    Product Change NoticeHuawei PCN SRAN-2012XXXX (EOM Notice onDBS3900(AC) APM30H&TMC11H&IBBS200D&T Ver.B

    cabinets)

    0. Change History

    DateEmendatory

    versionDescription uthor

    2012-08-26 Rev: 01 Yongpeng

    2012-12-26 Rev: 02Ver.D1 and Ver.D2 have been amalgamated into Ver.D

    Ver.D Cabinet Configuration is the same as Ver.D2Zhangli

    2013-02-05 Rev: 03

    1 Add the Change History table2 Delete the last order date of spare parts

    3 Update some spare parts codingZhangli

    1. Abstract

    The Ver.B cabinets and internal parts will be in the end of marketing (EOM). The DBS3900 (AC)

    Ver.D cabinets will be sold to replace the Ver.B cabinets. This PCN is intended for customers using Huawei

    DBS3900 (AC) Ver.B cabinets.

    The last date for purchase of the Ver.B cabinets is June 30, 2013 and the last date for supply of Ver.B

    cabinet is December 31, 2013.

    2. Supplier Information

    Huawei Technologies. Co., Ltd.

  • 8/11/2019 Huawei PCN APM30H -Ver.B to Ver.D.PDF

    2/12

    Confidential Page 2 of 12

    Product Change Notice

    3. Basic Information

    PCN No. SRAN-2012XXXX

    PCN Version Rev: 03

    Change Category B

    Milestone

    Release Official release of

    the PCN Feb 5, 2013

    Implementation GA of new

    cabinets December 31, 2012

    End of Marketing No order acceptedfor Ver.B cabinet

    June 30, 2013

    End of

    Production

    No delivery after

    EOP for Ver.B

    cabinet

    December 31, 2013, from which no old cabinets will

    be delivered (the delivery time in new sales contracts

    should not be later than this date)

    End of Service No service

    provided after EOS Subject to the specific contract

    4. Involved Systems and Products

    There is one type for APM30H/TMC11H/IBBS200D/T in Ver.D cabinets. Customer can use Ver.D to

    replace the current version of cabinets.

    Main System Subsystem Hardware Software Firmware Plug-in

    DBS3900 (AC) Ver.D Cabinets and internal parts Yes Yes

    note1

    No No

    Note 1 To replace Ver.B cabinets with the same maximum configuration of 6 RRU, the Ver.D cabinets can

    work normal with the same BTS software version. But if the enhanced configuration of Ver.D need be used

    like supporting 12 RRU, the BTS software version should be upgraded.

    5. Correlated Change

    N/A

  • 8/11/2019 Huawei PCN APM30H -Ver.B to Ver.D.PDF

    3/12

    Confidential Page 3 of 12

    Product Change Notice

    6. BOM Code Change

    New BOM

    Code Board Name

    Old BOM

    Code Board Name

    Complete Replacement

    Ver.D APM30H cabinet Ver.B APM30H cabinet Yes

    Ver.D IBBS200D cabinet Ver.B IBBS200D cabinet Yes

    Ver.D IBBS200T cabinet Ver.B IBBS200T cabinet Yes

    Ver.D TMC11H cabinet Ver.B TMC11H cabinet Yes

    01071382 EPU05A-03 02400460 EPS 01B No

    01071384 EPU05A-05 02400462 EPS 01D No

    02310HBJ R4850G 02130608 EPW30-48A No

    02310LYP PMU 11A 02317275 PMU 01B No

    02120734 FAN 02D 02120559 FAN 02A No

    03021VGY CMUEA 03020NXE CMUA No

    02120732 DCDU-12C 02120479 DCDU-03C No

    21161105 TEC module 21161003 TEC module No

    32030092

    The external fan of Heat

    Exchanger of

    APM30H/TMC11H

    Ver.D cabinet

    32030077

    97051086

    The external fan of Heat

    Exchanger of

    APM30H/TMC11H

    Ver.B cabinet

    No

    7. Categorization Basis

    (1) Ver.B cabinets and parts will be in the EOM and be replaced by Ver.D..

    (2) The new release has all the functions of current version and better performance. The Ver.B can support 6

    RRU(2*40W) at maximum. The Ver.D supports 6 RRU(2*60W) at maximum without BTS software

    upgrading. The Ver.D also supports 12 RRU(2*60W) with one DCDU-12B added at 1U user space in

    APM30H after BTS software is upgraded. The Ver.D cabinet supports two BBU in one APM30H also.

