herramientas de planificacion largo plazo - anglo american - los bronces
DESCRIPTION
PlaneamientoTRANSCRIPT
-
USO DE HERRAMIENTAS DE PLANIFICACION LARGO PLAZO EN DIVISION LOS BRONCES
Copper Anglo Chile operations
-
Collahuasi
Chagres
Collahuasi
MantosBlancos
Mantoverde
El SoldadoChagres
Los Bronces
Iquique
Antofagasta
Chaaral
Copiap
La CaleraValparaso
Santiago
San Felipe
Se ubica en la cordillera de los Andes sobre 3,500 msnm a 65 km al nor este de Santiago.
Precipitaciones de nieve anual : 7.7 m.
UBICACIN LOS BRONCES
-
Area MinaChancador Primario e infraestructuras relacionadas
Botaderos San Francisco
(Esteril y Lixiviable)Planta Lixiviacion San Francisco
Fase Donoso 1
Sector Infiernillo
N
ANDINA
INSTALACIONES LOS BRONCES
-
NDON 1
DON 2
INF 5
INF 6
INF 7
DON 3
DON 4
INF 5SW
CASINO
INF 8
DON 5
FASES LOS BRONCES
-
Planes Estratgicos
Planes LOM
Plan Budget (3YP)
Plan Short Term
UNIDAD DE EXPLOTACION: 1 BANCO
PERIODOS DEL PLAN: ANUAL
UNIDAD DE EXPLOTACION: POLIGONOS
PERIODOS DEL PLAN: MENSUAL
TIME CYCLE
HORIZONTE PLANIFICACION
-
MODELO DE BLOQUES
-
CHEQUEO MODELO DE BLOQUES
Statistics: Procedimiento Chequeo de las Variables** CUT10 STATISTICS FROM 3-D MODEL FILE 051015.DAT**
Statistical Analysis of MODEL grades based on CUT10
CUTOFF BLOCKS ABOVE CUTOFF MEAN S.T.D.0 13,536,640 100.0 0.2033 0.2298 CUT10
0.1 12,473,042 92.1 0.2168 0.2344 CUT100.2 3,160,957 23.4 0.5528 0.2552 CUT100.3 2,668,698 19.7 0.6084 0.2391 CUT100.4 2,158,654 15.9 0.6697 0.2253 CUT100.5 1,653,504 12.2 0.7368 0.2163 CUT100.6 1,173,916 8.7 0.8136 0.2127 CUT100.7 772,041 5.7 0.9003 0.2155 CUT100.8 473,364 3.5 0.9976 0.2252 CUT100.9 269,618 2.0 1.1122 0.2406 CUT101 154,181 1.1 1.238 0.2524 CUT10
1.1 91,799 0.7 1.37 0.2518 CUT101.2 61,888 0.5 1.4791 0.239 CUT101.3 45,648 0.3 1.562 0.2256 CUT101.4 32,548 0.2 1.6481 0.2128 CUT101.5 22,573 0.2 1.7373 0.1973 CUT101.6 15,753 0.1 1.8194 0.182 CUT101.7 10,753 0.1 1.8981 0.1691 CUT101.8 7,436 0.1 1.9663 0.161 CUT101.9 4,392 0.0 2.0456 0.1673 CUT102 2,091 0.0 2.164 0.1764 CUT10
2.1 969 0.0 2.3048 0.1717 CUT102.2 623 0.0 2.3932 0.1531 CUT102.3 396 0.0 2.4756 0.1332 CUT102.4 246 0.0 2.5556 0.1054 CUT102.5 150 0.0 2.6218 0.0796 CUT102.6 79 0.0 2.6838 0.0563 CUT102.7 32 0.0 2.741 0.0323 CUT102.8 1 0.0 2.83 0 CUT10
-
CHEQUEO MODELO DE BLOQUES
Pitres: Cubicacin de Fases LOM Anterior
-
MODELO DE PLANIFICACIN
Consideraciones al modelo Geolgico debido a diversas razones:
1) Geomecnicas : Codificacin segn Roseta de ngulos de Talud. Para la codificacin se utilizan las propiedades del modelo de bloque a travs de slidos.
