For the period ending 31 March 2011 Western Areas is an Australianbased nickel miner listed on the ASX and TSX. The main asset is the 100% owned Forrestania Nickel Project, 400km east of Perth. Western Areas is Australia’s third largest nickel miner producing approx 25,000 tonnes pa nickel in ore from the Flying Fox and Spotted Quoll mines. Western Areas is an active nickel explorer in Western Australia, Canada and Finland. Mining is in progress at Flying Fox T4 and T5 ore bodies where significant mine development is already in place Mining is also in progress in the high grade Tim King Pit at the Spotted Quoll mine 6km south of Flying Fox. Total Ore Reserves at Spotted Quoll comprise 1.9Mt at an average grade of 4.10% nickel containing approx. 80,790 nickel tonnes. Drilling has intersected high grade nickel up to 400m below the mineral resource at Spotted Quoll. Flying Fox and Spotted Quoll are two of the lowest cost nickel mines in the world. Surface infrastructure and development work has also been completed on the planned Cosmic Boy and Diggers South mines, located 20km and 40km south of Flying Fox. The Cosmic Boy concentrator was upgraded to 550,000 tpa ore in June Q 2010. This equates to production capacity of about 25,000 tpa nickel in concentrate. The plant is designed for a future upgrade to 1.0M tpa for potential future mines at Forrestania. Western Areas has offtake agreements with BHP Billiton for 10,000tpa nickel in concentrate, with Jinchuan for a total 25,000t nickel in concentrate and has a short term contract with Minara to treat oxide ore from the Tim King Pit. The Board remains focused on the core business of low cost, long life nickel production and on generating significant returns to shareholders. ASX & TSX code: WSA Shares on issue: 180m shares, 7.4m options. Market capitalisation: Approx A$1.35Bn @ $7.10 per share. Suite 3, Level 1, 11 Ventnor Avenue West Perth, 6005 WESTERN AUSTRALIA Telephone: +61 8 9334 7777 Facsimile: +61 8 9486 7866 www.westernareas.com.au Record Concentrate Sales & Low Cash Costs Sustained Western Areas reports another quarter of low cost production and record nickel concentrate sales from Forrestania. This quarter’s results are in line with, and in some cases exceed guidance provided in the December Q demonstrating the consistency of operations. Combined mine production was 7,400 tonnes (16.3M lbs) nickel compared with 7,959 tonnes (17.5M lbs) nickel in the December Q. High grades (6.1% nickel) in the Tim King Pit plus consistent performance in the Flying Fox T5 deposit contributed to strong production. Average cash cost for nickel in concentrate was US$2.23/lb. Record sales to BHP Billiton and Jinchuan for the March Q totalled 6,813t nickel in concentrate, being 662t higher than the previous September Q record. As a result, nickel in concentrate stockpiles decreased by approximately 50%. Record sales coincided with a strong average LME nickel price of US$26,903/tonne (US$12.20/lb) for the quarter. Drilling has also confirmed a major high grade extension below the planned Stage One Spotted Quoll underground mine. The aim of this drilling is to add 40,000 60,000 tonnes nickel to Spotted Quoll. This could potentially support an increase in the mine life and production rate above the current annual target of 10,000 tpa nickel. March Q 2011 Highlights 1. Production from Flying Fox mine (excluding Lounge Lizard) was 77,205 tonnes mined at 5.4% nickel for 4,132 tonnes (9.1M lbs) contained nickel. 2. Production from the Tim King Pit at Spotted Quoll was 53,819 tonnes mined at 6.1% nickel for 3,268 tonnes (7.2M lbs) contained nickel. 3. 126,383 ore tonnes were milled to produce 6,226 tonnes (13.7M lbs) nickel in concentrate. Average plant recovery was 92%, exceeding forecast by 3%. 4. Average cash cost (before smelting/refining charges) was US$2.23/lb nickel, well below Western Areas’ long term guidance of US$2.50/lb. 5. Stockpiles contained an estimated 5,418 tonnes (11.9M lbs) nickel in ore and concentrate. 6. Cash and nickel sales receivables totalled A$208.8M. This compares with A$156.7M at the end of the December Q, representing a net positive movement of A$52.1M after paying shareholders a dividend of A$18.0M. 7. A major drilling program is underway at Flying Fox to test the T6, T7 and T8 sulphide zones, with the aim of extending mine life beyond ten years. 8. Spotted Quoll Stage One underground mine development is due to commence in April with the initial three year contract awarded to Barminco. 9. Mineralisation at Spotted Quoll now appears to continue to at least 1,700m down dip (~1,200m vertical depth) and remains open at depth and along strike. 10. 19.9% owned Canadian company Mustang Mineral Corp announced outstanding platinum/palladium results from initial drilling at an IP anomaly in Manitoba. 11. 77% owned FinnAust Mining Plc commenced drilling to test high priority base metal targets in Finland, prior to a potential UK listing in October 2011.

Upload: vuongtram

Post on 14-Apr-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: For period ending 31 March 2011 - corporate-ir.net · For the period ending 31 March 2011 ... 25,000 tonnes pa nickel in ore from the ... April with the initial three year contract

For the period ending 31 March 2011 

Western  Areas  is  an  Australian‐based nickel miner  listed  on  the  ASX  and  TSX.  The  main  asset  is  the  100%  owned Forrestania Nickel Project, 400km east of Perth.   Western Areas  is Australia’s  third largest  nickel  miner  producing  approx 25,000  tonnes  pa  nickel  in  ore  from  the Flying  Fox  and  Spotted  Quoll  mines. Western Areas  is an active nickel explorer in Western Australia, Canada and Finland.  

Mining  is  in progress at Flying Fox T4 and T5  ore  bodies  where  significant  mine development is already in place  

Mining is also in progress in the high grade Tim  King  Pit  at  the  Spotted  Quoll  mine 6km  south  of  Flying  Fox.    Total  Ore Reserves at Spotted Quoll comprise 1.9Mt at  an  average  grade  of  4.10%  nickel containing  approx.  80,790  nickel  tonnes.  Drilling  has  intersected  high  grade  nickel up to 400m below the mineral resource at Spotted Quoll.    

Flying  Fox  and  Spotted Quoll  are  two  of the  lowest cost nickel mines  in the world. Surface  infrastructure  and  development work  has  also  been  completed  on  the planned  Cosmic  Boy  and  Diggers  South mines,  located  20km  and  40km  south  of Flying Fox.  

The  Cosmic  Boy  concentrator  was upgraded  to  550,000  tpa  ore  in  June  Q 2010.  This equates to production capacity of about 25,000 tpa nickel in concentrate.  The plant is designed for a future upgrade to 1.0M  tpa  for potential  future mines at Forrestania.  

