futureconstruct uusinta uutta euroopan t&k:sta rakennusinsinööripäivät 31 oct 2002,...

18
FutureConstruct FutureConstruct Uusinta uutta Euroopan T&K:sta Uusinta uutta Euroopan T&K:sta Rakennusinsinööripäivät Rakennusinsinööripäivät 31 Oct 2002, Helsinki FI 31 Oct 2002, Helsinki FI Olavi Tupamäki Villa Real Ltd/SA Merivalkama 12 Avenue Louise 65 FIN-02320 Espoo Finland B-1050 Bruxelles Belgique tel +358 9 802 3667 http://www.villareal.fi tel +32 2 535 7845 fax +358 9 802 3610 olavi.tupamaki@villareal.fi fax +32 2 535 7700

Upload: aaron-robinson

Post on 30-Dec-2015

15 views

Category:

Documents


0 download

DESCRIPTION

FutureConstruct Uusinta uutta Euroopan T&K:sta Rakennusinsinööripäivät 31 Oct 2002, Helsinki FI. Olavi Tupamäki Villa Real Ltd/SA Merivalkama 12 Avenue Louise 65 - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: FutureConstruct Uusinta uutta Euroopan T&K:sta Rakennusinsinööripäivät  31 Oct 2002, Helsinki FI

FutureConstructFutureConstructUusinta uutta Euroopan T&K:staUusinta uutta Euroopan T&K:sta

Rakennusinsinööripäivät Rakennusinsinööripäivät 31 Oct 2002, Helsinki FI31 Oct 2002, Helsinki FI

Olavi Tupamäki

Villa Real Ltd/SA

Merivalkama 12 Avenue Louise 65

FIN-02320 Espoo Finland B-1050 Bruxelles Belgique tel +358 9 802 3667 http://www.villareal.fi tel +32 2 535 7845

fax +358 9 802 3610 [email protected] fax +32 2 535 7700

Page 2: FutureConstruct Uusinta uutta Euroopan T&K:sta Rakennusinsinööripäivät  31 Oct 2002, Helsinki FI

AlkusanatAlkusanat

EU:ssa teknologian kieli on englanti. Jos tekee projektiehdotuksen suomeksi tai vaikka ranskaksi, se

käännätetään Euroopan komission toimesta englanniksi virheitä ja väärinkäsityksiä ei menestystä.

Tästä syystä tämäkin esitys on englanniksi. Tärkeimmät asiakirjat ovat kuitenkin saatavilla myös suomeksi

osoitteessa http://europa.eu.int/comm/research/fp6/documents_en.html. Suomenkielistä opastusta löytyy myös Tekesin sivuilta osoitteesta http://www.tekes.fi/eu/index.html.

Tammikuussa valmistuu myös allekirjoittaneen toimesta rakennus- ja kiinteistöklusterin käyttöön suomenkielinen opas “Eurooppalaiset Eurooppalaiset teknologiaohjelmat 2003teknologiaohjelmat 2003”.

Page 3: FutureConstruct Uusinta uutta Euroopan T&K:sta Rakennusinsinööripäivät  31 Oct 2002, Helsinki FI

Construction and CRECConstruction and CREC

In the EU construction represents 11% of the total GDP,In the EU construction represents 11% of the total GDP,and and

CREC nearly 30% of the same GDPCREC nearly 30% of the same GDP!!

Construction and Real Estate Cluster - CREC 2000 Finland

38 GEUR = 30% * GDP

Running45%

Exports & other intl

22%

Infrastructure Construction

10%

Building Construction

23%

Page 4: FutureConstruct Uusinta uutta Euroopan T&K:sta Rakennusinsinööripäivät  31 Oct 2002, Helsinki FI

EU6RTD (1)EU6RTD (1)European Research Area - ERAEuropean Research Area - ERA

EU6RTD is aimed at contributing towards the creation of the European Research Area – ERA, described below (17% directly for ERA).

National R&D Programmes

National ResearchOrganisations & JRC

EU6RTD and otherEuropean R&D

Open Cooperation& Coordination

European ResearchArea - ERA

Page 5: FutureConstruct Uusinta uutta Euroopan T&K:sta Rakennusinsinööripäivät  31 Oct 2002, Helsinki FI

EU6RTD (2) EU6RTD (2) Interesting themes for CRECInteresting themes for CREC

The EU’s 6th Framework Programme for Research and Technological Development – EU6RTDEU6RTD offers 17,500 MEUR for European RTD projects in 2002-06. The most interesting thematic priorities for the CREC are the following (final, as approved by the European Parliament and the Council Jun 2002):

1.1.2 Information society technologies 3,625 MEUR1.1.3 Nanotechnologies and nanosciences,

knowledge-based multifunctional materials and new production processes and devices 1,300 MEUR

1.1.6 Sustainable development, global change and ecosystems 2,120 MEUR

Sustainable energy systems 810 MEURSustainable surface transport 610 MEURGlobal change and ecosystems 700 MEUR

Page 6: FutureConstruct Uusinta uutta Euroopan T&K:sta Rakennusinsinööripäivät  31 Oct 2002, Helsinki FI

