i+d en la ub para futuros aceleradores lineales dr. Ángel diéguez
DESCRIPTION
I+D en la UB para futuros aceleradores lineales Dr. Ángel Diéguez Departamento de Electrónica , Universidad de Barcelona. Dr. Angel Diéguez Prof. Lluis Garrido Dr. Atilà Herms Dra. Anna Vilà Dr. David Gascón Raimon Casanova Albert Comerma Juan Trenado Lluis Freixes Eva Vilella. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: I+D en la UB para futuros aceleradores lineales Dr. Ángel Diéguez](https://reader035.vdocuments.pub/reader035/viewer/2022062408/5681351b550346895d9c7686/html5/thumbnails/1.jpg)
IV Jornadas Futuros Aceleradores LinealesIV Jornadas Futuros Aceleradores LinealesMadrid 2-3 Diciembre’09Madrid 2-3 Diciembre’09
![Page 2: I+D en la UB para futuros aceleradores lineales Dr. Ángel Diéguez](https://reader035.vdocuments.pub/reader035/viewer/2022062408/5681351b550346895d9c7686/html5/thumbnails/2.jpg)
IV Jornadas Futuros Aceleradores LinealesIV Jornadas Futuros Aceleradores LinealesMadrid 2-3 Diciembre’09Madrid 2-3 Diciembre’09
Dr. Angel DiéguezProf. Lluis GarridoDr. Atilà HermsDra. Anna VilàDr. David GascónRaimon CasanovaAlbert ComermaJuan TrenadoLluis FreixesEva Vilella
![Page 3: I+D en la UB para futuros aceleradores lineales Dr. Ángel Diéguez](https://reader035.vdocuments.pub/reader035/viewer/2022062408/5681351b550346895d9c7686/html5/thumbnails/3.jpg)
IV Jornadas Futuros Aceleradores LinealesIV Jornadas Futuros Aceleradores LinealesMadrid 2-3 Diciembre’09Madrid 2-3 Diciembre’09
Activities in future accelerators of the UB
…on design of sensors for future trackers
...on design of front-end electronics and readout
…on test
Collaboration with LPNHE/IN2P3
DEPFET collaboration
APDs developed @UB
![Page 4: I+D en la UB para futuros aceleradores lineales Dr. Ángel Diéguez](https://reader035.vdocuments.pub/reader035/viewer/2022062408/5681351b550346895d9c7686/html5/thumbnails/4.jpg)
IV Jornadas Futuros Aceleradores LinealesIV Jornadas Futuros Aceleradores LinealesMadrid 2-3 Diciembre’09Madrid 2-3 Diciembre’09
Si strips readout – col. In2P3Si strips readout – col. In2P3
Plan for future SiStr chipPlan for future SiStr chip
Define technology: 130nm IBM, 130nm ST, 90nm IBMAdapt 1 channel electronics: both Analog and DigitalBuild 8-16 channel module: Adapt control electronics to a basic module of 8-16 channels. Build 1st complete module in Si.…128 channels
Define technology: 130nm IBM, 130nm ST, 90nm IBMAdapt 1 channel electronics: both Analog and DigitalBuild 8-16 channel module: Adapt control electronics to a basic module of 8-16 channels. Build 1st complete module in Si.…128 channels
![Page 5: I+D en la UB para futuros aceleradores lineales Dr. Ángel Diéguez](https://reader035.vdocuments.pub/reader035/viewer/2022062408/5681351b550346895d9c7686/html5/thumbnails/5.jpg)
IV Jornadas Futuros Aceleradores LinealesIV Jornadas Futuros Aceleradores LinealesMadrid 2-3 Diciembre’09Madrid 2-3 Diciembre’09
DHP DEPFET col.DHP DEPFET col.
