İlker İç mimarlık

Upload: serkantoros

Post on 14-Apr-2018

236 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/29/2019 lker Mimarlk

    1/51

    imdiki irket yneticisi lker Denerin doum yl 1975dekurulan Ankara merkezli firmamz, 30 yl akn sredirAnkara ve evresinde byk inaat firmalarna i mimari

    ve dekorasyon konusunda alt yklenicilik yapmtr. Firmayneticimiz ilker Denerin 1999 senesinde i mimarlkmesleini yapmaya hak kazanmasyla birlikte, hizmetleriniproje, proje danmanl ve anahtar teslim i mekanuygulamarna tamtr. Yurt ii ve yurt dnda baarl ilereimza atan lker mimarlk kalitesini koruyarak gnmzekadar gelmitir. Bu yarm asra yaklaan sre iindeirketimizin faal kalp baarl olabilmesinin yegane anahtarmteri isteklerini, arzularn, dlerini her zaman birincisrada tutabilmi ve eksiksiz yerine getirebilmi olmasdr.

    Our Ankara-based company was established in 1975, thebirth year of lker Dener. Whe have been working with largeconstruction companies for over 30 years in and aroundAnkara and was subcontracting in interior design anddecoration. When lker Dener became an nterior designer in1999, company broadened its services to consultancy andturnkey interiors. Ilker Interior Design is responsible for greatachievements in domestic and abroad, while maintainingthe quality of Interior Design has come up today. Thiscompanys success which is approaching half a centuryis molded by attention to detail. Keeping the customerrequests, desires anddreams are always in the first place

    paved our way to our current day.

    nszForeword

  • 7/29/2019 lker Mimarlk

    2/51

  • 7/29/2019 lker Mimarlk

    3/51

    OZANKALE

    EVTASARIMIveren: kale irketler GrubuYklenici: lker mimarlk Ltd. ti.in tanm: Proje ve anahtar teslim (turnkey) dairerenovasyonu kapsam: Ankara ankaya caddesindeki 200mlikdairenin kaba inaat seviyesine kadar krlp yklarak, yeniprojeye gre anahtar teslim renovasyon uygulamasnnyaplmas.

    Yapm yl: 2004Sresi: 5 ay

    Employer: kale irketler GrubuContractor: Ilker Interior Design Ltd.Description of Work: Design and turnkey renovation ofan apartment.Business scope: Complete demolotion, turnkey

    renovation and reconstruction of the apartment, accordingto the new project in Ankara, ankaya

    Year built: 2004Duration: 5 months

  • 7/29/2019 lker Mimarlk

    4/51

    lker Dener, 2004 ylnda yapt bu tasarm ile MaisonFranaise dergisine konuk olmutur. Dergi ierisindekiyazdan yaptmz alntdr:

    Ankarann ankaya Caddesideki bu apartman dairesininyapmnda, Mimar lker Dener, ev sahiplerinin hareketliyaamlarndan etkilenmi. Evin her tarafndaki yansmalarve k oyunlaryla oluturulan farkl atmosferle, deiken vehareketli mekanlar oluturulmu.

    Ilker Dener, was the guest of the design magazine MaisonFranaise with this renovation project in 2004. Our excerptfrom the article follows:

    In this house of Ankaras Cankaya district, interior designerIlker Dener got inspired from active lifestyle of the owners.Play of light and reections on each side of the housecreates a different atmosphere, variable and animated.With changes to the oor plan, living space has been raisedto 250m from 200m. After a five-month-long processof change, it became a place that hosts many differentemotions and excitements.

  • 7/29/2019 lker Mimarlk

    5/51

    Yaplan plan deiiklikleriyle, dairenin kullanm alan 200mden 250myekartlmtr. Be ay sren deiim srecinden sonra ortaya kan, iinde birokfarkl duygu ve heyecan barndran bir mekan olmutur.

