“Innovando con la Energía en los Espacios Arquitectónicos”

Visión internacional de la situación de la I+D en el ahorro de energía en Edificios

Page 2: Inauguracion kubik campos_isoird_visioninternacional

Programas de I+D+i en el ámbito Europeo e

Internacional

José María CamposECBCS

EeB PPP

Agencia Internacional de la Energía – Programa ECBCS

Comisión Europea – EeB PPP

Page 3: Inauguracion kubik campos_isoird_visioninternacional

• Buildings use 40 % of total EU energy consumption• The built environment generates 1/3 of GHG in Europe• Even new buildings are far from being all energy efficient• Replacement rate is very small (1 to 2 % per year)• The renovation of the existing stock is a real challenge• Many experiments are made but actual impacts are limited

Business as usual is not an option!

EeB PPP as first step of a longer term strategy

Where is the built environment?

Page 4: Inauguracion kubik campos_isoird_visioninternacional

EeB EI- Background

At the end of 2005 the European Construction Technology Platform (ECTP) developed its Strategic Research Agenda (SRA ) defining priorities, around three main topics:

1. Meeting client and user requirements2. Becoming sustainable3. Transforming of the construction sector

In June 2007, ECTP published an associated roadmap proposing an Implementation Action Plan. This roadmap showed a major priority on new technologies, concepts and materials for efficient and clean buildings, a theme which initiated the E2B concepts and a significant part of E2B EI.

E2B EI initially stemmed from a group of ECTP members and is fully supported by the platform as an instrument to implement their roadmap.

Page 5: Inauguracion kubik campos_isoird_visioninternacional

EeB EI- Concept and objectives

• “The overall objective of EeB EI is to deliver, implement and optimize building and district concepts that have the technical, economic and societal potential to drastically cut the energy consumption and reduce CO2 emissions due to existing and new buildings at the overall scale of the European Union.

• EeB EI will speed up research on key technologies and develop a competitive industry in the fields of energy efficiency processes, products and services, with the main purpose to reach the goals set forth for 2020 and 2050 to address climate change issues and contribute to improve EU energy independence thereby transforming this challenge into a business opportunity "

Page 6: Inauguracion kubik campos_isoird_visioninternacional

E2BA The European Association

In 2008, the E2B A, an International, non-profit Industrial Association was created by 9 industrial stakeholders covering the Energy efficient building supply chain:

The E2B A currently has over 150 members.

Page 7: Inauguracion kubik campos_isoird_visioninternacional

E2BA: role and objectives

E2BA

The E2B Association’s main objectives are:• Prepare and manage a Public Private Partnership (PPP) with the EC• Seek and demonstrate industry engagement and represent• Coordinate members’ research interests within the PPP

E2B A’s aspiration is to develop and implement a €2bn research anddemonstration programme over the period 2009-2019.

National Liaison Points (NLPs) Network

NLPs are a network of E2B A’s representatives in all Member States, their role is:• Share national priorities to the E2B research agendas• Disseminate E2B information to the national stakeholders• Set up a national network of stakeholders to increase engagement and pave the

way for national follow-up actions• Seek national liaison points in unrepresented Member States

Page 8: Inauguracion kubik campos_isoird_visioninternacional

E2B roadmap2010-2013(-2019)

R&D programs

National program

National program

National program

Boost Research

E2B AssociationEC

NLP NLP NLP

Create Impact

A PowerfulEngine

Bring National Priorities of each MS to the E2B Agenda as a prerequisite for creating impact at EU scale

= create new business for players involved

= create new business for all stakeholders at EU scale

EI E2B

E2BA The European Association

Page 9: Inauguracion kubik campos_isoird_visioninternacional

E2BA The European Association

E2B Structure

General Assembly(all E2B-A members)

Indust.9

Resear.5

SME.4

Clients3

ExecutiveBoard

9

Steering Committee 30

Elected Members 21

Secretary

General

NLP network+

Eracobuild

Scientific Council(min. 10)

advice onscientific quality

tuning of E2B-MS priorities

election, approval

Five elected European technological institutes conform the Scientific Committee within the Steering Committee

Page 10: Inauguracion kubik campos_isoird_visioninternacional

EeB PPP: Launching

COM (2008) 800-“A European Economic Recovery Plan.” – The European Commission announces the launch of three public private partnerships (PPPs) in the framework of the plan for the economic recovery of Europe.