Western  Areas  has  offtake  agreements with  BHP  Billiton  for  10,000tpa  nickel  in concentrate,  with  Jinchuan  for  a  total 25,000t  nickel  in  concentrate  and  has  a short  term  contract with Minara  to  treat oxide ore from the Tim King Pit.  

The Board remains focused on the core business of low cost, long life nickel production and on generating significant returns to shareholders.    ASX & TSX code: WSA 

Shares on issue: 180m shares, 7.4m options.  Market capitalisation: Approx A$1.35Bn  @ $7.10 per share.   Suite 3, Level 1, 11 Ventnor Avenue West Perth, 6005 WESTERN AUSTRALIA Telephone: +61 8 9334 7777 Facsimile:  +61 8 9486 7866 www.westernareas.com.au 

Record Concentrate Sales & Low Cash Costs Sustained 

Western  Areas  reports  another  quarter  of  low  cost  production  and  record  nickel concentrate  sales  from Forrestania.   This quarter’s  results are  in  line with, and  in  some cases  exceed  guidance  provided  in  the  December Q  demonstrating  the  consistency  of operations.  

Combined mine production was 7,400  tonnes  (16.3M  lbs) nickel  compared with 7,959 tonnes (17.5M lbs) nickel in the December Q.  High grades (6.1% nickel) in the Tim King Pit plus consistent performance in the Flying Fox T5 deposit contributed to strong production.  Average cash cost for nickel in concentrate was US$2.23/lb.  

Record  sales  to  BHP  Billiton  and  Jinchuan  for  the March  Q  totalled  6,813t  nickel  in concentrate, being 662t higher than the previous September Q record.  As a result, nickel in concentrate stockpiles decreased by approximately 50%.   Record sales coincided with a strong average LME nickel price of US$26,903/tonne (US$12.20/lb) for the quarter.   

Drilling has also  confirmed  a major high grade extension below  the planned  Stage One Spotted Quoll underground mine.  The aim of this drilling is to add 40,000 ‐ 60,000 tonnes nickel  to Spotted Quoll. This  could potentially  support an  increase  in  the mine  life and production rate above the current annual target of 10,000 tpa nickel.    

March Q 2011 Highlights 

1. Production  from  Flying  Fox mine  (excluding  Lounge  Lizard) was  77,205  tonnes 

mined at 5.4% nickel for 4,132 tonnes (9.1M lbs) contained nickel.  

2. Production  from  the Tim King Pit at Spotted Quoll was 53,819  tonnes mined at 

6.1% nickel for 3,268 tonnes (7.2M lbs) contained nickel.  

3. 126,383 ore  tonnes were milled  to produce 6,226  tonnes  (13.7M  lbs) nickel  in 

concentrate.  Average plant recovery was 92%, exceeding forecast by 3%.  

4. Average cash cost (before smelting/refining charges) was US$2.23/lb nickel, well 

below Western Areas’ long term guidance of US$2.50/lb.  

5. Stockpiles  contained  an  estimated  5,418  tonnes  (11.9M  lbs) nickel  in ore and 

concentrate.   

6. Cash  and  nickel  sales  receivables  totalled  A$208.8M.  This  compares  with 

A$156.7M at the end of the December Q, representing a net positive movement 

of A$52.1M after paying shareholders a dividend of A$18.0M.  

7. A major  drilling  program  is  underway  at  Flying  Fox  to  test  the  T6,  T7  and  T8 

sulphide zones, with the aim of extending mine life beyond ten years.  

8. Spotted Quoll Stage One underground mine development is due to commence in 

April with the initial three year contract awarded to Barminco.  

9. Mineralisation  at  Spotted Quoll  now  appears  to  continue  to  at  least  1,700m 

down dip (~1,200m vertical depth) and remains open at depth and along strike.  

10. 19.9% owned Canadian company Mustang Mineral Corp announced outstanding 

platinum/palladium results from initial drilling at an IP anomaly in Manitoba.  

11. 77% owned FinnAust Mining Plc  commenced drilling  to  test high priority base 

metal targets in Finland, prior to a potential UK listing in October 2011.  

Page 2: For period ending 31 March 2011 - corporate-ir.net · For the period ending 31 March 2011 ... 25,000 tonnes pa nickel in ore from the ... April with the initial three year contract

Cherie Halfpenny (Environmental Advisor) cleaning seeds for rehabilitation 

1. MINE SAFETY AND ENVIRONMENT  

Safety  

Safety continues  to be a priority at Forrestania.  There were no Lost Time  Injuries  (LTI)  for March Q, however 

there were 6 Medically Treated  Injuries (MTI). The LTI (12 month moving average), at 2.69,  is the  lowest since 

July 2009.  Hazard and Action Reporting and Area Inspection continue on a regular basis to improve site safety. 

 

The  Emergency  Response  Team  consists  of  29 members who  are  being  trained  in  disciplines  for  emergency 

preparedness.   Training  in  the March Q  has  included Rope  Rescue  Instructor  training  and  BG4 Underground 

Search and Rescue. The Emergency Response Team (ERT) continues to work and train hard and will be entering 

the Mines Rescue Competition in partnership with St. Barbara Mine ERT, in Kalgoorlie, on 13th – 15th May. 

 

Forrestania hosted  its  second annual Aerodrome Emergency Management Committee meeting  in  late March. 

Representatives from Kondinin police, FESA, the Shire and Silver Chain reviewed the emergency plan.       

Environment  

The  Environment  Department  program  for  the  March  Q  consisted  of  monitoring,  statutory  reporting  and 

rehabilitation related activities to ensure project compliance at Forrestania. There were no external incidents for 

the March Q.  Highlights for the quarter included: 

 

Baseline environmental surveys completed for an internal haul road at Forrestania; 

An expansion of dust monitoring and forecasting capabilities at Forrestania operations sites; 

Commencement of a  substantial progressive  rehabilitation program at Forrestania,  including areas at the Spotted Quoll and Flying Fox mines; 

 

 

 

   

   

Community Support Forrestania Operations hosted a site visit for Year 8 Students from the regional Kulin District High School.  

The  visit  included  informative  sessions on Mine  Surveying,  Exploration  and Mine Geology, Underground  and Open  Pit Mine  Engineering  followed  by  a  tour  of  the  operations  viewing  the  Flying  Fox  infrastructure  and equipment, Spotted Quoll Pit, Core yard and the Concentrator.    

