general electric company of libya (gecol) - … · gec l ءابرهكلل ةماعلا ةكرشلا...

55
General Electric Company of Libya (GECOL)

Upload: dolien

Post on 20-Apr-2018

335 views

Category:

Documents


35 download

TRANSCRIPT

Page 1: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)

General Electric Company of

Libya (GECOL)

Page 2: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)

GEC L الشركة العامة للكهرباء

Presentation Outline

• General overview of GECOL

• Performance Indicators (KPI)

• GECOL Master Plan

Load forecast.

Generation expansion.

Demand side management (DSM).

Transmission expansion.

EHV Substations.

• GECOL future vision

• Challenges

• Damage in Libyan network

during the revolution

• Conclusion

Page 3: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)

GEC L الشركة العامة للكهرباء

Generation Types – March 2010

Page 4: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)

GEC L الشركة العامة للكهرباء

Overview • GECOL is a state-owned vertically structured power utility responsible for

generation, transmission and distribution of electric power throughout Libya.

• 2010 Key Figures:

Peak Load 5,759 MW

Installed Generation Capacity 8,907 MW

Generated Energy 32.6 TWh

400 kV Transmission system 2,823 km

220 kV Transmission system 13,782 km

30, 66 kV Subtransmission 23,132 km

11 kV distribution 52,260 km

Customers 1,224,193

Per-Capita Consumption 4,351 kWh

Urban & Rural Electrification Rate ~99%

Page 5: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)

GEC L الشركة العامة للكهرباء

Performance Indices

98.44 Average interconnection availability

0.27 Share of imported energy

98.1 System energy efficiency

3.48 Frequency violation events

75 Period of frequency violations

713 Supply continuity interruption (

0.16 Forced interruption

21.7 System minutes interruption (

0 Voltage violation events

0 Period of voltage violations

10.6 Equipment unavailability

95 Dependability of protection system (%)

93 Selectivity of protection system (%)

94 Security of protection system (%)

Page 6: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)

GECOL Master Plan

GEC L الشركة العامة للكهرباء Graphic Ennami

Page 7: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)

GEC L الشركة العامة للكهرباء Graphic Ennami

Peak Loads for the years 2008, 2009 (4756, 5282) MW.

The actual peak load during summer 2010 (5722 MW).

Page 8: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)

Load growth recorded about 79% increase between 2003 and 2012

0

1,000

2,000

3,000

4,000

5,000

6,000

2003 2004 2005 2006 2007 2008 2009 2010 2011 2012

Mega Watt

year

Mega Watt

year

Load Development

Growth Rate of 6.7% per year

MEDELEC 21st Annual Meeting - Tripoli, Libya, April 4th 2013

Page 9: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

2003 2004 2005 2006 2007 2008 2009 2010 2011 2012

Growth Rate of 7.6% per year

Giga Watt Hours

year

Energy Production Development 2003 - 2012

MEDELEC 21st Annual Meeting - Tripoli, Libya, April 4th 2013

Page 10: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)

0

2000

4000

6000

8000

10000

12000

14000 2

01

3

20

14

20

15

20

16

20

17

20

18

20

19

20

20

Mega Watts

Peak Load Mega Projects

Growth Rate of 11.4% per year

Load Development 2013 – 2020

MEDELEC 21st Annual Meeting - Tripoli, Libya, April 4th 2013

Page 11: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

2013 2014 2015 2016 2017

Giga Watt Hours

System Energy Mega Projects

year

Growth Rate of 13.9% per year

Energy Production Development - Expected

MEDELEC 21st Annual Meeting - Tripoli, Libya, April 4th 2013

Page 12: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)

GEC L الشركة العامة للكهرباء Graphic Ennami

Tripoli

west

south

alwosta

bengazi

Green mountain

Load density during

2000-2007

17.9% 8.7%

6%

14.7%

32%

20.3%

Page 13: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)

GEC L الشركة العامة للكهرباء Graphic Ennami

The deviation value between the KEPCO study and the actual peak load recorded during 2008, 2009 :

Year Forecasted

peak load MW Actual peak

load MW Deviation value MW

Deviation percent

2008 4834 4756 78 1.7%

2009 5225 5282 -57 - 1.1%

(13/08/2008)

(02/09/2009)

The forecasted peak load close to the actual peak load recorded during the

years 2008, 2009.

