per cooling tower)

    Gear Box Ratio 14.54:1(Helical type)

    No. of blade /fan 8

    Blade tip clearance 30mmBlade angle 8 degree.

    Motor

    Make Marathon

    Rpm 1480

    Current 128amp

    Voltage 415v

    CW CHEMICAL TREATMENT

    SCALE INHIBITORTank

    Qty 2

    Capacity 410 lit each

    Pump

    Qty 3(2w+1sb)

    Capacity 10LPH

    Pr. 2 bar

  • 7/30/2019 Final Bop Td

    45/79

    Type positive displacement

    CORROSION INHIBITOR

    Tank

    Qty 2

    Capacity 410 lit each

    Pump

    Qty 3(2w+1sb)Capacity 10LPH

    Pr. 2 bar

    Type positive displacement

    BIOCIDE

    Tank

    Qty 2

    Capacity 200 Lit each

    Pump

    Qty 3(2w+1sb)

    Capacity 10LPHPr. 2 bar

    Type positive displacement

    SULPHURIC ACID

    Unloading Pump

    Qty 2

    Dis. Pr 20kg/cm2

    Discharge 10m3/hr

    Storage Tank

    Qty- 2

    Capacity 10m3 each

    Fluid Handeled 98%w/w H2SO4

    Day Tank

    Qty- 2

    Capacity 0.63m3 each

    Fluid Handeled 98%w/w H2SO4

    Injection Pump

    Qty 3(2w+1sb)

    Capacity 20LPH

    Pr 2 bar

    Type positive displacement

    CW CHLORINATION SYSTEM

    Chlorine ton container

    QTY 20(6W+14SB)

    Capacity 900kgs each

    Design pr. 19.9kg/cm2

  • 7/30/2019 Final Bop Td

    46/79

    Evaporator

    QTY 2(1W+1SB)

    Capacity 120 kg/hr

    Chlorine Gas Strainer

    QTY 2(1W+1SB)

    ChlorinatorQTY 2(1W+1SB)

    Capacity 120 Kg/cm2

    TypeVaccum solution

    Chlorinator water supply booster pump

    Qty2(1w+1sb)

    TypeHorizontal Booster

    Chlorinated Water Diffuser

    Device for injection of chlorinated water

    LEAKED CHLORINE ABSORPTION SYSTEM

    Exhaust Fan

    Type Bifurcate Type

    BLOWER

    Qty 2(1w+1sb)

    Make Data air system

    Motor

    Make CG

    KW 3.7

    AMP. 7.3

    Chlorine Absorption Tower

    Qty1

    Caustic solution recirculation pumps

    Qty

    2(1w+1sb)Type

    Horizontal Centrifugal

    Make Antico

    Head 10 M

    Discharge 25 m3/hr

    Motor KW 2.2

    AVGF

  • 7/30/2019 Final Bop Td

    47/79

    Make BGR

    QTY 10(8W+2SB)

    Design Temp. 60 0 c

    Flow rate . 200m3/hr

    Design surface flow rate < 8m3/m2/hr

    Suspended solid in 25ppm

    Suspended solid out 2 ppmFilter media Graded Sand & Anthracite

  • 7/30/2019 Final Bop Td

    48/79

    MDischarge Thrust Rpm Kw Make Amp Volt(KV)

    18000M3/HR 1529KG 479 1650 BHEL 250 6.6

    2400M3/HR 5335KG 989 450 BHEL 75 6.6

  • 7/30/2019 Final Bop Td

    49/79

    TECHNICAL SPECIFICATIONS

    HYDROGEN BIPOLAR GAS GENERATOR (2X15 NM 3 /HR)

    Gas to be Produced HYDROGEN GAS

    No Of Stream Offered Two

    Capacity Per Stream 15 Nm 3 /hr

    Total Capacity from both Stream 30 Nm 3 /hr.

    DATASHEET OF ELECTROLYSER

    Model No. ANHFDQ-210/1.6

    Technology Bipolar Pressurized Water Electrolysis

    Capacity 15 Nm3/hr x 2 streams (Net

    Tag. No. Z 101A for stream A / Z101B for stream B

    H2 Capacity Nm3/hr 16.5 ( Ex Electrolyser )

    O2 Capacity Nm3/hr 8.25 ( Ex Electrolyser )

    H2 Purity % (By Vol.)

