formula hsbgn jakarta 2007

23
DITJEN PERUMAHAN DAN PERMUKIMAN DEP. PERMUKIMAN DAN PRASARANA WILAYAH ISI DATA HARGA BAHAN & UPAH KERJA HSBGN KONVERSI HSBGN PERHITUNGAN BGN PERHITUNGAN PAGAR PENJELASAN UMUM KOMPONEN BIAYA BGN KLASIFIKASI TIDAK SEDERHANA KOMPONEN BIAYA BGN KLASIFIKASI SEDERHANA KOMPONEN BIAYA BGN KLASIFIKASI KHUSUS

Upload: hendro-subagio

Post on 21-Nov-2015

323 views

Category:

Documents


49 download

DESCRIPTION

Formula

TRANSCRIPT

XXXXXXXXX

MenuUtamaDITJEN PERUMAHAN DAN PERMUKIMAN DEP. PERMUKIMAN DAN PRASARANA WILAYAH

ISI DATA HARGA BAHAN & UPAH KERJAHSBGNKONVERSI HSBGNPERHITUNGAN BGNPERHITUNGAN PAGARPENJELASAN UMUMKOMPONEN BIAYA BGN KLASIFIKASI TIDAK SEDERHANAKOMPONEN BIAYA BGN KLASIFIKASI SEDERHANAKOMPONEN BIAYA BGN KLASIFIKASI KHUSUS

PenjelasanPENJELASAN UMUM MODEL HARGA SATUAN TERTINGGI BANGUNAN GEDUNG NEGARA1.Model perhitungan disusun dengan program excel yang sederhana, sehingga mudah dioperasikan.2.Pengisian data harga bahan dan upah kerja, berdasarkan hasil survei yang dilakukan pada bulan Oktober/November untuk menghitung HSBGN tahun depannya.3.Pada saat pengisian data harga, mohon diperhatikan satuan bahan (mis: m2, lembar, m1) agar disesuaikan antara hasil survei dengan satuan yang ada pada form isian.4.Harga Satuan Tertinggi BGN yang dihasilkan dalam model ini adalah harga satuan tertinggi per m2 konstruksi fisik (yang untuk dilaksanakan oleh pemborong) sesuai dengan yang diatur dalam Keputusan Menteri Kimpraswil No. 332/KPTS/M2002 tentang Pedoman Teknis Pembangunan Bangunan Gedung Negara.5.Untuk mendapatkan perkiraan harga satuan tertinggi per m2 keseluruhan bangunan, dapat dilihat pada: konversi.6.Cara mengoperasikan pada Menu Utama dengan meng"click":Untuk mengetahui penjelasan umum pengoperasian program HSBGNUntuk mengisi harga satuan bahan bangunan dan upah kerjaUntuk mengetahui harga satuan tertinggi per - m2 Bangunan Gedung NegaraUntuk mengetahui konversi klasifikasi baru (sederhana / tidak sederhana) terhadap klasifikasi lama (kelas A,B,C)Untuk melihat komponen dalam model perhitungan BGNUntuk melihat komponen dalam model perhitungan pagar BGNUntuk melihat komponen biaya BGN klasifikasi sederhana/tidak sederhana/khususUntuk kembali ke menu utama

MENU UTAMAMENU UTAMAPENJELASAN UMUMISI DATA HARGA BAHAN & UPAH KERJAHSBGNKONVERSI HSBGNPERHITUNGAN BGNPERHITUNGAN PAGARKOMPONEN BIAYA BGN