Analog blocksAnalog blocks
Digital to Analog Converter: 8 bits, slow (DC), 1V or 1V2 power supply, radiation tolerant.Bandgap: 1V or 1V2 power supply, radiation tolerant.Analog to Digital Converter: 10 bits, slow (DC), 1V or 1V2 power supply, radiation tolerant.Analog mux for multiplexing ADC input
Digital to Analog Converter: 8 bits, slow (DC), 1V or 1V2 power supply, radiation tolerant.Bandgap: 1V or 1V2 power supply, radiation tolerant.Analog to Digital Converter: 10 bits, slow (DC), 1V or 1V2 power supply, radiation tolerant.Analog mux for multiplexing ADC input
![Page 6: I+D en la UB para futuros aceleradores lineales Dr. Ángel Diéguez](https://reader035.vdocuments.pub/reader035/viewer/2022062408/5681351b550346895d9c7686/html5/thumbnails/6.jpg)
IV Jornadas Futuros Aceleradores LinealesIV Jornadas Futuros Aceleradores LinealesMadrid 2-3 Diciembre’09Madrid 2-3 Diciembre’09
Digital contribution to the DHPDigital contribution to the DHP
Slow Control Interface: User Data Registers connected to JTAG.Design for testing: Automatic insertion of test and control logic compliant with IEEE 1149.1.Boundary Scan: BS chain connected to the same JTAG.
Slow Control Interface: User Data Registers connected to JTAG.Design for testing: Automatic insertion of test and control logic compliant with IEEE 1149.1.Boundary Scan: BS chain connected to the same JTAG.
DHP DEPFET col.DHP DEPFET col.
![Page 7: I+D en la UB para futuros aceleradores lineales Dr. Ángel Diéguez](https://reader035.vdocuments.pub/reader035/viewer/2022062408/5681351b550346895d9c7686/html5/thumbnails/7.jpg)
IV Jornadas Futuros Aceleradores LinealesIV Jornadas Futuros Aceleradores LinealesMadrid 2-3 Diciembre’09Madrid 2-3 Diciembre’09
APDs for the FT regionAPDs for the FT region
Avalanche photodiodes in standard CMOS technologiesAvalanche photodiodes in standard CMOS technologies
Learning from the fabricated structures: STM 130nm, AMS 0.35umDetector instabilities (dark counts, afterpulsing, cross-talk) are instabilities contributing to the detector response. Have deep impact on the readout details. It is very important to understand their origin and to reduce their incidence.Trying to learn also from device simulationsDesign of pixels and readout structures: Active quenching and fast readout.
Learning from the fabricated structures: STM 130nm, AMS 0.35umDetector instabilities (dark counts, afterpulsing, cross-talk) are instabilities contributing to the detector response. Have deep impact on the readout details. It is very important to understand their origin and to reduce their incidence.Trying to learn also from device simulationsDesign of pixels and readout structures: Active quenching and fast readout.
![Page 8: I+D en la UB para futuros aceleradores lineales Dr. Ángel Diéguez](https://reader035.vdocuments.pub/reader035/viewer/2022062408/5681351b550346895d9c7686/html5/thumbnails/8.jpg)
IV Jornadas Futuros Aceleradores LinealesIV Jornadas Futuros Aceleradores LinealesMadrid 2-3 Diciembre’09Madrid 2-3 Diciembre’09
APDs for the FT regionAPDs for the FT region
Avalanche photodiodes in standard CMOS technologiesAvalanche photodiodes in standard CMOS technologies
Learning from the fabricated structures: STM 130nm, AMS 0.35umDetector instabilities (dark counts, afterpulsing, cross-talk) are instabilities contributing to the detector response. Have deep impact on the readout details. It is very important to understand their origin and to reduce their incidence.Trying to learn also from device simulationsDesign of pixels and readout structures: Active quenching and fast readout.
Learning from the fabricated structures: STM 130nm, AMS 0.35umDetector instabilities (dark counts, afterpulsing, cross-talk) are instabilities contributing to the detector response. Have deep impact on the readout details. It is very important to understand their origin and to reduce their incidence.Trying to learn also from device simulationsDesign of pixels and readout structures: Active quenching and fast readout.
![Page 9: I+D en la UB para futuros aceleradores lineales Dr. Ángel Diéguez](https://reader035.vdocuments.pub/reader035/viewer/2022062408/5681351b550346895d9c7686/html5/thumbnails/9.jpg)
IV Jornadas Futuros Aceleradores LinealesIV Jornadas Futuros Aceleradores LinealesMadrid 2-3 Diciembre’09Madrid 2-3 Diciembre’09
Avalanche photodiodes in standard CMOS technologiesAvalanche photodiodes in standard CMOS technologies
Learning from the fabricated structures: STM 130nm, AMS 0.35umDetector instabilities (dark counts, afterpulsing, cross-talk) are instabilities contributing to the detector response. Have deep impact on the readout details. It is very important to understand their origin and to reduce their incidence.Trying to learn also from device simulationsDesign of pixels and readout structures: Active quenching and fast readout.