    O2 Purity % (By Vol.) 99.5 %

    DM Water Consumption 16.5 Liters/hour/stream

    Design Temperature 30% KOH ( By Volume )

    Operating Voltage 92 C

    Electrolyte DC-0 70 Volts Adjustable

    Operating DC Current 0 - 900 Amp. Adjustable

    Design Pressure 48 Bar g

    Discharge Pressure 32 Bar G

    No. of Module One per stream

    No of cell per module 74 Nos. approx

    A.C. Power Consumption 4.9 KWH/m3 of Raw H2Operating Temperature 90 C.

    MOC of cell Ni Plated CS

    Electrode Material - Anode Activated Nickel

    Electrode Material - Cathode Nickel

    Turn Down Ratio 60% to 100%

    Cooling Water Requirement 4m3hr circulating per stream

    Gas Separation skid Two Nos. (1 for each)

    Diaphragm Material Membrane Cloth

    DATASHEET OF DRYER

    Manufacturers Name Airox Nigen

    Operating Pressure 32 bar (g)

    Design Pressure 36 bar (g)

    Gas Tightness test pressure 40 bar (g

    Design Temperature 200C

    Type of Hydrogen Dryer Twin Bed Desiccant type

    No. of Desiccant Bed Two

    99.998% ( After Purifier )

  • 7/30/2019 Final Bop Td

    50/79

    Inlet H2 Capacity 16.5 Nm3/hr

    Outlet H2 Capacity 15 Nm3/hr.

    Desiccant type Molecular Sieve 13 X

    Absorber Bed MOC SS 304

    Total Cycle Time 24 Hours.

    Regeneration Cycle Time 12 Hours

    Supply 415 V / 3 Phase / 50 HzOutlet Dew Point Minus 70C

    No. of Dryer 2 Nos. per stream

    No Of Heaters One in each tower

    Regeneration Gas Dried Hydrogen

    Consumption of regeneration gas 7 to 8 % of gas

    Heater Capacity Dried Hydrogen

    Moisture Absorbent Material Molecular Sieve

    HYDROGEN BUFFER TANK

    Operating pressure 32 KG/CM2

    Design pressure 35.2 KG/CM2

    Test pressure 48 KG/CM2

    Design temperature 65C

    Capacity 400 ltr.

    Design code ASME Sec VIII Div. I

    7 Material of construction SA 516 Gr. 70

    Make ICL-India

    Type of Compressor Diaphragm type-oil free

    No. of Compressors 2 Nos.(one for each stream)

    Tag Nos. C101A / C 101 B

    MOC of diaphragm Alloy Steel

    MOC of Compressor Forged Steel

    Compressor Speed 400 rpm

    Medium of Gas Hydrogen

    Capacity 18.50 Nm3/fir (Each)

    Suction Pressure 32 bar (g)

    Suction temperature, C Ambient (max. 400C)

    Discharge Pressure 140-160 bar

    Discharge Temperature 520C

    Amount of cooling water required 1 m3/hr ( per compressor )

    Number of Stages 2

    Type of inter-cooler Water cooled inter cooler

    Drive V Belt - By Electric Motor

    Lubricating oil for Crank Case SERVO-32

    DATA SHEET OF HYDROGEN COMPRESSOR

  • 7/30/2019 Final Bop Td

    51/79

    Hydrogen Suction Pot 400 Ltrs @ 30 Bar G

    MOC of Suction POT 516 Gr 70

    MOC of Compressor's

    a)Piston Aluminium BS - 1490, LM-13

    b)Piston ring Teflon with 25-30% Carbon

    c)Crank shaft Forged Steel EN8

    d)Crank shaft bearing White Metale)Casing ASTM - A - 240, 316 SS

    f)Suction & Discharge Valves 316 SS

    Compressor BHP (shaft input)

    Efficiency 85%

    Type of Lubrication L-HM-32

    Power Supply / Consumption

    Electric motor

    Power

    Supply

    Speed 1440 rpm

    Type of Construction Flame proof

    DATA SHEET OF RECTIFIER

    Make/ Supplied : POWERCON/RPG

    Country of Origin : India

    Tag No : RT 201 A/B

    Quantity : one per stream total (two)

    Application : 3-Phase,-Non rev.6 pulse. Bridge

    Configuration. Fully controlled

    Operating System : Digitally via PLC

    Device protection of the bridge : Semi-conductor fuse of suitable rating And

    RC snubber circuit.