-
2) Metalrgicas: Correcciones a la Recuperacin Metalrgica. (Model Calculation)
Granulometra:
%#65 = 15.091*Ln(TPH*8)-128.7
Correccin Rec = (-0.015*(%#65^2)+0.473*(%#65)-3.554)
Donde TPH es el valor de TPH segn modelo CEET.
Limpieza:
Planta Los Bronces: Recuperacin de Limpieza 96.3%
Planta Confluencia: Recuperacin de Limpieza 97.3%
Tiempo Residencia:
Rec =-0.00000187189*TPH2+0.007038619*TPH-6.324249593
Donde TPH es el valor de TPH segn modelo.
MODELO DE PLANIFICACIN
-
3) Topogrficas: Crter de Andina. (model Calculation)
MODELO DE PLANIFICACIN
-
4) Comerciales: Acuerdo Pago Royalty con Andina. (Model Calculation)
MODELO DE PLANIFICACIN
-
DISEO DE FASES
El diseo de las fases se realiza mediante la herramienta PIT EXPANSION.
-
STRATEGIC PLANNER - MSSP
Lo primero es la cubicacin de las nuevas fases, para ello se utiliza una multirun configurando la herramienta PITRES.
-
STRATEGIC PLANNER - MSSP
-
STRATEGIC PLANNER - MSSP
-
STRATEGIC PLANNER - MSSP
-
STRATEGIC PLANNER - MSSP
-
STRATEGIC PLANNER - MSSP
-
STRATEGIC PLANNER - MSSP
-
STRATEGIC PLANNER - MSSP
-
SUMMARY MINING RESULTS
Period Phase Bench Reserve Reserve Schedule Schedule Destination Lift Sub- Reserve Grade Grade Grade Grade Grade Grade Grade Grade# ID Elevation Class ID Class # Class ID Class # Destination Elevation Region Tonnage CUT1 REC10 CUS10 MOT10 AST10 DEN10 RX10 R10A1 DON2 3400 0.1 2 T01WST 501 W1 2000 ALL 974.456 0.129 89.378 0.008 0.003 15.625 2.62 60 601 DON2 3400 0.15 3 T01WST 501 W1 2000 ALL 1986.463 0.178 88.731 0.008 0.006 15.1 2.626 52.169 52.0611 DON2 3400 0.2 4 T01ROM 61 RLCH1 2000 ALL 2577.421 0.224 88.741 0.009 0.008 15.358 2.621 50.335 51.8711 DON2 3400 0.25 5 T01ROM 61 RLCH1 2000 ALL 1794.303 0.272 89.357 0.01 0.008 17.273 2.619 52.207 53.611 DON2 3400 0.3 6 T01MIL 1 OR1 2000 ALL 193.92 0.304 89.995 0.009 0.006 14.397 2.623 57.336 57.3361 DON2 3400 0.31 7 T01MIL 1 OR1 2000 ALL 241.67 0.314 88.182 0.01 0.008 14.099 2.619 51.514 54.1641 DON2 3400 0.32 8 T01MIL 1 OR1 2000 ALL 116.801 0.325 90.248 0.01 0.009 28.693 2.63 54.208 55.2351 DON2 3400 0.33 9 T01MIL 1 OR1 2000 ALL 86.089 0.334 88.235 0.011 0.011 34.064 2.613 42.238 46.5021 DON2 3400 0.34 10 T01MIL 1 OR1 2000 ALL 123.616 0.344 87.825 0.008 0.008 14.178 2.615 53.798 56.2731 DON2 3400 0.35 11 T01MIL 1 OR1 2000 ALL 73.692 0.354 88.404 0.01 0.013 16.379 2.612 45.491 50.4571 DON2 3400 0.36 12 T01MIL 1 OR1 2000 ALL 52.842 0.363 87.13 0.01 0.008 14.673 2.625 49.344 50.2811 DON2 3400 0.37 13 T01MIL 1 OR1 2000 ALL 69.132 0.374 89.684 0.012 0.011 16.905 2.62 48.601 50.9441 DON2 3400 0.38 14 T01MIL 1 OR1 2000 ALL 28.171 0.385 88.437 0.011 0.006 14.415 2.624 54.509 54.5091 DON2 3400 0.39 15 T01MIL 1 OR1 2000 ALL 38.464 0.395 89.084 0.009 0.006 14.811 2.617 57.894 58.9471 DON2 3400 0.4 16 T01MIL 1 