infrastructure · motorway project which will connect central serbia and pan-european corridors 10...

37
Route 6 Prishtine - Hani I Elezit Motorway Project, Kosovo 42°37’9.49”N | 21° 6’56.37”E INFRASTRUCTURE SELECTED PROJECTS MOTORWAYS, BRIDGES & TUNNELS AIRPORTS & STADIUMS WATER WORKS, DAMS, PIPELINES & MINING CEMENT PLANTS

Upload: others

Post on 24-May-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: INFRASTRUCTURE · Motorway Project which will connect central Serbia and Pan-European Corridors 10 and 11. Morava Corridor Motorway Project is a 112 km dual-carriageway motorway,

Route 6 Prishtine - Hani I Elezit Motorway Project, Kosovo

42°37’9.49”N | 21° 6’56.37”E

INFRASTRUCTURESELECTEDPROJECTS

MOTORWAYS, BRIDGES & TUNNELS

AIRPORTS & STADIUMS

WATER WORKS, DAMS, PIPELINES & MINING

CEMENT PLANTS

Page 2: INFRASTRUCTURE · Motorway Project which will connect central Serbia and Pan-European Corridors 10 and 11. Morava Corridor Motorway Project is a 112 km dual-carriageway motorway,

2 ENKA İNŞAAT VE SANAYİ A.Ş. FACHSHEETS FACTSHEETS ENKA İNŞAAT VE SANAYİ A.Ş. 3Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Page | 2 3 | Page

MOTORWAYS, BRIDGES & TUNNELSMorava Corridor Motorway, Serbia1915 Canakkale Bridge, TurkeyRoute 6 Prishtine - Hani I Elezit Motorway, KosovoOsmangazi Suspension Bridge, TurkeyEurasia Tunnel, TurkeyWestern High Speed Diameter Motorway, RussiaRoute 7 Morine - Merdare Motorway, KosovoRreshen - Kalimash Motorway, AlbaniaAutostrada Transylvania - Romanian Motorway, RomaniaBregana – Zagreb - Dubrovnik Motorway, CroatiaAnkara – Gerede Motorway, TurkeyIstanbul Metro, TurkeyGolden Horn Steel Bridge, Turkey

AIRPORTS & STADIUMSDevelopment Of Muscat International Airport, OmanSheremetyevo International Airport, Terminal 3, RussiaFC Shakhtar Shaktar Stadium, Donbass Arena, Ukraine

WATER WORKS, DAMS, PIPELINES & MININGUmm Qasr Basra Multi-purpose Terminal (BMT), Iraq433 MW Namakhvani HPP Cascade, GeorgiaDerna Desalination Plant, LibyaSoussa Desalination Plant, LibyaZawia Desalination Plant, LibyaZuara Desalination Plant, LibyaOued Athmenia Dam, AlgeriaAktau Port Rehabilitation, KazakhstanKumtor Gold Mine, KyrgyzstanKoktenkol Molybdenum, KazakhstanBekme Dam, IraqBerke Dam, TurkeyFormer USSR (CIS) Turkey Natural Gas Pipeline,Iraq - Turkey Crude Oil Pipeline ExpansionBenghazi Water Reservoir, LibyaWasia Water Treatment Plant, Saudi ArabiaAl Rass Water Supply & Treatment, Saudi Arabia Ras Lanuf New Town (Water Supply & Sewage Systems), LibyaBrega New Town Project Water Reservoirs & Piping Works, LibyaAl Khafji Phase 2 Desalination Plant, Saudi ArabiaAl Medinah Housing (Water Supply & Sewage Systems), Saudi ArabiaIstanbul Yenikapi Pretreatment Plant & Pumping Station, TurkeyDiyarbakir & Kahramanmaraş drinking & Sewage System, Turkey

CEMENT PLANTSMessebo Cement Factory, EthiopiaBenghazi Cement Plant, LibyaHawari Cement Plant, LibyaSouq Al-Khamis Cement Plant, LibyaAl Khoms Cement Plant, LibyaTasluja Cement Plant, IraqKerbela Cement Plant, IraqFalluja White Cement Plant, Iraq Badoosh Cement Plant, IraqNew Badoosh Cement Plant / Operation & Maintenance, IraqRashadiya Cement Plant, JordanKubaisa Cement Plant, Iraq

Route 6 Prishtine - Hani I Elezit Motorway Project, Kosovo

42°37’9.49”N | 21° 6’56.37”E

CONT

ENTS

Page 3: INFRASTRUCTURE · Motorway Project which will connect central Serbia and Pan-European Corridors 10 and 11. Morava Corridor Motorway Project is a 112 km dual-carriageway motorway,

4 ENKA İNŞAAT VE SANAYİ A.Ş. FACHSHEETS FACTSHEETS ENKA İNŞAAT VE SANAYİ A.Ş. 5Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Page | 4 5 | Page