    Operating DC voltage at output 50 to 70 V

    Rectifier Rated DC Voltage : 70 Volts

    Operating DC current at output : 500 - 900 Amps (Max.)

    Over load capability : 10 % (on 900 Amps)

    Rectifier Design DC current : 1000 AmpsCooling : Forced Air Cooled

    TECHNICAL SPECIFICATION OF MILL REJECT HANDLING SYSTEM

    Coal Consumption per Unit: 186.865 TPH (Design Coal)

    Coal Consumption per Unit 219.8 TPH (Worst Coal)

    3.7 KW

    415 V / 50 Hz / 3 Ph

    5.5 KW

    415 V/ 50 Hz / 3 Ph

  • 7/30/2019 Final Bop Td

    52/79

    Rated Mill Rejects output per Mill 467.2 kg/hr (Design Coal)

    Rated Mill Rejects output per Mill 439.6 kg/hr (Worst Coal)

    Design value of Reject collected in each Pyrit 467.2 kg/hr

    Selected Mill Reject/Mill/hr 500 kg/hr (after rounding off

    Operating Temp.(Deg.C) 130 deg C (Approx).

    Maximum Temp. Of Mill Reject (Deg.C) 200 deg C (Approx).

    Elevation of Mill Reject Spout in Mill Area EL (+) 2.900 M.Particle Size of Mill Rejects to be handled (-) 50 mm.

    Mill Arrangement In a Single row of six mills at the rear side of the boiler

    Volumetric Calculation 1600 kg/m3

    Conveying 1600 kg/m3

    Load Calculation 2200 kg/m3.

    Compressor Design Condition 50 deg C & 90 % RH

    Reject conveying velocity 3.5 to 5.7 m/s.

    Mill Reject storage bunker capacity 36 hours storage of mill rejects generated from two units (consider

    Therefore effective capacity of each bunker r 98.91 m3

    Effective storage capacity of bunker selected 100 m3

    Reject generation rate per unit 2.198 TPH.

    pyrite hopper with mesh size 50X50 mm

  • 7/30/2019 Final Bop Td

    53/79

  • 7/30/2019 Final Bop Td

    54/79

  • 7/30/2019 Final Bop Td

    55/79

  • 7/30/2019 Final Bop Td

    56/79

    ing worst coal).

  • 7/30/2019 Final Bop Td

    57/79

    FIRE FIGHTING SYSTEM

    Hydrant system included

    Chemical house

    Raw water Pump House cum MCC Room

    Sludge Pump house

    CW Pump House

    Water treatment Plant

    400 KV!220KV!33KV Power Plant switchyard

    Generator, Station and Unit auxiliary Transformers in Transformer yard for unit nos.1& 2 (For Phase - I)

    ESP Switchgear Control room

    Mill Building

    Entire power house including Boiler areas

    Coal Handling plant including all Terminal points, substation and office

    Crusher house

    Chlorination plant buildingCHP control room and MCC room

    Ash handling plant

    Ash slurry pump house

    Ash mechanical exhauster room

    Ash compressor room

    Ash water pump house

    MCC room ash handling

    MCC room dry FA transportation system

    Mill reject system compressor house (if provided separately) Remote dry fly ash silo area MCC! control ro

    Fuel oil unloading station

    Administrative building

    Effluent treatment plant

    DMCW pump area

    Air washer room

    Coal mill area, coal feeder floor and coal bunker floor

    Hydrogen Generation room cum MCC room

    Fuel Oil Unloading Tank Area

    Lube Oil Tank Area

    Workshop building & Store

    Petrol Pump Area

    JOCKEY PUMPS

    Make WPIL

    Service For pressurization of fire water System

    Duty Intermittent

    Location Indoor

    Liquid Handled Raw Water

    Number of Pumps Required Two

  • 7/30/2019 Final Bop Td

    58/79

    Rated capacity 25 M3/hr

    Total head, (MLC 101.45 Mtr

    Rated speed (rpm) 2900

    Pump type Non-pull out type & above Floor discha

    Type of coupling Flexible Pin Bush Coupling

    Bearing lubrication By self-water

    Type of shaft bearing Cut-less rubber backed by bronze, shorMotor for Jockey Pump