EU6RTD (3)EU6RTD (3)Specific Programmes (1)Specific Programmes (1)

Specific ProgrammesSpecific Programmes add “flesh on the bones” information to the EU6RTD. The most interesting priorities for the CREC are the following (final, as approved by the Council late September 2002):

Integrating and strengthening the European Research Area - ERA1.1.2. Information society technologies

(i) Applied IST research addressing major societal and economic challenges

1.1.3. Nano-technologies and nano-sciences, knowledge-based multifunctional materials and new production processes and devices(ii) Knowledge-based multifunctional materials(iii) New production processes and devices

Page 7: FutureConstruct Uusinta uutta Euroopan T&K:sta Rakennusinsinööripäivät  31 Oct 2002, Helsinki FI

EU6RTD (4)EU6RTD (4)Specific Programmes (2)Specific Programmes (2)

1.1.6. Sustainable development, global change and ecosystems1.1.6.1. Sustainable energy systems1.1.6.2. Sustainable surface transport1.1.6.3. Global change and ecosystems

1.2.2. Horizontal research activities involving SMEs(i) Collective research(ii) Cooperative research

The specific programmes as well as other documents can be found at http://europa.eu.int/comm/research/fp6/documents_en.html in all EU languages. Myös suomeksi.

Page 8: FutureConstruct Uusinta uutta Euroopan T&K:sta Rakennusinsinööripäivät  31 Oct 2002, Helsinki FI

EU6RTD (5)EU6RTD (5)Work ProgrammesWork Programmes

Work ProgrammesWork Programmes are documents containing more detailed descriptions of the Specific Programmes. For project proposal preparation Work Programmes are the most important documents.

Work Programmes will be prepared and issued by the Commission alone.

Work Programmes are said to be drafted after the results of the EoI call for important R&D topics (closed date 07 June 2002) will be available. These (some 11,700 EoIs) are now publicly available.

No drafts for Work Programmes are publicly available yet. They are supposed to be finalised by the end of November 2002 latest.

Page 9: FutureConstruct Uusinta uutta Euroopan T&K:sta Rakennusinsinööripäivät  31 Oct 2002, Helsinki FI

EU6RTD (6) EU6RTD (6) Project Types = Instruments (1) Project Types = Instruments (1)

Integrated Projects - IP

Clearly defined development objectives Typically industry-led project Duration 3-5 years Magnitude >50 MEUR EU funding max 50%

Networks of Excellence - NoE

Advancing research and integrating the activities of the consortium partners on a particular research topic and spread excellence

Research centre/university-led project; 100-500 researchers Duration over 5 years plus continuation thereafter without EU

funding Magnitude >10 MEUR EU funding as per the number of researchers, max 25%

Page 10: FutureConstruct Uusinta uutta Euroopan T&K:sta Rakennusinsinööripäivät  31 Oct 2002, Helsinki FI

EU6RTD (7)EU6RTD (7) Project Types = Instruments (2) Project Types = Instruments (2)

Specific Targeted Research Projects – STRP

Similar to earlier RTD projects Typically industry-led project Duration 2-4 years Magnitude 2-10 MEUR EU funding max 50%

This is what was required by European Council of Civil Engineers - ECCE and several EU member states.

Page 11: FutureConstruct Uusinta uutta Euroopan T&K:sta Rakennusinsinööripäivät  31 Oct 2002, Helsinki FI

EU6RTD (8)EU6RTD (8) Project Types = Instruments (3)Project Types = Instruments (3)

Specific research projects for SMEs: any topic

Cooperative research - CRAFT; as before; EU funding max 50%. Collective research; Medium-term research activities carried out

by technical research centres for industrial associations or industry groupings in entire sectors of industry dominated by SMEs at the European level; EU funding max 50%.

The ITRE Committee of the European Parliament proposed that Exploratory Award (valmisteluraha 25,000 – 50,000 EUR) should be returned into EU6RTD, as required by European Council of Civil Engineers – ECCE. The parliament, however, gave up after compromise negotiations.

Page 12: FutureConstruct Uusinta uutta Euroopan T&K:sta Rakennusinsinööripäivät  31 Oct 2002, Helsinki FI

EU6RTD (9)EU6RTD (9) Project Types = Instruments (4)Project Types = Instruments (4)

Other instruments available, not described here in more details, are:

• National programmes carried out jointly - Article 169: By governments or national research organisations and industries. Apparently for no good use.

• Networking of national programmes: ERA-Nets to be implemented as specific support action (for preparation) and/or coordination action (running); see below.

• Specific support actions: Similar to earlier accompanying measures.

• Coordination actions: Similar to earlier thematic networks and concerted actions.

Page 13: FutureConstruct Uusinta uutta Euroopan T&K:sta Rakennusinsinööripäivät  31 Oct 2002, Helsinki FI

EU6RTD (10)EU6RTD (10)Participation RulesParticipation Rules

Partners: At least three (3) independent partners established in three (3) different member or associated state. In practice, for a successful IP or NoE partners from several (>10) states are needed.