Harga Satuan(DALAM RUPIAH)HARGA SATUAN BANGUNAN GEDUNG NEGARA PER-M2GEDUNG BERTINGKATGEDUNG TIDAK BERTINGKATRUMAH NEGARAKLAS SEDERHANAKLAS TIDAK SEDERHANAKLAS SEDERHANAKLAS TIDAK SEDERHANATIPE CTIPE BTIPE A3,044,0004,262,0002,318,0003,245,0002,252,0002,702,0002,702,000DATA HARGA BAHAN BANGUNAN DAN UPAH KERJADATA HARGA BAHAN BANGUNANNONAMA BAHANSATUANHARGA SURVAI (Rp)KETERANGANHARGA SURVAI TOKO A (Rp)HARGA SURVAI TOKO B (Rp)HARGA SURVAI TOKO C (Rp)HARGA SURVAI TOKO D (Rp)HARGA RATA-RATA (Rp)A.BAHAN PASANGAN1PASIR BETONm3150,000130,000130,000130,000130,000130,0002PASIR PASANGm3150,000110,000110,000110,000110,000110,0003PASIR URUGm3100,000100,000100,000100,000100,000100,0004SEMEN PC (50 Kg)zak41,00036,00036,00036,00036,00036,0005KERIKIL BETON UK. 3 cm s/d 4 cmm3145,000100,000100,000100,000100,000100,0006KERIKIL KORALm3175,000180,000180,000180,000180,000180,000B.BAHAN PONDASI7BATU KALI / BATU BELAH / BATU GUNUNGm3100,000130,000130,000130,000130,000130,000C.BAHAN LANTAI8KERAMIK 30 X 30m251,57565,00065,00065,00065,00065,000D.BAHAN DINDING9BATAKO UK. 20 X 40 X 10bh0PILIH SALAH SATU SESUAI DENGAN BAHAN YANG TERSEDIA10BATU BATA UK. 5.5 X 11 X 23bh2750000011BATU TELA UK. 20 X 30 X 10bh01,5001,5001,5001,5001,50012BETON ROSTER / KERAWANGbh02,5002,5002,5002,5002,500E.BAHAN PENUTUP LANGIT-LANGIT13ETERNIT, UK. 100 X 100lbr0PILIH SALAH SATU SESUAI BAHAN YANG TERSEDIA8,5008,5008,5008,5008,50014KAYU LAPIS 4 MM UK 120 X 240lbr37,00035,00035,00035,00035,00035,000F.BAHAN PENUTUP ATAP15BUBUNGAN GENTENG PLENTONG "S"bh12,400PILIH SALAH SATU SESUAI DENGAN BAHAN YANG TERSEDIA0000016GENTENG PLENTONG "S"bh7,5000000017SENG DATAR BJLS 0.3m037,50037,50037,50037,50037,50018SENG GELOMBANG KECILlbr037,50037,50037,50037,50037,50019BUBUNGAN ASBES GELOMBANGm00000020ASBES GELOMBANG KECILlbr000000G.BAHAN KAYU21KAYU BALOK KLAS Im35,000,0001,800,0001,800,0001,800,0001,800,0001,800,00022KAYU BALOK KLAS IIm32,350,0001,500,0001,500,0001,500,0001,500,0001,500,00023KAYU PAPAN KLAS IIm32,450,0001,500,0001,500,0001,500,0001,500,0001,500,00024KAYU PAPAN KLAS IIIm32,250,0001,100,0001,100,0001,100,0001,100,0001,100,00025KAYU PAPAN KLAS IVm32,000,0001,000,0001,000,0001,000,0001,000,0001,000,00026KAYU LAPIS 4 mm UK. 8" X 4"lbr37,00035,00035,00035,00035,00035,00027KAYU LAPIS 12 mm UK. 8" X 4"lbr135,000120,000120,000120,000120,000120,000H.BAHAN BESI28BESI BETON POLOS DIA. 10 mmKg7,4004,5004,5004,5004,5004,50029BESI BETON ULIR DIA. 13 mmKg7,9005,0005,0005,0005,0005,00030KAWAT BENDRAT / BETONKg10,00015,00015,00015,00015,00015,00031PAKU UK. 3 CM - 7 CMKg10,0008,5008,5008,5008,5008,50032PAGAR BRC JADI (T 1M)m131,50080,00080,00080,00080,00080,00033BESI PROFIL C a PIPA BESI DIA. 2"m72,50012,00012,00012,00012,00012,000I.BAHAN SANITAIR / SALURAN AIR34BAK MANDI FIBRE GLASS 70 X 70 X 66bh150,000275,000275,000275,000275,000275,00035BAK RESERVOIR FIGRE GLASS KAP. 1000 ltrbh750,000825,000825,000825,000825,000825,00036BUIS BETON 1/2 DIA. 20 CMbh41,41215,00015,00015,00015,00015,00037PIPA GIP DIA. 1"m9,61125,00025,00025,00025,00025,00038PIPA GIP DIA. 1 1/2"m14,08340,00040,00040,00040,00040,00039PIPA GIP DIA. 2"m20,59455,00055,00055,00055,00055,00040PIPA PVC DIA. 1/2"m14,2475,5005,5005,5005,5005,50041PIPA PVC DIA. 3/4"m18,9867,5007,5007,5007,5007,50042PIPA PVC DIA. 2"m58,88712,83712,83712,83712,83712,83743PIPA PVC DIA. 3"m122,30124,50024,50024,50024,50024,50044PIPA PVC DIA. 4"m174,10545,00045,00045,00045,00045,00044KLOSET DUDUK KERAMIKbh1,712,000900,000900,000900,000900,000900,00045KLOSET JONGKOK KERAMIK STANDARbh1,582,000193,000193,000193,000193,000193,00046URINOAR KERAMIK STANDARbh1,323,000815,000815,000815,000815,000815,00047WASTAFEL GANTUNG KERAMIKbh702,000107,500107,500107,500107,500107,500JBAHAN FINISHING48CAT BESIKg47,00023,00023,00023,00023,00023,00049CAT DINDINGKg48,71422,00022,00022,00022,00022,00050CAT KAYUKg53,00023,00023,00023,00023,00023,000K.BAHAN LAIN - LAIN51KACA BENING 5 MMm272,50065,00065,00065,00065,00065,00052POMPA TANGANbh125,000125,000125,000125,000125,000125,00053INSTALASI LISTRIKtitik164,000DATA UPAH KERJANOTENAGA KERJASATUANHARGA SURVAI (Rp)UPAH SURVAI KONT. AUPAH SURVAI KONT. BUPAH SURVAI KONT. CUPAH SURVAI KONT. DUPAH RATA-RATA1MANDORORG50,00050,00043,33043,33043,33044,9982KEPALA TUKANGORG60,00045,00037,14037,14037,14039,1053TUKANG BATUORG55,00040,00030,95030,95030,95033,2134LADEN TUKANG BATUORG35,00030,00024,76024,76024,76026,0705TUKANG BESIORG55,00040,00030,95030,95030,95033,2136LADEN TUKANG BESIORG35,00030,00024,76024,76024,76026,0707TUKANG KAYUORG55,00040,00030,95030,95030,95033,2138LADEN TUKANG KAYUORG35,00030,00024,76024,76024,76026,0709TUKANG CATORG55,00040,00030,95030,95030,95033,21310LADEN TUKANG CATORG35,00030,00024,76024,76024,76026,07011TUKANG BONGKARORG35,00030,00024,76024,76024,76026,07012PEKERJA GALIAN & URUGORG40,95040,00030,95030,95030,95033,21313TUKANG LISTRIKORG47,14040,00037,14037,14037,14037,85514TUKANG PIPAORG39,76040,00024,76024,76024,76028,570