Page 14: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)

Electricity Demand and Generation balance from Period 2010-2020 in MW Year 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

System Peak Load 5,832 6,307 6,785 7,271 7,764 8,261 8762 9264 9769 10274 10780

Mega Projects Load 1,097 1,982 3,497 3,930 4,211 4,211 4,211 4,211 4,211 4,211 4,211

Total 6,929 8,289 10,282 11,201 11,975 12,472 12,973 13,475 13,980 14,485 14,991

Generation Capacity 5,000 4,900 4,800 4,700 4,600 4,550 4,450 4,350 4,250 4,150 4,050

Balance -1,929 -3,389 -5,482 -6,501 -7,375 -7,922 -8,523 -9,125 -9,730 -10,335 -10,941

Projects Under

Construction

Misurata CC Power Plant I 460 690 690 690 690 690 690 690 690 690 690

Benghazi North CC Power

Plant I 460 690 690 690 690 690 690 690 690 690 690

West Sarir Gas Power Plant 460 690 690 690 690 690 690 690 690 690 690

Extension of West Mountain

Gas Power Plant 260 260 260 260 260 260 260 260 260 260 260

Zwetina Power Plant 460 460 460 690 690 690 690 690 690 690 690

Gulf steam Power Plant 350 1,050 1,400 1,400 1,400 1,400 1,400 1,400 1,400 1,400

Contracted

Projects

Ubari Gas Power Plant 300 600 600 600 600 600 600 600 600 600

Tripoli West Steam Power

Plant 350 1,050 1,400 1,400 1,400 1,400 1,400 1,400 1,400

Proposed Projects

Bumba Gulf Power Plant 350 700 1400 1400 1400 1400 1400 1400

Misurata CC Power Plant II 460 690 690 690 690 690 690 690

Militah Power Plant 920 920 1200 1200 1200 1200 1200 1200

Tripoli East Power Plant 350 700 1400 1400 1400

Zwetina Power Plant II 230 460 690 690

Abutraba Power Plant 350 700

Total Capacity of the new Projects 2,100 3,790 5,140 7,800 8,730 9,710 10,060 10,640 11,570 12,150 12,500

Balance after Capaity Additions 171 51 -692 1,299 1,355 1,788 1,537 1,515 1,840 1,815 1,559

Reserve Margin 2.47% 0.62% -6.73% 11.60% 11.32% 14.34% 11.85% 11.24% 13.16% 12.53% 10.40%

GEC L الشركة العامة للكهرباء Graphic Ennami

Page 15: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)

Generator Type Power Plant Units Actual Capacity in MW

Un

der

Co

nst

ruct

ion

&

Co

ntr

acte

d P

roje

cts

Stea m

Gulf 4ST - 700 1,400 1,400 1,400 Tripoli West II 4ST - - 350 1,050 1,400

Gas

West Mountain Extension 2GT 260 260 260 260 260

Sarir West 3GT 460 690 690 690 690 Ubari 4GT 300 600 600 600

Co

mb

ined

Cyc

le

Misurata I 2GT 460 460 460 460 460 1ST - 230 230 230 230

Benghazi North II 2GT 460 460 460 460 460 1ST - 230 230 230 230

Zwetina I 2GT 460 460 460 460 460 1ST - 230 230 230 230

Total Actual Capacity 2,100 4,020 5,370 6,070 6,420

Under Construction and Contracted Projects

Year 2010 2011 2012 2013 2014

Peak Load in MW 6,929 8,289 10,282 11,201 11,975

Actual Generation Capacity in MW 5,000 4,900 4,800 4,700 4,600

GEC L الشركة العامة للكهرباء Graphic Ennami

Page 16: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)

GEC L الشركة العامة للكهرباء Graphic Ennami

THE EXISTING POWER PLANTS 5269 MW Combined cycle

Gas station

Steam station

Page 17: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)

UNDER CONSTRUCTION , AND COMMISSIONING POWER PLANT

UNDER CONSTRUCTION , AND COMMISSIONING POWER PLANTS 4462 MW

GEC L الشركة العامة للكهرباء Graphic Ennami

Combined cycle

Gas station

Steam station

Page 18: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)

CONTRACTED POWER PLANTS 2250 MW

GEC L الشركة العامة للكهرباء Graphic Ennami

Combined cycle

Gas station

Steam station

CONTRACTED POWER PLANT

Page 19: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)