 

 

 

 

 

 

Kulin High School Students at Spotted Quoll 

Page 3: For period ending 31 March 2011 - corporate-ir.net · For the period ending 31 March 2011 ... 25,000 tonnes pa nickel in ore from the ... April with the initial three year contract

2.     MINE AND MILL PRODUCTION AND CASH COSTS 

 

             

FYTD

Tonnes Mined Jun Qtr Sep Qtr Dec Qtr Mar Qtr Total

Flying Fox Ore Tonnes Mined Tn's 91,437    84,935    96,635    77,205     258,775    Grade Ni % 4.0% 4.0% 4.6% 5.4% 4.6%

Ni Tonnes Mined Tn's 3,697    3,363    4,459    4,132    11,954    

Spotted Quoll

Ore Tonnes Mined Tn's 46,258    66,978    56,696    53,819     177,493    Grade Ni % 6.7% 7.4% 6.2% 6.1% 6.6%

Ni Tonnes Mined Tn's 3,113    4,939    3,500    3,268    11,707    

Total ‐ Ore Tonnes Mined Tn's 137,695    151,913   153,331   131,024    436,268    Grade Ni % 4.9% 5.5% 5.2% 5.6% 5.4%

Total Ni Tonnes Mined Tn's 6,810    8,302    7,959    7,400    23,661    

Tonnes Milled and Sold Jun Qtr Sep Qtr Dec Qtr Mar Qtr Total

Ore Processed Tns 83,639    131,542   123,027   126,383    380,952    Grade % 4.5% 5.7% 5.4% 5.4% 5.5%

Ave. Recovery % 88% 89% 90% 92% 90%

Ni Tonnes in Concentrate Tns 3,303    6,678    5,976    6,226    18,880    

Ni Tonnes in Concentrate Sold Tns 2,307    6,151    5,594    6,813    18,558    Ni Tonnes in Ore Sold Tns 241    987    507    119     1,613    Total Nickel Sold Tns 2,548    7,138    6,101    6,932    20,171    

Stockpiles Sep Qtr Dec Qtr Mar Qtr

Ore Tns 73,293    92,405    91,599    Grade % 4.6% 4.4% 4.8%

Concentrate  Tns 11,386    13,052    7,047   Grade % 14.1% 14.1% 14.0%

Contained Ni in Stockpiles Tns 4,977    5,906    5,418   

Financial Statistics Jun Qtr Sep Qtr Dec Qtr Mar Qtr FY YTD Average

Group Production Cost/lb

Mining Cost (*) A$/lb 1.72    1.36    1.36    1.66    1.46    Haulage A$/lb 0.09    0.07    0.08    0.08    0.08    Milling A$/lb 0.56    0.37    0.40    0.33    0.37    Admin A$/lb 0.17    0.15    0.19    0.17    0.17    By Product Credits A$/lb (0.03)    (0.02)    (0.02)    (0.02)    (0.02)    

Cash Cost Ni in Con (***) A$/lb 2.51    1.93    2.01    2.22    2.06    

Cash Cost Ni in Con/lb (***) US$/lb (**) 2.22    1.74    1.99    2.23    1.98    

Exchange Rate US$ / A$ 0.88    0.90    0.99    1.00    0.96    

2010/2011

Note. All reported numbers in this table exclude Lounge Lizard..

(*) Mining Costs are net of deferred waste costs and inventory stockpile movements

(**) US$ FX for Relevant Quarter is RBA ave daily rate  (Mar Qtr = A$1:US$1.00)

(***) Payable terms are not disclosed due to confidentiality conditions of the offtake agreements. Cash costs exclude royalties.

Note. Grade and recovery estimates are subject to change until the final assay data are received.

2009/2010

0.50 

1.00 

1.50 

2.00 

2.50 

3.00 

0.0%

1.0%

2.0%

3.0%

4.0%

5.0%

6.0%

7.0%

Jun Qtr 2010 Sep Qtr 2010 Dec Qtr 2010 Mar Qtr 2011

A$/lb

Grade %

Milled Grade & Cash Cost A$/lb

Milled Grade % Cash Cost Ni in Con

2.5%

3.0%

3.5%

4.0%

4.5%

5.0%

5.5%

6.0%

6.5%

115 

120 

125 

130 

135 

140 

145 

150 

155 

160 

Jun Qtr 2010 Sep Qtr 2010 Dec Qtr 2010 Mar Qtr 2011

Ore Tonnes Mined (Ktn's)

Grade %

Mined Grade & Ore Tonnes  

Ore Mined Tns Ore Mined Grade %

Page 4: For period ending 31 March 2011 - corporate-ir.net · For the period ending 31 March 2011 ... 25,000 tonnes pa nickel in ore from the ... April with the initial three year contract

  Flying Fox – Underground Mine A total of 77,205 tonnes of ore at an average grade of 5.4% nickel for 4,132 tonnes of nickel was mined from the Flying  Fox mine during  the March Q. Ore production  split  for  the March Q was  as  follows;  T1:3,370  tonnes; T4:2,188 tonnes; T5:71,648 tonnes indicating that T5 is now the dominant producer.  Ore production was down on  the Dec Q due  to majority of  the ore being mined  from development drives  in T5, which was  in  line with forecast.  The reduced tonnage was compensated for by the mined grade which was up 17% on the Dec Q.  

Long Hole stope production continued from the narrow 900 and 886 stopes in T1, the 730, 710 and 640 stopes in T4 and the first stope (455) in T5.  The remaining ore was mined from the 480 N/S flat back stope and seven ore drive headings in T4 and T5.  This will allow additional stope production areas for the June Q. 

High Grade Massive Sulphide Ore in the 410 Ore Drive T5 

 

Spotted Quoll – Tim King Open Pit Mine Ore mining continued in the March Q from the stage 1 pit with 53,819 tonnes mined at a grade of 6.1% nickel for 3,268 nickel tonnes.   Stage 1 mining advanced 10 vertical metres during the March Q to a depth of 85 metres from the surface with the stage 2 cutback advancing 20 vertical metres to a depth of 85 metres from the surface (Figure 2).  The stage 2 cutback was completed in the March Q.   

The project was in line with the forecast for the March Q with a total of 0.71 million bank cubic metres (“bcm”) mined. Ore mining from the stage 1 pit progressed into transitional ore with a total of 53,819 tonnes at a grade of 6.07% Ni for 3,268 nickel metal tonnes.   

At the end of the quarter there were 21,520 tonnes of transitional ore at an average grade of 5.6% Ni containing 1,204 nickel tonnes stockpiled on the Spotted Quoll mine ore pad.    

            

Aerial View of Tim King Pit 

    

Page 5: For period ending 31 March 2011 - corporate-ir.net · For the period ending 31 March 2011 ... 25,000 tonnes pa nickel in ore from the ... April with the initial three year contract

 Cosmic Boy Nickel Concentrator  126,383 tonnes of ore at 5.4% nickel were milled for the March Q with the Cosmic Boy concentrator producing 43,526 tonnes of concentrate grading 14.3% nickel for 6,226 nickel tonnes.  Concentrator metallurgical recovery averaged 92% with 98.3% plant availability.  