MENU UTAMA

StandarHargaPERHITUNGAN HARGA SATUAN TERTINGGI BGNKABUPATEN/KOTAJAKARTAPROVINSIJAKARTABULAN / TRIWULANJANUARI 2007TAHUN ANGGARAN2007(DALAM RUPIAH)GEDUNG PER-M2GEDUNG BERTINGKATGEDUNG TIDAK BERTINGKATRUMAH NEGARAKLAS SEDERHANAKLAS TIDAK SEDERHANAKLAS SEDERHANAKLAS TIDAK SEDERHANATIPE CTIPE BTIPE A3,044,0004,262,0002,318,0003,245,0002,252,0002,702,0002,702,000PAGAR PER-M1GEDUNGRUMAH NEGARAKLAS SEDERHANAKLAS TIDAK SEDERHANATIPE CTIPE BTIPE ADEPAN1,470,0001,617,000673,400740,740740,740SAMPING888,400977,240724,100796,510796,510

MENU UTAMA

KonversiKONVERSI SISTEM PERHITUNGAN HSBGN BARU KE SISTEM PERHITUNGAN HSBGN LAMASTANDAR HARGA SATUAN BANGUNAN GEDUNG NEGARA PER-M2 TERTINGGI(DALAM RUPIAH)BERTINGKATTIDAK BERTINGKATRUMAH DINASKETERANGANBARU 332/2002SEDERHANATIDAK SEDERHANASEDERHANATIDAK SEDERHANASEDERHANATIDAK SEDERHANA3,044,0004,262,0002,318,0003,245,0002,252,0002,702,000HARGA KONSTRUKSI FISIK100%140%100%140%100%120%LAMA 295/1997CBACBACBA3,348,4004,453,3724,989,1162,549,8003,391,2343,799,2022,477,2002,749,6923,071,728HARGA KESELURUHAN BANGUNAN100%133%149%100%133%149%100%111%124%