MOTORWAYS, BRIDGES & TUNNELS

AIRPORTS & STADIUMS

WATER WORKS, DAMS, PIPELINES & MINING

CEMENT PLANTS

MORAVA CORRIDOR MOTORWAY, SERBIA

1915 CANAKKALE BRIDGE, TURKEY

ROUTE 6 PRISHTINE - HANI I ELEZIT MOTORWAY, KOSOVO

OSMANGAZI SUSPENSION BRIDGE, TURKEY

EURASIA TUNNEL, TURKEY

WESTERN HIGH SPEED DIAMETER MOTORWAY, RUSSIA

ROUTE 7 MORINE - MERDARE MOTORWAY, KOSOVO

RRESHEN - KALIMASH MOTORWAY, ALBANIA

AUTOSTRADA TRANSYLVANIA - ROMANIAN MOTORWAY, ROMANIA

BREGANA – ZAGREB - DUBROVNIK MOTORWAY, CROATIA

ANKARA – GEREDE MOTORWAY, TURKEY

ISTANBUL METRO, TURKEY

GOLDEN HORN STEEL BRIDGE, TURKEY

MOT

ORW

AYS,

BR

IDGE

S & TU

NNEL

S

MOTORWAYS, BRIDGES &

TUNNELS

Page 4: INFRASTRUCTURE · Motorway Project which will connect central Serbia and Pan-European Corridors 10 and 11. Morava Corridor Motorway Project is a 112 km dual-carriageway motorway,

6 ENKA İNŞAAT VE SANAYİ A.Ş. FACHSHEETS FACTSHEETS ENKA İNŞAAT VE SANAYİ A.Ş. 7Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Page | 6 7 | Page

PROJECT DETAILS

LOCATION:Pojate-Preljina, Serbia

OWNER / CLIENT: Government of the Republic of Serbia Ministry of Construction, Transport and Infrastructure.

PROJECT DURATION:Dec 2019-Dec 2023

CONTRACT TYPE:Design & Build

CONTRACT VALUE:EUR 745 Million

SIGNIFICANT FEATURES /ACCOMPLISHMENTS:

• Project will connect central Serbia and Pan-European Corridors 10 and 11.

• First digital (5G) and widest motorway

• Regulation of river beds – 50 km

PROJECT DESCRIPTION

On December 5th 2019, ENKA-Bechtel Joint Venture signed the contract with the Government of Republic of Serbia to Design and Build 112 km Morava Corridor Motorway Project which will connect central Serbia and Pan-European Corridors 10 and 11.

Morava Corridor Motorway Project is a 112 km dual-carriageway motorway, with a design speed of 130 km/h, from Pojate and the A1 (the North-South motorway in central Serbia) through Kruševac (used to be the industrial hub of Yugoslavia) and up into Preljina in the north of Čačak. The project runs east/west in the West Morava River valley and is seen as a key enabler of the economic corridor to the industrial city of Kruševac and its ultimate international connections to Bosnia, Montenegro and North Macedonia. The motorway connects pan-European Corridors 10 and 11 and all major towns and cities in a central Serbian region that has a population of around 500,000 and includes Cacak, Kraljevo, Vrnjacka Banja, Trstenik, Krusevac and Cicevac .

Construction of the motorway will start in early 2020 and each individual section of the motorway will be completed within 2.5 years with the total construction period of 4 years under contract terms and conditions.

Sections 1 to 3 (from Pojate to Krusevac) 27.8 km will be opened to traffic by December 2021.

Sections 8 to 9 (from Adrani to Preljina) 30.7 km will be opened to traffic by December 2022.

Sections 4 to 7 (from Krusevac to Adrani) 53.9 km will be opened to traffic by December 2023.

Export Credit Agencies such as UKEF declared as contributors together with the Government of Serbia state budget.

MORAVA CORRIDOR MOTORWAY PROJECT MORAVA CORRIDOR MOTORWAY PROJECT

UNIQUE CHALLENGES

As per Serbian Design Standards, to enable 130 km/h design speed, the dual-carriageway motorway will be 30 meter wide. Single carriageway will compose of 2 x 3.75 m traffic lane, 2.5 m emergency lane, 1.5 m shoulder, 1.5 m edge strip and 2 m median (1.5 m in Section 8 and 9 only), totaling 15 m width and consequently 30 m width (29 m in Section 8 and 9 only) for dual-carriageway.

An extensive telecommunication network (5-G) is planned along the alignment to provide a Digital Corridor for improved connectivity in the region. The Project features 10 new interchanges, significant amount of structures crossing highways, railways and challenging Morava river along the route, high embankment fills with extensive embankment scour protection works, flood protection measures and long river diversions, dykes and construction of new river bed due to the wide flood plain of West Morava River. Total length of regulation of river beds included within the scope of the project is circa 50 km.

