1 OBRA: MEXICO NUEVO NUMEROS GENERADORES UBICACIÓN: CALLE MUNICIPIO LIBRE ESQ. ESTADO DE MÉXICO MZ. 1 LOTE FRACCIONAMIENTO A CO FECHA: 13 NOV 2013 PARTIDA: EXCAVACIÓN CALCULO: CLAVE CONCEPTO LOCALIZACION ELEMENTO MEDIDAS U EJE TRAMO LARGO ANCHO ALTO CANTIDAD ACIM001 m3 1-7 A-J 56.85 39.26 4.75 1.00 1-7 J-M 11.75 39.26 1.75 1.00 TOTAL ACIM002 m2 1 A-J TALUDES MURO 56.85 4.75 1 A 1-7 TALUDES MURO 40.95 4.75 1 J 1-7 TALUDES MURO 39.26 4.75 1 1-7 J-M TALUDES MURO 43.14 1.75 1 1 J-M TALUDES MURO 2.64 1.75 1 1-7 A-J ÁREA DE PISO 56.85 39.26 1 TOTAL ACIM003 m3 VOLÚMEN DE EXCAVACIÓN DE CAJÓN ESPESOR DE AFINE ÁREAS DE AFINES DE TALUDES Y PISOS 2963.08 0.20 TOTAL ACIM004 m3 ZC-1 A 1-2 ZC-1 6.23 1.20 1.05 1 A 2-3 ZC-1 3.35 1.20 1.05 2 A 3-4 ZC-1 6.29 1.20 1.05 2 A 4-5 ZC-1 3.80 1.20 1.05 2 A 5-6 ZC-1 5.93 1.20 1.05 2 A 6-7 ZC-1 2.75 1.20 1.05 2 EXCAVACIÓN EN CAJÓN DE CIMENTACIÓN POR MEDIOS MECÁNICOS EN MATERIAL TIPO II DE 0.00 A -5.00 m DE PROFUNDIDAD VOLÚMEN MEDIDO EN BANCO, INCLUYE: HERRAMIENTA, MANO DE OBRA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN. AFINE DE CORTES Y TALUDES EN CEPAS DE CIMENTACIÓN ZONA DE ZAPATAS Y CONTRATRABES POR MEDIOS MANUALES, INCLUYE: TRASPALEOS, ACARREOS HORIZONTALES 1RA ESTACIÓN DE 20.00 MTS, HERRAMIENTA, MANO DE OBRA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN. CARGA Y ACARREO DE MATERIAL PRODUCTO DE EXCAVACIÓN EN CAMIÓN FUERA DE LA OBRA A LUGAR DE TIRO AUTORIZADO CUALQUIER DISTANCIA, INCLUYE: HERRAMIENTA, MANO DE OBRA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN. EXCAVACIÓN DE CEPAS PARA ZAPATAS Y CONTRATRABES POR MEDIOS MECÁNICOS EN MATERIAL TIPO II DE 0.00 A - 1.00 m DE PROFUNDIDAD VOLÚMEN MEDIDO EN

Upload: marco-orozco

Post on 18-Jan-2016

14 views

Category:

Documents


2 download

DESCRIPTION

generadores de obra, para construcción de vivienda

TRANSCRIPT

Page 1: Gener Adores

1

OBRA: MEXICO NUEVO

NUMEROS GENERADORES UBICACIÓN:

FECHA: 13 NOV 2013

PARTIDA: EXCAVACIÓN CALCULO:

CLAVE CONCEPTO LOCALIZACION ELEMENTO MEDIDASU EJE TRAMO LARGO ANCHO ALTO CANTIDAD TOTAL

ACIM001 m3 1-7 A-J 56.85 39.26 4.75 1.00 10,601.67 1-7 J-M 11.75 39.26 1.75 1.00 806.94

TOTAL 11,408.61

ACIM002 m2 1 A-J TALUDES MURO 56.85 4.75 1 270.04 A 1-7 TALUDES MURO 40.95 4.75 1 194.51 J 1-7 TALUDES MURO 39.26 4.75 1 186.48

1-7 J-M TALUDES MURO 43.14 1.75 1 75.50 1 J-M TALUDES MURO 2.64 1.75 1 4.62

1-7 A-J ÁREA DE PISO 56.85 39.26 1 2,231.93 TOTAL 2,963.08

ACIM003 m3VOLÚMEN DE EXCAVACIÓN DE CAJÓN ESPESOR DE AFINE 11,408.61

ÁREAS DE AFINES DE TALUDES Y PISOS 2963.08 0.20 592.62

TOTAL 12,001.23

ACIM004 m3 ZC-1A 1-2 ZC-1 6.23 1.20 1.05 1 7.85 A 2-3 ZC-1 3.35 1.20 1.05 2 8.44 A 3-4 ZC-1 6.29 1.20 1.05 2 15.85 A 4-5 ZC-1 3.80 1.20 1.05 2 9.58 A 5-6 ZC-1 5.93 1.20 1.05 2 14.94 A 6-7 ZC-1 2.75 1.20 1.05 2 6.93 J 1-2 ZC-1 4.79 1.20 1.05 1 6.04

CALLE MUNICIPIO LIBRE ESQ. ESTADO DE MÉXICO MZ. 1 LOTE FRACCIONAMIENTO A COL. BARRIO NORTE

EXCAVACIÓN EN CAJÓN DE CIMENTACIÓN POR MEDIOS MECÁNICOS EN MATERIAL TIPO II DE 0.00 A -5.00 m DE PROFUNDIDAD VOLÚMEN MEDIDO EN BANCO, INCLUYE: HERRAMIENTA, MANO DE OBRA, EQUIPO Y TODO LO

NECESARIO PARA SU CORRECTA EJECUCIÓN.

AFINE DE CORTES Y TALUDES EN CEPAS DE CIMENTACIÓN ZONA DE ZAPATAS Y

CONTRATRABES POR MEDIOS MANUALES, INCLUYE: TRASPALEOS,

ACARREOS HORIZONTALES 1RA ESTACIÓN DE 20.00 MTS,

HERRAMIENTA, MANO DE OBRA, EQUIPO Y TODO LO NECESARIO PARA SU

CORRECTA EJECUCIÓN.

CARGA Y ACARREO DE MATERIAL PRODUCTO DE EXCAVACIÓN EN CAMIÓN

FUERA DE LA OBRA A LUGAR DE TIRO AUTORIZADO CUALQUIER DISTANCIA,

INCLUYE: HERRAMIENTA, MANO DE OBRA, EQUIPO Y TODO LO NECESARIO

PARA SU CORRECTA EJECUCIÓN.

EXCAVACIÓN DE CEPAS PARA ZAPATAS Y CONTRATRABES POR MEDIOS

MECÁNICOS EN MATERIAL TIPO II DE 0.00 A - 1.00 m DE PROFUNDIDAD

VOLÚMEN MEDIDO EN BANCO, INCLUYE: HERRAMIENTA, MANO DE OBRA, EQUIPO

Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

Page 2: Gener Adores

2

OBRA: MEXICO NUEVO

NUMEROS GENERADORES UBICACIÓN:

FECHA: 13 NOV 2013

PARTIDA: EXCAVACIÓN CALCULO:

CLAVE CONCEPTO LOCALIZACION ELEMENTO MEDIDASU EJE TRAMO LARGO ANCHO ALTO CANTIDAD TOTAL

CALLE MUNICIPIO LIBRE ESQ. ESTADO DE MÉXICO MZ. 1 LOTE FRACCIONAMIENTO A COL. BARRIO NORTE

7 J-K ZC-1 4.81 1.20 1.05 1 6.06 7 K-L ZC-1 4.32 1.20 1.05 1 5.44 7 L-M ZC-1 6.58 1.20 1.05 1 8.29

J-K 1-2 ZC-1 2.67 1.20 1.05 1 3.36 K-L 2-4 ZC-1 11.62 1.20 1.05 1 14.64 L-M 4-7 ZC-1 13.87 1.20 1.05 1 17.48 ZC-22,3 B-C ZC-2 4.10 1.70 1.05 2 14.64 B-C 2-3 ZC-2 2.55 1.70 1.05 2 9.10 B-C 2-3 ZC-2 1.75 1.70 1.05 2 6.25 6 B-C ZC-2 4.10 1.70 1.05 1 7.32 B 6-7 ZC-2 4.18 1.70 1.05 1 7.46

B-C 6-7 ZC-2 2.55 1.70 1.05 2 9.10 B-C 6-7 ZC-2 1.75 1.70 1.05 2 6.25 5 E-F ZC-2 5.55 1.70 1.05 1 9.91

4,5 H-I ZC-2 4.10 1.70 1.05 2 14.64 4-5 H-I ZC-2 4.45 1.70 1.05 1 7.94 H-I 4-5 ZC-2 2.55 1.70 1.05 2 9.10 H-I 4-5 ZC-2 1.75 1.70 1.05 2 6.25 3-4 K-L ZC-2 2.28 1.70 1.05 1 4.07 3-4 K-L ZC-2 3.67 1.70 1.05 1 6.55

Z-11-7 A-M Z-1 2.5 3 1.05 13 102.38

Z-21-7 A-M Z-2 2.5 3 1.05 18 141.75

Z-31-7 A-M Z-3 2.3 2.8 1.05 50 338.1

CT-1B-F 1-2 CT-1 7.98 1.30 1.05 5 54.46 G 1-2 CT-1 7.13 1.30 1.05 1 9.73 H 1-2 CT-1 6.70 1.30 1.05 1 9.15 I 1-2 CT-1 3.29 1.30 1.05 1 4.49

C-I 2-3 CT-1 4.40 1.30 1.05 7 42.04 B-I 3-4 CT-1 6.67 1.30 1.05 8 72.84 B-I 4-5 CT-1 4.40 1.30 1.05 8 48.05 B-I 5-6 CT-1 7.01 1.30 1.05 8 76.55 C-I 6-7 CT-1 4.05 1.30 1.05 7 38.70 2-6 A-B CT-1 7.08 1.30 1.05 5 48.32 4,5 B-C CT-1 3.10 1.30 1.05 1 4.23 2-6 C-D CT-1 4.55 1.30 1.05 5 31.05 2-6 D-E CT-1 4.82 1.30 1.05 5 32.90 2-6 E-F CT-1 5.55 1.30 1.05 4 30.30 2-6 F-G CT-1 4.87 1.30 1.05 5 33.24 2-6 G-H CT-1 4.40 1.30 1.05 5 30.03

2,3,6 H-I CT-1 5.63 1.30 1.05 3 23.05 4,5 H-I CT-1 1.63 1.30 1.05 2 4.45

EXCAVACIÓN DE CEPAS PARA ZAPATAS Y CONTRATRABES POR MEDIOS

MECÁNICOS EN MATERIAL TIPO II DE 0.00 A - 1.00 m DE PROFUNDIDAD

VOLÚMEN MEDIDO EN BANCO, INCLUYE: HERRAMIENTA, MANO DE OBRA, EQUIPO

Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

Page 3: Gener Adores

3

OBRA: MEXICO NUEVO

NUMEROS GENERADORES UBICACIÓN:

FECHA: 13 NOV 2013

PARTIDA: EXCAVACIÓN CALCULO:

CLAVE CONCEPTO LOCALIZACION ELEMENTO MEDIDASU EJE TRAMO LARGO ANCHO ALTO CANTIDAD TOTAL

CALLE MUNICIPIO LIBRE ESQ. ESTADO DE MÉXICO MZ. 1 LOTE FRACCIONAMIENTO A COL. BARRIO NORTE

K 2-3 CT-1 3.72 1.30 1.05 1 5.08 K 3-4 CT-1 7.02 1.30 1.05 1 9.58

K,L 4-5 CT-1 3.60 1.30 1.05 2 9.83 K,L 5-6 CT-1 5.73 1.30 1.05 2 15.64 K,L 6-7 CT-1 3.15 1.30 1.05 1 4.30 2 J-K CT-1 4.46 1.30 1.05 1 6.09 3 J-K CT-1 5.56 1.30 1.05 1 7.59

4-6 J-K CT-1 4.96 1.30 1.05 3 20.31 4 K-L CT-1 4.28 1.30 1.05 1 5.84

5,6 K-L CT-1 4.62 1.30 1.05 2 12.61 5 L-M CT-1 0.77 1.30 1.05 1 1.05 6 L-M CT-1 4.43 1.30 1.05 1 6.05

TOTAL 1,523.26

ACIM005 m2 ZC-1A 1-2 ZC-1 6.23 3.30 1 20.56 A 2-3 ZC-1 3.35 3.30 2 22.11 A 3-4 ZC-1 6.29 3.30 2 41.51 A 4-5 ZC-1 3.80 3.30 2 25.08 A 5-6 ZC-1 5.93 3.30 2 39.14 A 6-7 ZC-1 2.75 3.30 2 18.15 J 1-2 ZC-1 4.79 3.30 1 15.81 7 J-K ZC-1 4.81 3.30 1 15.87 7 K-L ZC-1 4.32 3.30 1 14.26 7 L-M ZC-1 6.58 3.30 1 21.71

J-K 1-2 ZC-1 2.67 3.30 1 8.81 K-L 2-4 ZC-1 11.62 3.30 1 38.35 L-M 4-7 ZC-1 13.87 3.30 1 45.77 2,3 B-C ZC-2 4.10 3.80 2 31.16 B-C 2-3 ZC-2 2.55 3.80 2 19.38 B-C 2-3 ZC-2 1.75 3.80 2 13.30 6 B-C ZC-2 4.10 3.80 1 15.58 B 6-7 ZC-2 4.18 3.80 1 15.88

B-C 6-7 ZC-2 2.55 3.80 2 19.38 B-C 6-7 ZC-2 1.75 3.80 2 13.30 5 E-F ZC-2 5.55 3.80 1 21.09

4,5 H-I ZC-2 4.10 3.80 2 31.16 4-5 H-I ZC-2 4.45 3.80 1 16.91 H-I 4-5 ZC-2 2.55 3.80 2 19.38

H-I 4-5 ZC-2 1.75 3.80 2 13.30 3-4 K-L ZC-2 2.28 3.80 1 8.66 3-4 K-L ZC-2 3.67 3.80 1 13.95 1-7 A-M Z-1 2.5 3 1.05 13 150.151-7 A-M Z-2 2.5 3 1.05 18 207.901-7 A-M Z-3 2.3 2.8 1.05 50 535.50B-F 1-2 CT-1 7.98 3.40 5 135.66