MENU UTAMA

PerhitunganPERHITUNGAN HARGA SATUAN TERTINGGI BANGUNAN GEDUNG NEGARA PER M2KAB/KOTA:JAKARTATANGGAL:30 April 2003KEBUTUHANRUMAH DINAS TIPE-70GEDUNG TIDAK BERTINGKATGEDUNGNOSATUANHARGABERTINGKATVOLUMEJUMLAHVOLUMEJUMLAHVOLUMEJUMLAH1234569101314KEBUTUHAN BAHAN DAN UPAHBAHANA.BAHAN PASANGAN1PASIR BETONm3150,000.000.095214,280.000.127819,170.000.176726,505.002PASIR PASANGm3150,000.000.8450126,750.000.278141,715.000.152022,800.003PASIR URUGm3100,000.000.135813,580.000.112111,210.000.162016,200.004SEMEN PC (50 Kg)zak41,000.002.328595,468.502.328595,468.502.9988122,950.805KERIKIL BETON UK. 3 cm s/d 4 cmm3145,000.000.085312,368.500.202829,406.001.3524196,098.006KERIKIL KORALm3175,000.000.00.00.0050875.001.3524236,670.00B.BAHAN PASANGAN0.00.00.07BATU KALI / BATU BELAH / BATU GUNUNGm3100,000.000.247624,760.000.215021,500.000.09389,380.00C.BAHAN LANTAI0.00.00.08KERAMIK 30 X 30m251,575.001.039553,612.211.039553,612.210.970250,038.07D.BAHAN DINDING0.00.00.09BATAKO UK. 20 X 40 X 10bh0.021.35530.010.47680.08.08980.010BATU BATA UK. 5.5 X 11 X 23bh275.00115.762531,834.6999.385027,330.8886.973423,917.6911BATU TELA UK. 20 X 30 X 10bh0.028.47380.013.96910.010.78640.012BETON ROSTER / KERAWANGbh0.00.00.00.21310.00.00.0E.BAHAN PENUTUP LANGIT-LANGIT0.00.00.013ETERNIT, UK. 100 X 100lbr0.00.94500.00.94500.00.88200.014KAYU LAPIS 4 MM 120 X 240bh37,000.000.478417,700.800.880332,571.100.09153,385.50F.BAHAN PENUTUP ATAP0.00.00.015BUBUNGAN GENTENG PLENTONG "S"bh12,400.000.77849,652.160.880310,915.720.09151,134.6016GENTENG PLENTONG "S"bh7,500.0029.5191221,393.2530.0390225,292.5014.0182105,136.5017SENG DATAR BJLS 0.3m0.00.06960.00.01850.00.00060.018SENG GELOMBANG KECILlbr0.00.85810.00.90380.00.00.019BUBUNGAN ASBES GELOMBANGm0.00.06960.00.01850.00.00060.020ASBES GELOMBANG KECILlbr0.00.85810.00.90380.00.00.0G.BAHAN KAYU0.00.00.021KAYU BALOK KLAS Im35,000,000.000.00.00.00.00.00178,500.0022KAYU BALOK KLAS IIm32,350,000.000.1332313,020.000.1557365,895.000.1660390,100.0023KAYU PAPAN KLAS IIm32,450,000.000.031877,910.000.00133,185.000.00122,940.0024KAYU PAPAN KLAS IIIm32,250,000.000.007917,775.000.0495111,375.000.1001225,225.0025KAYU PAPAN KLAS IVm32,000,000.000.00.00.00142,800.000.00224,400.0026KAYU LAPIS 4 mm UK. 8" X 4"lbr37,000.000.519619,225.200.13494,991.300.17286,393.6027KAYU LAPIS 12 mm UK. 8" X 4"lbr135,000.000.00.00.00.00.0025337.50H.BAHAN BESI0.00.00.028BESI BETON POLOS DIA. 10 mmKg7,400.0012.247590,631.5011.464884,839.5210.036174,267.1429BESI BETON ULIR DIA. 13 mmKg7,900.000.00.013.4580106,318.2019.8851157,092.2930KAWAT BENDRAT / BETONKg10,000.000.12241,224.001.271212,712.002.736227,362.0031PAKU UK. 3 CM - 7 CMKg10,000.000.0799799.000.24762,476.000.25762,576.00I.BAHAN SANITAIR / SALURAN AIR0.00.00.032BAK MANDI FIBRE GLASS 70 X 70 X 66bh150,000.000.01181,770.000.00.00.00.033BAK RESERVOIR FIGRE GLASS KAP. 1000 ltrbh750,000.000.00594,425.000.00362,700.000.0013975.0034BUIS BETON 1/2 DIA. 20 CMbh41,412.000.05912,445.900.11324,687.970.06152,546.8435PIPA GIP DIA. 1"m9,611.000.00.00.00.00.12571,208.1036PIPA GIP DIA. 1 1/2"m14,083.000.0142199.980.00.00.001419.7237PIPA GIP DIA. 2"m20,594.000.07091,460.110.00.00.30986,380.0238PIPA PVC DIA. 1/2"m14,247.000.00.00.0143203.730.00.039PIPA PVC DIA. 3/4"m18,986.000.00.00.0286543.000.00.040PIPA PVC DIA. 2"m58,887.000.00.00.04302,532.140.0041241.4441PIPA PVC DIA. 3"m122,301.000.00.00.00.00.00.042PIPA PVC DIA. 