89 KM

Lines in Operation

Lines Under Construction

GEC L الشركة العامة للكهرباء Graphic Ennami

Al-Beida

Benghazi North

Hoon

Misurata

Bani Walid

Ghdames

Al-Rowais

Tubrok

Sabha

Abu-Arqub

Al-Tabbah

GMMR

Al-Khoms

Ejdabia Ras Lanuf

Sirte

Benghazi West

Alg

eria

Egyp

t

Bir Al-Usta Milad

Zawia

Al-Sarir

Al-Gwarsha

Benghazi South

Tripoli South

Sidi Bannur Tu

nis

ia

Bumba Gulf

Surman south

Millitah Tripoli west

Lines Contracted

Ultra-high voltage (400kv) network

Page 20: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)

Stations 400kv under constructing and commissioning

GEC L الشركة العامة للكهرباء Graphic Ennami

Al-Beida

Benghazi North

Hoon

Misurata

Bani Walid

Ghdames

Al-Rowais

Tubrok

Sabha

Abu-Arqub

Al-Tabbah

GMMR

Al-Khoms

Ejdabia Ras Lanuf

Sirte Benghazi West

Alg

eria

Egyp

t

Bir Al-Usta Milad

Zawia

Al-Sarir

Al-Gwarsha

Benghazi South

Tripoli South

Sidi Bannur Tu

nis

ia

Bumba Gulf

Surman south

Millitah Tripoli west

Stations 400kv contracted

400/220kv Substations

Page 21: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)

GEC L الشركة العامة للكهرباء

Demand side management (DSM).

Page 22: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)

GEC L الشركة العامة للكهرباء

DSM Definition

• Manipulation of the load shape

– Lower it

– Change its shape

• Through

– Codes and standards

– Change behavior

– Change technologies

– Pricing

Page 23: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)

GEC L الشركة العامة للكهرباء Graphic Ennami

Libyan-Egyptian Interconnection:

The feasibility study of the Libyan-Egyptian Interconnection concluded that exporting 500MW to Egypt is possible.

Libyan-Tunisian Interconnection:

The feasibility study of the Libyan-Tunisian Interconnection suggested the possibility of exchanging 500MW in both directions over 400kV voltage level.

Libyan-Algerian Interconnection:

The technical study of the Libyan-Algerian Interconnection has been implemented exchange 400 MW between the two countries

Cross-Border power exchange

Page 24: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)

GEC L الشركة العامة للكهرباء

GECOL future vision

Increase the exchange capacity between Libya and neabering country. Libyan-Italian Interconnection: The preliminary findings of the feasibility study of the Libyan-Italian Interconnection over DC through submarine cable suggested that exporting 1000MW to Italy is possible. Libyan-Greek Interconnection: Discussions between Libya and Greece are underway, with emphasis on the importance of such interconnection aiming at exporting 3000MW to Greece.

Page 25: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)

GEC L الشركة العامة للكهرباء Graphic Ennami

Interconnection with Neighboring Countries

Page 26: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)

GEC L الشركة العامة للكهرباء Graphic Ennami

Using smart grid and meters to manage and operate the network.

Power quality issues:-

THD and voltage swell and sage specially in the distribution network.

Page 27: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)

Challenges facing at GECOL

GEC L الشركة العامة للكهرباء Graphic Ennami

Minor and major inspection for power plants which force us to stop them, as a results overdue maintenance needed. This situation causes a power shortage.

Building our capacity specially in following:-

• generation transmission project management.

• Renewable energy integration in the planning stage.

• Asset management and online conditional monitoring.

• Energy efficiency for both the end use equipments and network operation.

Page 28: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)

Damage in Libyan network during the revolution

GEC L الشركة العامة للكهرباء Graphic Ennami

Page 29: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)
Page 30: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)
Page 31: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)
Page 32: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)
Page 33: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)
Page 34: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)
Page 35: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)
Page 36: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)
Page 37: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)
Page 38: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)
Page 39: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)
Page 40: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)
Page 41: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)
Page 42: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)
Page 43: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)
Page 44: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)
Page 45: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)
Page 46: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)
Page 47: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)
Page 48: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)
Page 49: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)
Page 50: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)
Page 51: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)
Page 52: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)
Page 53: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)
Page 54: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)
Page 55: General Electric Company of Libya (GECOL) - … · GEC L ءابرهكلل ةماعلا ةكرشلا Presentation Outline •General overview of GECOL •Performance Indicators (KPI)

GEC L الشركة العامة للكهرباء Graphic Ennami

Thank you