OR1 2000 ALL 43.219 0.404 89.256 0.009 0.006 15.085 2.623 56.135 56.1351 DON2 3400 0.41 17 T01MIL 1 OR1 2000 ALL 6.692 0.414 85.951 0.015 0.048 19.214 2.573 13.93 351 DON2 3400 0.42 18 T01MIL 1 OR1 2000 ALL 23.701 0.425 91.314 0.009 0.004 18.313 2.62 59.873 59.9371 DON2 3400 0.43 19 T01MIL 1 OR1 2000 ALL 39.894 0.434 88.343 0.012 0.021 18.286 2.603 37.896 46.5441 DON2 3400 0.44 20 T01MIL 1 OR1 2000 ALL 15.621 0.445 88.781 0.014 0.034 20.561 2.584 29.656 44.8281 DON2 3400 0.45 21 T01MIL 1 OR1 2000 ALL 34.123 0.454 88.18 0.015 0.007 15.204 2.633 43.998 43.9981 DON2 3400 0.46 22 T01MIL 1 OR1 2000 ALL 22.029 0.464 86.927 0.017 0.008 15.426 2.633 43.265 42.1781 DON2 3400 0.47 23 T01MIL 1 OR1 2000 ALL 14.818 0.477 84.66 0.014 0.012 15.085 2.634 38.539 39.2481 DON2 3400 0.48 24 T01MIL 1 OR1 2000 ALL 6.187 0.484 86.11 0.022 0.006 13.4 2.64 35 351 DON2 3400 0.49 25 T01MIL 1 OR1 2000 ALL 3.287 0.497 87.768 0.018 0.022 18.423 2.598 21.766 351 DON2 3400 0.5 26 T01MIL 1 OR1 2000 ALL 6.141 0.502 91.32 0.01 0.005 19.5 2.62 60 601 DON2 3400 0.51 27 T01MIL 1 OR1 2000 ALL 6.064 0.519 81.89 0.015 0.012 13.9 2.64 35 351 DON2 3400 0.52 28 T01MIL 1 OR1 2000 ALL 6.187 0.527 84.93 0.022 0.009 13.3 2.64 35 351 DON2 3400 0.53 29 T01MIL 1 OR1 2000 ALL 6.141 0.532 92.14 0.009 0.004 19.4 2.62 60 601 DON2 3400 0.54 30 T01MIL 1 OR1 2000 ALL 10.086 0.546 83.588 0.019 0.012 13.664 2.64 35 351 DON2 3400 0.56 32 T01MIL 1 OR1 2000 ALL 24.904 0.563 88.69 0.017 0.007 15.933 2.63 47.329 47.3291 DON2 3400 0.58 34 T01MIL 1 OR1 2000 ALL 12.699 0.588 88.396 0.018 0.007 16.576 2.63 47.088 47.0881 DON2 3400 0.59 35 T01MIL 1 OR1 2000 ALL 9.544 0.593 88.344 0.015 0.008 17.439 2.627 51.085 51.0851 DON2 3400 0.6 36 T01MIL 1 OR1 2000 ALL 11.534 0.608 86.754 0.018 0.006 15.856 2.69 37.774 37.7741 DON2 3400 0.61 37 T01MIL 1 OR1 2000 ALL 12.539 0.612 91.049 0.016 0.003 18.484 2.676 49.794 49.7941 DON2 3400 0.62 38 T01MIL 1 OR1 2000 ALL 32.398 0.625 90.548 0.016 0.003 17.944 2.685 48.15 48.151 DON2 3400 0.63 39 T01MIL 1 OR1 2000 ALL 37.344 0.635 90.106 0.015 0.003 16.616 2.728 40.296 40.2961 DON2 3400 0.64 40 T01MIL 1 OR1 2000 ALL 9.492 0.646 87.535 0.02 0.006 16.031 2.701 38.37 38.371 DON2 3400 0.65 41 T01MIL 1 OR1 2000 ALL 29.305 0.655 90.944 0.014 0.002 16.871 2.73 40 401 DON2 3400 0.66 42 T01MIL 1 OR1 2000 ALL 8.306 0.662 89.997 0.015 0.005 15.918 2.625 53.482 53.4821 DON2 3400 0.67 43 T01MIL 1 OR1 2000 ALL 19.195 0.673 92.303 0.012 0.002 15.9 2.73 40 401 DON2 3400 0.68 44 T01MIL 1 OR1 2000 ALL 18.938 0.688 92.027 0.012 0.002 17.376 2.694 46.485 46.485
STRATEGIC PLANNER - MSSP
-
CONCLUSIONES
Los resultados obtenidos se entregan de forma rpida, robusta y consecuentes con los alineamientos entregados en los planes estratgicos, en relacin al secuenciamiento de fases.