    Motor for Jockey Pump JPP-1 ,JPP-2 2

    Power 15 KW

    Volt 415 v

    FIRE WATER PUMPS

    Service

    Fire Spray Water System

    Fire Hydrant System

    Duty Continuous

    Location Indoor

    Number of Pumps Required

    a) Hydrant Pump 3 Nos (1 no Motor driven + 2 no engine driven

    b) Spray Water Pump 2 Nos (2 no Motor Driven)

    Spray Water Pump capacity 25 m3/hr

    Total head, (MLC) 88

    Air compressor

    Qty 2 (1 Working+ 1 stand by)Capacity 41 m3/hr

    Hydrant Pump

    Make WPIL

    Liquid Handled Raw Water

    Rated capacity 410

    Total head, (MLC) 100.78 mtr

    Rated speed 1500 for Engine & 1485 for Motor D

    Pump type Non-pull out type & above Floor dis

    Impeller type Close

    Shaft sealing arrangement Stuffing box

    Type of Pump Engine Connection Through Gear Head and Propeller S

    Type of Pump Motor coupling Flexible Pin Bush Coupling

    Bearing lubrication By self-water

    DIESEL ENGINE FOR BOOSTER PUMP

  • 7/30/2019 Final Bop Td

    59/79

    Designation Internal Combustion Diesel Engine ,

    Make- Greaves

    Type Compression ignition, mechanical (

    No. of engine required One (1)

    Duty Continuous

    Nominal output 60 HP @ 1500 RPM

    Speed of the engine 1500Fuel of the engine High speed diesel oil

    Cooling water Service water (Clarified water

    Analysis of fuel IS-1460

    DIESEL ENGINE FOR MAIN FIRE PUMP

    Designation Internal Combustion Diesel Engine

    Make- Greaves

    Type Compression ignition, mechanical (

    No. of engine required One (2)

    Duty Continuous

    Nominal output 254 HP @ 1500 RPM

    Speed of the engine 1500

    Fuel of the engine High speed diesel oil

    Cooling water Service water (Clarified water

    Analysis of fuel IS-1460

    MOTOR DRIVEN BOOSTER PUMP

    Service For pressurizing fire water at the

    Designation BOOSTER PUMPDuty Intermittent

    Location ndoor

    Number of Pumps Required One (01)

    Liquid Handled Water

    Rated capacity 137

    Total head, (MLC) 50

    Rated speed (rpm 1470

    Range of operation 30 -130 %

    No of stage of pump Single

    Pump type Axially Split Single-Suction VolutImpeller type Closed

    Shaft sealing arrangement Gland Packing

    Duration of test 15 min

    Hydrotest pressure 11 kg/cm2

    Type of shaft bearing Anti-Friction

    Mode of pump starting Open Valve

    Type of coupling Flexible Coupling

    Type of cooling of pump Water

  • 7/30/2019 Final Bop Td

    60/79

    Bearing lubrication Grease

    HYDRO NUMETIC TANK

    Capacity 22.5 m3

    Type Vertical cylinder

    Max working pr. 12.5 kg/cm2Design Workingpr. 13.125 kg/cm2

    Design temp. 50 0C

    Hydro test pr. 17.065kg/cm2

    Qty. 1

    Fluid storage Fire water and compressed air

    Details Spray System

    Sl. No. System

    1 HVW Spray (High Velocity Water)

    2 MVW Spray (Medium) Velocity

    Water)

  • 7/30/2019 Final Bop Td

    61/79

    FOAM SYSTEM

    Area Covered LDO TankFoam Chamber

    Qty 2

    Capacity 285 lpm

    Inlet Pressure 3.5 kg/cm2

    Foam Pump

    Qty 2( 1 motor driven+1 engine driven)

    capacity 2 m3/

    hr

    discharge head 10.0 kg/cm2

    Motor

    RPM 1430KW 3.7

    DIESEL ENGINE

    RPM 1500

    POWER 6BHP

    Foam Tank

    Capacity 1000 lit

    Foam concentration 3%

    Foam solution required for LDO Tank 570 lpm

  • 7/30/2019 Final Bop Td

    62/79

    Mobile Fire Fighting System

    Trailer pumps 3

    capacity 1800 lpm

    Pr. 7 kg/cm2

    portable fire pump

    capacity 275 lpm

    Pr. 4.2 Kg/cm2

    Fire Station Equipments

    Breathing apparatus sets 10 No.