    8. Software version for the enhanced configuration of Ver.D.

    The enhanced configuration of Ver.D

    1 Indoor Cabinet FMUEA board

    2 Outdoor Cabinet CMUEA board

    3 support 5pcs PSU

    Network element Software version

    SRAN6.0

    CME V200R011C00SPC250+CP2501

    BSC V900R013C00SPC582

    MBTS V100R004C00SPC190

    CME V200R012C00SPC220+CP2201

    http://void%280%29/http://void%280%29/http://void%280%29/
  • 8/11/2019 Huawei PCN APM30H -Ver.B to Ver.D.PDF

    4/12

    Confidential Page 4 of 12

    Product Change Notice

    BSC V900R014C00SPC520

    MBTS V100R007C00SPC240

    SRAN8.0

    CME ALL

    BSC ALLMBTS ALL

    9. Change Description

    (A) The change of the Ver. D cabinets

    The changed parts include the Heat Exchanger, fan tray, TEC and DCDU.etc. The external size andinstalling of new cabinet are the same as old one.

    The Ver.D cabinet improves the capacity of power supply, heat dissipation and cabling. It has all thefunctions of the Ver.B cabinet and better performance instead. The Ver.D cabinet supports two BBU,The Cooling capability from 700W to 1500W in one APM30H or TMC11H .

    The cabinet version info can be acquired by OMC remotely or be seen on the nameplate in the cabineton site.

    (B) The major changed parts from Ver.B to Ver.D cabinet

  • 8/11/2019 Huawei PCN APM30H -Ver.B to Ver.D.PDF

    5/12

  • 8/11/2019 Huawei PCN APM30H -Ver.B to Ver.D.PDF

    6/12

    Confidential Page 6 of 12

    Product Change Notice

    4.1E(6.6bels@25 , 7.6bels@45 )

    9.2 The change of AC/DC power system inside in APM30H(A) The layout and name change.

    When Ver.D APM30H cabinet replace the Ver.B cabinet, the EPU05A-03 (220V AC) orEPU05A-05 (110V AC) replace the EPS 01B (220V AC) or EPS 01D (110V AC) of embedded

    power system. The height is 1U only for PSU and PMU in new version cabinet. The old PSU andPMU are 2U high. upgraded the highest efficiency from 91% to 96%.

    APM30H Ver.D supports 5 PSU at maximum. Three PSU can be managed in Ver.D cabinet likeVer.B cabinet with the same BTS software. The BTS software need be upgraded if four or fivePSU need be used in Ver.D cabinet to support 12 RRU.

    (B) The change of PSU

    version name Power capacity The highest efficiency

    Ver.B EPW30-48A 1600W/PCS 91%

    Ver.D R4850G 3000W/PCS 96%

    Ver.B PMU 01B -- --

    Ver.D PMU 11A-- --

    Remark: The height is 1U only for PSU and PMU in new version cabinet. The old PSU and PMUare 2U high.

    (C) The change of AC power distribution

  • 8/11/2019 Huawei PCN APM30H -Ver.B to Ver.D.PDF

    7/12

    Confidential Page 7 of 12

    Product Change Notice

    (D) The change of DC power distribution

    Remark: The spare fuses are changed from 2*5A+6*15A to 5*5A+3*30 A in APM30H cabinet.

    (E) The change of AC power interface from customer

    LLVD

    630A(FUSE) RRU

    1125A(1P MCB) RFC

    BLVD

    230A(FUSE) BBU

    130A(FUSE) FAN

    430A(FUSE) TM

    130A (FUSE ) TMC

    130A(FUSE) IBBS

    1125A (2P MCB) BATT

    LLVD

    620A(1P MCB) RRU

    BLVD

    215A(FUSE) BBU

    115A(FUSE) FAN

    45A(FUSE) TM

    125A (1P MCB ) TMC

    115A(FUSE) TEC

    1100A (1P MCB) BATT

    220V input EPS 01B 220V input EPU05A-03

    AC Input Breaker

    316A(1P MCB) PSU

    AC Output Breaker

    116A(2P MCB) Heater/Socket

    AC Input Breaker

    240A+125A (1P MCB) PSU

    AC Output Breaker

    116A (2P MCB) Heater/Socket

    AC Input Breaker

    140A(2P MCB) PSU

    AC Output Breaker

    116A(1P MCB) Heater

    116A(1P MCB) Socket

    AC Input Breaker

    1100A(2P MCB) PSU

    AC Output Breaker

    116A (1P MCB) Heater

    116A (1P MCB) Socket

    110V dual phase input EPS 01D 110V dual phase input EPU05A-05

  • 8/11/2019 Huawei PCN APM30H -Ver.B to Ver.D.PDF

    8/12

    Confidential Page 8 of 12

    Product Change Notice

    Only when the Ver.D cabinet has more powerful RF configurations than Ver.B, the power interfaceshould be changed.