4"m174,105.000.092116,035.070.03586,232.960.00821,427.6643KLOSET DUDUK KERAMIKbh1,712,000.000.005910,100.800.00122,054.400.00111,883.2044KLOSET JONGKOK KERAMIK STANDARbh1,582,000.000.00599,333.800.007211,390.400.00213,322.2045URINOAR KERAMIK STANDARbh1,323,000.000.00.00.00729,525.600.00688,996.4046WASTAFEL GANTUNG KERAMIKbh702,000.000.00.00.0012842.400.0012842.40J.BAHAN FINISHING0.00.00.047CAT BESIKg47,000.000.00.00.00.00.0122573.4048CAT DINDINGKg48,714.001.292162,943.360.534626,042.500.445621,706.9649CAT KAYUKg53,000.000.316916,795.700.368019,504.000.200510,626.50K.BAHAN LAIN - LAIN0.00.00.050KACA BENING 5 MMm272,500.000.08235,966.750.03762,726.000.05253,806.2551POMPA TANGANbh125,000.000.0059737.500.0018225.000.0013162.5052INSTALASI LISTRIKtitik164,000.000.0059967.600.0018295.200.0013213.2052BAHAN LAIN - LAIN (5% dari total Bahan)0.070,080.930.074,407.800.097,797.060.00.00.0Sub Total Biaya Bahan Bangunan0.01,345,247.310.01,427,572.030.01,876,138.540.00.00.0UPAH0.00.00.01MANDORORG50,000.000.286714,335.000.297614,880.000.269713,485.002KEPALA TUKANGORG60,000.000.10776,462.000.201512,090.000.261715,702.003TUKANG BATUORG55,000.000.819045,045.000.505327,791.500.366220,141.004LADEN TUKANG BATUORG35,000.000.737125,798.500.404314,150.500.294610,311.005TUKANG BESIORG55,000.000.366720,168.500.476326,196.501.061858,399.006LADEN TUKANG BESIORG35,000.000.24658,627.500.340211,907.000.991034,685.007TUKANG KAYUORG55,000.001.8675102,712.501.529884,139.001.8299100,644.508LADEN TUKANG KAYUORG35,000.000.404714,164.500.371813,013.000.318311,140.509TUKANG CATORG55,000.000.498627,423.000.411822,649.000.331918,254.5010LADEN TUKANG CATORG35,000.000.430115,053.500.23148,099.000.10413,643.5011TUKANG BONGKARORG35,000.000.0096336.000.12704,445.000.962933,701.5012TUKANG GALI & URUGORG40,950.000.803332,895.141.127146,154.751.371556,162.9313TUKANG LISTRIKORG47,140.000.18158,555.910.10805,091.120.09184,327.4514TUKANG PIPAORG39,760.000.0241958.220.0225894.600.0086341.94Sub Total Biaya Upah Kerja322,535.27291,500.97380,939.82IIBIAYA KONSTRUKSI (K)Sub Total Biaya Bahan Bangunan1,345,247.311,427,572.031,876,138.54Sub Total Biaya Upah Kerja18.97%322,535.2716.67%291,500.9716.60%380,939.82Sub Biaya Peralatan Kerja(10% Upah Kerja)32,253.53(10% Upah Kerja)29,150.10(20% Upah Kerja)38,093.98A.BIAYA NYATA BANGUNAN(A)1,700,036.111,748,223.102,295,172.34B.JASA KONTRAKTOR + OVERHEAD10% (A)170,003.61174,822.31229,517.23C.PAJAK - PAJAK204,004.33209,786.77275,420.68a.PPh Pasal 21 & 232% (A)34,000.7234,964.4645,903.45b.PPn10% (A)170,003.61174,822.31229,517.23D.SUB TOTAL (A) + (B) + (C)2,074,044.052,132,832.182,800,110.25E.ASURANSI64,601.3766,432.4887,216.55a.All Risk3% (A)51,001.0852,446.6968,855.17b.Tenaga Kerja (ASTEK)0,5% (A)8,500.188,741.1211,475.86c.Pihak ke III0,3% (A)5,100.115,244.676,885.52F.PERIZINAN25,500.5426,223.3534,427.58a.Izin Mendirikan Bangunan (IMB)1% (A)17,000.3617,482.2322,951.72b.Sertifikat Laik Fungsi0.5% (A)8,500.188,741.1211,475.86G.TINGKAT INFLASI5% Bahan67,262.3771,378.6093,806.93H.KESELAMATAN DAN KESEHATAN KERJA1% (D)20,740.4421,328.3228,001.10I.SUB TOTAL BIAYA KONSTRUKSI FISIK2,252,148.772,318,194.933,043,562.41IVBIAYA KONSTRUKSI FISIK BANGUNAN SEDERHANA PER M22,252,000.002,318,000.003,044,000.00IVBIAYA KONSTRUKSI FISIK BANGUNAN SEDERHANA PER M22,702,400.003,245,200.004,261,600.00VBIAYA KONSTRUKSI FISIK BANGUNAN TIDAK SEDERHANA PER M22,702,000.003,245,000.004,262,000.00

