Storage Tank Design
ATM LPS
AWWAAPI BS EN
LPS
API ENAWWA 650BS
2654 EN
14015API 620
EN 14620
P<2.5 Psi 2.5 < P < 15 Psi
www.hedcoint.com
TYPES OF STORAGEPRESSURIZED STORAGESEMI-REFRIGERATED STORAGEATMOSPHERIC PRESSURE STORAGE
www.hedcoint.com
BUTANE-0.5
BUTADIENE-4.5
AMMONIA-33
PROPANEPROPANE-42
PROPYLENE-47
ETHANE-88
ETHYLENE103-103
METHANE-161
LNG-162NITROGEN
-195www.hedcoint.com
•Containment addresses the question:Wh t if th t k l k ?What if the tank leaks?
SINGLE CONTAINMENTDOUBLE CONTAINMENTDOUBLE CONTAINMENTFULL CONTAINMENTMEMBRANE TANKMEMBRANE TANK
www.hedcoint.com
⑥⑤ ⑦⑤
① ⑧④ ②
③④ ⑨1 primary container (steel) 6 roof (steel)
3 foundation4 foundation heating system
7 loose fill insulation8 outer steel shell (not capable of containing liquid)9 bund wall
2 bottom insulation
5 suspended roof (insulated)
⑦⑥ ⑦ ⑧⑩① ⑨②③④ ⑤③
2 secondary container (steel or concrete)6 suspended roof (insulated)7 roof (steel)
1 primary container (steel)2 secondary container (steel or concrete)
4 foundation5 foundation heating system
7 roof (steel)8 loose fill insulation9 outer shell (not capable of containing liquid)
10 cover (rain shield)
3 bottom insulation
1 primary container (steel)2 secondary container (steel)
5 suspended roof (insulated)6 roof (steel)
2 bottom insulation3 foundation4 foundation heating system
7 loose fill insulation8 concrete roof9 pre-stressed concrete outer tank (secondary container)
VAPOUR DISPERSION SCENARIO
CREDIBLE SPILL (by EN1473) for SINGLE CONTAINMENT
Tank CompleteTank Complete Failure
Public F ilitiV
Plant fence
FacilitiesVapor
2.5 ~ 3 kmwww.hedcoint.com
CREDIBLE SPILL (by EN1473) for DOUBLE CONTAINMENT,
Roof Collaspe
Plant f
Public Facilities
fence
800 m
www.hedcoint.com
The tank shall be designed so that:under normal operating conditions, the liquid and the vapour is contained;and the vapour is contained;it can be filled and emptied at the specified rates;boil-off is controlled and in exceptional cases can be relieved to flare or vent;pressure operating range specified is p p g g pmaintained;ingress of air and moisture is prevented, except in exceptional cases when the vacuum reliefin exceptional cases when the vacuum relief valves have to be used;boil-off is as specified and condensation/frost on the external surface is minimised Frost heave ofthe external surface is minimised. Frost heave of the foundation shall be prevented;
www.hedcoint.com
Mechanical designTh l d igThermal designBoil off rateInsulationInsulationFoundationFrost heaveFrost heaveRoll overCool downCool downIn tank pump
www.hedcoint.com
Insulation
Base WallR fBase
Perlite bl k
Mineral wool
Hard wood
Foam glass
Wall
Loose perlite PUF
Roof
block wool
FiberglassLoose perliteperlite
www.hedcoint.com
60
40
50
g/cm
2
30
40
stre
ngth
k
10
20
ompr
essi
ve
0.3125
0.4375Perlite Cement Ratio
00 10 20 30 40 50
co
dayy
www.hedcoint.com
MAX ALLOWABLE BOIL-OFF RATE = 0.05% CONTENT WEIGHT/DAY = 417 Kg/hr
MAX DESIGN BOIL-OFF RATE = 0.95*417=396 Kg/hr
CALC. BOIL-OFF RATE = 382 Kg/hr
On ground type-Good soil condition required.
Elevated type- Poor soil condition
-Concrete slab required-Electric heaters are installed
into the slab to avoid frost
- Piles are required- Large initial investment
Small maintenance costinto the slab to avoid frost heave.
-Small initial investmentLarge running cost
- Small maintenance cost - Elevated height is around
1.0 m to 1.5 m -Large running cost