    Input voltageCabinet

    version

    RFU types and

    configurationAC power interface from customer

    220Vac threephase

    Ver.B,

    Ver.D6 x RRU(2*40W) 25A/3P (2.5 mm 2 cables) minimum.

    Ver.D6 x RRU(2*60W) 25A/3P (4 mm 2 cables) minimum.

    12 RRU(2*60W) 40A/3P (6 mm 2 cables) minimum.

    220Vac singlephase

    Or 110Vac

    dual-live-wire

    Ver.B,

    Ver.D6 x RRU(2*40W) 50A/2P, (6 mm 2 cables) minimum.

    Ver.D6 x RRU(2*60W) 63A/2P (16 mm

    2 cables) minimum.

    12 RRU(2*60W) 100A/2P (16 mm 2 LSZH cables) minimum.

    9.3 The change of cable outlet in APM30H and TMC11H

    The power cable diameter is enlarged and the cable outlet is adjusted also on the bottom of cabinet. Thenew outdoor type of cable bag has double space for cable and much shorter installing time than the currentversion.

    9.4 The change of DCDU in TMC11H

    (A) The layout and name change.

    (B) The enhance of DC distribution

    Version Distribution capacity

    Ver.B 7x12A 1P MCB +2x6A 1P MCB

  • 8/11/2019 Huawei PCN APM30H -Ver.B to Ver.D.PDF

    9/12

    Confidential Page 9 of 12

    Product Change Notice

    Ver.D 10 x 30A (fuse)

    Remark: There are three spare fuses of 30A in the right of new DCDU.

    (C) The change of the input connection to support the parallel connection of 2 route 16mm 2 cables.

    (D) The change of output connectors to benefit installing. Plugging or unplugging the connector can power on or off the load of the new version DCDU.

    (E) For new version DCDU, No supply the DC SPD ALARM Connector.

    9.5 The change of fan tray in IBBS200D

    There is only one fan in IBBS200D Ver.D to save power consumption. The Ver.B has two fans.

    The monitor board is changed from CMUA of Ver.B cabinet to CMUEA of Ver.D cabinet. But the

    external cable interfaces keeps the same.

    9.6 The change of TEC module in IBBS200T

    The Thermoelectric Cooler module is changed in IBBS200T Ver.D. The installing interface keeps

    the same for the new TEC module.

    The monitor board is changed from CMUA of Ver.B cabinet to CMUEA of Ver.D cabinet. But the

    external cable interfaces keeps the same.

  • 8/11/2019 Huawei PCN APM30H -Ver.B to Ver.D.PDF

    10/12

    Confidential Page 10 of 12

    Product Change Notice

    9.7 The change of IBBS200D/IBBS200T PDU

    The power distribution unit is improved in Ver.D to support more powerful equipments with more

    discharge current.

    9.8 The change of cable outlet in IBBS200D/IBBS200T

    The power cable diameter is enlarged and the cable outlet is adjusted also on the bottom of cabinet. Thenew outdoor type of cable bag has double space for cable and much shorter installing time than the currentversion.

    9.9 The change of all cabinets package

    The cabinet external packages are changed from wood to paper in order to be moreenvironments friendly.

  • 8/11/2019 Huawei PCN APM30H -Ver.B to Ver.D.PDF

    11/12

    Confidential Page 11 of 12

    Product Change Notice

    10. Impact of Change

    Security Fire Service Communication

    None None Yes

    For Ver.D cabinet is configured four or

    five PSU to support more than 6 RRU,

    the BTS software need be upgraded and

    it interrupt service within 5 minutes

    No service is impacted if there are three

    PSU are used in Ver.D at maximum to

    support 6 RRU

    None

    Maintenance Reliability Power Consumption Traffic

    Yes.

    Some spare parts of the

    Ver. D cabinet are

    different from the Ver. B

    cabinet. Therefore, a

    certain quantity of spare

    parts of the Ver. B

    cabinet must be reserved

    for future use.

    None Yes

    Ver.D cabinet support much more

    powerful RRU with some increased

    power consumption.

    No more power consumption is

    increased for Ver.D cabinet using the

    same type and number of BBU and

    RRU modules as Ver.B cabinet.

    Yes.

    Ver.D BTS supports

    much higher traffic.

    11. Involved Documents

    The changes will affect the DBS3900 Product description and DBS3900 User Manual .

    12. Appendixes

    None

  • 8/11/2019 Huawei PCN APM30H -Ver.B to Ver.D.PDF

    12/12

    Confidential Page 12 of 12

    Product Change Notice

    13. Remarks

    If you have any questions, contact Huawei local sales representatives or technical support personnel for

    assistance.