ENKA SCOPE OF SERVICES

ENKA, with its joint-venture partner Bechtel, will design and build 112 km dual-carriageway motorway

Project scope includes 78 bridges, 24 overpasses, 12 underpasses, over 20.0 million m3 excavation, over 17 million m3 earth fill, 490,000 m3 concrete, 1.7 million m3 subbase, 1.1 million ton asphalt and 460 km guardrail.

The project is expected to create around 4,000 jobs at peak, during construction.

To perform this important Infrastructure Project, ENKA will provide its top level engineering, production, quality, environment, health and safety standards which were gained in more than 60 years of its history.

Total Length

Total Underpass

Total Overpass

Total Bridge

Total Excavation

Total Earth Fill

Total Concrete

Total Subbase

Total Asphalt

Total Guardrail

Regulation of River BedsMaj

or Q

uant

ities

Maj

or Q

uant

ities

km

ea

ea

ea

ton

km

km

112

12

24

78

20 Million

17 Million

490,000

1.7 Million

1.1 Million

460

50

Commodity CommodityTotal TotalUoM UoM

Page 5: INFRASTRUCTURE · Motorway Project which will connect central Serbia and Pan-European Corridors 10 and 11. Morava Corridor Motorway Project is a 112 km dual-carriageway motorway,

8 ENKA İNŞAAT VE SANAYİ A.Ş. FACHSHEETS FACTSHEETS ENKA İNŞAAT VE SANAYİ A.Ş. 9Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Page | 8 9 | Page

1915 ÇANAKKALE BRIDGE

PROJECT DETAILS

LOCATION:Çanakkale, Turkey

ADMINISTRATION: Republic of Turkey Ministry of Transportation and Infrastructure, General Directorate of Highways (KGM)

APPOINTED COMPANY: ÇOK A.Ş.

BRIDGE CONTRACTOR: Daelim-Limak-SK E&C-Yapı Merkezi Joint Venture (DLSY JV)

BRIDGE FABRICATOR: Çimtaş Gemlik Works

GROUND ASSEMBLER: Çimtaş Module and Shipyard, Gölcük

SUBCONTRACTOR: Kasktaş A.Ş.

DIVISION OF WORKS:

ÇIMTAŞ GEMLIK WORKSTower panels detailing, supply and fabrication, transportation to the Çimtaş Gölcük Module and Shipyard.Girder panels detailing, supply and fabrication, transportation to the Çimtaş Gölcük Module and Shipyard.

ÇIMTAŞ GÖLCÜK MODULE & SHIPYARD

Ground assembly of tower panels into tower blocks, trial assembly, painting and delivery to final location.

Ground assembly of girder panels into girder blocks, mega-block formation, trial assembly, painting and delivery to final location.

KASKTAŞEuropean Anchor Block: Slope Stability and Excavation Works

Asian Anchor Block: Excavation Support and Barrette Piling Works

European Approach Viaducts: Soil Improvement and Piling Works

European and Asian Berth Structures:Sheetpile Driving and Tie-Rod Installation Works

PROJECT DURATION:2018 – 2023

PROJECT DESCRIPTION

1915 Çanakkale Bridge World’s Longest Suspension Bridge.

ENKA SCOPE OF SERVICES:

With a main span of 2,023 m and total length of 4,608 m, 1915 Çanakkale Bridge will be the longest suspension bridge in the world upon completion.

Scopes of ENKA’s subsidiaries, Çimtaş and Kasktaş, under separate subcontracts are as following:

Çimtaş scope of works:

• All permanent steel components of 1915 Çanakkale Bridge with a total weight of over 100,000 ton are being fabricated by Çimtaş

• Strict fabrication tolerances have been applied as ±3 mm for Tower Blocks and ±5 mm for Girder Blocks

• The tower and deck blocks will be delivered to the installation site by Çimtaş owned 4,400 DWT dynamic positioning vessel “GMK-1”

• Tower and Girder blocks of a suspension bridge have been simultaneously fabricated at the same location for the first time in the world by Çimtaş during the execution of Osmangazi Bridge and the same success is being repeated for 1915 Çanakkale Bridge Project.

Kasktaş scope of works:

• European Anchor Block, Slope Stability and Barrette Pile Works consisting of 165,000 m³ excavation work; 14,400 m rock bolts; 11,540 m² of shotcrete; 12,000 m secant piles; 54 no’s of dewatering wells were executed by Kasktaş.

• Asian Anchor Block Excavation Support and Barrette Pile Works consisting of a 5,700 m of secant piled shoring system and a special foundation system with 7 rows of 8,000 m3 barrette piles having a total plan length of 51.5 m and a thickness of 120 cm were performed by Kasktaş.

• The construction of 365 m long European Approach Viaduct Soil Improvement and Piling Works were undertaken. A total of 120,100 m of deep soil mixing (DSM), 29,900 m³ unreinforced barrette piles; 6,600 m foundation piles with a diameter of 150 cm and a maximum depth of 70 m work has been completed under PE3, PE4, PE5 and SPE (Side Span Pier) viaduct foundations.