    Daire oda ve mutfakla i ie gemi salondan oluuyor. Geniletilmi salonunzemin kaplamasnda Venge kullanlm. 110mlik mekan lker Dener tarafndanblmlere ayrlyor ve bu ayrm srasnda ilevsellik n plana kyor. Hikmetmobilyaya yaptrlan ana oturma grubu televizyona dnk tasarlanm. Bu blmsalondan ayrmak iin L eklinde bir konsol kullanlm. zerine sabitlenmi lkerDener tasarm krmz abajurlarla renklenen konsola, raar sayesinde ktphanefonksiyonu da kazandrlm.

    The apartment consists of three roomsand a kitchen lounge intertwined.Wenge oor covering for an extendedhall. 110m of space is divided byIlker Dener which brings functionalityforward. Living room set which wascraeted by Hikmet Furniture is facingthe TV. An L-shaped bracket is usedto separate the hall. Lampshadesdesigned by Ilker Dener hangs overthe bracket giving it a lively color, whileshelves add functionality as a library.

  • 7/29/2019 lker Mimarlk

    6/51

  • 7/29/2019 lker Mimarlk

    7/51

    Bu konsolun devamnda duvar araclyla, Botanik Park

    manzarasna dnk ikinci bir oturma grubu yer alyor. Bublmn yerden tavana uzanan pencerelerinden daryizlemek ayr bir zevk. Salonun dier bir dikkat ekici ynise mutfaa geiin saland blm. On kiilik yemekmasas, Phlippe Starck sandalyeler ile bir tasarm objesihaline getirilmi. Ayrca sandalyelerin effaf olmas da grseldevamll salam. Yemek masas arkasndaki plexiglassbfe, kullanlan kl pano ile renk kazanyor. Bfe, iindekilerkadar effaf sandalyelere de renk katyor.

    Oda ve banyolarn zerinde bulunduu koridor da, evingenelinde olduu gibi renklerle anlam kazanyor. Salonunaksine renksiz ve sade grnen koridor tavandakiaydnlatmalar ile farkl bir kimlie brnyor.

    This bracked is followed by a wall and a second sitting

    area that faces towards the views of the Botanical Park.With Floor-to-ceiling windows, watching outside from thissection is a pleasure. Another striking aspect of the house isthe transition from the hall into the kitchen. Dining table forten people and chairs from Phlippe Starck has been turned

    into a design object. Transparent chairs also help with thevisual continuity. Plexiglass buffet behind the dining table iscolorized by a lighted panel. This adds color to the buffet aswell as the chairs.

    Corridor that houses the rooms and the bathrooms gainmeaning with color too. Contrary to the hall this placeappears clear and simple while overhead lighting takes on adifferent identity. This corridor makes the transition from thehallway between rooms and colors so it signals the changefrom a colorful hall to clean and simple bedroom.

  • 7/29/2019 lker Mimarlk

    8/51

    ALLODRBECO

    Bu koridor odalar aras gei kadarrenkler aras geii de salyor; renkli

    salondan beyaz ve sade yatak odasnageiin sinyallerini veriyor.

    Koridorun sonundaki ebeveyn yatakodas, soyunma ve yatak blmlerin-den oluuyor. lker Dener bu bembe-yaz oday da renksiz brakmam vezemini pelu kapl basaman zerin-deki yatak blmnn tavanna, renkliaydnlatmalar yerletirmi. Ebeveynbanyosunun yatak odasyla balantsiin odann tavannda kullanlan renkli

    aydnlatmalara banyoda da yer veril-mi. Farkl renkler de kullanabilen ay-dnlatmalar, duygularn ifade edilmesinisalyor. Ruh halimizi anlatan renkler,bylece evin her tarafna tanm olu-yor.

    Ev susuyor renkler konuuyor.

  • 7/29/2019 lker Mimarlk

    9/51

    WYOURAMSTO

    MEREALITYThe master bedroom at the end of the corridor cosists ofdressing and sleeping parts. Ilker Dener did not leave thisspace colorless, he placed colorful lighting over the shagcarpet and elevated bed platform. Same lighting is usedin the parental bathroom to connect it to the bedroom.Lighting allows the use of diffrent color and makes wayfor emotive expressions, this way you can carry the moodthroughout the house.

    Home is silent, colors do the talk.

  • 7/29/2019 lker Mimarlk

    10/51

    STANBULDA

    YALIKEYFveren: Nadire ikalein tanm: engelkydeki yalnn projelerine greuygulamasnn yaplmas.