AFINE DE CORTES Y TALUDES EN CEPAS DE ZAPATAS Y CONTRATRABES DE POR

MEDIOS MANUALES, INCLUYE: TRASPALEOS, ACARREOS

HORIZONTALES 1RA ESTACIÓN DE 20.00 MTS, HERRAMIENTA, MANO DE

OBRA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

Page 4: Gener Adores

4

OBRA: MEXICO NUEVO

NUMEROS GENERADORES UBICACIÓN:

FECHA: 13 NOV 2013

PARTIDA: EXCAVACIÓN CALCULO:

CLAVE CONCEPTO LOCALIZACION ELEMENTO MEDIDASU EJE TRAMO LARGO ANCHO ALTO CANTIDAD TOTAL

CALLE MUNICIPIO LIBRE ESQ. ESTADO DE MÉXICO MZ. 1 LOTE FRACCIONAMIENTO A COL. BARRIO NORTE

G 1-2 CT-1 7.13 3.40 1 24.24 H 1-2 CT-1 6.70 3.40 1 22.78 I 1-2 CT-1 3.29 3.40 1 11.19

C-I 2-3 CT-1 4.40 3.40 7 104.72 B-I 3-4 CT-1 6.67 3.40 8 181.42 B-I 4-5 CT-1 4.40 3.40 8 119.68 B-I 5-6 CT-1 7.01 3.40 8 190.67 C-I 6-7 CT-1 4.05 3.40 7 96.39 2-6 A-B CT-1 7.08 3.40 5 120.36 4,5 B-C CT-1 3.10 3.40 1 10.54 2-6 C-D CT-1 4.55 3.40 5 77.35 2-6 D-E CT-1 4.82 3.40 5 81.94 2-6 E-F CT-1 5.55 3.40 4 75.48 2-6 F-G CT-1 4.87 3.40 5 82.79 2-6 G-H CT-1 4.40 3.40 5 74.80

2,3,6 H-I CT-1 5.63 3.40 3 57.43 4,5 H-I CT-1 1.63 3.40 2 11.08 K 2-3 CT-1 3.72 3.40 1 12.65 K 3-4 CT-1 7.02 3.40 1 23.87

K,L 4-5 CT-1 3.60 3.40 2 24.48 K,L 5-6 CT-1 5.73 3.40 2 38.96 K,L 6-7 CT-1 3.15 3.40 1 10.71 2 J-K CT-1 4.46 3.40 1 15.16 3 J-K CT-1 5.56 3.40 1 18.90

4-6 J-K CT-1 4.96 3.40 3 50.59 4 K-L CT-1 4.28 3.40 1 14.55

5,6 K-L CT-1 4.62 3.40 2 31.42 5 L-M CT-1 0.77 3.40 1 2.62 6 L-M CT-1 4.43 3.40 1 15.06

TOTAL 3,210.62 ACIM006 m3

VOLUMEN DE CEPAS 1523.26 1 1,523.26 VOLUMEN DE AFINES 0.10 3,210.62 1 321.06

TOTAL 1,844.32 ACIM007 m3

VOL. EXCAVACIÓN VOL- CONCRETO1,523.26 685.17 838.09

CARGA Y ACARREO DE MATERIAL PRODUCTO DE EXCAVACIÓN EN CAMIÓN

FUERA DE LA OBRA A LUGAR DE TIRO AUTORIZADO CUALQUIER DISTANCIA,

INCLUYE: HERRAMIENTA, MANO DE OBRA, EQUIPO Y TODO LO NECESARIO

PARA SU CORRECTA EJECUCIÓN.

RELLENO DE CEPAS EN CIMENTACIÓN CON MATERIAL PRODUCTO DE

EXCAVACIÓN COMPACTADA POR MEDIOS MECÁNICOS (BAILARINA) EN

CAPAS DE 20 CM AL 90% DE LA PRUEBA PROCTOR, INCLUYE: HUMEDECIDO DEL

MATERIAL, TRASPALEOS, ACARREOS 1RA ESTACIÓN DE 20.00 MTS

DISTANCIA HORIZONTAL, HERRAMIENTA, MANO DE OBRA, EQUIPO

Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

Page 5: Gener Adores

5

OBRA: MEXICO NUEVO

NUMEROS GENERADORES UBICACIÓN:

FECHA: 13 NOV 2013

PARTIDA: EXCAVACIÓN CALCULO:

CLAVE CONCEPTO LOCALIZACION ELEMENTO MEDIDASU EJE TRAMO LARGO ANCHO ALTO CANTIDAD TOTAL

CALLE MUNICIPIO LIBRE ESQ. ESTADO DE MÉXICO MZ. 1 LOTE FRACCIONAMIENTO A COL. BARRIO NORTE

TOTAL 838.09

ACIM008 m2 ZC-11-7 A,J 40.95 0.70 2 57.33 1 A-E 25.30 0.70 1 17.71 1 F-J 25.15 0.70 1 17.60 7 A-J 56.85 0.70 1 39.80

2-3 B 5.85 0.70 1 4.10 7 J-M 20.85 0.70 1 14.60

1-7 J-M 43.14 0.70 1 30.20

ZC-22 B-C 5.00 0.70 1 3.50 3 B-C 5.00 0.70 1 3.50

6-7 B-C 9.78 0.70 1 6.85 4-5 H-I 14.05 0.70 1 9.83 3-4 K-L 6.32 0.70 1 4.42

Z-11-7 A-M 1.5 2 13 39.00

Z-21-7 A-M 1.5 2 18 54.00

Z-31-7 A-M 1.3 1.8 50 117

CT-11-7 B-I 40.95 0.30 8 98.28 2-6 A-J 56.85 0.30 5 85.28 2 J-K 5.93 0.30 1 1.78 3 J-L 8.55 0.30 1 2.57 4 J-L 14.36 0.30 1 4.31 5 J-M 15.21 0.30 1 4.56 6 J-M 18.50 0.30 1 5.55

1-7 A-M 5.85 4.10 4 95.94

RELLENO DE CEPAS EN CIMENTACIÓN CON MATERIAL PRODUCTO DE

EXCAVACIÓN COMPACTADA POR MEDIOS MECÁNICOS (BAILARINA) EN

CAPAS DE 20 CM AL 90% DE LA PRUEBA PROCTOR, INCLUYE: HUMEDECIDO DEL

MATERIAL, TRASPALEOS, ACARREOS 1RA ESTACIÓN DE 20.00 MTS

DISTANCIA HORIZONTAL, HERRAMIENTA, MANO DE OBRA, EQUIPO

Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

FABRICACIÓN DE PLANTILLA DE CONCRETO HECHO EN OBRA POR

MECÁNICOS DE UN f ´c = 100 Kg/cm2 DE 5 CM DE ESPESOR AGREGADO DE

3/4", INCLUYE: MAESTRAS, REGLEADO, HUMEDECIDO DE TERRENO, ACARREOS

HORIZONATLES DE 20.00 MTS, VACIADO DE MEZCLA, MATERIALES,

HERRAMIENTA, MANO DE OBRA, EQUIPO Y TODO LO NECESARIO PARA SU

CORRECTA EJECUCIÓN.

Page 6: Gener Adores

6

OBRA: MEXICO NUEVO

NUMEROS GENERADORES UBICACIÓN:

FECHA: 13 NOV 2013

PARTIDA: EXCAVACIÓN CALCULO:

CLAVE CONCEPTO LOCALIZACION ELEMENTO MEDIDASU EJE TRAMO LARGO ANCHO ALTO CANTIDAD TOTAL

CALLE MUNICIPIO LIBRE ESQ. ESTADO DE MÉXICO MZ. 1 LOTE FRACCIONAMIENTO A COL. BARRIO NORTE

TOTAL 717.69 ACIM009 Kg EJE TRAMO TIPO DIAM LONG VARILLA ELEM TOTAL (Kg)

A 1-7 ZC-1 Y CT-1 3 45.85 17 1 434.15 1 A-J ZC-1 Y CT-1 3 59.15 17 1 560.09 J 1-7 ZC-1 Y CT-1 3 37.76 17 1 357.55 7 A-J ZC-1 Y CT-1 3 59.15 17 1 560.09 7 J-M ZC-1 Y CT-1 3 22.17 17 1 209.93

1-7 J-M ZC-1 Y CT-1 3 45.04 17 1 426.48 A 1-7 ZC-1 YCT-1 EST 3 2.52 1 230 323.19 1 A-J ZC-1 YCT-1 EST 3 2.52 1 297 416.53 J 1-7 ZC-1 YCT-1 EST 3 2.52 1 190 266.41 7 A-J ZC-1 YCT-1 EST 3 2.52 1 297 416.53 7 J-M ZC-1 YCT-1 EST 3 2.52 1 112 157.00

1-7 J-M ZC-1 YCT-1 EST 3 2.52 1 226.2 317.50 2 B-C ZC-2 YCT-1 3 5.15 17 1 48.77 3 B-C ZC-2 YCT-1 3 5.15 17 1 48.77

6-7 B-C ZC-2 YCT-1 3 5.15 17 3 146.30 4 H-I ZC-2 YCT-1 3 5.15 17 1 48.77 5 H-I ZC-2 YCT-1 3 5.15 17 1 48.77

4-5 H-I ZC-2 YCT-1 3 2.55 17 2 48.29 4-5 H-I ZC-2 YCT-1 3 5.85 17 1 55.39 4-5 H-I ZC-2 YCT-1 3 3.15 17 2 59.65 3-4 K-L ZC-2 YCT-1 3 2.98 17 1 28.22 3-4 K-L ZC-2 YCT-1 3 4.40 17 1 41.66 2 B-C ZC-2 EST 3 2.52 1 26.75 37.55 3 B-C ZC-2 EST 3 2.52 1 26.75 37.55

6-7 B-C ZC-2 EST 3 2.52 1 26.75 37.55 4 H-I ZC-2 EST 3 2.52 1 26.75 37.55 5 H-I ZC-2 EST 3 2.52 1 26.75 37.55

4-5 H-I ZC-2 EST 3 2.52 1 13.75 19.30 4-5 H-I ZC-2 EST 3 2.52 1 30.25 42.46 4-5 H-I ZC-2 EST 3 2.52 1 16.75 23.51 3-4 K-L ZC-2 EST 3 2.52 1 15.9 22.32 3-4 K-L ZC-2 EST 3 2.52 1 23 32.28 1-7 A-J DD-1 3 13.12 3 66 1,446.95 1-7 K-M DD-1 3 13.12 3 15 328.85 2-6 A-J CT-1 3 59.15 10 5 1,647.33 1-7 B-I CT-1 3 42.85 10 8 1,909.40 2 J-K CT-1 3 5.85 10 1 32.58 3 J-L CT-1 3 8.78 10 1 48.90 4 J-L CT-1 3 12.86 10 1 71.63 5 J-M CT-1 3 15.25 10 1 84.94 6 J-M CT-1 3 18.99 10 1 105.77

2-6 A-J CT-1 EST 3 2.52 1 1483.75 2,082.65 1-7 B-I CT-1 EST 3 2.52 1 1722 2,417.07 2 J-K CT-1 EST 3 2.52 1 30.25 42.46 3 J-L CT-1 EST 3 2.52 1 44.9 63.02 4 J-L CT-1 EST 3 2.52 1 65.3 91.66 5 J-M CT-1 EST 3 2.52 1 77.25 108.43 6 J-M CT-1 EST 3 2.52 1 95.95 134.68

SUMINISTRO, HABILITADO Y ARMADO DE ACERO DE REFURZO DE UN f´y =

4200 Kg/cm2 DEL No. 3 (3/8"), INCLUYE: CORTES, DOBLECES, GANCHOS,

TRASLAPES, DESPERDICIOS, AMARRES CON ALAMBRE RECOCIDO, ACARREOS

VERTICALES Y HORIZONTALES DE 20.00 MTS 1RA ESTACIÓN, MATERIALES, HERRAMIENTA, MANO DE OBRA,

EQUIPO, FLETES, Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

Page 7: Gener Adores

7

OBRA: MEXICO NUEVO

NUMEROS GENERADORES UBICACIÓN:

FECHA: 13 NOV 2013

PARTIDA: EXCAVACIÓN CALCULO:

CLAVE CONCEPTO LOCALIZACION ELEMENTO MEDIDASU EJE TRAMO LARGO ANCHO ALTO CANTIDAD TOTAL

CALLE MUNICIPIO LIBRE ESQ. ESTADO DE MÉXICO MZ. 1 LOTE FRACCIONAMIENTO A COL. BARRIO NORTE

TOTAL 15,963.98 ACIM010 Kg EJE TRAMO TIPO DIAM LONG VARILLA ELEM TOTAL (Kg)

A 1-7 ZC-1 EST 4 1.13 1 307 345.15 1 A-J ZC-1 EST 4 1.13 1 395 444.94 J 1-7 ZC-1 EST 4 1.13 1 253 284.45 7 A-J ZC-1 EST 4 1.13 1 395 444.94 7 J-M ZC-1 EST 4 1.13 1 149 167.47

1-7 J-M ZC-1 EST 4 1.13 1 301 339.07 2 B-C ZC-2 EST 4 0.93 1 35 32.73 3 B-C ZC-2 EST 4 0.93 1 35 32.73

6-7 B-C ZC-2 EST 4 0.93 1 35 32.73 4 H-I ZC-2 EST 4 0.93 1 35 32.73 5 H-I ZC-2 EST 4 0.93 1 35 32.73

4-5 H-I ZC-2 EST 4 0.93 1 18 16.67 4-5 H-I ZC-2 EST 4 0.93 1 40 37.05 4-5 H-I ZC-2 EST 4 0.93 1 22 20.38 3-4 K-L ZC-2 EST 4 0.93 1 21 19.33 3-4 K-L ZC-2 EST 4 0.93 1 30 28.10

TOTAL 2,311.18 ACIM011 Kg EJE TRAMO TIPO DIAM LONG VARILLA ELEM TOTAL (Kg)