At the end of the quarter, approximately 91,599 tonnes of ore at an average grade of 4.8% nickel containing over 4,430 tonnes nickel was stockpiled at site awaiting treatment at Cosmic Boy or sale to Minara Resources Ltd. 

Half height containers leaving Cosmic Boy Plant for Esperance Port 

Cash Costs The cash cost of nickel in concentrate (excluding smelter/refinery charges and royalties) during the March Q was US$ 2.23/lb nickel which was in line with forecast.  The increase in cash cost as compared against the Dec Q was driven mainly by an  increase  in operating  cost at Spotted Quoll due  to  the  completion of  the  stage 2  capital program.  The YTD average cash cost of US$1.98/lb nickel is 21% below the guidance of US$2.50/lb nickel.

3.  NICKEL SALES Delivery of concentrate from the Cosmic Boy plant to BHP Billiton’s smelter at Kambalda and Jinchuan’s smelter in China continued during the March Q including a one off sale of surplus concentrate to Xstrata Nickel.  A record total of 53,471  tonnes of concentrate was  sold containing 6,813  tonnes of nickel.    In addition, 118  tonnes of nickel in ore were sold to Minara Resources Ltd.   

The concentrate stockpile at Cosmic Boy now stands at 4,720 tonnes at a grade of 13.9% nickel containing 657 tonnes of nickel metal. An additional 2,327  tonnes of  concentrate  containing 332  tonnes of nickel metal was stored at the Port of Esperance ready for shipment to China.  

12,730

97,037

106,037

134,173

28,084

43,89049,768

64,820

84,687

20,000 

40,000 

60,000 

80,000 

100,000 

120,000 

140,000 

160,000 

Jul‐10 Aug‐10 Sep‐10 Oct‐10 Nov‐10 Dec‐10 Jan‐11 Feb‐11 Mar‐11

Concentrate Tonnage Sold ‐ 9 Months 2010/2011

Cumulative

Other

Jinchuan

BHP

  

4.  FORRESTANIA MINE DEVELOPMENT AND INFRASTRUCTURE    Flying Fox Mine Development The capital infrastructure at the Flying Fox mine is substantially complete.  The main decline has advanced to 1093m below surface and  is situated close to the bottom of the T5 deposit (Figure 1).   The decline will not be advanced further over the next 12 months as lateral access development is being mined to open up the T5 ore  reserve. The main  return airway will be completed early  in  the  June Q along with  the 334 RL diamond drill drive.  This will allow infill drilling of the lower T5 and the T6 ore bodies.  

Page 6: For period ending 31 March 2011 - corporate-ir.net · For the period ending 31 March 2011 ... 25,000 tonnes pa nickel in ore from the ... April with the initial three year contract

 The  pilot  drill  hole  for  the  surface  leg  of  the  fresh  air  intake was  completed  and  back  reaming  of  the  4m diameter hole has commenced.  This will allow fresh, clean air down to the top of the T5 orebody.  

Spotted Quoll – Underground Mine Excellent progress has been made on new Spotted Quoll mine  infrastructure  in preparation for the start up of the  underground mine.    This  consists  of  a  surface workshop  extension,  new  change  rooms  for  underground personnel and an electrical switch yard.  The underground mining contract was awarded to Barminco during the quarter following an extensive competitive tender process.  The main decline will be developed in the west wall of the Tim King Pit starting approximately 70m below surface.    

 Senior Mine Management at the planned Spotted Quoll decline portal position 

 

Diggers South Project Mine optimisation work was  conducted during  the March Q  to  examine  alternative mining methods using  a lower  cut off grade  in  conjunction with alternative processing  routes.   The  focus of  this approach  is  twofold: firstly, to  increase the nickel metal recovered  from the known resource and secondly, to  increase the mineral resource by extensional diamond drilling. A drilling program to extend the resource and potentially the mine life at Diggers South will commence in the June Q.  Discussions have progressed with a number of potential partners around alternative mining and processing routes.  

 

Mossco Farm pipeline and evaporation ponds The 14klm pipeline extension  from Digger Rocks evaporation pond  to Western Areas’ owned  “Mossco Farm” was completed  in the March Q.   This extension to the existing dewatering facilities has been built to allow the long term disposal of water from both the Flying Fox and Spotted Quoll mines.   

Three  evaporation  ponds  with  an  evaporation  capacity  of  815,000  square  metres  are  being  built  to  add significant flexibility to the current dewatering system. The evaporation ponds are expected to be commissioned by the end of the June Q and are being constructed by Piacentini and CECK with a fleet of 7 scrapers.    

     Three scrapers stripping topsoil at Mossco Farm evaporation pond 

 

Page 7: For period ending 31 March 2011 - corporate-ir.net · For the period ending 31 March 2011 ... 25,000 tonnes pa nickel in ore from the ... April with the initial three year contract

 Figure 1: Interpreted longitudinal projection of Flying Fox Mine including Lounge Lizard deposit  

 

Page 8: For period ending 31 March 2011 - corporate-ir.net · For the period ending 31 March 2011 ... 25,000 tonnes pa nickel in ore from the ... April with the initial three year contract

Figure 2: Spotted Quoll – Interpreted Long Section (Plane of Vein) showing Stage Two target zone  

Page 9: For period ending 31 March 2011 - corporate-ir.net · For the period ending 31 March 2011 ... 25,000 tonnes pa nickel in ore from the ... April with the initial three year contract

 

5.  FORRESTANIA MINERAL RESOURCES AND ORE RESERVES

Flying Fox Underground diamond drilling to define the T5/T6 mineralised zones at Flying Fox and Lounge Lizard continued during the quarter.  Data is now being interpreted to update the Mineral Resource model for Flying Fox.  

Development of an underground drilling position from the mine decline is nearing completion and a new drill rig has been constructed for the drilling program to test the T7/T8 zones at Flying Fox.   

Ore development  at  T5  continued during  the quarter,  generating  the majority of  the hoist nickel  tonnes  for Flying Fox. Ore widths were as modelled or slightly wider, with high tenor nickel sulphide as expected.  

Spotted Quoll The next phase of in‐pit RC grade control drilling was completed in the Tim King open pit.  The defined ore in the pit contains 44% more Ni metal  than  the Mineral Resource model. Reconciliation  to  the end of March 2011 showed that mining allocated hoist was also 44% higher than the equivalent Ore Reserve depletion.  