Two-stage procedure: (For IP and NoE) calls for proposals may involve a two-stage evaluation procedure. In this case, following a positive evaluation of an outline proposal in the first stage, the proposers concerned shall be requested to submit a complete proposal in the second stage.

Small and medium size enterprise – SME:• less than 250 employees• no more than 40 MEUR annual turnover or no more than 27 MEUR annual

balance sheet total (may change...)• less than 25% of the capital or voting rights is owned by big enterprise(s),

except public investment corporations (eg banks, venture capital, SITRA)

Page 14: FutureConstruct Uusinta uutta Euroopan T&K:sta Rakennusinsinööripäivät  31 Oct 2002, Helsinki FI

EU6RTD (11)EU6RTD (11) TimetableTimetable

As the European Parliament, the Council (of Ministers) and the European Commission achieved a compromise about the basic EU6RTD, Specific programmes and Participation rules it looks like the first calls could open 15 Dec 2002 with a closing date of 15 Mar 2003. This call is principally for stage 1 outline proposals.

For stage 2 complete proposals a subsequent closing date of 31 July 2003 is envisaged.

Useful Events:• Brokerage Event on CREC-related topics 03-04 Oct 2002, Brussels BE ;

185 EUR (see http://www.e-core.org/frames/index_workshops.html).• European Research 2002 Conference 11-13 Nov 2002, Brussels BE; 180

EUR (see http://www.cordis.lu/fp6/).

Page 15: FutureConstruct Uusinta uutta Euroopan T&K:sta Rakennusinsinööripäivät  31 Oct 2002, Helsinki FI

EU6RTD (12)EU6RTD (12) Who can participate?Who can participate?

Companies (industrial), Research Institutes, Universities, Industry Associations etc

Small and large organisations EU Member States (15) Associated States = Norway, Iceland, Liechtenstein + Israel,

Switzerland Newly Associated (Candidate) States = Estonia, Latvia, Lithuania,

Poland, Czech, Slovakia, Hungary, Slovenia, Bulgaria, Romania, Cyprus, Malta + Turkey

Other Countries = on specific conditions, usually no EU funding; yet there is 600 MEUR available for (1) Mediterranean countries (including the Western Balkans), (2) Russia and the Newly Independent States (NIS) and (3) developing countries.

Page 16: FutureConstruct Uusinta uutta Euroopan T&K:sta Rakennusinsinööripäivät  31 Oct 2002, Helsinki FI

CREC-related EoIs (1)CREC-related EoIs (1)

Over 11,700 EoI - Expression of Interest were received by the European Commission by 07 Jun 2002 targeting at EU6RTD. They are now publicly available at http://www.cordis.lu/fp6/eoi-analysis.htm.

e-CORE - European Construction Research Network project, headed by CSTC BE, has compiled a list of CREC-related EoIs (see http://www.e-core.org/frames/index_database_eoi.html). Their total number is 311 EoIs (~3% of total). Yet, 166 only are described on the above website.

In the Brokerage Event on CREC-related topics 03-04 Oct 2002, Brussels BE, 82 selected EoIs were discussed in more details representing the following classifications, as per e-CORE:• IP – 66%• NoE – 33%

Page 17: FutureConstruct Uusinta uutta Euroopan T&K:sta Rakennusinsinööripäivät  31 Oct 2002, Helsinki FI

CREC-related EoIs (2)CREC-related EoIs (2)

• By priority thematic areas (79%):• 1.1.2 IST – 15%; • 1.1.3 Materials & processes – 37% • 1.1.6 Sustainable development – 27%

• Most important sub-priorities (77%):• 1.1.3 iii New production processes and devices 26%• 1.1.6.1 Sustainable energy systems 24%• 1.1.2 i Applied IST research addressing major societal and economic challenges 12%• 1.1.3 ii Knowledge-based multifunctional

materials 9%

• 1.1.6.2 Sustainable surface transport 6%

Page 18: FutureConstruct Uusinta uutta Euroopan T&K:sta Rakennusinsinööripäivät  31 Oct 2002, Helsinki FI

Actions towards EU6RTDActions towards EU6RTD

In the Brokerage Event aforesaid, an idea was to develop 15-20 IP and/or NoE proposals out of 311 EoIs listed, actually 82 EoIs discussed. No report on this work, however, is to be prepared.

Villa Real participated in 4 EoIs and is taking part in 1 IP proposal on “Sustainable City” as an active contributive partner (plus in ~2 other as a “sleeping” partner).

What to do next?What to do next?• IP and EoI: (1) study the list of EoIs, carefully (2) select the most interesting IP and EoI: (1) study the list of EoIs, carefully (2) select the most interesting

ones, (3) contact the coordinator to find out if an actual proposal is under ones, (3) contact the coordinator to find out if an actual proposal is under preparation and (4) express your willingness to join the consortium. preparation and (4) express your willingness to join the consortium.

• STRP and SMEs: Prepare your own proposals on new ideas requiring STRP and SMEs: Prepare your own proposals on new ideas requiring further development or to solve existing problems, and then select suitable further development or to solve existing problems, and then select suitable partners (total 5-8) for its implementation.partners (total 5-8) for its implementation.