1-7 A-J Z-1 5.00 4.86 15.00 13 1,478.41 1-7 A-J Z-1 5.00 3.83 20.00 13 1,553.45 1-7 A-J Z-2 5.00 4.86 12.00 13 1,182.73 1-7 A-J Z-2 5.00 3.83 16.00 13 1,242.76 1-7 J-M Z-2 5.00 4.86 12.00 5 454.90 1-7 J-M Z-2 5.00 3.83 16.00 5 477.98 1-7 A-J Z-3 5.00 4.33 11.00 40 2,972.11 1-7 A-J Z-3 5.00 3.43 15.00 40 3,210.48 1-7 J-M Z-3 5.00 4.33 11.00 10 743.03 1-7 J-M Z-3 5.00 3.43 15.00 10 802.62

TOTAL 14,118.47 ACIM012 Kg EJE TRAMO TIPO DIAM LONG VARILLA ELEM TOTAL (Kg)

1-7 A-J DD-1 6.00 1.33 20.00 66 3,950.10 1-7 J-M DD-1 6.00 1.33 20.00 15 897.75 1-7 A-J CT-1 6.00 42.85 6.00 10 5,784.75 1-7 A-J CT-1 6.00 59.15 6.00 7 5,589.68 2-3 B-C CT-1 6.00 5.15 6.00 2 139.05 2-3 B-C CT-1 6.00 5.15 6.00 2 139.05 6-7 B-C CT-1 6.00 5.15 6.00 2 139.05 6-7 B-C CT-1 6.00 5.30 6.00 2 143.10 4-5 H-I CT-1 6.00 5.85 6.00 2 157.95

SUMINISTRO, HABILITADO Y ARMADO DE ACERO DE REFURZO DE UN f´y =

4200 Kg/cm2 DEL No. 4 (1/2"), INCLUYE: CORTES, DOBLECES, GANCHOS,

TRASLAPES, DESPERDICIOS, AMARRES CON ALAMBRE RECOCIDO, ACARREOS

VERTICALES Y HORIZONTALES DE 20.00 MTS 1RA ESTACIÓN, MATERIALES, HERRAMIENTA, MANO DE OBRA,

EQUIPO, FLETES, Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

SUMINISTRO, HABILITADO Y ARMADO DE ACERO DE REFURZO DE UN f´y =

4200 Kg/cm2 DEL No. 5 (5/8"), INCLUYE: CORTES, DOBLECES, GANCHOS,

TRASLAPES, DESPERDICIOS, AMARRES CON ALAMBRE RECOCIDO, ACARREOS

VERTICALES Y HORIZONTALES DE 20.00 MTS 1RA ESTACIÓN, MATERIALES, HERRAMIENTA, MANO DE OBRA,

EQUIPO, FLETES, Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

SUMINISTRO, HABILITADO Y ARMADO DE ACERO DE REFURZO DE UN f´y =

4200 Kg/cm2 DEL No. 6 (3/4"), INCLUYE: CORTES, DOBLECES, GANCHOS,

TRASLAPES, DESPERDICIOS, AMARRES CON ALAMBRE RECOCIDO, ACARREOS

VERTICALES Y HORIZONTALES DE 20.00 MTS 1RA ESTACIÓN, MATERIALES, HERRAMIENTA, MANO DE OBRA,

EQUIPO, FLETES, Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

Page 8: Gener Adores

8

OBRA: MEXICO NUEVO

NUMEROS GENERADORES UBICACIÓN:

FECHA: 13 NOV 2013

PARTIDA: EXCAVACIÓN CALCULO:

CLAVE CONCEPTO LOCALIZACION ELEMENTO MEDIDASU EJE TRAMO LARGO ANCHO ALTO CANTIDAD TOTAL

CALLE MUNICIPIO LIBRE ESQ. ESTADO DE MÉXICO MZ. 1 LOTE FRACCIONAMIENTO A COL. BARRIO NORTE

4-5 H-I CT-1 6.00 4.90 6.00 2 132.30 3-4 K-L CT-1 6.00 10.09 6.00 1 136.22 1-7 J-M CT-1 6.00 45.04 6.00 1 608.04 7 J-M CT-1 6.00 20.85 6.00 1 281.48 2 J-K CT-1 6.00 5.85 6.00 1 78.98 3 J-L CT-1 6.00 8.78 6.00 1 118.53 4 J-L CT-1 6.00 12.86 6.00 1 173.61 5 J-M CT-1 6.00 15.25 6.00 1 205.88 6 J-M CT-1 6.00 18.99 6.00 1 256.37

TOTAL 18,931.86 ACIM013 m2 1-7 A-J LOSA 56.45 40.55 1 2,289.05

1-7 J-M LOSA 20.21 38.86 1 440.09

TOTAL 2,729.14 ACIM014 m2 D 2 Z-1 2.00 1.50 0.25 1 1.75

E 6 Z-1 2.00 1.50 0.25 1 1.75 E 2-3 Z-1 2.00 1.50 0.25 2 1.75 F 2-6 Z-1 2.00 1.50 0.25 5 1.75 G 6 Z-1 2.00 1.50 0.25 1 1.75 H 2-3 Z-1 2.00 1.50 0.25 2 1.75 H 6 Z-1 2.00 1.50 0.25 1 1.75 D 6 Z-2 2.00 1.50 0.25 1 1.75 D 3 Z-2 2.00 1.50 0.25 1 1.75 E 4-5 Z-2 2.00 1.50 0.25 2 1.75 G 2-5 Z-2 2.00 1.50 0.25 4 1.75 I 2-6 Z-2 2.00 1.50 0.25 5 1.75 K 4-6 Z-2 2.00 1.50 0.25 3 1.75 L 5-6 Z-2 2.00 1.50 0.25 2 1.75 A 1-7 Z-3 1.80 1.30 0.25 7 1.55 B 1-5 Z-3 1.80 1.30 0.25 3 1.55 C 1-7 Z-3 1.80 1.30 0.25 7 1.55 D 1,7 Z-3 1.80 1.30 0.25 2 1.55 D 4-5 Z-3 1.80 1.30 0.25 2 1.55 E 1,7 Z-3 1.80 1.30 0.25 2 1.55 F 1,7 Z-3 1.80 1.30 0.25 2 1.55 G 1,7 Z-3 1.80 1.30 0.25 2 1.55 H 1,7 Z-3 1.80 1.30 0.25 2 1.55 H 4-5 Z-3 1.80 1.30 0.25 2 1.55 I 1,7 Z-3 1.80 1.30 0.25 2 1.55 J 1-7 Z-3 1.80 1.30 0.25 7 1.55

J-K 1-2 Z-3 1.80 1.30 0.25 3 1.55 K 7 Z-3 1.80 1.30 0.25 1 1.55

SUMINISTRO, HABILITADO Y ARMADO DE MALLA ELECTROSOLDADA 6X6/10-10

INCLUYE: CORTES, DOBLECES, GANCHOS, TRASLAPES, DESPERDICIOS,

AMARRES CON ALAMBRE RECOCIDO, ACARREOS VERTICALES Y

HORIZONTALES DE 20.00 MTS 1RA ESTACIÓN, MATERIALES, HERRAMIENTA,

MANO DE OBRA, EQUIPO, FLETES, Y TODO LO NECESARIO PARA SU

CORRECTA EJECUCIÓN.

CIMBRADO Y DESCIMBRADO EN CIMENTACIÓN ACABADO COMÚN EN ZAPATAS, DADOS Y CONTRATRABES,

INCLUYE: ALINEADO, PLOMEADO, HABILITADO DE CIMBRA, CORTES,

DESPERDICIOS, ACARREOS VERTICALES Y HORIZONTALES HASTA 20.00 MTS

1RA ESTACIÓN, DESMOLDANTE, LIMPIEZA DE SUPERFICIE DE CONTACTO, APUNTALADO, AMARRES, MATERIALES,

HERRAMIENTA, MANO DE OBRA, EQUIPO Y TODO LO NECESARIO PARA SU

CORRECTA EJECUCIÓN.

Page 9: Gener Adores

9

OBRA: MEXICO NUEVO

NUMEROS GENERADORES UBICACIÓN:

FECHA: 13 NOV 2013

PARTIDA: EXCAVACIÓN CALCULO:

CLAVE CONCEPTO LOCALIZACION ELEMENTO MEDIDASU EJE TRAMO LARGO ANCHO ALTO CANTIDAD TOTAL

CALLE MUNICIPIO LIBRE ESQ. ESTADO DE MÉXICO MZ. 1 LOTE FRACCIONAMIENTO A COL. BARRIO NORTE

3 K-L Z-3 1.80 1.30 0.25 1 1.55 5 L-M Z-3 1.80 1.30 0.25 1 1.55 L 4,7 Z-3 1.80 1.30 0.25 2 1.55

L-M 6-7 Z-3 1.80 1.30 0.25 2 1.55 1-7 A-J DD-1 1.20 0.80 0.25 13 13.00 1-7 A-M DD-2 1.20 0.80 0.35 18 25.20 1-7 A-M DD-3 1.20 0.80 0.50 50 100.00 1,7 A-B ZC-1 6.80 0.15 0.35 2 6.80 1,7 B-C ZC-1 3.20 0.15 0.35 2 3.20 1,7 C-D ZC-1 4.75 0.15 0.35 2 4.75 1,7 D-E ZC-1 4.92 0.15 0.35 2 4.92 1,7 E-F ZC-1 6.06 0.15 0.35 2 6.06 1,7 F-G ZC-1 5.16 0.15 0.35 2 5.16 1,7 G-H ZC-1 4.70 0.15 0.35 2 4.70 1,7 H-I ZC-1 6.00 0.15 0.35 2 6.00 1,7 I-J ZC-1 3.40 0.15 0.35 2 3.40 A 1-2 ZC-1 7.13 0.15 0.35 1 3.57 J 1-2 ZC-1 5.60 0.15 0.35 1 2.80

A,J 2-3 ZC-1 3.95 0.15 0.35 2 3.95 A,J 3-4 ZC-1 6.90 0.15 0.35 2 6.90 A,J 4-5 ZC-1 4.40 0.15 0.35 2 4.40 A,J 5-6 ZC-1 6.53 0.15 0.35 2 6.53 A,J 6-7 ZC-1 3.65 0.15 0.35 2 3.65 J-M 1-7 ZC-1 33.32 0.15 0.35 1 16.66 7 J-M ZC-1 17.42 0.15 0.35 1 8.71

2,3 B-C ZC-2 4.10 0.15 0.15 2 2.46 5 2-3 ZC-2 5.85 0.15 0.15 1 1.76

B-C 2-3 ZC-2 2.55 0.15 0.15 2 1.53 B-C 2-3 ZC-2 3.15 0.15 0.15 2 1.89 5 E-F ZC-2 5.55 0.15 0.15 1 1.66 6 B-C ZC-2 4.10 0.15 0.15 1 1.23 B 6-7 ZC-2 4.88 0.15 0.15 1 1.46

B-C 6-7 ZC-2 2.55 0.15 0.15 2 1.53 B-C 6-7 ZC-2 3.15 0.15 0.15 2 1.89 4,5 H-I ZC-2 4.15 0.15 0.15 2 2.49 H-I 4-5 ZC-2 5.85 0.15 0.15 1 1.76 H-I 4-5 ZC-2 2.55 0.15 0.15 2 1.53 H-I 4-5 ZC-2 3.15 0.15 0.15 2 1.89 K-L 3-4 ZC-2 2.28 0.15 0.15 1 0.68 K-L 3-4 ZC-2 4.04 0.15 0.15 1 1.21 1-7 A-B CT-1 6.80 1.00 1.00 7 95.20 1-7 B-C CT-1 3.60 1.00 1.00 7 50.40 1-7 C-D CT-1 5.15 1.00 1.00 7 72.10 1-7 D-E CT-1 5.52 1.00 1.00 7 77.28 1-7 E-F CT-1 6.25 1.00 1.00 7 87.50 1-7 F-G CT-1 5.57 1.00 1.00 7 77.98 1-7 G-H CT-1 5.10 1.00 1.00 7 71.40 1-7 H-I CT-1 6.33 1.00 1.00 7 88.62 1-7 I-J CT-1 4.30 1.00 1.00 7 60.20 A-J 1-2 CT-1 8.05 1.00 1.00 10 161.00

Page 10: Gener Adores

10

OBRA: MEXICO NUEVO

NUMEROS GENERADORES UBICACIÓN:

FECHA: 13 NOV 2013

PARTIDA: EXCAVACIÓN CALCULO:

CLAVE CONCEPTO LOCALIZACION ELEMENTO MEDIDASU EJE TRAMO LARGO ANCHO ALTO CANTIDAD TOTAL

CALLE MUNICIPIO LIBRE ESQ. ESTADO DE MÉXICO MZ. 1 LOTE FRACCIONAMIENTO A COL. BARRIO NORTE

A-J 2-3 CT-1 4.40 1.00 1.00 10 88.00 A-J 3-4 CT-1 6.90 1.00 1.00 10 138.00 A-J 4-5 CT-1 4.40 1.00 1.00 10 88.00 A-J 5-6 CT-1 7.20 1.00 1.00 10 144.00 A-J 6-7 CT-1 4.05 1.00 1.00 10 81.00 J-M 1-7 CT-1 33.32 1.00 1.00 1 66.64 2-7 J-K CT-1 5.56 1.00 1.00 6 66.72 3 K-L CT-1 1.76 1.00 1.00 1 3.52

4-7 K-L CT-1 5.32 1.00 1.00 4 42.56 5 L-M CT-1 1.67 1.00 1.00 1 3.34 6 L-M CT-1 5.27 1.00 1.00 1 10.54 7 L-M CT-1 7.40 1.00 1.00 1 14.80

B-C 2-3 CT-1 2.55 1.00 1.00 2 10.20 B-C 2-3 CT-1 3.15 1.00 1.00 2 12.60 B-C 6-7 CT-1 2.55 1.00 1.00 2 10.20 B-C 6-7 CT-1 3.15 1.00 1.00 2 12.60 H-I 4-5 CT-1 2.10 1.00 1.00 2 8.40 H-I 4-5 CT-1 2.75 1.00 1.00 2 11.00 K-L 3-4 CT-1 2.50 1.00 1.00 1 5.00 K-L 3-4 CT-1 3.93 1.00 1.00 1 7.86

0.00

TOTAL 1,984.39 ACIM015 m3 1-7 A-J Z-1 1.74 13 22.62

1-7 A-M Z-2 1.54 18 27.76 1-7 A-M Z-3 1.41 50 70.50

AREA1,7 A-B ZC-1 6.80 0.40 2 5.44 1,7 B-C ZC-1 3.20 0.40 2 2.56 1,7 C-D ZC-1 4.75 0.40 2 3.80 1,7 D-E ZC-1 4.92 0.40 2 3.94 1,7 E-F ZC-1 6.06 0.40 2 4.85 1,7 F-G ZC-1 5.16 0.40 2 4.13 1,7 G-H ZC-1 4.70 0.40 2 3.76 1,7 H-I ZC-1 6.00 0.40 2 4.80 1,7 I-J ZC-1 3.40 0.40 2 2.72 A 1-2 ZC-1 7.13 0.40 1 2.85 J 1-2 ZC-1 5.60 0.40 1 2.24

A,J 2-3 ZC-1 3.95 0.40 2 3.16 A,J 3-4 ZC-1 6.90 0.40 2 5.52 A,J 4-5 ZC-1 4.40 0.40 2 3.52 A,J 5-6 ZC-1 6.53 0.40 2 5.22 A,J 6-7 ZC-1 3.65 0.40 2 2.92 J-M 1-7 ZC-1 33.32 0.40 1 13.33 7 J-M ZC-1 17.42 0.40 1 6.97

2,3 B-C ZC-2 4.10 0.40 2 3.28 B-C 2-3 ZC-2 5.85 0.40 1 2.34 B-C 2-3 ZC-2 2.55 0.40 2 2.04 B-C 2-3 ZC-2 3.15 0.40 2 2.52

SUMINISTRO Y VACIADO DE CONCRETO PREMEZCLADO CLASE II BOMBEABLE,

REVENIMIENTO DE 14+- 2 CM, DE UN f´c = 250 Kg/cm2, INCLUYE: VIBRADO,

PALEOS, TRASPALEOS, ARTEZAS, CANALONES, PASARELAS,

DESPERDICIOS, CURADO CON MEMBRANA BASE AGUA, MATERIALES,

HERRAMIENTA, MANO DE OBRA, EQUIPO Y LO NECESARIO PARA SU CORRECTA

EJECUCIÓN.