    Yapm yl: 2003Yer: engelky

    Employer: Nadire kaleDescription of Work: Villa renovation and applicationaccording to projects.Production year: 2003Location: engelky

  • 7/29/2019 lker Mimarlk

    11/51

  • 7/29/2019 lker Mimarlk

    12/51

    WELLBORN

    LUXURYHOTEL

  • 7/29/2019 lker Mimarlk

    13/51

  • 7/29/2019 lker Mimarlk

    14/51

    veren: Ulusoy Kat A.. (HayrettinUlusoy, Haluk Ulusoy, nar Ulusoy)Yklenici: Kubilay Urhan naatin tanm: Kocaeli, Baiskelemevkiinde 150 odal 5 yldzl otelinaat.Proje koordinatr: lker DenerYapm yl: 2012Sresi: 9 ay

    Employer: Ulusoy Paper Co.(Hayrettin Ulusoy, Haluk Ulusoy narUlusoy)

    Contractor: Kubilay UrhanConstruction Co.Description of Work: 5 Star hotel

    construction in Kocaeli, Baiskele

    Project coordinator: Ilker DenerYear built: 2012Duration: 9 months

  • 7/29/2019 lker Mimarlk

    15/51

    veren ile 1 yl sresince; proje fizibilite almalar, maliyetanalizleri yapld. Arazinin deprem blgesinde olmas sebebiile ncelikle saha almas yaptrlarak Jet Grout metoduile zemin slah yapld. Tm araziye 4500m ve toplamda

    1200 adet, 18 ve 20m boylarnda 80cm apnda Jet Groutuygulamas yaplarak zemin snf ykseltildi.

    During the first year of project, feasibility studies and costanalysis were performed with the employer. Primarily dueto the earthquake risk of the area, ground for the fieldworkwas built by the method of Jet Grouting. Ground class wasincreased by appliying 1200 Jet Grouts with 18 and 20mheight 80cm thickness.

  • 7/29/2019 lker Mimarlk

    16/51

  • 7/29/2019 lker Mimarlk

    17/51

    Dear Mr. Ilker Dener;

    During the construction of Wellborn Luxury Hotel you have managed to understand and realize theexpectations of the customer to full extent. You have shown utmost discipline and high motivation whilefulfilling your responsibilities from start to finish. Disregarding the concept of time, you have worked with

    an endless energy and devotion to follow the schedule. You have approached the rising problems froma solution oriented perspective. You have kept the motivation and the discipline of your workers. During

    all this time, you gave great care to work safety and completed the project without a single accident.I thank you for all the successful things I have listed above and for completing your work perfectly intime. I wish you success on your following projects.

    Sincerely,

    nar ULUSOY

  • 7/29/2019 lker Mimarlk

    18/51

  • 7/29/2019 lker Mimarlk

    19/51

    Bu esnada toplam 4500 ton p42.5imento kullanld. 1 ocak 2012tarihinde harfiyatna balanan otelininaat, ilk misafirlerini 24 kasm 2012tarihinde arlad. Temel kotunun denizseviyesinden 2,5m derinde ve inaat

    sahasnn denize 20m mesafedeolmasna ramen iyi bir pompaj sistemikurularak k artlarnda bile(2012Kocaelide son 50 yln en soukk) kaba inaat; 1250 ton demir,10.000m3 betonu toplam 110 gndebitirildi.

    Nisan ay ile balayan ince iler 1ekim tarihinde tamamen bitirilerek oteliletmesine teslim edildi.

    Meanwhile, a total of 4,500 tons ofp42.5 cement were used. On 1 January2012 the construction of the hotelbegan and welcomed its first guests on

    24 November 2012. Even though thefoundation grade is 2,5m below the seaand site is 20m away from the shore, awell established pumping system helpedto lay; 1,250 tons of iron, 10.000m ofconcrete in total of 110 days, even inwinter conditions. (2012, Coldest winterof the last 50 years in Kocaeli)

    Trim works began on april and deliveredto customer on first day of october.Hotel houses a total of 147 rooms, 16

    hotel suites, 1 king suite and 1 dreamsuite. 600-seat multipurpose room is thelargest in the province of Kocaeli.