MENU UTAMA

Perhitungan PagarPERHITUNGAN HARGA SATUAN TERTINGGI PAGAR PER-M1 BGNKAB/KODYA:JAKARTATANGGAL:30 April 2003KEBUTUHANRUMAH DINASGEDUNGNOSATUANHARGAPAGAR DEPANPAGAR SAMPINGPAGAR DEPANPAGAR SAMPINGVOLUMEJUMLAHVOLUMEJUMLAHVOLUMEJUMLAHVOLUMEJUMLAH123456789101112KEBUTUHAN BAHAN DAN UPAHBAHANA.BAHAN PASANGAN1PASIR BETONm3150,0000.01251,875.000.04817,215.000.01762,640.000.06089,120.002PASIR PASANGm3150,0000.393859,070.000.476071,400.000.479671,940.000.602190,315.003PASIR URUGm3100,0000.06146,140.000.07147,140.000.09159,150.000.08358,350.004SEMEN PC (50 Kg)zak41,0001.016241,664.202.401298,449.201.216249,864.203.0376124,541.605KERIKIL BETON UK. 3 cm s/d 4 cmm3145,0000.00000.00.00000.00.00000.00000.06KERIKIL KORALm3175,0000.03916,842.500.089015,575.000.072412,670.000.112619,705.00B.BAHAN PASANGAN0.00000.00000.00000.00007BATU KALI / BATU BELAH / BATU GUNUNGm3100,0000.300030,000.000.375037,500.000.375037,500.000.375037,500.00C.BAHAN DINDING0.00000.00000.00000.00009BATAKO UK. 20 X 40 X 10bh00.00000.00.00000.00.00000.00000.010BATU BATA UK. 5.5 X 11 X 23bh27521.33335,866.66102.857128,285.7032.00008,800.00114.285731,428.5711BATU TELA UK. 20 X 30 X 10bh00.00000.00.00000.00.00000.00000.012BETON ROSTER / KERAWANGbh00.00000.00.00000.00.00000.00000.0D.BAHAN KAYU0.00000.00000.00000.000021KAYU BALOK KLAS Im35,000,0000.00000.00.00000.00.00000.00000.022KAYU BALOK KLAS IIm32,350,0000.00000.00.00000.00.00000.00000.023KAYU PAPAN KLAS IIm32,450,0000.00000.00.00000.00.00000.00000.024KAYU PAPAN KLAS IIIm32,250,0000.00000.00.00000.00.00000.00000.025KAYU PAPAN KLAS IVm32,000,0000.005310,600.000.010721,400.000.005310,600.000.010721,400.0026KAYU LAPIS 4 mm UK. 8" X 4"lbr37,0000.00000.00.00000.00.00000.00000.027KAYU LAPIS 12 mm UK. 8" X 4"lbr135,0000.00000.00.00000.00.00000.00000.0E.BAHAN BESI0.00000.00000.00000.000028BESI BETON POLOS DIA. 10 mmKg7,4006.246546,224.1012.826094,912.4017.4813129,361.6216.2249120,064.2629BESI BETON ULIR DIA. 13 mmKg7,9000.00000.00.00000.00.00000.00000.030KAWAT BENDRAT / BETONKg10,0000.0527527.000.23102,310.000.26692,669.000.29222,922.0031PAKU UK. 3 CM - 7 CMKg10,0000.0499499.000.25702,570.000.26692,669.000.32513,251.0032PAGAR BRC JADI (T 1M)m131,5001.0000131,500.000.00000.00.00000.00.00000.033PAGAR PROFIL C a PIPA BESI DIA.. 2"m72,5000.00000.00.00000.08.0000580,000.000.00000.0F.BAHAN FINISHING0.00000.00000.00000.000034CAT BESIKg47,0000.290613,658.200.00000.00.486122,846.700.00000.035CAT DINDINGKg48,7140.206610,064.310.825040,189.050.00001.043650,837.9336CAT KAYUKg53,0000.00000.00.00000.00.00000.00000.0Sub Total Biaya Bahan Bangunan364,530.97426,946.35940,710.52519,435.360.00.00.00.0UPAH0.00.00.01MANDORORG50,0000.05532,764.450.05532,764.450.06423,211.320.06993,497.032KEPALA TUKANGORG60,0000.06643,984.960.06643,984.960.06643,984.960.08405,040.973TUKANG BATUORG55,0000.235012,926.130.455025,026.130.235012,926.130.575631,658.054LADEN TUKANG BATUORG35,0000.17956,282.500.289510,132.500.17956,282.500.366312,820.505TUKANG BESIORG55,0000.787343,302.720.15758,662.501.144862,965.220.199210,956.006LADEN TUKANG BESIORG35,0000.27129,491.860.05862,051.000.27129,491.860.07412,593.507TUKANG KAYUORG55,0000.08564,708.000.11276,197.410.08564,708.000.14257,839.728LADEN TUKANG KAYUORG35,0000.04281,498.000.05631,970.500.04281,498.000.07132,495.509TUKANG CATORG55,0000.548430,162.650.548430,162.650.548430,162.650.693738,155.7510LADEN TUKANG CATORG35,0000.473116,559.660.473116,559.660.473116,559.660.598520,947.9711TUKANG BONGKARORG35,0000.0105368.120.0105368.120.0105368.120.0133465.6812TUKANG GALI & URUGORG40,9500.15326,273.080.15326,273.080.15326,273.080.19387,935.45Sub Total Biaya Upah Kerja138,322.13114,152.96158,431.50144,406.12IIBIAYA KONSTRUKSI (K)Sub Total Biaya Bahan Bangunan364,530.97426,946.35940,710.52519,435.36Sub Total Biaya Upah Kerja138,322.1320.88%114,152.96158,431.5021.52%144,406.12Sub Biaya Peralatan Kerja6,916.11(5% Upah Kerja)5,707.657,921.58(5% Upah Kerja)7,220.31A.BIAYA NYATA BANGUNAN(A)509,769.21546,806.961,107,063.60671,061.79B.JASA KONTRAKTOR + OVERHEAD10% (A)50,976.9210.000054,680.70110,706.3667,106.18C.PAJAK - PAJAK61,172.3065,616.84132,847.6380,527.42a.PPh Pasal 21 & 232% (A)10,195.382.000010,936.1422,141.2713,421.24b.PPn10% (A)50,976.9210.000054,680.70110,706.3667,106.18D.SUB TOTAL (A) + (B) + (C)621,918.43667,104.501,350,617.59818,695.39E.ASURANSI19,371.2420,778.6642,068.4225,500.35a.All Risk3% (A)15,293.083.000016,404.2133,211.9120,131.85b.Tenaga Kerja (ASTEK)0,5% (A)2,548.850.50002,734.035,535.323,355.31c.Pihak ke III0,3% (A)1,529.310.30001,640.423,321.192,013.19F.PERIZINAN7,646.548,202.1016,605.9610,065.93a.Izin Mendirikan Bangunan (IMB)1% (A)5,097.691.00005,468.0711,070.646,710.62b.Izin Penggunaan Bangunan (IPB)0.5% (A)2,548.850.50002,734.035,535.323,355.31G.TINGKAT INFLASI5% Bahan18,226.555.000021,347.3247,035.5325,971.77H.KESELAMATAN & KESEHATAN KERJA1% (D)6,219.181.00006,671.0513,506.188,186.95I.SUB TOTAL BIAYA KONSTRUKSI FISIK673,381.94724,103.631,469,833.68888,420.39IVBIAYA KONSTRUKSI FISIK BANGUNAN SEDERHANA PER M2673,400.00724,100.001,470,000.00888,400.00IVBIAYA KONSTRUKSI FISIK BANGUNAN SEDERHANA PER M2740,740.00796,510.001,617,000.00977,240.00VBIAYA KONSTRUKSI FISIK BANGUNAN TIDAK SEDERHANA PER M2740,700.00796,500.001,617,000.00977,200.00