    Fire Entry suits 8 Nos.

    Foam compound 4 Sets

    Portable Generators 3 Sets

    Dry Chemical Powder 3 Nos.

    Foam Generators 3000 Kgs.

    Telescopic ladders 3 Nos.

    First aid kits 15,000 Ltrs

    Miners lamps with rechargeable battery 8 Nos.

    PORTABLE AND MOBILE FIRE EXTINGUISHERS

    Description Capacity of each extinguisher

    Pressurized water type extinguisher (Gas expelled water type) 9 liters

    Carbon-di-oxide Type Extinguisher 9 liters,4.5 kg

    Portable extinguisher (Dry chemical powder type) 5 KG/2kg

    Stands for holding potable fire extinguisher

    Dry chemical powder type

    Mechanical Foam type 50 liters

    Carbon-di-oxide type 22.5 KG

    Mobile Fire Extinguishers 50 KG

  • 7/30/2019 Final Bop Td

    63/79

    m

  • 7/30/2019 Final Bop Td

    64/79

    ge

    hardness 60-65

    riven.

    charge

    aft

  • 7/30/2019 Final Bop Td

    65/79

    Model-3G1 1T (H E),

    ir less)

    ir less)

    boiler area

    Pump

  • 7/30/2019 Final Bop Td

    66/79

    Area Covered

    HVW Spray ISO - 420 KV Generator Transformer(2 Nos.)

    HVW Spray Layout - 33 KV Station Transformer(2

    Nos.)

    HVW Spray Layout - 33 KV Unit Auxiliary

    Transformer (4 Nos.)

    HVW Spray Layout - Boiler Feed Pumps for unit 1

    & 2

    HVW Spray Layout - Turbine Lube Oil Tanks,

    Coolers & Consoles.

    HVW Spray Layout for Boiler Burner Fronts

    HVW Spray Layout - Generator Seal Oil Tanks,

    Coolers Assembly.

    HVW Spray Layout - Turbine Oil Canal Pipelines.

    HVW Spray System - Diesel Oil Storage tank for

    DG Set

    MVW Spray System for- Cable Spreader EL. 0.0M

    For Unit-1 & 2 AB way of TG Building

    MVW Spray System for-Cable valute for boiler

    MCC at El. +5.0 for Unit 1 & 2 D way of TG

    buildingMVW Spray System for-Cable Spreader EL. 8.5 M

    For Unit-1 & 2 AB way of TG Building

    MVW Spray System for-Cable Spreader EL. 12.5

    M For Unit-1 & 2 B way of TG Building

    MVW Spray System - LDO Tanks

    MVW Spray System Layout for Conveyor CV-1

  • 7/30/2019 Final Bop Td

    67/79

    MVW Spray System Layout for Conveyor CV-2

    MVW Spray System Layout for Conveyor CV-3

    MVW Spray System Layout for Conveyor CV-4

    MVW Spray System Layout for Conveyor CV-5

    MVW Spray System Layout for Conveyor CV-5

    MVW Spray System Layout for Conveyor CV-6

    MVW Spray System Layout for Conveyor CV-7

    MVW Spray System Layout for Conveyor CV-8

    MVW Spray System Layout for Conveyor CV-9

    MVW Spray system for Cable Spreader, ESP

    control room

    MVW Spray system Layout for Conveyor CV- 5A

    Cable Spreader ESP El. 8.5 Mtr.

  • 7/30/2019 Final Bop Td

    68/79

    Required Total Nos

    80

    30,100

    50,50

    15

    4

    20

  • 7/30/2019 Final Bop Td

    69/79

    TECHNICAL SPECIFICATION OF HVAC SYSTEM

    Vapour Absorption Chiller Unit

    Make VoltasLocation AC Plant Room of TG Building.