Las herramientas utilizadas respetan bastantes bien las restricciones operativas e interferencias del entorno que se tienen.
An cuando el software entrega una secuencia operativa, est debe ser revisada y actualizada en los prximos pasos de planificacin debido principalmente al escenario dinmico de corto plazo
-
OPORTUNIDADES
Incorporacin de la herramienta Haulage para el calculo de las distancias de transporte.
Implementacin de Automaping para la busqueda de L.C. de acuerdo al mapeo de los destinos y restricciones propias de la faena.
-
USO DE HERRAMIENTAS DE PLANIFICACION CORTO PLAZO EN DIVISION LOS BRONCES
Copper Anglo Chile operations
-
PLANIFICACIN CORTO PLAZO
INPUT
Plan Short Term Mensual
Modelo Geolgico mensual
Levantamiento topogrfico diario
Planificacin de Mantenciones
Mantenciones Planta
Secuencia de extraccin minerales.
Secuencia de Desarrollo Mina
OUTPUT
Plan Semanal
Plan Diario
Carta de minerales da a da
-
SHORT TERM Y MODELO GEOLGICO
Short Term:
- Alimentacin de mineral a planta
- Polgonos de mineral a extraer
- Secuencia de extraccin y desarrollo por fases
- Layout general de caminos
- Movimiento Mina
- Metros perforados y material tronado
Modelo Geolgico
- El modelo geolgico es entregado mes a mes
- Se carga el modelo geolgico del mes al archivo 15 de minesight
- Se crea una vista del modelo del mes correspondiente
- Se cbica mediante IP usando el modelo geolgico correspondiente para cuantificar las caractersticas de cada polgono
-
Planificacin Corto plazo
- Terreno diario
- Reunin diaria 12 AM
- Redefinir directrices del plan semanal
- Realizar proyeccin de carta de minerales
- Jueves: Presentacin plan semanal
Topografa mina
- Marcacin de pozos de perforacin
- Levantamiento de pozos de perforacin
- Replanteo de zonas de extraccin
- Levantamiento de zonas de extraccin
- Marcacin de patas de botaderos
- Levantamiento y control de botaderos
- Levantamiento de Stock de mineral
- Marcacin de rampas
- Control de rampas
- Levantamientos especiales
METODOLOGA DE TRABAJO DIARIA
-
Temporales principalmente en periodo de invierno:
- Prioridad a carguo de mineral
- Prioridad a equipos de servicios para mantener pistas
- Tapado de pozos de perforacin
Colindancia con Andina:
- Restriccin de botaderos cercanos al crter
- Restriccin de tronaduras cercanas al rea de hundimineto
Mina subterrnea:
- Existencia de galeras, piques, chimeneas y caserones antiguos (Auscultacin y hundimiento)
- Existencia de fierros y desechos provenientes de la mina subterrnea que puedan afectar al chancado.
CONSIDERACIONES GENERALES
-
Perforacin:
- 4 Perforadoras Elctricas Bucyrus Erie 10 5/8
- 2 Perforadoras Diesel Pit Viper 10 5/8
- 2 Perforadoras Roc L8 6 arrendadas.
- 1 Perforadora Pit Viper arrendada
Carguo:
- 5 Palas Elctricas Bucyrus Erie (60 a 73 yd3)
- 1 Pala hidrulica Komatsu PC5500 de 37 yd3
- 3 Cargadores Le Torneau L-1000 (26 a 31 yd3)
Transporte:
- 32 camiones Komatsu 930 E de 300 ton.