Learning from the fabricated structures: STM 130nm, AMS 0.35umDetector instabilities (dark counts, afterpulsing, cross-talk) are instabilities contributing to the detector response. Have deep impact on the readout details. It is very important to understand their origin and to reduce their incidence.Trying to learn also from device simulationsDesign of pixels and readout structures: Active quenching and fast readout.
APDs for the FT regionAPDs for the FT region
![Page 10: I+D en la UB para futuros aceleradores lineales Dr. Ángel Diéguez](https://reader035.vdocuments.pub/reader035/viewer/2022062408/5681351b550346895d9c7686/html5/thumbnails/10.jpg)
IV Jornadas Futuros Aceleradores LinealesIV Jornadas Futuros Aceleradores LinealesMadrid 2-3 Diciembre’09Madrid 2-3 Diciembre’09
APDs for the FT regionAPDs for the FT region
![Page 11: I+D en la UB para futuros aceleradores lineales Dr. Ángel Diéguez](https://reader035.vdocuments.pub/reader035/viewer/2022062408/5681351b550346895d9c7686/html5/thumbnails/11.jpg)
IV Jornadas Futuros Aceleradores LinealesIV Jornadas Futuros Aceleradores LinealesMadrid 2-3 Diciembre’09Madrid 2-3 Diciembre’09
APDs for the FT regionAPDs for the FT region
![Page 12: I+D en la UB para futuros aceleradores lineales Dr. Ángel Diéguez](https://reader035.vdocuments.pub/reader035/viewer/2022062408/5681351b550346895d9c7686/html5/thumbnails/12.jpg)
IV Jornadas Futuros Aceleradores LinealesIV Jornadas Futuros Aceleradores LinealesMadrid 2-3 Diciembre’09Madrid 2-3 Diciembre’09
![Page 13: I+D en la UB para futuros aceleradores lineales Dr. Ángel Diéguez](https://reader035.vdocuments.pub/reader035/viewer/2022062408/5681351b550346895d9c7686/html5/thumbnails/13.jpg)
IV Jornadas Futuros Aceleradores LinealesIV Jornadas Futuros Aceleradores LinealesMadrid 2-3 Diciembre’09Madrid 2-3 Diciembre’09
APDs for the FT regionAPDs for the FT region
![Page 14: I+D en la UB para futuros aceleradores lineales Dr. Ángel Diéguez](https://reader035.vdocuments.pub/reader035/viewer/2022062408/5681351b550346895d9c7686/html5/thumbnails/14.jpg)
IV Jornadas Futuros Aceleradores LinealesIV Jornadas Futuros Aceleradores LinealesMadrid 2-3 Diciembre’09Madrid 2-3 Diciembre’09
Parameter AMS HV 350 nm STM LV 130 nm
Vb 17.2V 10.4 V
Tq 40-70 ns 1.5 – 2 ns
Dark count 5kHz (ΔV~0.3V) 10kHz (ΔV~0.3V)
Afterpulsing high Low
Crosstalk <5% ?
Avalanche photodiodes in standard CMOS technologiesAvalanche photodiodes in standard CMOS technologies
Learning from the fabricated structures: STM 130nm, AMS 0.35umDetector instabilities (dark counts, afterpulsing, cross-talk) are instabilities contributing to the detector response. Have deep impact on the readout details. It is very important to understand their origin and to reduce their incidence.Trying to learn also from device simulationsDesign of pixels and readout structures: Active quenching and fast readout.
Learning from the fabricated structures: STM 130nm, AMS 0.35umDetector instabilities (dark counts, afterpulsing, cross-talk) are instabilities contributing to the detector response. Have deep impact on the readout details. It is very important to understand their origin and to reduce their incidence.Trying to learn also from device simulationsDesign of pixels and readout structures: Active quenching and fast readout.