  • 7/29/2019 lker Mimarlk

    20/51

  • 7/29/2019 lker Mimarlk

    21/51

  • 7/29/2019 lker Mimarlk

    22/51

  • 7/29/2019 lker Mimarlk

    23/51

    Toplam 147 otal otelde 16 ated suit, 1 adet king suit, 1 adetdream suit mevcut. 600 kiilik ok amal salon ise Kocaeliilinin en bydr.

    Otelde toplam 8 adet 30-150 kiilik toplant ve seminer salonumevcut. 1 adet kapal 1 adet ak havuz ve spa merkezi,kapal spor salonunu da barndran otele Trk Hamam, 2adet zel hamam ve sauna kompleksi de dahildir. 400 kiilikAllday Dining Restaurant, Roof Restorant ve Roof bar vardr.

    Lobbybar ve pastahanesinide bnyesinde bulundurur.

    lker Dener 2010 yl aralk aynda tant Ulusoy ailesinin 5yldzl otel yapma dn gerekletirme srecinde srekliaile ile birlikte mesai harcamtr ve sayn Haluk Ulusoyunkendi deyimi ile kader arkada olmutur. lker mimarlk Ltd.ti. ise projenin tm ince ilerinde alt yklenici olarak hizmetvermi, duvar kad, seramik, cam ve mozaik gibi bir okrnn ithalatn gerekletirerek uygulamarn yapmtr.

    A total of 8 meeting rooms and seminar rooms capable of30 to 150 people, 1 indoor 1 outdoor pool, a spa center,an indoor gym, Turkish bath, including 2 private hammam,a sauna complex, 400 people Allday Dining Restaurant,

    Roof Restaurant and bar, Lobbybar and a patisserie is alsoavailable inside the hotel.

    Ilker Dener and Ulusoy family met in December 2012 inthe process of realizing their dream of making 5-star hotel.Constantly working with the family and Mr. Haluk Ulusoy,they have been friends of destiny from Mr. Haluks words.Ilker Interior Design Ltd. did all the trim work of the projectand served as a sub-contractor. Wall murals, ceramics,glass and mosaics like products were imported by ourcompany as well.

  • 7/29/2019 lker Mimarlk

    24/51

  • 7/29/2019 lker Mimarlk

    25/51

  • 7/29/2019 lker Mimarlk

    26/51

    naatSreci/ConstructionPeriod

  • 7/29/2019 lker Mimarlk

    27/51

  • 7/29/2019 lker Mimarlk

    28/51

    ZKANLAR

    MAKNASANAY

  • 7/29/2019 lker Mimarlk

    29/51

    veren: zkanlar Makina Sanayii (Hasan zkan, Aydnzkan, Ayhan zkan)Yklenici: lker mimarlk Ldt. ti.iin tanm: 2000m kapal alan olan idari binann komple

    dekorasyonunun yapm.in kapsam: 3 adet ynetici odas, 1 adet seminersalonu, 1 adet toplant odas, yemekhane ak ofisler,mdr ofisleri, proje ofisi, sekreteryalar ve giri fuayesi.Yapm yl: 2007Sresi: 2 ay

    Employer: zkanlar Machine Industry Co. (Hasan Ozkan,Aydin Ozkan, Ayhan zkan)Contractor: Ilker Interior Design Ldt.job description: Decoration of the administrative building,

    complete with a covered area of 2000m.Scope of work: 3 executive rooms, 1 conference room,1 meeting room, dining room open plan offices, managersoffices, project offices, secretariats and the entrance foyer

    from scratch.Year built: 2007Duration: 2 months

  • 7/29/2019 lker Mimarlk

    30/51

  • 7/29/2019 lker Mimarlk

    31/51

  • 7/29/2019 lker Mimarlk

    32/51

  • 7/29/2019 lker Mimarlk

    33/51

  • 7/29/2019 lker Mimarlk

    34/51

  • 7/29/2019 lker Mimarlk

    35/51

    SNOP

    METALA..