   

 Surface Diamond Drill Rig at Flying Fox 

      

Page 10: For period ending 31 March 2011 - corporate-ir.net · For the period ending 31 March 2011 ... 25,000 tonnes pa nickel in ore from the ... April with the initial three year contract

 6.  BIOHEAP 

Initial testing on samples from Digger Rocks, New Morning and tailings from the Cosmic Boy nickel concentrator has been successfully completed. The outcomes of the study were considered to be very encouraging. As a result, additional test work on Diggers South Ore and Forrestania tailing samples commenced in the March Q. The data generated from these studies will improve the understanding of the leaching characteristics of this material.  

A  desktop  study  considering  a  hydrometallurgical  processing  facility  for  the  Cosmic  Boy  concentrator  plant, Digger  South  and  New  Morning  deposits  has  been  concluded.    The  study  recommended  more  detailed investigation into several areas of interest and further work will be initiated pending an economic assessment.  Western Areas  is currently  reviewing  laboratory  facilities  to accommodate  future BioHeap™  research and  test work  requirements.   Research and development  into  key areas of  the  technology  continues, with  the aim of broadening the scope of application of BioHeap™.  No further metallurgical testwork was conducted on samples of sulphide ores from the Finland Projects during the March Q, where  exploration  and  resource drilling  is ongoing.    It  is  expected  that metallurgical work will recommence in the June Q when representative samples of the ore are available.  

7.  FORRESTANIA EXPLORATION  

Figure 3: Interpreted Long Section extending 6km including Spotted Quoll, New Morning and Flying Fox 

Exploration drilling for the majority of the quarter focused on evaluating the potential for deeper extensions to the Spotted Quoll deposit and the Flying Fox deposit (Figures 1 and 2).  

Spotted Quoll At Spotted Quoll a major  resource extension drilling program  is underway with  two diamond drill  rigs  testing below  the  Stage One  ore  reserve  (Figure  2).  Drilling  has  intersected  high  grade  nickel mineralisation  up  to 1,700m down dip (1,200m vertical depth) below surface, confirming the exceptional continuity of this high grade deposit at depth.  

Four  drill  holes were  completed  in  the  Stage  Two  target  area  during  the March Q with  recent  intersections including 3.7m @ 8.2% nickel, 2.2m @ 9.2% nickel and 3.2m @ 6.3% nickel.    

Western Areas has set a new exploration target in the Stage Two extension at Spotted Quoll of between 40,000 tonnes to 60,000 tonnes contained nickel.    If this  is achieved, potential exists for a significant  increase to both mine life and annual production rate from the planned underground mine.    Drilling is currently in progress testing the northern and southern margins of the target area and this is expected to  lead  to  further drilling  in  the untested areas above and  to  the north of Stage Two  (Figure 2).   Drilling will continue throughout the June Q to test the extent and continuity of mineralisation intersected in the recent drill holes.  An initial mineral resource estimate for Stage Two is expected to be completed by the end of the June Q.  

Page 11: For period ending 31 March 2011 - corporate-ir.net · For the period ending 31 March 2011 ... 25,000 tonnes pa nickel in ore from the ... April with the initial three year contract

Flying Fox Surface diamond drilling to test for deeper resource extensions to the T6, T7 and potentially T8 sulphide zones at Flying  Fox  continued  in  the  March  Q  (Figure  1).    This  drilling  program  will  be  accelerated  when  drilling commences from the underground mine development.  

The first surface drill hole in this program intersected a zone of nickel sulphide on the T6 Fault (0.7m @ 2.4%Ni), adjacent to the dolerite dyke.  Down hole Electro Magnetics (EM) indicates the intersection is on the edge of a strongly conductive anomaly immediately to the south of the drill hole.  Although the extent of the conductor is not defined, an EM anomaly in a previous drill hole 200m to the south may represent part of the same source.  Drilling is now targeting this EM anomaly and the T7 sulphide zone which is interpreted below T6.    

Forrestania Elsewhere in the Forrestania Project region, drilling was undertaken at other prospects which have potential to host new sulphide deposits.  This included drilling at Sibelius (14km north west of Cosmic Boy), North Endeavour (6km south of Cosmic Boy), South Iron Cap (12km south Cosmic Boy), Purple Haze (21km south east of Cosmic Boy) and Hatters Hill (34km south east of Cosmic Boy).    

A number of potentially  significant drill hole  intersections were made at  several of  the prospects.   The most significant result was  in drill hole SID19 at South  Iron Cap which  intersected 40.5m @ 0.8% Ni  from 255.5m down  hole  depth.    Previous drilling  at  South  Iron Cap  is  generally widely  spaced  and  further drilling will be undertaken in the June Q to define the significance of this wide zone of sulphide mineralisation.  South Iron Cap is located approximately 3km north of the large Diggers South nickel deposit.  

8.  AUSTRALIAN REGIONAL EXPLORATION  Western  Areas’  extensive  regional  nickel  interests  in Western  Australia  include  joint  venture  projects which extend over 500km  in the central part of the Yilgarn Craton.   These projects host several potentially significant nickel sulphide discoveries outside Forrestania.  

Sandstone Joint Venture (WSA earning 70% interest in nickel rights) The  Sandstone  JV  covers  a  large  area  (approximately  25km  by  15km)  of what  is  considered  to  be  a  highly prospective ultramafic sequence which has had minimal previous exploration for nickel.  Early in 2010, Western Areas’  second diamond drill hole WAD002  intersected disseminated nickel  sulphides which assayed 26.2m @ 0.4% nickel from 60.3m depth.  This included a narrow interval of semi‐massive sulphides which analysed 0.2m @ 4.1% Ni from 86.3m down hole depth.  

Aircore Drilling at Sandstone 

 

Page 12: For period ending 31 March 2011 - corporate-ir.net · For the period ending 31 March 2011 ... 25,000 tonnes pa nickel in ore from the ... April with the initial three year contract

Western Areas  is undertaking  a  systematic  exploration program  to  test  large  areas of prospective high MgO cumulate  ultramafic  rocks  for  nickel  sulphides.    This  includes  using  high  definition  Induced  Polarisation  (IP) geophysical surveys to identify anomalous conductors and aircore drilling to define targets for deeper drilling.  

IP surveys continued to assess the south east portion of the Project area, where higher MgO cumulate ultramafic rocks  have  been  identified  in  previous  shallow  drilling.  The  IP  survey  started  at  the  end  of  December  and continued  through  the March Q.    This  technique  is  proving  to  be  very  effective  at  identifying  anomalies  for drilling  in  the Sandstone Project area.   Large amounts of data are currently being processed and  then will be inverted to assist  interpretation. The data  is generally high quality and two areas (Figure 4) have already been identified which will require deeper drilling to define the source of the IP response.   