Page 11: Gener Adores

11

OBRA: MEXICO NUEVO

NUMEROS GENERADORES UBICACIÓN:

FECHA: 13 NOV 2013

PARTIDA: EXCAVACIÓN CALCULO:

CLAVE CONCEPTO LOCALIZACION ELEMENTO MEDIDASU EJE TRAMO LARGO ANCHO ALTO CANTIDAD TOTAL

CALLE MUNICIPIO LIBRE ESQ. ESTADO DE MÉXICO MZ. 1 LOTE FRACCIONAMIENTO A COL. BARRIO NORTE

5 E-F ZC-2 6.25 0.40 1 2.50 6 B-C ZC-2 4.35 0.40 1 1.74 B 6-7 ZC-2 4.88 0.40 1 1.95

B-C 6-7 ZC-2 2.55 0.40 2 2.04 B-C 6-7 ZC-2 3.15 0.40 2 2.524,5 H-I ZC-2 4.15 0.40 2 3.32 H-I 4-5 ZC-2 5.85 0.40 1 2.34 H-I 4-5 ZC-2 2.55 0.40 2 2.04 H-I 4-5 ZC-2 3.15 0.40 2 2.52 K-L 3-4 ZC-2 2.28 0.40 1 0.91 K-L 3-4 ZC-2 4.04 0.40 1 1.62 2-6 A-B CT-1 7.28 0.30 5 10.92 4,5 B-C CT-1 3.60 0.30 2 2.16 2-6 C-D CT-1 5.15 0.30 5 7.73 2-6 D-E CT-1 5.48 0.30 5 8.22 2-6 E-F CT-1 6.25 0.30 4 7.50 2-6 F-G CT-1 5.57 0.30 5 8.36 2-6 G-H CT-1 5.10 0.30 5 7.65 2-6 H-I CT-1 6.33 0.30 3 5.70 2-6 I-J CT-1 4.30 0.30 5 6.45 B-I 1-2 CT-1 8.00 0.30 8 19.20 B-I 2-3 CT-1 4.85 0.30 7 10.18 B-I 3-4 CT-1 7.34 0.30 8 17.62 B-I 4-5 CT-1 4.40 0.30 8 10.56 B-I 5-6 CT-1 7.20 0.30 8 17.28 B-I 6-7 CT-1 4.05 0.30 7 8.50 J-M 1-7 CT-1 33.32 0.30 1 10.00 2-7 J-K CT-1 5.56 0.30 5 8.34 3 K-L CT-1 1.76 0.30 1 0.53

4-7 K-L CT-1 5.32 0.30 3 4.79 5 L-M CT-1 1.67 0.30 1 0.50 6 L-M CT-1 5.27 0.30 1 1.58 7 L-M CT-1 7.40 0.30 1 2.22

1-7 A-J LOSA 56.45 40.55 0.10 1 228.90 1-7 J-M LOSA 20.21 38.86 0.10 1 44.01

TOTAL 685.17 ACIM016 ml 1 A-J 56.85 1 56.85

7 A-J 56.85 1 56.85 A 1-7 40.95 1 40.95 7 J-M 20.85 1 20.85

1-7 J-M 43.14 1 43.14

TOTAL 218.64 ACIM017 ml

CIMBRA FALSA A BASE DE CASETÓN DE POLIESTIRENO EN ZONA DE

COLINDANCIAS, INCLUYE: CORTES, DESPERDICIOS, ACARREOS VERTICALES

Y HORIZONTALES HASTA 20.00 MTS 1RA ESTACIÓN, HERRAMIENTA, MANO

DE OBRA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA

EJECUCIÓN.

CORTE CON DISCO EN PISO DE 2 CM DE PROFUNDIDAD Y 3 MM DE ANCHO,

INCLUYE: TRAZO, MATERIALES, HERRAMIENTA, MANO DE OBRA, EQUIPO

Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

Page 12: Gener Adores

12

OBRA: MEXICO NUEVO

NUMEROS GENERADORES UBICACIÓN:

FECHA: 13 NOV 2013

PARTIDA: EXCAVACIÓN CALCULO:

CLAVE CONCEPTO LOCALIZACION ELEMENTO MEDIDASU EJE TRAMO LARGO ANCHO ALTO CANTIDAD TOTAL

CALLE MUNICIPIO LIBRE ESQ. ESTADO DE MÉXICO MZ. 1 LOTE FRACCIONAMIENTO A COL. BARRIO NORTE

TOTAL 0.00 ACIM018 m2 1,7 A-J 61.96 0.10 2 12.39

A,J 1-7 45.15 0.10 2 9.03 J-M 1-7 49.83 0.10 1 4.98 7 J-M 22.91 0.10 1 2.29

2-6 B-I 2.80 0.10 37 10.36 4-6 K-L 2.80 0.10 5 1.40 2,3 B-C 6.70 0.10 2 1.34 B 2-3 10.30 0.10 1 1.03

B-C 2-3 15.10 0.10 1 1.51 6 B-C 6.70 0.10 1 0.67 B 6-7 10.20 0.10 1 1.02

B-C 6-7 15.10 0.10 1 1.51 4,5 H-I 6.70 0.10 2 1.34 H-I 4-5 10.30 0.10 1 1.03 H-I 4-5 15.10 0.10 1 1.51 K-L 3-4 12.27 0.10 1 1.23

TOTAL 52.64 ACIM019 m2 1-7 A-J LOSA 56.45 40.55 1 2,289.05

1-7 J-M LOSA 20.21 38.86 1 440.09

TOTAL 2,729.14 ACIM020 ml

CORTE CON DISCO EN PISO DE 2 CM DE PROFUNDIDAD Y 3 MM DE ANCHO,

INCLUYE: TRAZO, MATERIALES, HERRAMIENTA, MANO DE OBRA, EQUIPO

Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

SUMINISTRO Y COLOCACIÓN DE CELOTEX EN FRONTERAS DE

ELEMENTOS ESTRCUTURALES CON PISO, INCLUYE: CORTES, DESPERDICIOS,

MATERIALES, HERRAMIENTA, MANO DE OBRA, EQUIPO Y TODO LO NECESARIO

PARA SU CORRECTA EJECUCIÓN.

PISO PULIDO POR MEDIOS MECÁNICOS APLICANDO DENSIFICADOR MINERAL,

INCLUYE: DESPERDICIOS, MATERIALES, HERRAMIENTA, MANO DE OBRA, EQUIPO

Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

SUMINISTRO Y COLOCACIÓN DE SELLADOR ELASTICO DE POLIURETANO -

ASFALTO AUTONIVELANTE DE UN COMPONENTE ROAD 1c - SL MARCA SIKA Y/O SIMILAR Y BACK ROAD EN

JUNTA DE CORTE CON DISCO, INCLUYE: LIMPIEZAS, DESPERDICIOS,

MATERIALES, HERRAMIENTA, MANO DE OBRA, EQUIPO Y TODO LO NECESARIO

PARA SU CORRECTA EJECUCIÓN.

Page 13: Gener Adores

13

OBRA: MEXICO NUEVO

NUMEROS GENERADORES UBICACIÓN:

FECHA: 13 NOV 2013

PARTIDA: EXCAVACIÓN CALCULO:

CLAVE CONCEPTO LOCALIZACION ELEMENTO MEDIDASU EJE TRAMO LARGO ANCHO ALTO CANTIDAD TOTAL

CALLE MUNICIPIO LIBRE ESQ. ESTADO DE MÉXICO MZ. 1 LOTE FRACCIONAMIENTO A COL. BARRIO NORTE

TOTAL 0.00

Page 14: Gener Adores

14

Page 15: Gener Adores

15

OBRA: MEXICO NUEVO

NUMEROS GENERADORES UBICACIÓN:

FECHA: 18 NOV 2013

PARTIDA: EXCAVACIÓN CALCULO:

CLAVE CONCEPTO LOCALIZACION ELEMENTO MEDIDASU EJE TRAMO LARGO ANCHO ALTO CANTIDAD TOTAL

AEST001 Kg A 1-7 MURO 3.00 6.68 14 24 1,250.18 J 1-7 MURO 3.00 6.68 14.00 24 1,250.18 1 A-J MURO 3.00 6.68 19.00 24 1,696.67 7 A-J MURO 3.00 6.68 19.00 24 1,696.67

1-7 A-J MURO 3.00 6.68 15.00 24 1339.47367 J-M MURO 3.00 6.68 7.00 24 625.09 2 B-C MURO 3.00 7.14 1.00 24 95.45 3 B-C MURO 3.00 7.14 1.00 24 95.45 B 2-3 MURO 3.00 6.68 1.00 24 89.30

2-3 B-C MURO 3.00 4.44 2.00 24 118.71 2-3 B-C MURO 3.00 5.04 2.00 24 134.75 B 6-7 MURO 3.00 6.68 2.00 24 178.60 6 B-C MURO 3.00 7.14 1.00 24 95.45

6-7 B-C MURO 3.00 4.40 2.00 24 117.64 6-7 B-C MURO 3.00 5.04 2.00 24 134.75 4 H-I MURO 3.00 7.14 1.00 24 95.45 5 H-I MURO 3.00 7.14 1.00 24 95.45

4-5 H-I MURO 3.00 6.68 2.00 24 178.60 4-5 H-I MURO 3.00 4.44 2.00 24 118.71 4-5 H-I MURO 3.00 5.04 2.00 24 134.75 E 1-2 MURO 3.00 6.68 2.00 24 178.60 F 1-2 MURO 3.00 6.68 2.00 24 178.60 E 6-7 MURO 3.00 6.68 2.00 24 178.60 F 6-7 MURO 3.00 6.68 2.00 24 178.60

3-4 K-L MURO 3.00 5.44 1.00 24 72.72 3-4 K-L MURO 3.00 7.56 1.00 24 101.06 A 1-7 EST MURO 3 0.84 2 24 22.46 J 1-7 EST MURO 3 0.84 2 24 22.46 1 A-J EST MURO 3 0.84 4 24 44.92 7 A-J EST MURO 3 0.84 4 24 44.92

1-7 A-J EST MURO 3 0.84 3 24 33.69 7 J-M EST MURO 3 0.84 2 24 22.46

1-7 A-J EST MURO 3 0.84 31 24 348.10

TOTAL 10,968.44 AEST002 Kg A 1-7 MURO 4 5.00 12 40.95 2,447.17

J 1-7 MURO 4 5.00 12 40.95 2,447.17 1 A-J MURO 4 5.00 12 56.85 3,397.36 7 A-J MURO 4 5.00 12 56.85 3,397.36

1-7 A-J MURO 4 5.00 12 43.14 2,578.05 7 J-M MURO 4 5.00 12 20.85 1245.9962 B-C MURO 4 5.00 12 3.35 200.20 3 B-C MURO 4 5.00 12 3.35 200.20 B 2-3 MURO 4 5.00 12 5.30 316.73

2-3 B-C MURO 4 5.00 12 4.00 239.04 2-3 B-C MURO 4 5.00 12 5.20 310.75 B 6-7 MURO 4 5.00 12 5.10 304.78 6 B-C MURO 4 5.00 12 3.35 200.20

6-7 B-C MURO 4 5.00 12 4.00 239.04

CALLE MUNICIPIO LIBRE ESQ. ESTADO DE MÉXICO MZ. 1 LOTE FRACCIONAMIENTO A COL. BARRIO NORTE

SUMINISTRO, HABILITADO Y ARMADO DE ACERO DE REFURZO DE UN f´y =

4200 Kg/cm2 DEL No. 3 (3/8"), INCLUYE: CORTES, DOBLECES, GANCHOS,

TRASLAPES, DESPERDICIOS, AMARRES CON ALAMBRE RECOCIDO, ACARREOS

VERTICALES Y HORIZONTALES DE 20.00 MTS 1RA ESTACIÓN, MATERIALES, HERRAMIENTA, MANO DE OBRA,

EQUIPO, FLETES, Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

SUMINISTRO, HABILITADO Y ARMADO DE ACERO DE REFURZO DE UN f´y =

4200 Kg/cm2 DEL No. 4 (1/2"), INCLUYE: CORTES, DOBLECES, GANCHOS,

TRASLAPES, DESPERDICIOS, AMARRES CON ALAMBRE RECOCIDO, ACARREOS

VERTICALES Y HORIZONTALES DE 20.00 MTS 1RA ESTACIÓN, MATERIALES, HERRAMIENTA, MANO DE OBRA,

EQUIPO, FLETES, Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

Page 16: Gener Adores

16

OBRA: MEXICO NUEVO

NUMEROS GENERADORES UBICACIÓN:

FECHA: 18 NOV 2013

PARTIDA: EXCAVACIÓN CALCULO:

CLAVE CONCEPTO LOCALIZACION ELEMENTO MEDIDASU EJE TRAMO LARGO ANCHO ALTO CANTIDAD TOTAL

CALLE MUNICIPIO LIBRE ESQ. ESTADO DE MÉXICO MZ. 1 LOTE FRACCIONAMIENTO A COL. BARRIO NORTE

6-7 B-C MURO 4 5.00 12 5.20 310.75 4 H-I MURO 4 5.00 12 3.35 200.20 5 H-I MURO 4 5.00 12 3.35 200.20

4-5 H-I MURO 4 5.00 12 5.30 316.73 4-5 H-I MURO 4 5.00 12 2 119.52 4-5 H-I MURO 4 5.00 12 2.6 155.38 E 1-2 MURO 4 5.00 12 7.75 463.14 F 1-2 MURO 4 5.00 12 7.75 463.14 E 6-7 MURO 4 5.00 12 4.50 268.92 F 6-7 MURO 4 5.00 12 4.50 268.92

3-4 K-L MURO 4 5.00 12 2.50 149.40 3-4 K-L MURO 4 5.00 12 3.71 221.71

TOTAL 20,662.02 AEST003 Kg A 1-7 MURO 5 41.35 6 1 387.04

J 1-7 MURO 5 41.35 6 1 387.04 1 A-J MURO 5 57.25 6 1 535.86 7 A-J MURO 5 57.25 6 1 535.86

1-7 A-J MURO 5 43.54 6 1 407.53 7 J-M MURO 5 21.25 6 1 198.90 2 B-C MURO 5 3.75 6 1 35.13 B-C MURO 5 3.75 6 1 35.10 B 2-3 MURO 5 5.70 6 1 53.35

2-3 B-C MURO 5 4.40 6 1 41.18 2-3 B-C MURO 5 5.60 6 1 52.42 B 6-7 MURO 5 5.50 6 1 51.48 6 B-C MURO 5 3.75 6 1 35.10

6-7 B-C MURO 5 4.40 6 1 41.18 6-7 B-C MURO 5 5.60 6 1 52.42 4 H-I MURO 5 3.75 6 1 35.10 5 H-I MURO 5 3.75 6 1 35.10

4-5 H-I MURO 5 5.40 6 1 50.54 4-5 H-I MURO 5 2.40 6 1 22.46 4-5 H-I MURO 5 3.00 6 1 28.08 E 1-2 MURO 5 8.15 6 1 76.28 F 1-2 MURO 5 8.15 6 1 76.28 E 6-7 MURO 5 4.90 6 1 45.86 F 6-7 MURO 5 4.90 6 1 45.86

3-4 K-L MURO 5 2.90 6 1 27.14 3-4 K-L MURO 5 4.11 6 1 38.47

TOTAL 3,330.76 ACIM004 m3 ZC-1

1-7 A,J 40.95 1.20 1.05 2 103.19 1 A-E 25.30 1.20 1.05 1 31.88 1 F-J 25.15 1.20 1.05 1 31.69 7 A-J 56.85 1.20 1.05 1 71.63

SUMINISTRO, HABILITADO Y ARMADO DE ACERO DE REFURZO DE UN f´y =

4200 Kg/cm2 DEL No. 5 (5/8"), INCLUYE: CORTES, DOBLECES, GANCHOS,

TRASLAPES, DESPERDICIOS, AMARRES CON ALAMBRE RECOCIDO, ACARREOS

VERTICALES Y HORIZONTALES DE 20.00 MTS 1RA ESTACIÓN, MATERIALES, HERRAMIENTA, MANO DE OBRA,

EQUIPO, FLETES, Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

EXCAVACIÓN DE CEPAS PARA ZAPATAS Y CONTRATRABES POR MEDIOS

MECÁNICOS EN MATERIAL TIPO II DE 0.00 A - 1.00 m DE PROFUNDIDAD

VOLÚMEN MEDIDO EN BANCO, INCLUYE: HERRAMIENTA, MANO DE OBRA, EQUIPO

Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

Page 17: Gener Adores

17

OBRA: MEXICO NUEVO

NUMEROS GENERADORES UBICACIÓN:

FECHA: 18 NOV 2013

PARTIDA: EXCAVACIÓN CALCULO:

CLAVE CONCEPTO LOCALIZACION ELEMENTO MEDIDASU EJE TRAMO LARGO ANCHO ALTO CANTIDAD TOTAL

CALLE MUNICIPIO LIBRE ESQ. ESTADO DE MÉXICO MZ. 1 LOTE FRACCIONAMIENTO A COL. BARRIO NORTE

2-3 B 5.85 1.20 1.05 1 7.37 7 J-M 20.85 1.20 1.05 1 26.27

1-7 J-M 43.14 1.20 1.05 1 54.36

ZC-22 B-C 5.00 1.70 1.05 1 8.92 3 B-C 5.00 1.70 1.05 1 8.92

6-7 B-C 9.78 1.70 1.05 1 17.46 4-5 H-I 14.05 1.70 1.05 1 25.08 3-4 K-L 6.32 1.70 1.05 1 11.28

Z-11-7 A-M 2.5 3 1.05 13 102.38

Z-21-7 A-M 2.5 3 1.05 18 141.75

Z-31-7 A-M 2.3 2.8 1.05 50 338.1

CT-11-7 B-I 40.95 1.30 1.05 8 447.17 2-6 A-J 56.85 1.30 1.05 5 388.00 2 J-K 5.93 1.30 1.05 1 8.09 3 J-L 8.55 1.30 1.05 1 11.67 4 J-L 14.36 1.30 1.05 1 19.60 5 J-M 15.21 1.30 1.05 1 20.76 6 J-M 18.50 1.30 1.05 1 25.25

1-7 A-M 5.85 4.10 1.05 4 100.74

TOTAL 2,001.58

ACIM005 m3 ZC-11-7 A,J 40.95 3.30 0.05 2 13.51 1 A-E 25.30 3.30 0.05 1 4.17 1 F-J 25.15 3.30 0.05 1 4.15 7 A-J 56.85 3.30 0.05 1 9.38

2-3 B 5.85 3.30 0.05 1 0.97 7 J-M 20.85 3.30 0.05 1 3.44

1-7 J-M 43.14 3.30 0.05 1 7.12

ZC-22 B-C 5.00 3.80 0.05 1 0.95 3 B-C 5.00 3.80 0.05 1 0.95

EXCAVACIÓN DE CEPAS PARA ZAPATAS Y CONTRATRABES POR MEDIOS

MECÁNICOS EN MATERIAL TIPO II DE 0.00 A - 1.00 m DE PROFUNDIDAD

VOLÚMEN MEDIDO EN BANCO, INCLUYE: HERRAMIENTA, MANO DE OBRA, EQUIPO

Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

AFINE DE CORTES Y TALUDES EN CEPAS DE ZAPATAS Y CONTRATRABES DE POR

MEDIOS MANUALES, INCLUYE: TRASPALEOS, ACARREOS

HORIZONTALES 1RA ESTACIÓN DE 20.00 MTS, HERRAMIENTA, MANO DE

OBRA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

Page 18: Gener Adores

18

OBRA: MEXICO NUEVO

NUMEROS GENERADORES UBICACIÓN:

FECHA: 18 NOV 2013

PARTIDA: EXCAVACIÓN CALCULO:

CLAVE CONCEPTO LOCALIZACION ELEMENTO MEDIDASU EJE TRAMO LARGO ANCHO ALTO CANTIDAD TOTAL

CALLE MUNICIPIO LIBRE ESQ. ESTADO DE MÉXICO MZ. 1 LOTE FRACCIONAMIENTO A COL. BARRIO NORTE

6-7 B-C 9.78 3.80 0.05 1 1.86 4-5 H-I 14.05 3.80 0.05 1 2.67 3-4 K-L 6.32 3.80 0.05 1 1.20

Z-11-7 A-M 4.6 3 0.05 13 8.97

Z-21-7 A-M 4.6 3 0.05 18 12.42

Z-31-7 A-M 4.4 2.8 0.05 50 30.8

CT-11-7 B-I 40.95 3.40 0.05 8 55.69 2-6 A-J 56.85 3.40 0.05 5 48.32 2 J-K 5.93 3.40 0.05 1 1.01 3 J-L 8.55 3.40 0.05 1 1.45 4 J-L 14.36 3.40 0.05 1 2.44 5 J-M 15.21 3.40 0.05 1 2.59 6 J-M 18.50 3.40 0.05 1 3.15

1-7 A-M 5.85 4.10 0.05 4 4.80

TOTAL 222.01 ACIM006 m3

1-7 A,J 2,001.58 1-7 A,J 222.01

TOTAL 2,223.58 ACIM007 m3 1-7 A-M

VOL. EXCAVACIÓN VOL- CONCRETO2,001.58 458.86 1,542.72

CARGA Y ACARREO DE MATERIAL PRODUCTO DE EXCAVACIÓN EN CAMIÓN

FUERA DE LA OBRA A LUGAR DE TIRO AUTORIZADO CUALQUIER DISTANCIA,

INCLUYE: HERRAMIENTA, MANO DE OBRA, EQUIPO Y TODO LO NECESARIO

PARA SU CORRECTA EJECUCIÓN.

RELLENO DE CEPAS EN CIMENTACIÓN CON MATERIAL PRODUCTO DE

EXCAVACIÓN COMPACTADA POR MEDIOS MECÁNICOS (BAILARINA) EN

CAPAS DE 20 CM AL 90% DE LA PRUEBA PROCTOR, INCLUYE: HUMEDECIDO DEL

MATERIAL, TRASPALEOS, ACARREOS 1RA ESTACIÓN DE 20.00 MTS

DISTANCIA HORIZONTAL, HERRAMIENTA, MANO DE OBRA, EQUIPO

Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

Page 19: Gener Adores

19

OBRA: MEXICO NUEVO

NUMEROS GENERADORES UBICACIÓN:

FECHA: 18 NOV 2013

PARTIDA: EXCAVACIÓN CALCULO:

CLAVE CONCEPTO LOCALIZACION ELEMENTO MEDIDASU EJE TRAMO LARGO ANCHO ALTO CANTIDAD TOTAL

CALLE MUNICIPIO LIBRE ESQ. ESTADO DE MÉXICO MZ. 1 LOTE FRACCIONAMIENTO A COL. BARRIO NORTE

TOTAL 1,542.72

ACIM008 m2 ZC-11-7 A,J 40.95 1.20 2 98.28 1 A-E 25.30 1.20 1 30.36 1 F-J 25.15 1.20 1 30.18 7 A-J 56.85 1.20 1 68.22

2-3 B 5.85 1.20 1 7.02 7 J-M 20.85 1.20 1 25.02

1-7 J-M 43.14 1.20 1 51.77

ZC-22 B-C 5.00 1.70 1 8.50 3 B-C 5.00 1.70 1 8.50

6-7 B-C 9.78 1.70 1 16.63 4-5 H-I 14.05 1.70 1 23.89 3-4 K-L 6.32 1.70 1 10.74

Z-11-7 A-M 2.5 3 13 97.50

Z-21-7 A-M 2.5 3 18 135.00

Z-31-7 A-M 2.3 2.8 50 322

CT-11-7 B-I 40.95 1.30 8 425.88 2-6 A-J 56.85 1.30 5 369.53 2 J-K 5.93 1.30 1 7.71 3 J-L 8.55 1.30 1 11.12 4 J-L 14.36 1.30 1 18.67 5 J-M 15.21 1.30 1 19.77 6 J-M 18.50 1.30 1 24.05

1-7 A-M 5.85 4.10 4 95.94

TOTAL 1,906.26 ACIM009 Kg EJE TRAMO TIPO DIAM LONG VARILLA ELEM TOTAL (Kg)

A 1-7 ZC-1 3 45.85 17 1 434.15

RELLENO DE CEPAS EN CIMENTACIÓN CON MATERIAL PRODUCTO DE

EXCAVACIÓN COMPACTADA POR MEDIOS MECÁNICOS (BAILARINA) EN

CAPAS DE 20 CM AL 90% DE LA PRUEBA PROCTOR, INCLUYE: HUMEDECIDO DEL

MATERIAL, TRASPALEOS, ACARREOS 1RA ESTACIÓN DE 20.00 MTS

DISTANCIA HORIZONTAL, HERRAMIENTA, MANO DE OBRA, EQUIPO

Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

FABRICACIÓN DE PLANTILLA DE CONCRETO HECHO EN OBRA POR

MECÁNICOS DE UN f ´c = 100 Kg/cm2 DE 5 CM DE ESPESOR AGREGADO DE

3/4", INCLUYE: MAESTRAS, REGLEADO, HUMEDECIDO DE TERRENO, ACARREOS

HORIZONATLES DE 20.00 MTS, VACIADO DE MEZCLA, MATERIALES,

HERRAMIENTA, MANO DE OBRA, EQUIPO Y TODO LO NECESARIO PARA SU

CORRECTA EJECUCIÓN.