    veren: Snop metal A.. TrkiyeYklenici: Kubilay Urhan naatAlt Yklenici: lker imimarlk ltd ti. tm idari bina inceilerini yapmtr.Proje mdr: lker Denerin tanm: Fabrika binas ve idari bina inaat.Yapm yl: 2008Fabrika: 4000m

    dari bina: 1100 min sresi: 4 ayToplam arazi : 25.000m

    Employer: Snop metal Co. Ltd. Turkey

    Contractor: Kubilay Urhan Construction Co.Sub-Contractor: Ilker Interior Design ltd. completedadministrative buildings all trim work.Project manager: Ilker DenerDescription of Work: Construction of Factory buildingand administration building.Year built: 2008Factory: 4000mAdministrative building: 1100 mWork time: 4 monthsTotal area: 25.000m

  • 7/29/2019 lker Mimarlk

    36/51

    Snop Metal A.. Renault, Walkswagen,Seat, Porsche gibi markalarn otomobilimalatnn yapld lkelerin tmnde,bu markalarn metal aksamlarn(gvdeparalar) retmektedir.

    Snop Metal Co. Ltd. Produces themetal parts(body parts) that is used

    by the automotive brands such as Re-nault, Walkswagen, Seat and Porscheduring their manufacturing process.

  • 7/29/2019 lker Mimarlk

    37/51

    Fransa merkezli bir otomotiv firmas olan firmann; spanya,ek cumhuriyeti, Fransa, Rusya, in ve Trkiyede fabrikalarbulumaktadr. Fabrikada 4 adet press makinas, 1 adetkonveyor hatt, irili ufakl 30 adet robot kaynak, 2 adet16/32 ton hereketli vin barndrmaktadr. Ana karkas elikkonstrksiyondan tekil edilmi fabrika binasnn d cephesive ats sanvi pannelden yaplmtr. 630 ton ve 1200 ton

    press makinas temelleri vardr.

    The company is an automotive firm based in France, withfactories in Spain, the Czech Republic, Russia, China andTurkey. There are 4 presses, 1 conveyor line, 30 large andsmall robotic welding machines and 2 mobile cranes with16/32 ton lift. The main frame is formed from steel constru-ction, exterior and roof is made of sandvich pannels. It alsoincludes 630 ton and 1200 ton press machine foundations.

  • 7/29/2019 lker Mimarlk

    38/51

  • 7/29/2019 lker Mimarlk

    39/51

  • 7/29/2019 lker Mimarlk

    40/51

    HOWON

    OTOMOTVveren: Howon Otomotiv ve Filtre SistemleriYklenici: Kubilay Urhan naatProje mdr: lker Denerin kapsam: toplam 25.000m 3 etap fabrika ve idaribina inaat.Yer: zmit/Kocaeli, Sarmee

    Yapm yl: 1. ve 2. etaplar 2008, 3. etap 2012Sresi: 1. etap 150 gn, 2. etap 110 gn, 3 etap 150 gn.

    Employer: Howon Automotive and Filter SystemsContractor: Kubilay Urhan Construction Co.Project Director: Ilker DenerScope of work: Construction of 25.000m administrativebuilding and factories in 3 stages.Location: zmit / Kocaeli, SarmeeYear: 1st and 2nd stages in 2008, 3rd stage in 2012Duration: 1st stage 150 days, 2nd stage, 110 days and

    150 days on the 3rd stage.

    Howon Otomotiv, Hyundai arabalarnn retiminin yapldlkelerde, aralarn gvde paralarnn ve metal aksamlarnn%80ini reten, Korede, inde ve Trkiyede faaliyetgstere Kore meneili bir firmadr.

    Howon Automotive, is a Korea based company that produ-ces the %80 of the body parts of Hyundai Automobiles inKorea, China and Turkey.

  • 7/29/2019 lker Mimarlk

    41/51

    1. etap kapsamnda 8000m retim hol, 1 adet blankingline, 3 adet 1200 ton pres hol, 1 adet konveyor hol, 1adet 2000m idari bina ve 15.000m saha betonununkapsamaktadr. 2. etap 8700m robot holn ve 3. etap ise9000mlik 2 adet press hol ve stok alann iermektedir. Her etapta da proje mdrln ve proje koordinasyonunu

    lker Dener yrtmtr. Ayrca lker mimarlk Ltd. ti. idaribinann tm ince ilerini alt yklenici olarak yapmtr.