 Figure 4: 3D inversion model of IP data from the Sandstone Project, used to target drilling 

 

Shallow aircore drilling was undertaken in a number of areas in the south east and central portions of the project area.   A total of 202 aircore holes were completed for 9,500m.   Encouraging mafic and ultramafic rocks, some with sulphides present, have been intersected in the drilling and  elevated values for Nickel and Platinum Group Elements  (PGE) have been  returned  from a number of assays  to date.   Deeper  testing of  these areas will be conducted in the June quarter when larger percussion and diamond core drill rigs are expected to arrive on site.  

The IP and drilling programs were interrupted by heavy rain in February and recommenced in mid March.  

Compilation of the geology  is continuing and  is being used to define areas of higher MgO ultramafic rocks that will require drilling.  

Lake King JV (WSA 70%) The Lake King JV tenements cover a 40km  long nickel prospective belt  located approximately 70km south west of Forrestania.  Western Areas has earned 70% interest in this project.  

Exploration during the March Q  included drilling of magnetic anomalies with deeper reverse circulation drilling (7 holes  for 1258m) and diamond drilling  (3 holes  for 355.3m). The  recent drilling  results  confirmed  that  the prospective host ultramafic sequence at Nickel Hill extends 10km north of Nickel Hill, and along a separate belt 6km to the south of Nickel Hill.    The deeper drilling  also  returned  anomalous  shallow nickel  and  copper  intersections,  from  the northern  and south eastern prospects.  Further work is required to interpret the significance of the results to date.  

     

Page 13: For period ending 31 March 2011 - corporate-ir.net · For the period ending 31 March 2011 ... 25,000 tonnes pa nickel in ore from the ... April with the initial three year contract

Kawana JV (WSA earning 80%) The Kawana Project  is  located approximately 250km north west of Western Areas’ Forrestania operations. The Project covers the northern portion of the Southern Cross‐Bullfinch Greenstone Belt. The Project area has been subject to only limited systematic nickel exploration.  

Drill testing of bedrock electromagnetic (EM) conductors associated with ultramafic units at the Wild West and Twilight prospects was undertaken  in  the March Q.    The drilling  showed  the  source  to  these  anomalies was barren massive iron sulphides.  The presence of higher MgO ultramafic rocks at the Quartz Ridge and Wild West prospects indicates further work is required to evaluate the potential of the Kawana Project.  

9.  FINNAUST MINING Plc  

Western Areas has increased its equity in FinnAust Mining Plc to 77.2% by investing a further €2M.  FinnAust has approximately €2.5 million in cash following completion of the recent subscription by Western Areas.   

Funds are being used to continue the drilling program and prepare for the potential  listing on the London AIM Market around October this year.   Grant Thornton has been appointed as Nominated Advisor to the proposed London AIM listing.  

FinnAust has extensive holdings covering six exploration projects in the Kainuu Schist Belt and three exploration projects  in  the adjacent Outokumpu  ‐ Savonranta Belt  in central Finland.   FinnAust considers  this  region may represent a major metal province with potential to host multiple base metal deposits.    

Production  in  the Kainuu Schist Belt  is dominated by the  large Talvivaara open pit mine  (owned by Talvivaara Mining Plc) which is successfully using a bacterial leaching technology to extract nickel, zinc, copper and cobalt from low grade sulphide mineralisation in a black schist ore host.  Talvivaara has announced production targets of 15,000tpa nickel and 30,000tpa zinc for 2011 increasing to 50,000tpa nickel and 90,000 tpa zinc from 2012.    

In  2010, Western  Areas  conducted  shallow  drilling  in  the  Kainuu  Schist  Belt  and  confirmed  the widespread occurrence of Talvivaara type sulphide mineralisation on claims and reservations now held by FinnAust.  

The historic Outokumpu mine produced a total of approximately 42 million tonnes of ore at an average grade of 3.1% copper, 1.0% zinc, 0.2% cobalt and 0.1% nickel between 1913 and 1988.   FinnAust has tenements  in the immediate area of the Outokumpu mine and 20km south in the Savonranta area.  

FinnAust  has  identified  over  50  exploration  targets  in  nine  different  project  areas  within  the  Kainuu  and Outokumpu ‐ Savonranta Belts.   These targets have potential for the following deposit types:  

1. Talvivaara Type 2. Outokumpu Type 3. Volcanogenic Massive Sulphide Type 4. Gabbro hosted Type 

 

 The FinnAust drilling program  in 2011  is  intended to  focus on a range of targets  for both Talvivaara Type and Outokumpu  Type mineralisation.  In  addition,  the  2011  program will  include  geophysical  surveys  over  other targets, metallurgical test work of a range of different ore types and resource drilling programs.    Drilling  has  commenced  at  the Hakonen  Project  area,  located  3km  east  of  the  Talvivaara mine  to  follow  up nickel,  zinc  and  copper  sulphide mineralisation  intercepted  at  shallow  depth  in  1963.  This mineralisation  is associated with coincident magnetic and EM anomalies which extend over several kilometres.  

Page 14: For period ending 31 March 2011 - corporate-ir.net · For the period ending 31 March 2011 ... 25,000 tonnes pa nickel in ore from the ... April with the initial three year contract

Figure 5: Plan of Kainuu Schist Belt in Finland showing FinnAust Mining holdings and location of Talvivaara  

 

FinnAust Drilling Results   R1 Mineral Resource An initial Mineral Resource estimate has been completed for the Rautavaara R1 Deposit, located 60km south of Talvivaara mine, with 65,300 tonnes contained nickel (Table 1).  Drilling  is planned to commence  in the June Q with the aim of increasing the size of the R1 mineral resource. 

Figure 6:  Geological Wireframes – Rautavaara R1 Deposit 

 

Page 15: For period ending 31 March 2011 - corporate-ir.net · For the period ending 31 March 2011 ... 25,000 tonnes pa nickel in ore from the ... April with the initial three year contract

 

Table 1   Mineral Resource Estimate Rautavaara R1 Deposit, reported at a lower cut‐off of 0.10% Ni, January 2011 

Mineral  Resource  Parameters: Geological wireframes were  constructed  utilising Datamine  Studio  software  for  the  black  schist  and  ultramafic horizons, surface topography, base of overburden  (glacial till) and bounding fault zone (see Figure 6).   Estimation of Ni, Cu, Co and Zn was made using Ordinary Kriging; with Mineral Resource reported using a lower cut‐off of 0.1% Ni (cf Talvivaara 0.07% Ni).  Mineralisation was only estimated within the black schist horizon; whilst some erratic mineralisation within ultramafic and some skarn material was present but low in Zn and Cu and has different  leaching properties and acid consumption, and  is therefore not considered  in this analysis. Based upon the drill data density, quality, geological understanding and kriging efficiency analysis, the majority of the defined mineral resource has been assigned to the  Indicated Mineral Resource category as detailed in Table 1.  The Mineral  Resource  estimate  was  completed  by Mr  John  Haywood  who  is  a  full‐time  employee  of Western  Areas  NL.    Black  Schist  sulphide mineralisation was modelled as 3D solids, and a block model was created using “Datamine Studio” software, filling the solids with cells and sub‐cells; with Ni, Cu, Co and Zn estimated by Ordinary Kriging. The stratabound black schist mineralisation at Rautavaara R1 exhibits good continuity of width and grade, with drilling density sufficient to define the structural complexity.     