• Berth Structures providing transportation of two continents during construction works consisting of sheetpile walls were constructed on both European and Asian sides.

UNIQUE CHALLENGESÇimtaş

• In order to compensate the weld shrinkages, steel structure was modelled in 3 different stages in reverse order as installation, trial assembly and fabrication stages

• All Pre-cambering methods, multi torch welding processes and automated NDT were developed in-house

• Vertical Trial Assembly of Tower Blocks is being performed with 3 tower blocks in every cycle with a total height of 33 m and with a total weight of 2,000 ton

• After completion of the block formation works, 128 Girder Blocks will be welded in pairs and transformed into so called “Mega Blocks” in order to reduce the number of lifting and total installation duration

• All “Mega Blocks” with 45m x 48 m dimensions will be transported to the installation site in Çanakkale by Çimtaş

Kasktaş

• European Anchor Block, Slope Stability and Barrette Pile Works:

• For a maximum excavation depth of 46 m; slope stability protection shotcrete was applied with ±1 cm construction tolerance.

• Asian Anchor Block Excavation Support and Barrette Pile Works:

• A bi-directional preliminary load test was performed on 6,575 mm x 1,200 mm test barrette by using 5 no. of special jacks with a maximum capacity of 5,200 tons.

• European Approach Viaduct Soil Improvement and Piling Works:

• Full length wet samples were taken from 27 m long Deep Soil Mixing (DSM) Columns,

• 1,500 mm diameter bored pile installations have been completed under Abutment (AE), PE3, PE4, PE5 viaduct foundations and SPE (Side Span Pier) foundations. 72 m long special bored piles, which are one of the longest bored piles executed in Turkey; have been installed under SPE (Side Span Pier) areas. Bi-directional axial preliminary loading tests have been applied on 2 test piles and tested up to a maximum test load of 4,200 tons.

• In order to ensure the soft soil layers to be secured against liquefaction and deep-seated slip; 26.5 m long DSM columns by means of intersecting cell lines and unreinforced barrette piles up to 67 m depth constitute the difficult and ambitious applications of the project. All barrette piles were checked by Koden with a verticality of (1/200).

1915 ÇANAKKALE BRIDGE

Excavation

Barrette Piles

Unreinforced Barrette Piles

Secant Pile

Dewatering Well

Shotcrete

Deep Soil Mixing

Foundation Pile

Rock Bolt

Sheet Pile

Tower Height

Number of Tower Blocks

Block Weight

Tower Total Weight

Girder Width

Number of Girder Blocks

Block Weight

Girder Total Weight

Maj

or Q

uant

ities

Maj

or Q

uant

ities

m

ea

m2

m

m

m

m2

m

ea

ton

ton

m

у eaу

ton

ton

165.000

8.000

29.900

12.000

54

11,540

120,100

6,600

14,400

2,500

318

146

225-830

47,000

45

153

300-650

53,000

Commodity CommodityTotal TotalUoM UoM

Page 6: INFRASTRUCTURE · Motorway Project which will connect central Serbia and Pan-European Corridors 10 and 11. Morava Corridor Motorway Project is a 112 km dual-carriageway motorway,

10 ENKA İNŞAAT VE SANAYİ A.Ş. FACHSHEETS FACTSHEETS ENKA İNŞAAT VE SANAYİ A.Ş. 11Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Page | 10 11 | Page

PROJECT DETAILS

LOCATION:Pristina-Hani I Elezit, Kosovo

OWNER / CLIENT: Ministry of Infrastructure the Government of the Republic of Kosovo

PROJECT DURATION:July 2014-Dec 2020

CONTRACT TYPE:Design & Build

CONTRACT VALUE:EUR 704 Million

SIGNIFICANT FEATURES /ACCOMPLISHMENTS:

• Links Kosovo to North Macedonia

• By the end of the project, over 8,4 million person-hours had been reached without a lost time incident.

• More than 22 million direct person-hours had been worked.

• “2016 GRAA (Global Road Achievement Awards) Winner of the Environmental Mitigation category” selected by IRF (International Road Federation)

PROJECT DESCRIPTION

The contract for the Pristina-Hani i Elezit Motorway was signed between the Bechtel-ENKA General Partnership (BEGP) and the Ministry of Infrastructure of the Government of Kosovo in July 2014. The contract was an EPC contract and BEGP was responsible for the engineering, procurement and construction of the overall project.

It was BEGP’s second project in Kosovo. The motorway project is part of the South–East Europe Core Road Network, in which it is referred to as Route 6. The project crosses Kosovo from north to south, linking to Pristina in the north and stretching south as far as Hani i Elezit on the border with North Macedonia. The motorway is expected to have significant strategic and economic benefits. Kosovo is connected to Skopje and has access to Corridor 10, facilitating its trade with the rest of the world. The economic benefits arel not be limited to Kosovo.