MENU UTAMA

Tabel SederhanaaTABEL E1DAFTAR BIAYA KOMPONEN KEGIATANPEMBANGUNAN BANGUNAN GEDUNG NEGARAKlasifikasi :SEDERHANA(dalam ribuan rupiah)BIAYA KONSTRUKSI FISIKBIAYA KONSTRUKSI FISIKBIAYA PERENCANAANKONSTRUKSIBIAYA MANAJEMEN KONSTRUKSIBIAYA PENGAWASAN KONSTRUKSIBIAYA PENGELOLAANPROYEKTOTAL BIAYA PEMBANGUNANDENGAN MANAJEMEN KONSTRUKSIDENGAN PENGAWASAN KONSTRUKSI12323456551.760.00467.0645.52-29.529.66636.46CATATAN:1.MASUKKAN NILAI BIAYA KONSTRUKSI PADA KOLOM BIAYA KONSTRUKSI FISIK (KOLOM 1) DALAM RIBUAN RUPIAH.BIAYA KONSTRUKSI FISIK MERUPAKAN PERKALIAN HARGA STANDAR (KONSTRUKSI FISIK) YANG BERLAKU UNTUK KLASIFIKASI/TIPE BGN YANG BERSANGKUTAN DENGAN TOTAL LUASNYA.2.SECARA OTOMATIS PROGRAM AKAN MENGHITUNG NILAI KOMPONEN-KOMPONEN BIAYA LAINNYA, DALAM RIBUAN RUPIAH.UNTUK BANGUNAN KLASIFIKASI SEDERHANA TIDAK ADA BIAYA MANAJEMEN KONSTRUKSI.3.BIAYA KESELURUHAN YANG DIBUTUHKAN UNTUK PEMBANGUNAN BGN ADALAH PADA KOLOM (6) YAITU TOTAL BIAYA PEMBANGUNAN.

PROSENTASE BIAYA PERENCANAANPROSENTASE BIAYA PENGAWASANPROSENTASE BIAYA MANAJEMENPROSENTASE BIAYA PENGELOLAANPROSENTASE BIAYA PERENCANAANPROSENTASE BIAYA PENGAWASANPROSENTASE BIAYA MANAJEMENPROSENTASE BIAYA PENGELOLAANPROSENTASE BIAYA PENGELOLAANPROSENTASE BIAYA PENGELOLAANPROSENTASE BIAYA PENGELOLAANPROSENTASE BIAYA PENGELOLAANPROSENTASE BIAYA PENGELOLAANPROSENTASE BIAYA PENGELOLAANMENU UTAMA