Item  Details Comments

Cells Size   25m (X) by 25m (Y) by 25m (Z) Sub‐celled to match solids 

Interpolation Method  Ordinary Kriging Validated by ID2 estimate 

Search Radii  150m (X) by 150m (Y) by 30m (Z) Strong continuity of grade 

Nominal Drill hole spacing   40m by 80m to 100m by 100m Diamond drilling 

Surface diamond drill hole collar surveys used differential GPS; downhole surveys used a gyroscopic instrument; a density database was utilised; there is high assay confidence with systematic QA/QC procedures;.  An alternate inverse distance squared estimate was made to validate the ordinary kriged resource.  A validation of drill holes against block model grades was made.  

10. MUSTANG MINERALS CORP  

On  22 March  2010, Mustang Minerals  Corp  (“Mustang”)  announced  a  potentially  significant  platinum  and palladium discovery at Mustang’s 100% owned Mayville Project  in southeast Manitoba.   Western Areas owns 19.9% of Mustang.  

A wide zone of platinum and palladium mineralisation associated with disseminated sulphides and chromitite was  intersected  in  two diamond core drill holes at shallow depth  (see Figure 7).   These  included  results  from MAY11‐07 which intersected 9.15 meters at average grade of 9.5 g/t combined platinum and palladium within a wider zone of 41.16 meters at an average grade of 2.9 g/t platinum and palladium.   

Drill  hole MAY  11‐07 was  drilled  as  part  of  a  reconnaissance  drill  program  testing  a  number  of  geophysical targets  across  the Mayville Property where Mustang has  an existing  copper‐nickel‐PGM mineral  resource.   A sketch cross section and geophysical plan is shown below  

Mustang  is drilling a previously untested,  IP‐EM‐magnetic  trend within  the Bird River  Intrusive Complex.   The PGM mineralisation appears  to be associated with disseminated sulphides within a host ultramafic unit which has a potential  strike  length up  to 2 km, based on geophysics  (Figures 7 & 8).   The host unit  is  located 1 km southeast  of Mustang’s  gabbro  hosted Mayville  copper/nickel  sulphide  deposit  and  250 meters  north  of  a separate, recent discovery of  copper/nickel sulphides, announced by Mustang on March 3rd, 2011. 

Tonnes (t)NI grade

(%)Zn grade

(%)Cu grade

(%)Co grade

(%)NI metal

(t) Zn metal

(t) Cu metal

(t)Co metal

(t)

Measured Resource-

-

-

-

-

-

- -

-

Indicated Resource 28,301,300

0.192

0.378

0.101

0.012

54,210

107,050 28,690

3,530

Inferred Resource5,960,400

0.186

0.391

0.104

0.012

11,090

23,280 6,210

700

Tonnes (t)NI grade

(%)Zn grade

(%)Cu grade

(%)Co grade

(%) NI metal

(t) Zn metal

(t) Cu metal

(t) Co metal

(t)

Indicated + Inferred Resource 34,261,700

0.191

0.380

0.102

0.012

65,300

130,330 34,900

4,230

Resource Category Rautavaara R1 Deposit

Page 16: For period ending 31 March 2011 - corporate-ir.net · For the period ending 31 March 2011 ... 25,000 tonnes pa nickel in ore from the ... April with the initial three year contract

 Figure 7: Sketch section of two ‘discovery drill holes’ showing platinum and palladium mineralisation 

The PGM mineralisation remains completely open along strike and at depth  

 Figure 8: Image of VTEM data covering part of Mustang’s extensive holdings in the Mayville Project area 

 

Subsequent to the end of March Q Mustang announced that three additional drill holes had been drilled at the new PGM discovery area. The first hole was drilled 50 metres south of MAY11‐07 (at the same 65 degree angle) to test for mineralisation at a greater depth as well as define the southern limit as MAY11‐07 which was collared into PGM mineralisation. The next two holes were drilled 50 metres to the east and 50 metres to the west of the drill collar at MAY11‐07.   

Drilling  in  all  three  drill  holes  encountered  a  strongly  altered  ultramafic  unit  containing  locally  finely disseminated  chalcopyrite, pyrrhotite, pyrite  sulphides and  locally  significant  chromite.   This  is  the  same  rock type which hosts the MAY11‐07 PGM mineralisation.  Mustang Minerals had not announced assay results from the three later drill holes at the time of the release of Western Areas’ March Q Report.  

 

 

 

 

 

 

Page 17: For period ending 31 March 2011 - corporate-ir.net · For the period ending 31 March 2011 ... 25,000 tonnes pa nickel in ore from the ... April with the initial three year contract

11.    CORPORATE AND FINANCING 

Cash Balance and Working Capital At 31 March 2011, Western Areas had an unaudited A$154.2M  in cash plus nickel sales  receivables valued at A$54.6M.  Total cash plus nickel sales receivables A$208.8M (December Q was A$156.7M).  Net movement in cash for the quarter was A$28.7M post the payment of an $18.0M interim dividend during the quarter.    

Working capital in stockpiles of both ore and concentrate had a value at cost of A$24.9m. The in situ value of the nickel metal  contained  in ore and  concentrate  stockpiles at  current prices was ~A$140.0m at  the end of  the March Q.  These stockpiles are subject to plant recoveries, processing, smelting and refining costs.  

Dividends The Company paid a $0.10/share  interim dividend based on the earnings for the half year ended 31 December 2010.  This was settled on 28 March 2011 and represented a return of A$18.0m to shareholders.  

After assessment of  the growth and development of  the Company’s assets at  the Forrestania Project and  the current Balance Sheet, the Company has adjusted its dividend policy.  Western Areas’ dividend policy is to target the  return  of  sustainable  and  consistent  dividends  to  shareholders, while  ensuring  that  current  and  future treasury requirements are satisfied and balance sheet strength is not compromised.  

Hedging The Company manages nickel price risk with a combination of short term quotation period (“QP”) hedging and a set  limit of medium term hedging.   The policy allows the use of forward sales, bought options and collar style options. 

QP hedging is used to manage the risk of price fluctuations for nickel already shipped to customers that is still subject to price finalisation. 

Medium term hedging is used to manage the risk of unforeseen nickel price shocks with approximately 25% of the expected nickel sales per month hedged out to a maximum of 12 months.   