The motorway is part of a European network of roads and is expected to contribute to economic integration throughout the region. The project envisaged the construction of 65 km of 2x2 carriageway motorway, designed in three stages. The motorway had been designed in accordance with Trans-European Motorway (TEM) standards as well as Croatian standards, and construction works had been done in accordance with the 2011 general technical requirements (GTR) of the Croatian Road Authority.

UNIQUE CHALLENGES

Alignment of the Route 6 Motorway Section 3 crosses many mountainous terrains and cliffs. Due to the complex geology on the terrain and deeper soil investigation requirements, geotechnical investigations are being carried out with complete attention by a number of teams performing extensive investigations. 19 million m3 of excavation with deepest point 62 m and 11 million m3 of embankments with highest point 24 m were performed during the construction.

ROUTE 6 PRISTINA - HANI I ELEZIT MOTORWAY PROJECT ROUTE 6 PRISTINA - HANI I ELEZIT MOTORWAY PROJECT

13 bridges, totaling 8 km were constructed with 1,777 precast, prestressed, posttensioned and hybrid type of beams. 312 thousand m3 of concrete and 70 thousand meter of piles were placed during the construction of bridges. Due to challenging and mountainous terrain, a 5.75 km meter long Lepence Bridge was constructed along a deep narrow valley accommodating Lepence River and Souther Part of Route 10 Railway Track Line. Design and construction of the bridge including very detailed geotechnical investigation is completed in 18 months.

Due to the complex geology on the terrain and deeper soil investigation requirements, geotechnical investigations, including 16,000 meter of boreholes, were carried out with complete attention by a number of teams performing extensive investigations. 200 thousand meter of active and passive anchors with different thickness of shotcrete works have been performed in order to stabilize deep cut slopes along the alignment.

Climate conditions were of a big concern. During March 2016, despite the heavy rainfall, the project team proceeded with its construction works associated with utility relocation as well as earthworks, structures, drainage, surveying, finishing, and manufacture & operations departments.

Utilities along the project were also one of the challenges. The utility lines had been investigated and identified on site. There existed high voltage lines, power lines and various sewage, water supply and irrigation lines. The design and relocation of some utility crosses underneath the motorway had been completed while others had commenced. 350 utility lines have been relocated and handed over to local authorities and service providers on behalf of the Employer.

ENKA SCOPE OF SERVICES

ENKA, according to the contract, designed, executed and completed the construction works. ENKA, as the Design/Build Contractor, was responsible for completion of the design in accordance with the required European Standards and Specifications.

The number of direct hire personnel reached 3,353 at its peak, including citizens of 13 different countries, citizens of Kosovo made up 80% of the total. It is one of ENKA’s goals to build a strong quality culture on the project and train the personnel to ensure that quality and safety are part of their everyday activities. Consequently, BEGP had provided all the personnel working on the project with training in safety and quality.

In addition to completed Pristina-Hani I Elezit Motorway, Employer requested to incorporate 2 interchanges and 1 overpass to the BEGP’s scope. At 28 May 2019, Along with the request of the Ministry of Infrastructure and Transport, the term of completion of Contract for construction of Pristina-Hani I Elezit Motorway is extended from 01.06.2019 until 01.12.2020. Concordantly, Employer’s instruction to start the construction activities is expected.

Total Length

Total Interchange

Total Underpass

Total Overpass

Total Bridge Length

Total Haul Road

Total Excavation

Total Fill

Total Concrete

Total Pile

Total Drainage Pipe

Total Subbase&CTB

Total Asphalt

Total Guardrail

Total Fence

Actve and Passive Anchors

Regulation of River Beds

Maj

or Q

uant

ities

Maj

or Q

uant

ities

km

ea

ea

ea

km

km

m

km

ton

ton

m

m2

m

km

65

8

19

20

8

57

19 Million

11 Million

561,000

69,700

426

1.6 Million

610,000

166,000

206,000

200,000

12

Commodity CommodityTotal TotalUoM UoM

Page 7: INFRASTRUCTURE · Motorway Project which will connect central Serbia and Pan-European Corridors 10 and 11. Morava Corridor Motorway Project is a 112 km dual-carriageway motorway,

12 ENKA İNŞAAT VE SANAYİ A.Ş. FACHSHEETS FACTSHEETS ENKA İNŞAAT VE SANAYİ A.Ş. 13Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Page | 12 13 | Page

PROJECT DETAILS

LOCATION:İzmit, Turkey

DEVELOPER: Otoyol Investment and Operation Co., Inc.

EPC CONTRACTOR: NÖMAYG JV

BRIDGE CONTRACTOR: IHI Infrastructure Systems & ITOCHU Consortium

BRIDGE FABRICATOR: Çimtaş Gemlik Works

GROUND ASSEMBLER: Çimtaş Module and Shipyard, Gölcük

SUBCONTRACTOR: Kasktaş A.Ş.

