icao/eurocontrol/ec/sju joint workshop ... · world atm congress 2013 aviation arena ......
TRANSCRIPT
12 February 2013 Page 1
ICAO/EUROCONTROL/EC/SJU Joint WorkshopICAO/EUROCONTROL/EC/SJU Joint Workshop Standardization Needs Standardization Needs –– ICAOICAO’’s Responses Response
Christian SchleiferChristian Schleifer‐‐HeingHeingäärtnerrtnerPresident of the Air Navigation Commission
International Civil Aviation Organization (ICAO)
World ATM Congress 2013 Aviation Arena ‐
Madrid12 February 2013
12 February 2013 Page 2
The Big PictureThe Big Picture Post 12th
Air Navigation Conference
•• 1,0301,030 Participants
•• 120120 States
•• 3030
International Organizations
•• 2525+ + Media Articles
•• 1010
Days
•• 232232
Conference Recommendations
•• 153153
Working Papers (WP)
•• 6262
Information Papers (IP)
12 February 2013 Page 3
The Big PictureThe Big Picture Post 12th
Air Navigation Conference
Important DevelopmentsImportant Developments
•• 44
ICAO Milestones– Global Air Navigation Plan (GANP)– 2012 Safety Report– ASBU Block 0 iKit– Air Operator Certificates (AOC) iKIT
•• 88
Agreements Signed
12 February 2013 Page 4
Operational Improvements Operational Improvements at the Service of Statesat the Service of States
12 February 2013 Page 5
Global Plans and ReportsGlobal Plans and Reports A Strategic Systems Approach
12 February 2013 Page 6
Background:Background: ANAN‐‐CONF/12 RecommendationsCONF/12 Recommendations
• ICAO was asked to improve its project management and coordination of contributing ICAO panels, study groups and other expert groups, including
task forces and other specialized teams tasked with the development of ICAO provisions and related work, through:
– consistent application of the Directives for Panels of the Air Navigation Commission;
– receiving regular reports from the expert groups against agreed terms of reference and work
programmes;
– mandating strong coordination between all expert groups developing ICAO provisions to
ensure efficient management of issues and avoidance of duplication;
– application of the principles of accountability, geographical representation, focus, efficiency,
consistency, transparency and integrated planning to the operation of all the expert groups;
– developing documented procedures for other expert groups, including task forces and other
specialized teams as well; and
– better use of today’s communication media and internet to facilitate virtual meetings, thereby
increasing participation and reducing costs to States and ICAO;
12 February 2013 Page 7
Background:Background: ANAN‐‐CONF/12 RecommendationsCONF/12 Recommendations
• ICAO was asked to establish and lead a suitable coordination with the other standards‐making organizations in order to make the best use of the
capabilities of these other standards‐making organizations and to make reference their material, where appropriate.
• ICAO to initiate studies to improve the verification and validation process required within ICAO before material developed by recognized standards‐ making organizations can be referenced in ICAO documentation
• Consider a methodology by which ICAO can capture the regional implementation and challenges, and to reflect them in a standardized process
to effectively support the aviation system block upgrade deployment.
12 February 2013 Page 8
Setting up for the future:Setting up for the future: Working Together in CollaborationWorking Together in Collaboration
• Work after AN‐CONF/12
• Work Program for standardization
• management of expert groups
• Modernizing ICAO Panels
• Coordination Technical Specifications
Organization
12 February 2013 Page 9
Proposal:Proposal: Structure of ICAO Expert GroupsStructure of ICAO Expert Groups
RPASRPAS
SASPSASP
IFPPIFPP FLIRECFLIREC
XModelXModel
METMET AIMAIM
PBNPBN
NOPNOPOPLINKOPLINK
Aerodromes Aerodromes
Airspace Capacity and
Efficient Use
Airspace Capacity and
Efficient Use
Trajectory Based
Operations
Trajectory Based
Operations
ATM OpsATM Ops
Flight OpsFlight Ops
OPERATIONAL
IMPROVEMENT
OPERATIONAL OPERATIONAL
IMPROVEMENTIMPROVEMENT
ATM System
Architecture
ATM System ATM System
ArchitectureArchitecture
AvionicsAvionicsAvionics
INTEGRATIONINTEGRATIONINTEGRATION
Airworthiness Airworthiness Airworthiness Dangerous GoodsDangerous GoodsDangerous Goods Safety
Management
Safety Safety
ManagementManagement SPECIALTIESSPECIALTIESSPECIALTIES
12 February 2013 Page 10
Proposal:Proposal: Structure of ICAO Expert GroupsStructure of ICAO Expert Groups