The  current  nickel  hedge  book  consists  of  zero  cost  collars with  an  average  floor  price  of US$10.10/lb with upside participation to US$12.14/lb for hedged sales.  The company believes this is a prudent approach to future profitability  and  cashflow while  providing  75%  exposure  to  the  spot  nickel  price. Details  of  hedges  as  at  31 March 2011 are as follows: 

 

Hedging Details  Fiscal 2011 Fiscal 2012 Nickel Hedging Collar Style Options

Ni Tonnes Sold  1,350 2,400 US$ Price / Tonne Call 22,594 22,100 US$ Price / Tonne Put 27,751 26,235 

   Foreign Exchange Contracts  US$ Sold   5,000 ‐ US$ Rate  0.8991 ‐ 

   

 The  hedging  contracts  listed  above  are  not  subject  to margin  calls.    In  line with  the medium  term  hedging strategy, post quarter end, the Company entered into a further 900 tonnes for FY12.  The average floor price was US$10.09/lb with upside participation to US$13.89/lb.  

Convertible Bonds The successful restructure of the A$225m of convertible bonds due  in July 2012 during the December quarter last year  left  the Company holding 3  convertible bonds with a manageable and  staggered maturity profile as follows: 

CB1  ‐  A$105.5m due in July 2012 with a 8.0% coupon (convert strike price of A$7.94) 

CB2  ‐  A$125.0m due in July 2015 with a 6.4% coupon (convert strike price of A$6.61) 

CB3  ‐  A$110.2m due in July 2014 with a 6.4% coupon (convert strike price of A$7.71) 

Western Areas has created a bond repayment fund which has A$60m allocated to date and will progressively be accrued until the July 2012 repayment date for CB1.  All of Western Areas Convertible Bonds are quoted on the Singapore Stock Exchange.  

Debt Facilities, The ANZ loan Facility (A$80m) continues to remain undrawn as at the date of this report. 

Page 18: For period ending 31 March 2011 - corporate-ir.net · For the period ending 31 March 2011 ... 25,000 tonnes pa nickel in ore from the ... April with the initial three year contract

 

‐ENDS‐ For further details, please contact:    Julian Hanna           Dan Lougher Managing Director – Western Areas NL    Operations Director – Western Areas NL Telephone +61 8 9334 7777       Telephone +61 8 9334 7777 Email: [email protected]      Email: [email protected]  

David Southam      Shane Murphy Finance Director – Western Areas NL      Financial Dynamics   Telephone +61 8 9334 7777       Telephone +61 8 9386 1233 / 0420 945 291 Email: [email protected]  Email: [email protected]    Or visit: www.westernareas.com.au   

QA‐QC STATEMENT:   Mr Adrian Black from geological consultants Newexco Services Pty Ltd (“Newexco”) and Mr Charles Wilkinson from Western Areas are  responsible  for  the  verification  and  quality  assurance  of  the  Company’s  exploration  data  and  analytical  results  from  the Forrestania Nickel Project.   Surface diamond drill hole collar surveys used differential GPS, downhole surveys employed a north seeking gyroscopic  instrument; comprehensive density database; high assay confidence with systematic QA/QC procedures; and validated  database.    Samples  of  quarter  core  from  the  drill  holes  described  in  this  release  are  prepared  and  analysed  by ALS Chemex Ltd  laboratory  in Perth  for nickel, copper, cobalt and other elements. Core samples are crushed and pulverised  to 90% passing  75 microns  then  analysed  for  nickel  by  ore  grade  determination  using  the  ALS OG–62 method.  Assays  standards  are routinely inserted in the sample stream by Newexco for quality control.  The  information within  this  report as  it  relates  to mineral  resources, ore  reserves and mine development activities  is based on information  compiled  by Mr  John Haywood, Mr  Tim  Peters, Mr Dan  Lougher  and Mr  Julian Hanna  of Western Areas NL.   Mr Haywood, Mr  Lougher  and Mr Hanna  are members  of AusIMM  and  are  full  time  employees  of  the  Company.   Mr  Peters  is  a member of AusIMM and  is a consultant  to Western Areas.   Mr Haywood, Mr Peters, Mr Lougher and Mr Hanna have sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which they are  undertaking  to  qualify  as  Competent  Persons  as  defined  in  the  2004  Edition  of  the  ‘Australasian  Code  for  Reporting  of Exploration Results, Mineral Resources and Ore Reserves.’   Mr Haywood, Mr Peters, Mr Lougher and Mr Hanna consent  to  the inclusion in the report of the matters based on the information in the form and context in which it appears.   FORWARD LOOKING STATEMENT:   This release contains certain forward‐looking statements including nickel production targets. These forward‐looking statements are subject to a variety of risks and uncertainties beyond the Company's ability to control or predict which could cause actual events or results to differ materially from those anticipated in such forward‐looking statements.   Examples of  forward  looking  statements used  in  this  report  include “This could potentially  support an  increase  in mine  life and mine production rate above the target 10,000 tpa nickel”, and “A drilling program to extend the resource and potentially the mine life  at  Diggers  South will  commence  in  the  June Q”,  and  “Western  Areas  has  set  a  new  exploration  target  in  the  Stage  Two extension at Spotted Quoll of between 40,000 tonnes to 60,000 tonnes contained nickel”, and “Elsewhere in the Forrestania Project region,  drilling was  undertaken  at  other  prospects which  have  the  potential  to  host  new  sulphide  deposits  “  and  “exploration drilling focused on evaluating potential for deeper extensions to the Spotted Quoll deposit and the Flying Fox deposit”, and “The presence  of  higher MgO  ultramafic  rocks  at  the Quartz  Ridge  and Wild West  prospects  indicates  further work  is  required  to evaluate  the potential of  the Kawana Project”, and “Funds are being used  to continue  the drilling program and prepare  for  the potential listing on the London AIM Market around October this year” and “FinnAust considers this region may represent a major metal province with potential to host multiple base metal deposits” and “potentially significant platinum and palladium discovery at Mustang’s 100% owned Mayville Project”.  This announcement does not include reference to all available information on the Company or the Forrestania Nickel Project or the Regional Nickel Projects of FinnAust Mining Plc and should not be used in isolation as a basis to invest in Western Areas.  Potential investors should refer to Western Area’s other public releases and statutory reports and consult their professional advisers before considering investing in the Company.  For Purposes of Clause 3.4 (e) in Canadian instrument 43‐101, the Company warrants that Mineral Resources which are not Mineral Reserves do not have demonstrated economic viability. 

   

THIS NEWS RELEASE IS NOT FOR DISTRIBUTION TO THE U.S. NEWSWIRE SERVICES OR  FOR DISSEMINATION IN THE U.S 

 