    In the first stage of the construction; 8000m of productionhall, 1 blanking line, 3 press halls with 1200 ton capacity,1 conveyor hall, 1 administrative building with 2000m ofspace and 15.000m field concrete. 2nd stage includes arobot hall of 8700m and 3rd stage adds 2 press halls with9000m space. All three phases of the project were mnaged

    and coordinated by Ilker Dener. Also Ilker Interior Designcompleted all the trim works of the administrive building asa sub contractor.

  • 7/29/2019 lker Mimarlk

    42/51

    ARMADA

    ALIVERMERKEZKARTAL

    YUVASI

  • 7/29/2019 lker Mimarlk

    43/51

    veren: Beikta Jimnastik Klbadna ANF Turizm Res. Say. ve DTicaret Ltd. ti.Yklenici: ilker i mimarlk ltd ti tanm: Ankara Armada alveriMerkezide 160m anahtar teslimdkkan projesi ve uygulamas.Yer: Ankara Armada Alveri MerkeziSre: Proje ve uygulama toplam 1 ay.

    Yapm yl: 2013

    Employer: ANF Tourism Res. To say.Domestic and Foreign Trade Co. onbehalf of Beikta Gymnastics ClubContractor: Ilker Interior Design Ltd.Job description: 160m turnkeyshop project.Location: Ankara Armada ShoppingCenter

    Duration: Design and applicationtotal 1 month.Year built: 2013

  • 7/29/2019 lker Mimarlk

    44/51

  • 7/29/2019 lker Mimarlk

    45/51

  • 7/29/2019 lker Mimarlk

    46/51

    Referanslarmz/References

    To whom it may concern;

    Ilker Inderior Design - Ilker Dener, have successfully completed various projects with strong regard towards cost, time and qualitydemands, as a trim works sub contractor and also as project manager such as; Snop Izmit Metal Ltd. Co. factory and administrive

    building first and second stages, Hyundai Howon factory and administrive building 1st, 2nd and 3rd stages, Samsun, Gaziantep,Adana, Van, Erzurum and Kars Jet Fuel Terminals belonging toTurkish Airlines Opet Aviation Fuels Ltd. Co., Yediveren Akyazi Facilitiesand Wellborn 5 star hotel. We are still in bussiness with the successful firm.

    Regards;Kubilay URHAN

  • 7/29/2019 lker Mimarlk

    47/51

    We thank Ilker Interior Design Ltd. for their devoted and exquisite work during the decoration and renovation of our bowling saloon.We wish you success in your future projects.

    Rollhouse Bowling SaloonSevsel Tur. Yat. Ins. Tic. Ltd.Sinem AYDIN

  • 7/29/2019 lker Mimarlk

    48/51

    We would like to thank you for your attention to detail, compliance with the job plan, and perfectly executing your responsibilities in a timelymanner throughout all our projects.

    We wish to keep our collaborations and hope to see you succeed in your future projects.

    Regards

  • 7/29/2019 lker Mimarlk

    49/51

    Pakistan Bykelilii adna lker mimarlk naat Ticaret Limited irketine, 3.000mlik d cephe, 10.000mlik i cephe, 20 banyorenovasyonu ve elektrik tesisatnn ngrlen zaman erevesi iinde yaplmasnda gsterdikleri stn baar ve destek iin teekkr ederiz.

    Ankara, Trkiyedeki Pakistam slam Cumhuriyeti Konsolosluu, lker mimarlk naat Ticaret Limited irketinin yapt tm yeniletirmeprojelerindeki memnuniyetini belirtir.

    SayglarmlaJanbaz KHAN

  • 7/29/2019 lker Mimarlk

    50/51

    To whom it may concern;

    Ilker Inderior Design Ltd. has succesfull completed the interior decoration and trim work projects of 2 houses belonging to our companyand 2 rooms in our office complex.

    Regards.

  • 7/29/2019 lker Mimarlk

    51/51

    Works completed by our subcontractor Ilker Interior Design is listed below;