Aerodromes Aerodromes
Airspace Capacity and
Efficient Use
Airspace Capacity and
Efficient Use
Trajectory Based
Operations
Trajectory Based
Operations
ATM OpsATM Ops
Flight OpsFlight Ops
OPERATIONAL
IMPROVEMENT
OPERATIONAL OPERATIONAL
IMPROVEMENTIMPROVEMENT
ATM System
Architecture
ATM System ATM System
ArchitectureArchitecture
AvionicsAvionicsAvionics
INTEGRATIONINTEGRATIONINTEGRATION
Airworthiness Airworthiness Airworthiness Dangerous GoodsDangerous GoodsDangerous Goods Safety
Management
Safety Safety
ManagementManagement SPECIALTIESSPECIALTIESSPECIALTIES
RPASRPAS
SASPSASP
IFPPIFPP FLIRECFLIREC
XModelXModel
METMET AIMAIM
PBNPBN
OPLINKOPLINKNOPNOP
12 February 2013 Page 11LEGEND: Existing GroupsLEGEND: Existing GroupsLEGEND: Existing Groups
Proposal:Proposal: Structure of ICAO Expert GroupsStructure of ICAO Expert Groups
Aerodromes Aerodromes
Airspace Capacity and
Efficient Use
Airspace Capacity and
Efficient Use
Trajectory Based
Operations
Trajectory Based
Operations
ATM OpsATM Ops
Flight OpsFlight Ops
OPERATIONAL
IMPROVEMENT
OPERATIONAL OPERATIONAL
IMPROVEMENTIMPROVEMENT
ATM System
Architecture
ATM System ATM System
ArchitectureArchitecture
AvionicsAvionicsAvionics
INTEGRATIONINTEGRATIONINTEGRATION
Airworthiness Airworthiness Airworthiness Dangerous GoodsDangerous GoodsDangerous Goods Safety
Management
Safety Safety
ManagementManagement SPECIALTIESSPECIALTIESSPECIALTIES
IFPPIFPP
SASPSASP
NOPNOP
PBNPBN
RPASRPAS
FLIRECFLIREC
XModelXModelOPLINKOPLINK
ACPACP
AIRPAIRP
APAP
ASPASP
SASPSASP
SMPSMP
IFPPIFPP
FLIRECPFLIRECP
DGPDGP
ATMRPPATMRPP
OPSPOPSP
OPLINKPOPLINKP
NSPNSP
PANELPANEL
WTSGWTSGWTSG
PBNSGPBNSGPBNSG
PASGPASGPASG
NOSSSGNOSSSGNOSSSG
HTSGHTSGHTSG FPLSGFPLSGFPLSG
AMOFSGAMOFSGAMOFSG
AIS‐AIMSGAISAIS‐‐AIMSGAIMSG
UASSGUASSGUASSG
SIXSGSIXSGSIXSG SISGSISGSISG
AISMAPSGAISMAPSGAISMAPSG
METWSGMETWSGMETWSG
SGSG
SIPTFSIPTF
IVATFIVATF
GPBNTFGPBNTFASTA
F
ASTA
F
AOLSTFAOLSTF
SM ICGSM ICG
FATTFATT
CSGCSG
ATFM CGATFM CG
LC CGLC CGPBN OA TFPBN OA TF
PBNTTPBNTT
FTFFTF
VATF ParisVATF Paris
SOTFSOTF
TF / OtherTF / Other
ATFATF
ACTFACTF
METMET
AIMAIM
Coord.Coord.
VACTVACT FACTFACT
12 February 2013 Page 12
Proposal:Proposal: Structure of ICAO Expert GroupsStructure of ICAO Expert Groups
Aerodromes Aerodromes
Airspace Capacity and
Efficient Use
Airspace Capacity and
Efficient Use
Trajectory Based
Operations
Trajectory Based
Operations
ATM OpsATM Ops
Flight OpsFlight Ops
OPERATIONAL
IMPROVEMENT
OPERATIONAL OPERATIONAL
IMPROVEMENTIMPROVEMENT
ATM System
Architecture
ATM System ATM System
ArchitectureArchitecture
AvionicsAvionicsAvionics
INTEGRATIONINTEGRATIONINTEGRATION
Airworthiness Airworthiness Airworthiness Dangerous GoodsDangerous GoodsDangerous Goods Safety
Management
Safety Safety
ManagementManagement SPECIALTIESSPECIALTIESSPECIALTIES
CoordinationCoordination
Sub
Panel
Sub Sub
PanelPanel
Sub
Panel
Sub Sub
PanelPanel
Sub
Panel
Sub Sub
PanelPanel
Sub
Panel
Sub Sub
PanelPanel
Sub
Panel
Sub Sub
PanelPanel
Sub
Panel
Sub Sub
PanelPanel
Sub
Panel
Sub Sub
PanelPanel
Sub
Panel
Sub Sub
PanelPanelSub
Panel
Sub Sub
PanelPanel
Sub
Panel
Sub Sub
PanelPanel
12 February 2013 Page 13
Next StepsNext Steps
• Standardization Roadmap
B0‐05: Improved Flexibility and Efficiency in Descend Profiles (CDOs)Deployment of performance‐based airspace and arrival procedures that allow the
aircraft to fly their optimum aircraft profile taking account of
airspace and traffic
complexity with continuous descent operations (CDOs)
B1‐05: Improved Flexibility and Efficiency in Descend Profiles (OPDs)Deployment of performance‐based airspace and arrival procedures that allow
aircraft to fly their optimum aircraft profile taking account of
airspace and traffic
complexity with Optimized Profile Descents (OPDs)
Module # Standard Title Date of Availability Organization Action Status
B0‐05 DOC 4444 PANS ATM Already available (2012) ICAO N/A N/A
B1‐05 Document 1234 2018 Org#1 Update Started
B1‐05 Document 5678 2018 Org#2 TBD N/A
B1‐05 DOC9931 – Continuous Descent Manual 2018 ICAO TBD N/A
12 February 2013 Page 14
Challenges Challenges
• Operational Policies– Incentives to allow early benefits of new
technologies and procedures (including economic incentives)
• Financing Policies– On the Agenda of the Air
Transport Conference (AT Conf/6)
– Expect tasking to service providers, operators and economists
12 February 2013 Page 15
Bottom LineBottom Line
Technical WorkTechnical WorkRelatively easy
Supporting PoliciesSupporting Policies
Not so easy