SUMINISTRO, HABILITADO Y ARMADO DE ACERO DE REFURZO DE UN f´y =

4200 Kg/cm2 DEL No. 3 (3/8"), INCLUYE: CORTES, DOBLECES, GANCHOS,

TRASLAPES, DESPERDICIOS, AMARRES CON ALAMBRE RECOCIDO, ACARREOS

VERTICALES Y HORIZONTALES DE 20.00 MTS 1RA ESTACIÓN, MATERIALES, HERRAMIENTA, MANO DE OBRA,

EQUIPO, FLETES, Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

Page 20: Gener Adores

20

OBRA: MEXICO NUEVO

NUMEROS GENERADORES UBICACIÓN:

FECHA: 18 NOV 2013

PARTIDA: EXCAVACIÓN CALCULO:

CLAVE CONCEPTO LOCALIZACION ELEMENTO MEDIDASU EJE TRAMO LARGO ANCHO ALTO CANTIDAD TOTAL

CALLE MUNICIPIO LIBRE ESQ. ESTADO DE MÉXICO MZ. 1 LOTE FRACCIONAMIENTO A COL. BARRIO NORTE

1 A-J ZC-1 3 59.15 17 1 560.09 J 1-7 ZC-1 3 37.76 17 1 357.55 7 A-J ZC-1 3 59.15 17 1 560.09 7 J-M ZC-1 3 22.17 17 1 209.93

1-7 J-M ZC-1 3 45.04 17 1 426.48 A 1-7 ZC-1 EST 3 2.52 1 230 323.19 1 A-J ZC-1 EST 3 2.52 1 297 416.53 J 1-7 ZC-1 EST 3 2.52 1 190 266.41 7 A-J ZC-1 EST 3 2.52 1 297 416.53 7 J-M ZC-1 EST 3 2.52 1 112 157.00

1-7 J-M ZC-1 EST 3 2.52 1 226.2 317.50 2 B-C ZC-2 3 5.15 17 1 48.77 3 B-C ZC-2 3 5.15 17 1 48.77

6-7 B-C ZC-2 3 5.15 17 3 146.30 4 H-I ZC-2 3 5.15 17 1 48.77 5 H-I ZC-2 3 5.15 17 1 48.77

4-5 H-I ZC-2 3 2.55 17 2 48.29 4-5 H-I ZC-2 3 5.85 17 1 55.39 4-5 H-I ZC-2 3 3.15 17 2 59.65 3-4 K-L ZC-2 3 2.98 17 1 28.22 3-4 K-L ZC-2 3 4.40 17 1 41.66 2 B-C ZC-2 EST 3 2.52 1 26.75 37.55 3 B-C ZC-2 EST 3 2.52 1 26.75 37.55

6-7 B-C ZC-2 EST 3 2.52 1 26.75 37.55 4 H-I ZC-2 EST 3 2.52 1 26.75 37.55 5 H-I ZC-2 EST 3 2.52 1 26.75 37.55

4-5 H-I ZC-2 EST 3 2.52 1 13.75 19.30 4-5 H-I ZC-2 EST 3 2.52 1 30.25 42.46 4-5 H-I ZC-2 EST 3 2.52 1 16.75 23.51 3-4 K-L ZC-2 EST 3 2.52 1 15.9 22.32 3-4 K-L ZC-2 EST 3 2.52 1 23 32.28 1-7 A-J DD-1 3 13.12 3 66 1,446.95 1-7 K-M DD-1 3 13.12 3 15 328.85 2-6 A-J CT-1 3 59.15 10 5 1,647.33 1-7 B-I CT-1 3 42.85 10 8 1,909.40 2 J-K CT-1 3 5.85 10 1 32.58 3 J-L CT-1 3 8.78 10 1 48.90 4 J-L CT-1 3 12.86 10 1 71.63 5 J-M CT-1 3 15.25 10 1 84.94 6 J-M CT-1 3 18.99 10 1 105.77

2-6 A-J CT-1 EST 3 2.52 1 1483.75 2,082.65 1-7 B-I CT-1 EST 3 2.52 1 1722 2,417.07 2 J-K CT-1 EST 3 2.52 1 30.25 42.46 3 J-L CT-1 EST 3 2.52 1 44.9 63.02 4 J-L CT-1 EST 3 2.52 1 65.3 91.66 5 J-M CT-1 EST 3 2.52 1 77.25 108.43 6 J-M CT-1 EST 3 2.52 1 95.95 134.68

SUMINISTRO, HABILITADO Y ARMADO DE ACERO DE REFURZO DE UN f´y =

4200 Kg/cm2 DEL No. 3 (3/8"), INCLUYE: CORTES, DOBLECES, GANCHOS,

TRASLAPES, DESPERDICIOS, AMARRES CON ALAMBRE RECOCIDO, ACARREOS

VERTICALES Y HORIZONTALES DE 20.00 MTS 1RA ESTACIÓN, MATERIALES, HERRAMIENTA, MANO DE OBRA,

EQUIPO, FLETES, Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

Page 21: Gener Adores

21

OBRA: MEXICO NUEVO

NUMEROS GENERADORES UBICACIÓN:

FECHA: 18 NOV 2013

PARTIDA: EXCAVACIÓN CALCULO:

CLAVE CONCEPTO LOCALIZACION ELEMENTO MEDIDASU EJE TRAMO LARGO ANCHO ALTO CANTIDAD TOTAL

CALLE MUNICIPIO LIBRE ESQ. ESTADO DE MÉXICO MZ. 1 LOTE FRACCIONAMIENTO A COL. BARRIO NORTE

TOTAL 15,963.98 ACIM010 Kg EJE TRAMO TIPO DIAM LONG VARILLA ELEM TOTAL (Kg)

A 1-7 ZC-1 EST 4 1.13 1 307 345.15 1 A-J ZC-1 EST 4 1.13 1 395 444.94 J 1-7 ZC-1 EST 4 1.13 1 253 284.45 7 A-J ZC-1 EST 4 1.13 1 395 444.94 7 J-M ZC-1 EST 4 1.13 1 149 167.47

1-7 J-M ZC-1 EST 4 1.13 1 301 339.07 2 B-C ZC-2 EST 4 0.93 1 35 32.73 3 B-C ZC-2 EST 4 0.93 1 35 32.73

6-7 B-C ZC-2 EST 4 0.93 1 35 32.73 4 H-I ZC-2 EST 4 0.93 1 35 32.73 5 H-I ZC-2 EST 4 0.93 1 35 32.73

4-5 H-I ZC-2 EST 4 0.93 1 18 16.67 4-5 H-I ZC-2 EST 4 0.93 1 40 37.05 4-5 H-I ZC-2 EST 4 0.93 1 22 20.38 3-4 K-L ZC-2 EST 4 0.93 1 21 19.33 3-4 K-L ZC-2 EST 4 0.93 1 30 28.10

TOTAL 2,311.18 ACIM011 Kg EJE TRAMO TIPO DIAM LONG VARILLA ELEM TOTAL (Kg)

1-7 A-J Z-1 5.00 4.86 15.00 13 1,478.41 1-7 A-J Z-1 5.00 3.83 20.00 13 1,553.45 1-7 A-J Z-2 5.00 4.86 12.00 13 1,182.73 1-7 A-J Z-2 5.00 3.83 16.00 13 1,242.76 1-7 J-M Z-2 5.00 4.86 12.00 5 454.90 1-7 J-M Z-2 5.00 3.83 16.00 5 477.98 1-7 A-J Z-3 5.00 4.33 11.00 40 2,972.11 1-7 A-J Z-3 5.00 3.43 15.00 40 3,210.48 1-7 J-M Z-3 5.00 4.33 11.00 10 743.03 1-7 J-M Z-3 5.00 3.43 15.00 10 802.62

TOTAL 14,118.47 ACIM012 Kg EJE TRAMO TIPO DIAM LONG VARILLA ELEM TOTAL (Kg)

1-7 A-J DD-1 6.00 1.33 20.00 66 3,950.10 1-7 J-M DD-1 6.00 1.33 20.00 15 897.75 1-7 A-J CT-1 6.00 42.85 6.00 10 5,784.75 1-7 A-J CT-1 6.00 59.15 6.00 7 5,589.68 2-3 B-C CT-1 6.00 5.15 6.00 2 139.05 2-3 B-C CT-1 6.00 5.15 6.00 2 139.05 6-7 B-C CT-1 6.00 5.15 6.00 2 139.05 6-7 B-C CT-1 6.00 5.30 6.00 2 143.10 4-5 H-I CT-1 6.00 5.85 6.00 2 157.95 4-5 H-I CT-1 6.00 4.90 6.00 2 132.30 3-4 K-L CT-1 6.00 10.09 6.00 1 136.22 1-7 J-M CT-1 6.00 45.04 6.00 1 608.04

SUMINISTRO, HABILITADO Y ARMADO DE ACERO DE REFURZO DE UN f´y =

4200 Kg/cm2 DEL No. 4 (1/2"), INCLUYE: CORTES, DOBLECES, GANCHOS,

TRASLAPES, DESPERDICIOS, AMARRES CON ALAMBRE RECOCIDO, ACARREOS

VERTICALES Y HORIZONTALES DE 20.00 MTS 1RA ESTACIÓN, MATERIALES, HERRAMIENTA, MANO DE OBRA,

EQUIPO, FLETES, Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

SUMINISTRO, HABILITADO Y ARMADO DE ACERO DE REFURZO DE UN f´y =

4200 Kg/cm2 DEL No. 5 (5/8"), INCLUYE: CORTES, DOBLECES, GANCHOS,

TRASLAPES, DESPERDICIOS, AMARRES CON ALAMBRE RECOCIDO, ACARREOS

VERTICALES Y HORIZONTALES DE 20.00 MTS 1RA ESTACIÓN, MATERIALES, HERRAMIENTA, MANO DE OBRA,

EQUIPO, FLETES, Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

SUMINISTRO, HABILITADO Y ARMADO DE ACERO DE REFURZO DE UN f´y =

4200 Kg/cm2 DEL No. 6 (3/4"), INCLUYE: CORTES, DOBLECES, GANCHOS,

TRASLAPES, DESPERDICIOS, AMARRES CON ALAMBRE RECOCIDO, ACARREOS

VERTICALES Y HORIZONTALES DE 20.00 MTS 1RA ESTACIÓN, MATERIALES, HERRAMIENTA, MANO DE OBRA,

EQUIPO, FLETES, Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

Page 22: Gener Adores

22

OBRA: MEXICO NUEVO

NUMEROS GENERADORES UBICACIÓN:

FECHA: 18 NOV 2013

PARTIDA: EXCAVACIÓN CALCULO:

CLAVE CONCEPTO LOCALIZACION ELEMENTO MEDIDASU EJE TRAMO LARGO ANCHO ALTO CANTIDAD TOTAL

CALLE MUNICIPIO LIBRE ESQ. ESTADO DE MÉXICO MZ. 1 LOTE FRACCIONAMIENTO A COL. BARRIO NORTE

7 J-M CT-1 6.00 20.85 6.00 1 281.48 2 J-K CT-1 6.00 5.85 6.00 1 78.98 3 J-L CT-1 6.00 8.78 6.00 1 118.53 4 J-L CT-1 6.00 12.86 6.00 1 173.61 5 J-M CT-1 6.00 15.25 6.00 1 205.88 6 J-M CT-1 6.00 18.99 6.00 1 256.37

TOTAL 18,931.86 ACIM013 m2 1-7 A-J 56.85 40.95 1 2,328.01

39.26 20.85 0.5 409.29

TOTAL 2,737.29 ACIM014

ACIM015 m3 1-7 A-J Z-1 1.63 13 21.19 1-7 A-M Z-2 1.60 18 28.76 1-7 A-M Z-3 1.44 50 72.00

AREAA 1-7 ZC-1 40.95 0.40 1 16.38 J 1-7 ZC-1 39.26 0.40 1 15.70 1 A-J ZC-1 56.85 0.40 1 22.74 7 A-J ZC-1 56.85 0.40 1 22.74

1-7 J-M ZC-1 43.14 0.40 1 17.26 7 J-M ZC-1 20.85 0.40 1 8.34

2-3 B-C ZC-2 5.40 0.40 2 4.32

SUMINISTRO, HABILITADO Y ARMADO DE MALLA ELECTROSOLDADA 6X6/10-10

INCLUYE: CORTES, DOBLECES, GANCHOS, TRASLAPES, DESPERDICIOS,

AMARRES CON ALAMBRE RECOCIDO, ACARREOS VERTICALES Y

HORIZONTALES DE 20.00 MTS 1RA ESTACIÓN, MATERIALES, HERRAMIENTA,

MANO DE OBRA, EQUIPO, FLETES, Y TODO LO NECESARIO PARA SU

CORRECTA EJECUCIÓN.

CIMBRADO Y DESCIMBRADO EN CIMENTACIÓN ACABADO COMÚN EN ZAPATAS, DADOS Y CONTRATRABES,

INCLUYE: ALINEADO, PLOMEADO, HABILITADO DE CIMBRA, CORTES,

DESPERDICIOS, ACARREOS VERTICALES Y HORIZONTALES HASTA 20.00 MTS

1RA ESTACIÓN, DESMOLDANTE, LIMPIEZA DE SUPERFICIE DE CONTACTO, APUNTALADO, AMARRES, MATERIALES,

HERRAMIENTA, MANO DE OBRA, EQUIPO Y TODO LO NECESARIO PARA SU

CORRECTA EJECUCIÓN.

SUMINISTRO Y VACIADO DE CONCRETO PREMEZCLADO CLASE II BOMBEABLE,

REVENIMIENTO DE 14+- 2 CM, DE UN f´c = 250 Kg/cm2, INCLUYE: VIBRADO,

PALEOS, TRASPALEOS, ARTEZAS, CANALONES, PASARELAS,

DESPERDICIOS, CURADO CON MEMBRANA BASE AGUA, MATERIALES,

HERRAMIENTA, MANO DE OBRA, EQUIPO Y LO NECESARIO PARA SU CORRECTA

EJECUCIÓN.