PROJECT DURATION:2012 – 2016

CONTRACT TYPE:Unit Rate

CONTRACT VALUE:US$ 955 Million

SIGNIFICANT FEATURES /ACCOMPLISHMENTS:

• Tower and Girder blocks of a suspension bridge have been simultaneously fabricated at the same location for the first time in the world.

• Strict fabrication tolerances have been applied as ±3 mm for Tower Blocks and ±5 mm for Girder Blocks.

• Since there was no available barge to carry out the transportation of the bridge blocks, a Dynamic Positioning Vessel, GMK-1, was built by Çimtaş specifically for this project.

Kasktaş:

• Water Jetted Sheet Pile Driving & Extracting

• Cantilever Multi-Cell Diaphragm Wall

• Box Type Foundation System consisting of Continuous Horizontal Reinforced Diaphragm Wall

• Soil Improvement by Jet Grout Columns

PROJECT DESCRIPTIONOsman Gazi Bridge is a suspension bridge, located at the Gulf of Izmit along the eastern end of the Sea of Marmara, in close vicinity of Izmit and approximately 50 km southeast of Istanbul, Turkey. It is the fourth-longest suspension bridge in the world by the length of its central span.

The bridge connects the North Eastern and South Eastern coast of the Izmit Bay, significantly reducing regional travel time. Crossing the bay, the bridge and the connecting highway provides three lanes of traffic in each direction.

Bridge has a total length of 2,682 m with a main span of 1,550 m and having total weight of 52,000 ton.

ENKA SCOPE OF SERVICESScopes of ENKA’s subsidiaries, Çimtaş and Kasktaş, under separate subcontracts are as following:

Çimtaş scope of works:

• ENKA’s fully owned subsidiary Çimtaş has performed Engineering, fabrication, transportation, block formation, trial assembly, fit-up and welding works of girder blocks. Accordingly, Çimtaş Steel (Gemlik Works) and Çimtaş Module and Shipyard (Gölcük Yard) successfully achieved on time completion of the fabrication and ground assembly activities for the Osman Gazi Bridge Project where in total Çimtaş has performed:

• Fabrication of 18,200 tons of tower panels and 33,800 tons of girder panels, thus, completing a total of 52,000 tons welded fabrication.

• Formation and trial assembly of 108 tower blocks comprising of 432 tower panels.

• Delivery of the tower blocks to the erection site by “GMK-1”, a 4,400 DWT dynamic positioning vessel built by Çimtaş Module and Shipyard.

• Formation and trial assembly of 113 girder blocks each with a size of 35mx25mx5m, comprising 3,246 girder panels.

• Combination of the girder blocks on the ground in pairs, to form so called “Mega Blocks”. Under this scope, Çimtaş Steel has transformed 52 girder blocks to 26 Mega Blocks.

• Site erection of the girder blocks where Çimtaş Steel executes the final adjustment and welding works. Within this scope, Çimtaş also performs a part of the girder block shipments via vessel GMK-1.

Kasktaş scope of works:

• At Dry Dock 12,450 m2 water jetted sheet pile driving and extracting works were completed.

• At South Anchorage Block, a total of 14,000 m2 cantilever multi-cell diaphragm wall was successfully executed to enable maximum excavation depth of 16.5 m within an artificial fill for the first time in Turkey.

• A total of 14,700 m2 of diaphragm walls as a box type deep foundation under the South Approach Viaduct (SAV) Footings. The length of South Approach Viaducts is ~1,380 m and founded on 11 no. of footings placed with 125 m of spacing. Height of viaduct footings varies between 13 m to 57 m.

• A soil improvement consisting of 7,500 m of jet grouting under the North Side Span Pier was completed.

UNIQUE CHALLENGES

Çimtaş:

• Total 52,000 tons of steel have been fabricated and delivered on time in 18 months although there have been a considerable amount of design revisions and change requests from the Client.

• In order to compensate the weld shrinkages, steel structure was modelled in 3 different stages in reverse order as installation, trial assembly and fabrication stages.

• All Pre-cambering methods, multi torch welding processes and automated NDT were developed in-house.

• After completion of the block formation works, 52 Girder Blocks have been transformed into 26 “Mega Blocks” in order to reduce the installation time.

• Dynamic Positioning Vessel GMK-1 has been modified in order to transport the “Mega Blocks” to jobsite.

Kasktaş:

• The Osman Gazi Bridge Project is located in one of the most seismically active regions in the world. Since the project alignment intersects with the North Anatolian Fault Line, the design of the structures is of special importance. Especially South Anchorage Block and South Approach Viaducts represent the initials in Turkey in terms of civil engineering.

• South Anchorage Block and South Side Span Pier were designed by enabling rectangular shoring system to work together with multi-cell shoring system and compatible with the shape of integrated structure. The shape of the plan view of the shoring system looks like a guitar. This shoring design is unique not only in Turkey but also in the world.