- 9 camiones Komatsu 830 E de 250 ton.
EQUIPOS MINA
-
DESARROLLO PLAN SEMANAL
Importar topografa diaria
-
DESARROLLO PLAN SEMANAL
Triangular y crear la superficie
-
DESARROLLO PLAN SEMANAL
Grillar con la topografa actual el archivo 13 de minesight.
-
DESARROLLO PLAN SEMANAL
Actualizar el % de topografa al modelo 3-D
-
DESARROLLO PLAN SEMANAL
Actualizar carpetas de topografa mina (Polgonos tronadura, polgonos remanentes)
Cargar la Vista del plano diario de la mina en Minesight
-
DESARROLLO PLAN SEMANAL
Cubicar mediante IP los polgonos a trabajar
-
DESARROLLO PLAN SEMANAL
Teorico D+SDailyProy
Traslado NovPerforar 0.90Tronar 1.00 Viernes Sbado Domingo Lunes Martes Mircoles Jueves ViernesMP 1.05 5-Nov 6-Nov 7-Nov 8-Nov 9-Nov 10-Nov 11-Nov 12-NovSERV 0.86675 1.2 CBA CBA CBA
CARGUIO Disparo CuT% Rec% Recf% Con% Tph ceet Tph planta Kton Cu/hr DIFST02-M-144 0.87 89 89 20 2187 2,187 59 17 -3 4 10 30 18ST02-M-145 0.86 83 83 31 2467 2,467 102 18 10 25 26
L8 D1-3520-173-M3 1.13 90 90 25 2266 2,266 5 23 0 5L8 D1-3520-173-M4 0.83 94 94 27 2260 2,260 3 18 0 3L8 D1-3520-173-M5 0.85 90 90 25 2320 2,320 16 18 0 16L8 D1-3520-173-M7 0.93 90 90 25 2320 2,320 10 19 0 10P8 D1-3535-176-M4 1.10 90 90 25 2388 2,388 45 24 -1 32 10P8 D1-3520-173/Parte3 1.16 90 90 26 2367 2,367 97 25 0 15 35 35 12L8 D1-3505-100 1.16 90 90 27 2340 2,340 58 24 28 15 15L8 DE-3565-191 1.04 87 87 22 2177 2,177 68 20 18 25 25P7 IS5-3385-103/M1 0.88 87 87 31 2460 2,460 49 19 0 30 19
P7/9 IS5-3385-103/M2 0.87 84 84 29 2344 2,344 17 17 2 15P9 IS5-3385-107 0.95 89 89 29 2398 2,398 50 20 0 25 10 15
Total Alimen Chanc Kton 60 60 60 60 60 60 60 60RESUMEN DE PRODUCCIN
2,322 2,340 2,256 2,324 2,440 2,380 2,365 2,314
54.5 54.9 52.9 54.5 57.2 55.8 55.5 54.30.95 1.01 0.98 0.88 0.94 1.07 1.13 1.02
PROM TOTAL 86 90 87 88 86 90 90 89
#DIV/0! 3867 443 498 451 419 464 536 561 495
Kton Planta%CuT
TPH Total:
Recuperacin %Cu final
Cu Fino Ton
Ton Cu Fino
Las caractersticas de los polgonos de mineral cuando estn tronados son cargadas por geologa.
Las carcteristicas de los poligonos de mineral cuando no estn tronados son cargadas por C.P mediante la informacin del IP
-
CONCLUSIONES
El software y los recursos de la mina nos permiten obtener un avance diario, el cual se hace muy detallado para tratar las contingencias de la mina.
El IP es una herramienta de gran utilidad para planificar los materiales existentes en la mina, tanto como de mineral, lix, y estril para la programacin semanal.
Si bien los escenarios de corto plazo son dinmicos el IP nos permite analizar diversas alternativas rpidamente que son consecuentes con el lineamiento de LP.
-
OPORTUNIDADES
Implementar herramienta Material Manager. con el fin de poder agilizar la planificacin del corto plazo.
Implementar MSAXIS, con el fin de mejorar el Ore Control.