Page 23: Gener Adores

23

OBRA: MEXICO NUEVO

NUMEROS GENERADORES UBICACIÓN:

FECHA: 18 NOV 2013

PARTIDA: EXCAVACIÓN CALCULO:

CLAVE CONCEPTO LOCALIZACION ELEMENTO MEDIDASU EJE TRAMO LARGO ANCHO ALTO CANTIDAD TOTAL

CALLE MUNICIPIO LIBRE ESQ. ESTADO DE MÉXICO MZ. 1 LOTE FRACCIONAMIENTO A COL. BARRIO NORTE

2-3 B-C ZC-2 5.85 0.40 1 2.34 2-3 B-C ZC-2 2.55 0.40 2 2.04 2-3 B-C ZC-2 3.15 0.40 2 2.52 6-7 B-C ZC-2 5.40 0.40 1 2.16 6-7 B-C ZC-2 5.30 0.40 1 2.12 6-7 B-C ZC-2 2.55 0.40 2 2.04 6-7 B-C ZC-2 3.15 0.40 2 2.52 4-5 H-I ZC-2 4.10 0.40 2 3.28 4-5 H-I ZC-2 5.85 0.40 1 2.34 4-5 H-I ZC-2 2.55 0.40 2 2.04 4-5 H-I ZC-2 3.15 0.40 2 2.52 3-4 K-L ZC-2 2.30 0.40 1 0.92 3-4 K-L ZC-2 4.04 0.40 1 1.62 B 1-7 CT-1 29.33 0.30 1 8.80

C-I 1-7 CT-1 39.35 0.30 7 82.63 2 A-J CT-1 52.45 0.30 1 15.74 3 A-J CT-1 52.45 0.30 1 15.74

4-5 A-J CT-1 52.45 0.30 2 31.47 6 A-J CT-1 52.15 0.30 1 15.65 2 J-K CT-1 5.00 0.30 1 1.53 J-L CT-1 7.62 0.30 1 2.29 4 J-L CT-1 11.30 0.30 1 3.39 5 J-M CT-1 13.90 0.30 1 4.17 6 J-M CT-1 17.50 0.30 1 5.25 K 2-7 CT-1 30.72 0.30 1 9.22 L 4-7 CT-1 17.12 0.30 1 5.14

TOTAL 458.86 ACIM016 ml 1 A-J 56.85 1 56.85

7 A-J 56.85 1 56.85 A 1-7 40.95 1 40.95 7 J-M 20.85 1 20.85

1-7 J-M 43.14 1 43.14

TOTAL 218.64 ACIM017 ml

CIMBRA FALSA A BASE DE CASETÓN DE POLIESTIRENO EN ZONA DE

COLINDANCIAS, INCLUYE: CORTES, DESPERDICIOS, ACARREOS VERTICALES

Y HORIZONTALES HASTA 20.00 MTS 1RA ESTACIÓN, HERRAMIENTA, MANO

DE OBRA, EQUIPO Y TODO LO NECESARIO PARA SU CORRECTA

EJECUCIÓN.

CORTE CON DISCO EN PISO DE 2 CM DE PROFUNDIDAD Y 3 MM DE ANCHO,

INCLUYE: TRAZO, MATERIALES, HERRAMIENTA, MANO DE OBRA, EQUIPO

Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

Page 24: Gener Adores

24

OBRA: MEXICO NUEVO

NUMEROS GENERADORES UBICACIÓN:

FECHA: 18 NOV 2013

PARTIDA: EXCAVACIÓN CALCULO:

CLAVE CONCEPTO LOCALIZACION ELEMENTO MEDIDASU EJE TRAMO LARGO ANCHO ALTO CANTIDAD TOTAL

CALLE MUNICIPIO LIBRE ESQ. ESTADO DE MÉXICO MZ. 1 LOTE FRACCIONAMIENTO A COL. BARRIO NORTE

TOTAL 0.00 ACIM018 m2

TOTAL 0.00 ACIM019 m2 1-7 A-J 56.85 40.95 1 2,328.01

39.26 20.85 0.5 409.29

TOTAL 2,737.29 ACIM020 ml

TOTAL 0.00

SUMINISTRO Y COLOCACIÓN DE CELOTEX EN FRONTERAS DE

ELEMENTOS ESTRCUTURALES CON PISO, INCLUYE: CORTES, DESPERDICIOS,

MATERIALES, HERRAMIENTA, MANO DE OBRA, EQUIPO Y TODO LO NECESARIO

PARA SU CORRECTA EJECUCIÓN.

PISO PULIDO POR MEDIOS MECÁNICOS APLICANDO DENSIFICADOR MINERAL,

INCLUYE: DESPERDICIOS, MATERIALES, HERRAMIENTA, MANO DE OBRA, EQUIPO

Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.

SUMINISTRO Y COLOCACIÓN DE SELLADOR ELASTICO DE POLIURETANO -

ASFALTO AUTONIVELANTE DE UN COMPONENTE ROAD 1c - SL MARCA SIKA Y/O SIMILAR Y BACK ROAD EN

JUNTA DE CORTE CON DISCO, INCLUYE: LIMPIEZAS, DESPERDICIOS,

MATERIALES, HERRAMIENTA, MANO DE OBRA, EQUIPO Y TODO LO NECESARIO

PARA SU CORRECTA EJECUCIÓN.

Page 25: Gener Adores

25

OBRA: MEXICO NUEVO

NUMEROS GENERADORES UBICACIÓN:

FECHA: 18 NOV 2013

PARTIDA: EXCAVACIÓN CALCULO:

CLAVE CONCEPTO LOCALIZACION ELEMENTO MEDIDASU EJE TRAMO LARGO ANCHO ALTO CANTIDAD TOTAL

CALLE MUNICIPIO LIBRE ESQ. ESTADO DE MÉXICO MZ. 1 LOTE FRACCIONAMIENTO A COL. BARRIO NORTE

Page 26: Gener Adores

26

Page 27: Gener Adores

Página 27 ACERO CIM#3

OBRA: CIMENTACIÓN Y ESTRUCTURA SOTANOS DE ESTACIONAMIENTO TORRES MEXICO NUEVO

GENERADORES DE ACEROFECHA: 14-OCT-2014

PARTIDA: CIMENTACIÓN

LOCALIZACION DIAM LONG. NUMERO 2 3 4 5 6 8 10 12

CONCEPTO EJE TRAMO TIPO VARILLA VARILLA VARILLA ELEM TOTAL 0.250 0.557 0.996 1.560 2.250 3.975 6.225 8.938

CIMENTACION

A 1-7 ZC-1 y CT-1 3 45.85 17 1 779.45 434.15 1 A-J ZC-1 y CT-1 3 59.15 17 1 1,005.55 560.09 J 1-7 ZC-1 y CT-1 3 37.76 17 1 641.92 357.55 7 A-J ZC-1 y CT-1 3 59.15 17 1 1,005.55 560.09 7 J-M ZC-1 y CT-1 3 22.17 17 1 376.89 209.93

1-7 J-M ZC-1 y CT-1 3 45.04 17 1 765.68 426.48 A 1-7 ZC-1 Y CT-1 EST 3 2.52 1 230 580.23 323.19 1 A-J ZC-1 Y CT-1 EST 3 2.52 1 297 747.81 416.53 J 1-7 ZC-1 Y CT-1 EST 3 2.52 1 190 478.30 266.41 7 A-J ZC-1 Y CT-1 EST 3 2.52 1 297 747.81 416.53 7 J-M ZC-1 Y CT-1 EST 3 2.52 1 112 281.86 157.00

1-7 J-M ZC-1 Y CT-1 EST 3 2.52 1 226 570.02 317.50 2 B-C ZC-2 Y CT-1 3 5.15 17 1 87.55 48.77 3 B-C ZC-2 Y CT-1 3 5.15 17 1 87.55 48.77

6-7 B-C ZC-2 Y CT-1 3 5.15 17 3 262.65 146.30 4 H-I ZC-2 Y CT-1 3 5.15 17 1 87.55 48.77 5 H-I ZC-2 Y CT-1 3 5.15 17 1 87.55 48.77

4-5 H-I ZC-2 Y CT-1 3 2.55 17 2 86.70 48.29 4-5 H-I ZC-2 Y CT-1 3 5.85 17 1 99.45 55.39 4-5 H-I ZC-2 Y CT-1 3 3.15 17 2 107.10 59.65 3-4 K-L ZC-2 Y CT-1 3 2.98 17 1 50.66 28.22 3-4 K-L ZC-2 Y CT-1 3 4.40 17 1 74.80 41.66 2 B-C ZC-2 YCT-1 EST 3 2.52 1 27 67.41 37.55 3 B-C ZC-2 YCT-1 EST 3 2.52 1 27 67.41 37.55

6-7 B-C ZC-2 YCT-1 EST 3 2.52 1 27 67.41 37.55 4 H-I ZC-2 YCT-1 EST 3 2.52 1 27 67.41 37.55 5 H-I ZC-2 YCT-1 EST 3 2.52 1 27 67.41 37.55

4-5 H-I ZC-2 YCT-1 EST 3 2.52 1 14 34.65 19.30 4-5 H-I ZC-2 YCT-1 EST 3 2.52 1 30 76.23 42.46 4-5 H-I ZC-2 YCT-1 EST 3 2.52 1 17 42.21 23.51 3-4 K-L ZC-2 YCT-1 EST 3 2.52 1 16 40.07 22.32 3-4 K-L ZC-2 YCT-1 EST 3 2.52 1 23 57.96 32.28

TOTAL KG 0.00 5,347.65 0.00 0.00 0.00 0.00 0.00 0.00TOTAL TON 0.000 5.348 0.000 0.000 0.000 0.000 0.000 0.000

UBICACIÓN:

SUMINISTRO, HABILITADO Y ARMADO DE ACERO DE REFURZO DE UN f´y = 4200

Kg/cm2 DEL No. 3 (3/8"), INCLUYE: CORTES, DOBLECES, GANCHOS,

TRASLAPES, DESPERDICIOS, AMARRES CON ALAMBRE RECOCIDO, ACARREOS VERTICALES Y HORIZONTALES DE 20.00

MTS 1RA ESTACIÓN, MATERIAL

Page 28: Gener Adores

Página 28 ACERO CIM#4

OBRA: CIMENTACIÓN Y ESTRUCTURA SOTANOS DE ESTACIONAMIENTO TORRES MEXICO NUEVO

GENERADORES DE ACEROFECHA: 14-OCT-2014

PARTIDA: CIMENTACIÓN

LOCALIZACION DIAM LONG. NUMERO 2 3 4 5 6 8 10 12

CONCEPTO EJE TRAMO TIPO VARILLA VARILLA VARILLA ELEM TOTAL 0.250 0.557 0.996 1.560 2.250 3.975 6.225 8.938

CIMENTACION

A 1-7 ZC-1 EST 4 1.13 1 307 346.53 345.15 1 A-J ZC-1 EST 4 1.13 1 395 446.73 444.94 J 1-7 ZC-1 EST 4 1.13 1 253 285.59 284.45 7 A-J ZC-1 EST 4 1.13 1 395 446.73 444.94 7 J-M ZC-1 EST 4 1.13 1 149 168.14 167.47

1-7 J-M ZC-1 EST 4 1.13 1 301 340.43 339.07 2 B-C ZC-2 EST 4 0.93 1 35 32.86 32.73 3 B-C ZC-2 EST 4 0.93 1 35 32.86 32.73

6-7 B-C ZC-2 EST 4 0.93 1 35 32.86 32.73 4 H-I ZC-2 EST 4 0.93 1 35 32.86 32.73 5 H-I ZC-2 EST 4 0.93 1 35 32.86 32.73

4-5 H-I ZC-2 EST 4 0.93 1 18 16.74 16.67 4-5 H-I ZC-2 EST 4 0.93 1 40 37.20 37.05 4-5 H-I ZC-2 EST 4 0.93 1 22 20.46 20.38 3-4 K-L ZC-2 EST 4 0.93 1 21 19.41 19.33 3-4 K-L ZC-2 EST 4 0.93 1 30 28.21 28.10

TOTAL KG 0.00 0.00 2,311.18 0.00 0.00 0.00 0.00 0.00TOTAL TON 0.000 0.000 2.311 0.000 0.000 0.000 0.000 0.000

UBICACIÓN:

SUMINISTRO, HABILITADO Y ARMADO DE ACERO DE REFURZO DE UN f´y = 4200

Kg/cm2 DEL No. 3 (3/8"), INCLUYE: CORTES, DOBLECES, GANCHOS,

TRASLAPES, DESPERDICIOS, AMARRES CON ALAMBRE RECOCIDO, ACARREOS VERTICALES Y HORIZONTALES DE 20.00

MTS 1RA ESTACIÓN, MATERIAL

Page 29: Gener Adores

Página 29 ACERO CIM#5

OBRA: CIMENTACIÓN Y ESTRUCTURA SOTANOS DE ESTACIONAMIENTO TORRES MEXICO NUEVO

GENERADORES DE ACEROFECHA: 14-OCT-2014

PARTIDA: CIMENTACIÓN

LOCALIZACION DIAM LONG. NUMERO 2 3 4 5 6 8 10 12

CONCEPTO EJE TRAMO TIPO VARILLA VARILLA VARILLA ELEM TOTAL 0.250 0.557 0.996 1.560 2.250 3.975 6.225 8.938

CIMENTACION

1-7 A-J Z-1 5 4.86 15 13 947.70 1,478.41 1-7 A-J Z-1 5 3.83 20 13 995.80 1,553.45 1-7 A-J Z-2 5 4.86 12 13 758.16 1,182.73 1-7 A-J Z-2 5 3.83 16 13 796.64 1,242.76 1-7 J-M Z-2 5 4.86 12 5 291.60 454.90 1-7 J-M Z-2 5 3.83 16 5 306.40 477.98 1-7 A-J Z-3 5 4.33 11 40 1,905.20 2,972.11 1-7 A-J Z-3 5 3.43 15 40 2,058.00 3,210.48 1-7 J-M Z-3 5 4.33 11 10 476.30 743.03 1-7 J-M Z-3 5 3.43 15 10 514.50 802.62

TOTAL KG 0.00 0.00 0.00 14,118.47 0.00 0.00 0.00 0.00TOTAL TON 0.000 0.000 0.000 14.118 0.000 0.000 0.000 0.000

UBICACIÓN:

SUMINISTRO, HABILITADO Y ARMADO DE ACERO DE REFURZO DE UN f´y = 4200

Kg/cm2 DEL No. 3 (3/8"), INCLUYE: CORTES, DOBLECES, GANCHOS,

TRASLAPES, DESPERDICIOS, AMARRES CON ALAMBRE RECOCIDO, ACARREOS VERTICALES Y HORIZONTALES DE 20.00

MTS 1RA ESTACIÓN, MATERIAL

Page 30: Gener Adores

Página 30 ACERO CIM#6

OBRA: CIMENTACIÓN Y ESTRUCTURA SOTANOS DE ESTACIONAMIENTO TORRES MEXICO NUEVO

GENERADORES DE ACEROFECHA: 14-OCT-2014

PARTIDA: CIMENTACIÓN

LOCALIZACION DIAM LONG. NUMERO 2 3 4 5 6 8 10 12

CONCEPTO EJE TRAMO TIPO VARILLA VARILLA VARILLA ELEM TOTAL 0.250 0.557 0.996 1.560 2.250 3.975 6.225 8.938

CIMENTACION

1-7 A-J DD-1 6 1.33 20 66 1,755.60 3,950.10 1-7 J-M DD-1 6 1.33 20 15 399.00 897.75 1-7 A-J CT-1 6 42.85 6 10 2,571.00 5,784.75 1-7 A-J CT-1 6 59.15 6 7 2,484.30 5,589.68 2-3 B-C CT-1 6 5.15 6 2 61.80 139.05 2-3 B-C CT-1 6 5.15 6 2 61.80 139.05 6-7 B-C CT-1 6 5.15 6 2 61.80 139.05 6-7 B-C CT-1 6 5.30 6 2 63.60 143.10 4-5 H-I CT-1 6 5.85 6 2 70.20 157.95 4-5 H-I CT-1 6 4.90 6 2 58.80 132.30 3-4 K-L CT-1 6 10.09 6 1 60.54 136.22 1-7 J-M CT-1 6 45.04 6 1 270.24 608.04 7 J-M CT-1 6 20.85 6 1 125.10 281.48 2 J-K CT-1 6 5.85 6 1 35.10 78.98 3 J-L CT-1 6 8.78 6 1 52.68 118.53 4 J-L CT-1 6 12.86 6 1 77.16 173.61 5 J-M CT-1 6 15.25 6 1 91.50 205.88 6 J-M CT-1 6 18.99 6 1 113.94 256.37

TOTAL KG 0.00 0.00 0.00 0.00 18,931.86 0.00 0.00 0.00TOTAL TON 0.000 0.000 0.000 0.000 18.932 0.000 0.000 0.000

UBICACIÓN:

SUMINISTRO, HABILITADO Y ARMADO DE ACERO DE REFURZO DE UN f´y = 4200

Kg/cm2 DEL No. 3 (3/8"), INCLUYE: CORTES, DOBLECES, GANCHOS,

TRASLAPES, DESPERDICIOS, AMARRES CON ALAMBRE RECOCIDO, ACARREOS VERTICALES Y HORIZONTALES DE 20.00

MTS 1RA ESTACIÓN, MATERIAL

Page 31: Gener Adores

Página 31 ACERO EST#3

OBRA: CIMENTACIÓN Y ESTRUCTURA SOTANOS DE ESTACIONAMIENTO TORRES MEXICO NUEVO

GENERADORES DE ACEROFECHA: 14-OCT-2014

PARTIDA: CIMENTACIÓN

LOCALIZACION DIAM LONG. NUMERO 2 3 4 5 6 8 10 12

CONCEPTO EJE TRAMO TIPO VARILLA VARILLA VARILLA ELEM TOTAL 0.250 0.557 0.996 1.560 2.250 3.975 6.225 8.938

CIMENTACION

UBICACIÓN:

Page 32: Gener Adores

Página 32 ACERO EST#4

OBRA: CIMENTACIÓN Y ESTRUCTURA SOTANOS DE ESTACIONAMIENTO TORRES MEXICO NUEVO

GENERADORES DE ACEROFECHA: 14-OCT-2014

PARTIDA: CIMENTACIÓN

LOCALIZACION DIAM LONG. NUMERO 2 3 4 5 6 8 10 12

CONCEPTO EJE TRAMO TIPO VARILLA VARILLA VARILLA ELEM TOTAL 0.250 0.557 0.996 1.560 2.250 3.975 6.225 8.938

CIMENTACION

UBICACIÓN:

Page 33: Gener Adores

Página 33 ACERO EST#6

OBRA: CIMENTACIÓN Y ESTRUCTURA SOTANOS DE ESTACIONAMIENTO TORRES MEXICO NUEVO

GENERADORES DE ACEROFECHA: 14-OCT-2014

PARTIDA: CIMENTACIÓN

LOCALIZACION DIAM LONG. NUMERO 2 3 4 5 6 8 10 12

CONCEPTO EJE TRAMO TIPO VARILLA VARILLA VARILLA ELEM TOTAL 0.250 0.557 0.996 1.560 2.250 3.975 6.225 8.938

CIMENTACION

UBICACIÓN:

Page 34: Gener Adores

Página 34 HERRERIA AZOTEAS AB

CUMBRES DE MALTRATA

NUMEROS GENERADORESUBICACIÓN: DR. VERTIZ #787 COL. NARVARTE, MEXICO, D.F.FECHA: 7-Sep-06

EDIFICADORA GALAXIA, S.A. DE C.V. PARTIDA: ACABADOS (HERRERÍA AZOTEAS)

CLAVE DESCRIPCIONLOCALIZACION

UNIDADMEDIDAS

EJE TRAMO TIPO LARGO

ACABADOS EN HERRERIAKf-12

PZA

TOTAL DE Kf-12 ( BARANDAL EDIFICIO A-B) -PZA-

Kf-13

PZA

TOTAL DE Kf-13 ( BARANDAL EDIFICIO A-B) -PZA-

Kf-14

PZA

TOTAL DE Kf-14 ( BARANDAL EDIFICIO A-B) -PZA-

OBRA:

BARANDAL A BASE DE TUBO INDUSTRIAL MOFLE DE 2 1/2" DE DIAMETRO CAL. 16 (PASAMANOS Y POSTES) TUBO INDUSTRIAL DE 1 1/2" DE DIAMETRO CAL. 18 A CADA 15 CM. LOS POSTES SERAN DE 1.80 M DE LONG. Y A CADA 2.01 M., UNIDO CON PLACA DE ACERO DE 10 x 10 CM x 1/4" DE ESPESOR FIJADO A LA LOSA DE CONCRETO CON 1 ANCLA DE 1 1/2" x 1/8" CON MEDIDA DE 18.50 x 1.80 M

BARANDAL A BASE DE TUBO INDUSTRIAL MOFLE

DE 2 1/2" DE DIAMETRO CAL. 16 (PASAMANOS Y

POSTES) TUBO INDUSTRIAL DE 1 1/2" DE

DIAMETRO CAL. 18 A CADA 15 CM. LOS POSTES

SERAN DE 1.80 M DE LONG. Y A CADA 2.01 M.,

UNIDO CON PLACA DE ACERO DE 10 x 10 CM x 1/4"

DE ESPESOR FIJADO A LA LOSA DE CONCRETO

CON 1 ANCLA DE 1 1/2" x 1/8" CON MEDIDA DE

23.50 x 1.80 M

BARANDAL A BASE DE TUBO INDUSTRIAL MOFLE

DE 2 1/2" DE DIAMETRO CAL. 16 (PASAMANOS Y

POSTES) TUBO INDUSTRIAL DE 1 1/2" DE

DIAMETRO CAL. 18 A CADA 15 CM. LOS POSTES

SERAN DE 1.80 M DE LONG. Y A CADA 2.01 M.,

UNIDO CON PLACA DE ACERO DE 10 x 10 CM x 1/4"

DE ESPESOR FIJADO A LA LOSA DE CONCRETO

CON 1 ANCLA DE 1 1/2" x 1/8" CON MEDIDA DE

13.55 x 1.80 M

Page 35: Gener Adores

Página 35 HERRERIA AZOTEAS AB

CUMBRES DE MALTRATADR. VERTIZ #787 COL. NARVARTE, MEXICO, D.F.

ACABADOS (HERRERÍA AZOTEAS)

MEDIDAS No. DETOTAL

ANCHO ALTO PIEZAS

ACABADOS EN HERRERIA

1.00 1.00

TOTAL DE Kf-12 ( BARANDAL EDIFICIO A-B) -PZA- 1.00

1.00 1.00

TOTAL DE Kf-13 ( BARANDAL EDIFICIO A-B) -PZA- 1.00

1.00 1.00

TOTAL DE Kf-14 ( BARANDAL EDIFICIO A-B) -PZA- 1.00

Page 36: Gener Adores

Página 36 losas

OBRA: SIMON BOLIVARGENERADORES DE ACERO PLANO:

FECHA: MARZO 21 2013

DPTO. C.C. Y C.P.

LOCALIZACION DIAM LONG. NUMERO 2 3 4

CONCEPTO EJE TRAMO TIPO VARILLA VARILLA VARILLA ELEM TOTAL 0.250 0.557 0.996

SIMON BOLIVAR - RECIMENTACIONES

3 4.61 6 5 138.30 77.03 2 1.40 31 5 217.00 54.25 3 23.09 4 0.00 0.00 2 1.27 112 0.00 0.00

TOTAL KG 54.25 77.03 0.00TOTAL TON 0.054 0.077 0.000

ELABORO: M A S

Page 37: Gener Adores

Página 37 losas

5 6 8 10 12

1.560 2.250 3.975 6.225 8.938

SIMON BOLIVAR - RECIMENTACIONES

0.00 0.00 0.00 0.00 0.000.000 0.000 0.000 0.000 0.000

Page 38: Gener Adores

Página 38 ACERO NERVADURAS#3

OBRA: CIMENTACIÓN Y ESTRUCTURA SOTANOS DE ESTACIONAMIENTO TORRES MEXICO NUEVO

GENERADORES DE ACEROFECHA: 14-OCT-2014

PARTIDA: CIMENTACIÓN

LOCALIZACION DIAM LONG. NUMERO 2 3 4 5 6 8 10 12

CONCEPTO EJE TRAMO TIPO VARILLA VARILLA VARILLA ELEM TOTAL 0.250 0.557 0.996 1.560 2.250 3.975 6.225 8.938

CIMENTACION

UBICACIÓN:

Page 39: Gener Adores

Página 39 ACERO NERVADURAS#4

OBRA: CIMENTACIÓN Y ESTRUCTURA SOTANOS DE ESTACIONAMIENTO TORRES MEXICO NUEVO

GENERADORES DE ACEROFECHA: 14-OCT-2014

PARTIDA: CIMENTACIÓN

LOCALIZACION DIAM LONG. NUMERO 2 3 4 5 6 8 10 12

CONCEPTO EJE TRAMO TIPO VARILLA VARILLA VARILLA ELEM TOTAL 0.250 0.557 0.996 1.560 2.250 3.975 6.225 8.938

CIMENTACION

UBICACIÓN:

Page 40: Gener Adores

Página 40 ACERO NERVADURAS#6

OBRA: CIMENTACIÓN Y ESTRUCTURA SOTANOS DE ESTACIONAMIENTO TORRES MEXICO NUEVO

GENERADORES DE ACEROFECHA: 14-OCT-2014

PARTIDA: CIMENTACIÓN

LOCALIZACION DIAM LONG. NUMERO 2 3 4 5 6 8 10 12

CONCEPTO EJE TRAMO TIPO VARILLA VARILLA VARILLA ELEM TOTAL 0.250 0.557 0.996 1.560 2.250 3.975 6.225 8.938

CIMENTACION

UBICACIÓN:

Page 41: Gener Adores

Página 41 ACERO NERVADURAS#8

OBRA: CIMENTACIÓN Y ESTRUCTURA SOTANOS DE ESTACIONAMIENTO TORRES MEXICO NUEVO

GENERADORES DE ACEROFECHA: 14-OCT-2014

PARTIDA: CIMENTACIÓN

LOCALIZACION DIAM LONG. NUMERO 2 3 4 5 6 8 10 12

CONCEPTO EJE TRAMO TIPO VARILLA VARILLA VARILLA ELEM TOTAL 0.250 0.557 0.996 1.560 2.250 3.975 6.225 8.938

CIMENTACION

UBICACIÓN:

Page 42: Gener Adores

Página 42 ACERO NERVADURAS#10

OBRA: CIMENTACIÓN Y ESTRUCTURA SOTANOS DE ESTACIONAMIENTO TORRES MEXICO NUEVO

GENERADORES DE ACEROFECHA: 14-OCT-2014

PARTIDA: CIMENTACIÓN

LOCALIZACION DIAM LONG. NUMERO 2 3 4 5 6 8 10 12

CONCEPTO EJE TRAMO TIPO VARILLA VARILLA VARILLA ELEM TOTAL 0.250 0.557 0.996 1.560 2.250 3.975 6.225 8.938

CIMENTACION

UBICACIÓN:

Page 43: Gener Adores

Página 43 ACERO NERVADURAS#12

OBRA: CIMENTACIÓN Y ESTRUCTURA SOTANOS DE ESTACIONAMIENTO TORRES MEXICO NUEVO

GENERADORES DE ACEROFECHA: 14-OCT-2014

PARTIDA: CIMENTACIÓN

LOCALIZACION DIAM LONG. NUMERO 2 3 4 5 6 8 10 12

CONCEPTO EJE TRAMO TIPO VARILLA VARILLA VARILLA ELEM TOTAL 0.250 0.557 0.996 1.560 2.250 3.975 6.225 8.938

CIMENTACION

UBICACIÓN:

Page 44: Gener Adores

Página 44 Formato

OBRA: TORRES MEXICO NUEVO

GENERADORES DE ACERO Av. Estado de México esq. Municipio Libre. Col. Barrio Norte, Atizapan

FECHA: 14-OCT-2014

PARTIDA:

CONCEPTO: HOJA___DE____

LOCALIZACION DIAM LONG. NUMERO 2 3 4 5 6 8 10 12

DIBUJO EJE TRAMO TIPO VARILLA VARILLA VARILLA ELEM TOTAL 0.250 0.557 0.996 1.560 2.250 3.975 6.225 8.938

TOTAL KGTOTAL TON

UBICACIÓN:

Page 45: Gener Adores

45

OBRA: MEXICO NUEVO

NUMEROS GENERADORES UBICACIÓN:

FECHA: 13 NOV 2013

PARTIDA: HOJA__ DE___

CLAVE CONCEPTO LOCALIZACION ELEMENTO MEDIDASU EJE TRAMO LARGO ANCHO ALTO CANTIDAD TOTAL

CALLE MUNICIPIO LIBRE ESQ. ESTADO DE MÉXICO MZ. 1 LOTE FRACCIONAMIENTO A COL. BARRIO NORTE

Page 46: Gener Adores

46

OBRA: MEXICO NUEVO

NUMEROS GENERADORES UBICACIÓN:

FECHA: 13 NOV 2013

PARTIDA: HOJA__ DE___

CLAVE CONCEPTO LOCALIZACION ELEMENTO MEDIDASU EJE TRAMO LARGO ANCHO ALTO CANTIDAD TOTAL

CALLE MUNICIPIO LIBRE ESQ. ESTADO DE MÉXICO MZ. 1 LOTE FRACCIONAMIENTO A COL. BARRIO NORTE

Page 47: Gener Adores

47