• Diaphragm walls are implemented as a Box-Type Deep Foundation System under the foundations of South Approach Viaducts. Since the location of the project crosses the North Anatolian Fault Line and it lies within the secondary fault zone, special techniques were used for design and construction of diaphragm walls in order to install continuous horizontal reinforcement, which is quite different from the traditional methods. Therefore, the application of the diaphragm wall with continuous horizontal reinforcement is used for the first time in Turkey.

OSMANGAZI SUSPENSION BRIDGE OSMANGAZI SUSPENSION BRIDGE

The World’s Fourth Longest Suspension Bridge 2013 – 2016

Sheet Pile

Diaphragm Wall

Jet Grouting

Tower Height

Number of Tower Blocks

Block Weight

Tower Total Weight

Girder Width

Number of Girder Blocks

Block Weight

Girder Total Weight

Maj

or Q

uant

ities

Maj

or Q

uant

itiesm2

m2

m

m

pcs

ton

ton

m

pcs

ton

ton

12,450

28,700

7,500

252

108

130-360

18,200

36

113

230-400

33,800

Commodity CommodityTotal TotalUoM UoM

Page 8: INFRASTRUCTURE · Motorway Project which will connect central Serbia and Pan-European Corridors 10 and 11. Morava Corridor Motorway Project is a 112 km dual-carriageway motorway,

14 ENKA İNŞAAT VE SANAYİ A.Ş. FACHSHEETS FACTSHEETS ENKA İNŞAAT VE SANAYİ A.Ş. 15Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Page | 14 15 | Page

EURASIA TUNNEL

PROJECT DETAILS

Location : IstanbulTurkey

Administration : General Directorate of Infrastructure Investments (AYGM)

Contractor :Yapı Merkezi & SK Engineering Joint Venture (YMSK JV)

Subcontractor : Kasktaş A.Ş.

Project Duration :2014 – 2016

MAJOR COMPLETED WORKS:

European Transition Box (ETB)Diaphragm Wall supported by r.c. & steel struts, unreinforced diaphragm walls, jet grout columns and secant piles

Asian Transition Box (ATB)Excavation Support Works, two staged system with secant piles & contiguous piles supported by ground anchors

Yenikapı Underpass and U-Turn StructurresPiling Works

PROJECT DESCRIPTION

The Eurasia Tunnel connects the Asian and European sides of Istanbul via 5.4-kilometer highway tunnel crossing underneath the seafloor.

ENKA SCOPE OF SERVICES

ENKA’s subsidiary Kasktaş performed the Construction of Shoring Systems for TBM Launch and Receiving Structures of Eurasia Tunnel Project:

ATB has a rectangular geometry with 170 m x 25 m and an excavation depth of 39 m. A two staged shoring system consists of bored piles; supported by anchors. The reinforcement of piles and rock bolts used for TBM face are made of glass fibre.

ETB has a rectangular geometry with 70 m x 30 m. A Substation Building with a dimension of 45 m x 45 m and a 600 m-long access road (Cut & Cover Section) are also located in the same area, excavation depth is 31 m. A shoring system consists of diaphragm wall supported by steel and reinforced concrete struts. A 30 m deep impervious block, with a dimension of 17 m x 28 m, composed of unreinforced secant bored piles were constructed along the TBM axis at the receiving area. Moreover; a grid of underground support system composed of unreinforced diaphragm walls were also successfully constructed. Glass fibre reinforcement is also used for the diaphragm wall at the TBM receiving face.

WESTERN HIGH SPEED DIAMETER MOTORWAY

PROJECT DETAILS

Location:St. Petersburg, Russia

Employer: Northern Capital Highway LLC.

Contractor :Astaldi-Ic IÇTAS

Subcontractor : Kasktaş A.Ş.

Project Duration :2013 – 2014

MAJOR COMPLETED WORKS: A viaduct of longer than 7 km,Sea Channel Bridge,Suspension Bridge,Extra dose bridge, Ground and piling works of 70,000 m2 Diaphragm Wall and 52,500 m Bored Piles,Overpass and Temporary Platforms. The total project length is 11,6 km.

PROJECT DESCRIPTION

St Petersburg Western High Speed Diameter (WHSD) Project, is one of the most important Public Private Partnerships (PPP) realized in Russia up to now and has a strategic importance in St. Petersburg city’s transport system.

ENKA SCOPE OF SERVICES

Foundation piles and diaphragm walls have been constructed by ENKA’s subsidiary Kasktaş for 11,6 km of the highway section. In the content of the project; 70,000 m2 of diaphragm wall were completed. Besides, 52,500 m of foundation piles were executed from cofferdams and artificial islands; composed of sheet piled walls and filled with sand material with a limited access and working conditions. These cofferdams were located at the viaducts of the bridges and were connected to each other by temporary access roads. The subcontracted works were executed under challenging nature and limited operating conditions, where extreme winter temperatures of -30oC and -35oC.