    Quantity 1 no.

    Capacity: 200 TR

    cool water from 11.4C to 7C

    Type Steam fired, double effect/stage VAM

    Temp. of condenser cooling water I/L =31.8 C ,O/L=37.2C

    Refrigerant Amonia

    Absorbent Lithium Bromide

    Qty. NH3 450 Kg

    Qty Li-Br 1200 Kg

    Sol. pump

    Power 3.7 kw

    Current 9.5 amp

    Volt 415 v

    Refrigeration pump

    Power 0.4 kw

    Current 1.5 amp

    Volt 415 v

    Purge pump

    Power 0.37 kwCurrent 1.1 amp

    Volt 415 v

    Water Cooled Screw Chiller Unit

    Make Voltas

    Location AC Plant Room of TG Building.

    Quantity 2 no.

    Capacity: 100*2 TR

    cool water from 11.4C to 7CType Semi/Hermetically sealed screw compressor

    Temp. of condenser cooling water I/L =31.8 C ,O/L=36.2C

    Refrigerant R 134a (Qty.-180 Kg)

    Heater 300 Watt

    Compressor Motor

    Power 78 Kw

    Voltage 415 V

  • 7/30/2019 Final Bop Td

    70/79

    Condenser Water Pump Sets.

    Make Kirlosker Brothers Ltd.

    Location AC Plant Room of TG Building.

    Type Centrifugal

    Quantity 3 no.

    Capacity 115 CMHHead 35m

    Motor

    Make ABB

    Power 18.5 Kw

    Voltage 415 V

    Chilled Water Pump Sets.

    Make Kirlosker Brothers Ltd.

    Location AC Plant Room of TG Building.

    Type Centrifugal

    Quantity 3 no.

    Capacity 76 CMH

    Head 35m

    Motor

    Make ABB

    Power 15 Kw

    Voltage 415 V

    Cooling Tower

    Make

    Location Located at the roof EL. 21.0M

    Type Induced draft (single cell) FRP type

    Quantity 3Nos.(2R+1S)

    Water flow rate 115 CMH

    Heat removal rate 621000 Kcal / hr

    Temperature drop 5.4C

    Desig wet bulb temp. 27.8C

    Approach 4C

    Non Chemical Water Treatment Equipment

    Make

    Location Central chilled water plant

    Type Induced draft (single cell) FRP type

    Quantity 1No.

    Capacity 230 CMH

  • 7/30/2019 Final Bop Td

    71/79

    Expansion Tank

    Location Roof of AHU room El.-27mt

    Quantity 1

    Capacity 1 m3

    Air Handling Unit

    Make

    Location Located at the AHU room EL. 21.0M

    Type Double skin

    Quantity 3Nos.(3R)

    Dehumidified Air qty 26100 CMH

    Static Pressure 55 mm WG

    Total Heat 144.1 KW (41TR)

    Sensible Heat 120.4 KW

    Fresh Air Quantity 2200 CMHCooling Coil Entering Conditions 27.35 C

    Cooling Coil Leaving Temp. 13.79 C

    Vertical Air Handling Unit

    Make

    Location EL. 8.5 mt at TG bldg.

    Application Battery Charger room Unit-1 & unit-2

    Quantity 2Nos

    Dehumidified Air qty 8500 CMHStatic Pressure 45 mm WG

    Total Heat 38.65 KW (11TR)

    Sensible Heat 31.53 KW

    Fresh Air Quantity 600 CMH

    Cooling Coil Entering Conditions 25.13 C

    Cooling Coil Leaving Temp. 14.23 C

    Fan Coil Unit

    MakeLocation SWAS room unit 1&2 and confrence roomof T

    Type Sheet metal cabinet type Fan Coil

    Fan Coil Unit consist of following component

    a-FCU Fan

    Type: Centrifugal, DIDW with forward curved blade

    b-Cooling coil

    Type: Chilled water type

  • 7/30/2019 Final Bop Td

    72/79

    Construction: Seamless copper tubes with Al

    fins

    with

    fins,

    aluminium

    Design fouling factor: 0.0002 Hr

    Quantity 9Nos.

