guide for remote configuring new installed ptn.doc

17
文文文文 文文文文 文 Guide for remote configuring the new installed non-configured PTN

Upload: abdul-majeed

Post on 23-Aug-2014

147 views

Category:

Documents


10 download

TRANSCRIPT

Page 1: Guide for remote configuring new installed PTN.doc

文档名称 文档密级:公开

Guide

for remote configuring the new installed

non-configured PTN

Metro Ethernet Test Dept

2009-6-10

Page 2: Guide for remote configuring new installed PTN.doc

文档名称 文档密级:公开

一、Preparation

(1)software tools:T2000,Navigator

(2)Gateway NE(GNE)can be managed by T2000 and Navigator;

(3)new NE has physically connected to the PTN network and the DCN communication

between the GNE and the NE is OK;

(4)BarCode information of the main control board(SCA/CXP) of the new NE has sent back

from the sites.

二、Collect NE information

1、collect information from site

Take 2 photos in the site when installnation was finished, one is the whole view for the NE, the

other is the BarCode View for the SCA/CXP board;

Attention:

to make sure the the SCA/CXP on PTN can be seen clearly in the photo, the photo pattern

should be as follow:

Page 3: Guide for remote configuring new installed PTN.doc

文档名称 文档密级:公开

PTN3900 Whole View PTN 3900SCA Board BarCode View

PTN1900 Whole View PTN1900 CXP Board BarCode View

PTN950 Whole View

PTN950 CXP Board BarCode View

PTN910 Whole View

PTN910 CXP Board BarCode View

Page 4: Guide for remote configuring new installed PTN.doc

文档名称 文档密级:公开

PTN912 Whole View(For PTN912 CXP Board BarCode View,please refer to PTN 910 )

2、BarCode Information Table

Record the BarCode of SCA/CXP board and site information in the BarCode Information Table as

follow;(For the condition of two SCA/CXP, record the barcode information of both the working

and backup SCA/CXP )

三、Remote configure NE data in office

1、Use GNE IP to search new NE.

(1)open T2000, in the main manu click the menu;

(2)select command to open “search for NE” page;

(3)click the button to open “Input Search Domain” window;

Page 5: Guide for remote configuring new installed PTN.doc

文档名称 文档密级:公开(4)select “IP Address of GNE”;(5) input the GNE IP in the “Search Address”;

(6)then select “OK”;

(7)press to start NE search;

when the search for new NE is finished or stop

(8)select the uncreated NE, and change the GNE ID to the local GNE ID;

(9)press button to creat the new NE;

Page 6: Guide for remote configuring new installed PTN.doc

文档名称 文档密级:公开

(10)User Name:root;

Password:password;

then press OK;

There is prompt window to indicate the NE has been created.

The new NE will appear in the main topology with NE-ID.

Page 7: Guide for remote configuring new installed PTN.doc

文档名称 文档密级:公开

2、Using Navigator to make the NE change to working state;

2.1 Open Navigator software

Double click to open Navigator software;

2.2 connect to and login Gateway NE

(1)Enter the IP of the Gateway NE to the “NE IP Address”, then click the button to

connect to the Gateway NE;

Page 8: Guide for remote configuring new installed PTN.doc

文档名称 文档密级:公开

(2)Choose the “Force Login” , then click the button to log in Gateway NE.

Username for logging in NE is “szhw”, and password is “nesoft”.

2.3 login non Gateway NE

(1)Click the “Login” button to show the login interface;

(2)Enter the “NE ID” of the non Gateway NE, choose the “Force Login”, then click the

button to log in Gateway NE.

Page 9: Guide for remote configuring new installed PTN.doc

文档名称 文档密级:公开2.4 run command in navigator

Enter command(:cfg-verify) in the “command input windows” and get result from the “result

output windows”

After this step, We can enter the command (:cfg-get-nestate) in the “command input windows”, If

the result that displays in the “result output windows” is“NE-STATE:running”,then it

means the NE is in running state.

3、upload NE data and query board manufacturer information

3.1 Upload NE data

(1)Double click the new created NE in the main topology;(2)in the pup-up window, press to start NE data upload;

Page 10: Guide for remote configuring new installed PTN.doc

文档名称 文档密级:公开

(3)in the confirm window, press button to start upload NE data;

(4)press button in the operation result prompt window to finish NE data upload;

3.2 query board manufacturer information

(1)click in the main menu;

(2)then choose

Page 11: Guide for remote configuring new installed PTN.doc

文档名称 文档密级:公开

(3)Choose the board of the NE to be query in the “NE management tree”,

(4)then press to make the board to the “Board Manufatureer Information Report”

window,

(5)then press to get the report;

(6)recoard this BarCode and use this BarCode to find out the site name from the BarCode

Information Table.

Page 12: Guide for remote configuring new installed PTN.doc

文档名称 文档密级:公开4、change NE IP and NE ID(T2000)4.1 change communication parameter

(1)right click the NE in the main topology ,then choose to open NE explorer;

(2)enter Communication Parameter page

In the left side of the NE Explorer, click the Function Tree, then choose

Page 13: Guide for remote configuring new installed PTN.doc

文档名称 文档密级:公开(3)change the Subnet Mask

Enter new “subnet mask” according to LLD design then press

(4)change the IP

Enter new “IP” according to the LLD design, then press ;

(5)press to check and make sure the communication parameter is changed

successfully.

4.2 change NE ID

(1)Right click the new created NE in the main topology, and select ;

(2)in the pop-up window, click button;

(3)change the NE ID and Extended ID according to the LLD design, then press

Page 14: Guide for remote configuring new installed PTN.doc

文档名称 文档密级:公开

After this operation, waiting for 10 seconds then turn to step 5;

5、delete and creat the NE again

5.1 delete NE from the main topology

(1)right click on the new NE in the main topology and choose to delete the NE;

(2)press button to complete NE delete;

Page 15: Guide for remote configuring new installed PTN.doc

文档名称 文档密级:公开5.2 creat the NE again (follow step 1)

5.3 Upload NE data(follow step 3.1)