APDs for the FT regionAPDs for the FT region
![Page 15: I+D en la UB para futuros aceleradores lineales Dr. Ángel Diéguez](https://reader035.vdocuments.pub/reader035/viewer/2022062408/5681351b550346895d9c7686/html5/thumbnails/15.jpg)
IV Jornadas Futuros Aceleradores LinealesIV Jornadas Futuros Aceleradores LinealesMadrid 2-3 Diciembre’09Madrid 2-3 Diciembre’09
Avalanche photodiodes in standard CMOS technologiesAvalanche photodiodes in standard CMOS technologies
APDs for the FT regionAPDs for the FT region
Linear mode is also working in standard CMOS: spatial resolutionLinear mode is also working in standard CMOS: spatial resolution
![Page 16: I+D en la UB para futuros aceleradores lineales Dr. Ángel Diéguez](https://reader035.vdocuments.pub/reader035/viewer/2022062408/5681351b550346895d9c7686/html5/thumbnails/16.jpg)
IV Jornadas Futuros Aceleradores LinealesIV Jornadas Futuros Aceleradores LinealesMadrid 2-3 Diciembre’09Madrid 2-3 Diciembre’09
Learning from the fabricated structuresTrying to learn also from device simulationsDesign of pixels and readout structures: Active quenching and fast readout.
Learning from the fabricated structuresTrying to learn also from device simulationsDesign of pixels and readout structures: Active quenching and fast readout.
APDs for the FT regionAPDs for the FT region
Avalanche photodiodes in standard CMOS technologiesAvalanche photodiodes in standard CMOS technologies
![Page 17: I+D en la UB para futuros aceleradores lineales Dr. Ángel Diéguez](https://reader035.vdocuments.pub/reader035/viewer/2022062408/5681351b550346895d9c7686/html5/thumbnails/17.jpg)
IV Jornadas Futuros Aceleradores LinealesIV Jornadas Futuros Aceleradores LinealesMadrid 2-3 Diciembre’09Madrid 2-3 Diciembre’09
Learning from the fabricated structuresTrying to learn also from device simulationsDesign of pixels and readout structures: Active quenching and fast readout.
Learning from the fabricated structuresTrying to learn also from device simulationsDesign of pixels and readout structures: Active quenching and fast readout.
APDs for the FT regionAPDs for the FT region
Avalanche photodiodes in standard CMOS technologiesAvalanche photodiodes in standard CMOS technologies
![Page 18: I+D en la UB para futuros aceleradores lineales Dr. Ángel Diéguez](https://reader035.vdocuments.pub/reader035/viewer/2022062408/5681351b550346895d9c7686/html5/thumbnails/18.jpg)
IV Jornadas Futuros Aceleradores LinealesIV Jornadas Futuros Aceleradores LinealesMadrid 2-3 Diciembre’09Madrid 2-3 Diciembre’09
Ion dose, Boron
![Page 19: I+D en la UB para futuros aceleradores lineales Dr. Ángel Diéguez](https://reader035.vdocuments.pub/reader035/viewer/2022062408/5681351b550346895d9c7686/html5/thumbnails/19.jpg)
IV Jornadas Futuros Aceleradores LinealesIV Jornadas Futuros Aceleradores LinealesMadrid 2-3 Diciembre’09Madrid 2-3 Diciembre’09
APDs for the FT regionAPDs for the FT region
Pixel in Geiger mode with active quenching + control of recharge time (adapted to detector/testbeam)10ns signal and 300ns to send data in ILC (50% / 50% in testbeam)Occupancy determined by dark count ..0.7avalanches/pixel/ms3 x 3mm2 translates to a 25 x 152 pixels matrix
Pixel in Geiger mode with active quenching + control of recharge time (adapted to detector/testbeam)10ns signal and 300ns to send data in ILC (50% / 50% in testbeam)Occupancy determined by dark count ..0.7avalanches/pixel/ms3 x 3mm2 translates to a 25 x 152 pixels matrix
News designs including readout…News designs including readout…
400MHz clock is needed in the chip for FIFOs-DLL on chip-On chip clock-…-FIFOs, control, …
-PIXEL
![Page 20: I+D en la UB para futuros aceleradores lineales Dr. Ángel Diéguez](https://reader035.vdocuments.pub/reader035/viewer/2022062408/5681351b550346895d9c7686/html5/thumbnails/20.jpg)
IV Jornadas Futuros Aceleradores LinealesIV Jornadas Futuros Aceleradores LinealesMadrid 2-3 Diciembre’09Madrid 2-3 Diciembre’09
APDs for the FT regionAPDs for the FT region
3D interconnection for 1) coincidence filtering , triggering 2) 100% coverageDesign for test beam for a developed APD array,radiation tolerance tests, …
3D interconnection for 1) coincidence filtering , triggering 2) 100% coverageDesign for test beam for a developed APD array,radiation tolerance tests, …
Future designs…Future designs…