Tabel TdkSederhanabTABEL E2DAFTAR BIAYA KOMPONEN KEGIATANPEMBANGUNAN BANGUNAN GEDUNG NEGARAKlasifikasi :TIDAK SEDERHANA(dalam ribuan rupiah)BIAYA KONSTRUKSI FISIKBIAYA KONSTRUKSI FISIKBIAYA PERENCANAANKONSTRUKSIBIAYA MANAJEMEN KONSTRUKSIBIAYA PENGAWASAN KONSTRUKSIBIAYA PENGELOLAANPROYEKTOTAL BIAYA PEMBANGUNANDENGAN MANAJEMEN KONSTRUKSIDENGAN PENGAWASAN KONSTRUKSIDENGAN MANAJEMEN KONSTRUKSIDENGAN PENGAWASAN1232345672,008.001,643.551,668.65180.72145.58120.4838.152,372.452,347.35CATATAN:1.MASUKKAN NILAI BIAYA KONSTRUKSI PADA KOLOM BIAYA KONSTRUKSI FISIK (KOLOM 1) DALAM RIBUAN RUPIAH.BIAYA KONSTRUKSI FISIK MERUPAKAN PERKALIAN HARGA STANDAR (KONSTRUKSI FISIK) YANG BERLAKU UNTUK KLASIFIKASI/TIPE BGN YANG BERSANGKUTAN DENGAN TOTAL LUASNYA.2.SECARA OTOMATIS PROGRAM AKAN MENGHITUNG NILAI KOMPONEN-KOMPONEN BIAYA LAINNYA, DALAM RIBUAN RUPIAH.3.UNTUK KLASIFIKASI TIDAK SEDERHANA, DIMUNGKINKAN PILIHAN MENGGUNAKAN KONSULTAN MANAJEMEN KONSTRUKSI ATAU KONSULTAN PENGAWAS,TERGANTUNG PADA KRITERIA LUASAN, JUMLAH LANTAI, ATAU JUMLAH PENYEDIA JASA.4.BIAYA KESELURUHAN YANG DIBUTUHKAN UNTUK PEMBANGUNAN BGN ADALAH PADA KOLOM (6) UNTUK YANG MENGGUNAKAN KONSULTAN MANAJEMEN KONSTRUKSI, ATAU KOLOM (7) YANG MENGGUNAKAN KONSULTAN PENGAWAS.

PROSENTASE BIAYA PERENCANAANPROSENTASE BIAYA PENGAWASANPROSENTASE BIAYA MANAJEMENPROSENTASE BIAYA PENGELOLAANPROSENTASE BIAYA PERENCANAANPROSENTASE BIAYA PENGAWASANPROSENTASE BIAYA MANAJEMENPROSENTASE BIAYA PENGELOLAANPROSENTASE BIAYA PENGELOLAANPROSENTASE BIAYA PENGELOLAANPROSENTASE BIAYA PENGELOLAANPROSENTASE BIAYA PENGELOLAANMENU UTAMA

Tabel KhususcTABEL E3DAFTAR BIAYA KOMPONEN KEGIATANPEMBANGUNAN BANGUNAN GEDUNG NEGARAKlasifikasi:KHUSUS(dalam ribuan rupiah)BIAYA KONSTRUKSI FISIKBIAYA KONSTRUKSI FISIKBIAYA PERENCANAANKONSTRUKSIBIAYA MANAJEMEN KONSTRUKSIBIAYA PENGAWASAN KONSTRUKSIBIAYA PENGELOLAANPROYEKTOTAL BIAYA PEMBANGUNANDENGAN MANAJEMEN KONSTRUKSIDENGAN PENGAWASAN KONSTRUKSI123234562,008.001,614.430.00195.78159.64-38.152,401.57CATATAN:1.MASUKKAN NILAI BIAYA KONSTRUKSI PADA KOLOM BIAYA KONSTRUKSI FISIK (KOLOM 1) DALAM RIBUAN RUPIAH.BIAYA KONSTRUKSI FISIK MERUPAKAN PERKALIAN HARGA STANDAR (KONSTRUKSI FISIK) YANG BERLAKU UNTUK KLASIFIKASI/TIPE BGN YANG BERSANGKUTAN DENGAN TOTAL LUASNYA.2.SECARA OTOMATIS PROGRAM AKAN MENGHITUNG NILAI KOMPONEN-KOMPONEN BIAYA LAINNYA, DALAM RIBUAN RUPIAH.UNTUK KLASIFIKASI KHUSUS TIDAK MENGGUNAKAN KONSULTAN PENGAWAS.3.BIAYA KESELURUHAN YANG DIBUTUHKAN UNTUK PEMBANGUNAN BGN ADALAH PADA KOLOM (6).

PROSENTASE BIAYA PERENCANAANPROSENTASE BIAYA PENGAWASANPROSENTASE BIAYA MANAJEMENPROSENTASE BIAYA PENGELOLAANPROSENTASE BIAYA PERENCANAANPROSENTASE BIAYA PENGAWASANPROSENTASE BIAYA MANAJEMENPROSENTASE BIAYA PENGELOLAANPROSENTASE BIAYA PENGELOLAANPROSENTASE BIAYA PENGELOLAANMENU UTAMA