    Dehumidified Air qty 1020 CMH

    Static Pressure 15 mm WG

    Total Heat 5.27 KW (1.5TR)

    Sensible Heat 3.335 KW

    Fresh Air Quantity 33 CMH

    Fan Coil Unit

    Location For AC plant control room

    Quantity 2Nos.

    Dehumidified Air qty 680 CMH

    Static Pressure 15 mm WG

    Total Heat 3.514KW (1.0TR)

    Sensible Heat 2.24KW

    Fresh Air Quantity 45 CMH

    Energy Recovery Ventilator

    Location SWAS room unit 1&2 and confrence roomof T

    Quantity 3Nos.

    Capacity 250 CMH

    Fresh Air SystemLocation AHU room of TG Building & battery room

    Quantity 2Nos.

    Fresh Air Quantity 6600 CMH

    Static Pressure 20 mm WG

    Smoke exhaust systemLocation Located in AHU room at the roof

    Quantity 2

    Capacity 11500 CMH

    Static Pressure 10 mm WG

    Water cooled Precision type air Conditioners

  • 7/30/2019 Final Bop Td

    73/79

    Location Common ESP & AHP Control room of Unit-1 &

    Quantity 3Nos.(2r+1s)

    refrigerant R-410A/R-407C

    Capacity 26 TR

    Fresh Air System

    Location Common ESP & AHP Control room of Unit-1 &

    Quantity 1Nos.Fresh Air Quantity 4800 CMH

    Static Pressure 20 mm WG

    Water cooled Precision type air Conditioners

    Location Control room laboratories & offices DM Plant

    Quantity 3Nos.(2r+1s)

    refrigerant R-410A/R-407C

    Capacity 16 TR

    Fresh Air System

    Location Control room laboratories & offices DM Plant

    Quantity 1Nos.

    Fresh Air Quantity 1200 CMH

    Static Pressure 20 mm WG

    Air cooled Precision Air Conditioners

    Location 400 / 33 KV Switch yard Control Building

    Quantity 3Nos.(2r+1s)

    refrigerant R-410A/R-407C

    Capacity 11 TR

    Fresh Air System

    Location Control room laboratories & offices DM PlantQuantity 1Nos.

    Fresh Air Quantity 1000 CMH

    Static Pressure 20 mm WG

    Air cooled Duct able Split Air Conditioners

    Location a) Administrative Building b) Dining hall of Ca

    Quantity 6Nos. For Administrative Building & 2 nos. Di

    refrigerant R-22

    Capacity 16.5 TR

    Non-Ductable Split Air Conditioner1-Location Control Room of Raw water pump house

    Quantity 4 Nos (2R+2S)

    refrigerant R-22

    Capacity 2 TR

    2-Location Control Room of CW water pump house & co

    Quantity 8 Nos (4R+4S)

    refrigerant R-22

  • 7/30/2019 Final Bop Td

    74/79

    Capacity 2 TR

    3-Location Compressor Control Room

    Quantity 8 Nos (4R+4S)

    refrigerant R-22

    Capacity 2 TR

    4-Location Control Room of chemical house

    Quantity 4 Nos (2R+2S)

    refrigerant R-22

    Capacity 1.5TR

    5-Location Etp Control Room

    Quantity 3 Nos (2R+1S)

    refrigerant R-22

    Capacity 1.5 TR

    6-Location Weigh Bridge Control Room

    Quantity 3 Nos (2R+1S)

    refrigerant R-22

    Capacity 1.5 TR

    7-Location Control Room of Hydrogen plant

    Quantity 4 Nos (2R+2S)

    refrigerant R-22

    Capacity 1.5TR

    8-Location Office and Lab of Hydrogen plantQuantity 2 Nos (2R)

    refrigerant R-22

    Capacity 2TR

  • 7/30/2019 Final Bop Td

    75/79

  • 7/30/2019 Final Bop Td

    76/79

  • 7/30/2019 Final Bop Td

    77/79

    G Building

  • 7/30/2019 Final Bop Td

    78/79

    G Building

  • 7/30/2019 Final Bop Td

    79/79

    2

    2

    Bldg

    Bldg

    Bldg

    teen Building

    ing hall of Canteen Building