• In the automobile sector, a “European green cars initiative”• In the construction sector, a “European energy-efficient buildings' initiative” EeB

PPP (also called E2B PPP)• To increase the use of technology in manufacturing, "a factories of the future

initiative“ (FoF PPP)

FP7 – Research Budget 2010-2013

Page 11: Inauguracion kubik campos_isoird_visioninternacional

EeB PPP: Implementation of calls

The E2B PPP calls are going to be implemented following the rules ofthe 7th Framework Programme (FP7) for the period 2010-13.

Page 12: Inauguracion kubik campos_isoird_visioninternacional

El Roadmap

Page 13: Inauguracion kubik campos_isoird_visioninternacional

Ad-hoc Advisory Group

• Ad-Hoc Industrial Advisory Group: Set up in the framework of the E2BA with the purpose of answering the European Commission’s request to the E2B A of providing them with priorities for 2010 -2013. Composed by the Steering Committee and the Scientific Council. It´s objectives are:

• To define the RTD priorities for 2010, 2011, 2012, 2013

• To mobilise specific projects to answer to the EC Calls

• To gather the inputs of E2B A members

• To define a strategic Roadmap for the period 2010-2013

Page 14: Inauguracion kubik campos_isoird_visioninternacional

The industry vision (1/4)

Page 15: Inauguracion kubik campos_isoird_visioninternacional

The industry vision (2/4)

2010-13

Beyond 2013

Time horizon

R&Dchallenge

R&Dchallenge

R&Dchallenge

R&Dchallenge

R&Dchallenge

R&Dchallenge

R&Dchallenge

R&Dchallenge

EnablingTechnologies

(e.g. ICT,multifunctional materials,

novel processes, …)Mobilisation of the entire value and

innovation chains

Page 16: Inauguracion kubik campos_isoird_visioninternacional

The industry vision (3/4)

Page 17: Inauguracion kubik campos_isoird_visioninternacional

EeB PPP as first wave of a Long Term Strategy

EeB PPP2010-13

The industry vision (4/4)

Page 18: Inauguracion kubik campos_isoird_visioninternacional

Public Consultations

The roadmapping process

Page 19: Inauguracion kubik campos_isoird_visioninternacional

Research Priorities

Page 20: Inauguracion kubik campos_isoird_visioninternacional

The industry vision (4/4)

Page 21: Inauguracion kubik campos_isoird_visioninternacional

Provisional Budget WP2011

Page 22: Inauguracion kubik campos_isoird_visioninternacional

• EeB-NMP.2011-1 Materials for new energy efficient building components with reduced embodied energy

• EeB.NMP.2011-2 New efficient solutions for energy generation, storage and use related to space heating and domestic hot water in existing buildings

• EeB.NMP.2011-3 Energy saving technologies for buildings envelope retrofitting

• EeB.NMP.2011-4 Geo-clusters approach to support European energy-efficiency goals

• EeB-ICT-2011.6.4 ICT for energy-efficient buildings and spaces of public use• EeB-ICT-2011.6.5 ICT for energy-positive neighbourhoods

Calls WP2011 (1/2)

Page 23: Inauguracion kubik campos_isoird_visioninternacional

• EeB.ENERGY.2011 Demonstration of Very Low Energy New Buildings• EeB.ENV.2011.3.1.5-1 Technologies for ensuring, monitoring and/or

controlling a high quality indoor environment in relation to energy efficient buildings in particular

• Specific Support Action (SSA) with the goal to tailor the generic ILCD (International Reference Life Cycle Data System) Handbook guidance towards the specific needs and requirements of projects to be carried out within the EeB PPP

Calls WP2011 (2/2)

Page 24: Inauguracion kubik campos_isoird_visioninternacional

Muchas gracias!!!