Page 9: INFRASTRUCTURE · Motorway Project which will connect central Serbia and Pan-European Corridors 10 and 11. Morava Corridor Motorway Project is a 112 km dual-carriageway motorway,

16 ENKA İNŞAAT VE SANAYİ A.Ş. FACHSHEETS FACTSHEETS ENKA İNŞAAT VE SANAYİ A.Ş. 17Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Page | 16 17 | Page

PROJECT DETAILS

LOCATION:Morine-Merdare, Kosovo

OWNER / CLIENT: Directorate of Road Infrastructure Department Ministry of Transport and Communications Government of Kosovo.

PROJECT DURATION:Apr 2010-Dec 2013

CONTRACT TYPE:Design & Build

CONTRACT VALUE:US$ 1.1 Billion

SIGNIFICANT FEATURES /ACCOMPLISHMENTS:

• The largest infrastructure project ever undertaken by the Government of Kosovo

• Decorated with the Engineering News Records (ENR) magazine’s Global Best Competition 2013, “The Best Global Project Award” in the category of “Roads and Highways” around the world.

• Honored with the Colossus of Chamber of Civil Engineering in Croatia awarded to the IGH for Outstanding Achievements in Transportation Highway Project, Morine to Merdare, Kosovo

• Honored with the Bechtel Innovation Award, Borrow Haulage Management System

• Presented the International Road Federation (IRF), “Program Management” award in 2012

• Honored with Green Footprint Awards in 2011, with the reduce/ recycle/ reuse campaign and environmental awareness and sustainability applications pioneered across Kosovo.

PROJECT DESCRIPTION

The Morine to Merdare Kosovo Motorway allows the newly founded Kosovo, to become an important pillar at the center of Eastern Europe’s transport system, improving the economy and lives of Kosovo’s citizens; as the World Highway magazine mentioned in their article “Road to prosperity.” The Morine to Merdare Motorway spans from the Albanian border to the Serbian border, connecting Kosovo to the Trans-European Motorway and to the ports at Durres (in Albania). Connecting the newly founded country to the land and sea transportation grids in the region. It is the largest infrastructure project ever undertaken by the Government of Kosovo.

In April 2010, the Government of Kosovo authorized the construction of the 78 km Route 7 motorway from Morine to just north of the capital city, Pristina. The construction began within a month of signing the contract. The first 38 km part was completed in 18 months and project is fully completed in less than 44 months.

This east-west motorway serves as the centre-piece of Kosovo’s national transport system and promotes trade and development in Kosovo and throughout. It also improves road safety, and acts as an economic engine to increase investment in the country. The trade route created by the motorway will contribute to the economic integration of the countries from South-eastern Europe, Western Europe, and beyond.

UNIQUE CHALLENGES

The Sections 1,2,3 and part of the Section 4, making 38 km altogether are completed in 18 months including all design and expropriation, with the highest standards of construction. This period is the shortest period of construction for a 38 km motorway section built up-to-date.

The project has implemented a world-class safety program and has developed strong working relationships with all stakeholders and communities that are involved and impacted by the project.

The Project delivered the first 38 km in 18 months with prompt mobilization of equipment and personnel, applied the quality management system and safety procedure, completed segments of the motorway earlier than scheduled dates and within budget and achieved all these with support of the Client.

Maximizing the local content is another target of the project. The maximum peak number of employees was 3,734 including subcontractors. 70% of the workforce was Kosovan.

ENKA SCOPE OF SERVICES

The 2x2 carriageway motorway has a total length of 78 km, runs through 6 important regions of Kosovo and strictly complies with European standards. The design speed is 120 km/h and there are 9 sections of the project.

The designers are EGIS (France) and IGH (Croatia). BEGP (Bechtel-ENKA General Partnership) is responsible for design management and for application of the design.

The works include construction of 15 bridges with a total length of 3,334 m, of which the maximum length is 720 m; construction of 58 over and underpasses; 36 million m3 of excavation; 14 million m3 of fill; 2.2 million tons of subbase and CTB; 392 thousands m3 of concrete and 764 thousands tons of asphalt.

All materials used for the construction are fully tested, independently verified and approved prior to procurement and installation. The project employs extensive formation for its staff, supervisors, foremen and craft to meet the quality requirements. The project also has developed and implemented a comprehensive ES&H Management Program in compliance with the highest international standards.

ROUTE 7 MORINE - MERDARE MOTORWAY PROJECT ROUTE 7 MORINE - MERDARE MOTORWAY PROJECT

Total Length

Total Interchange

Total Underpass

Total Overpass

Total Bridge Length

Total Haul Road

Total Excavation

Total Fill

Total Concrete

Total Pile

Total Drainage Pipe

Total Subbase&CTB

Total Asphalt

Maj

or Q

uant

ities

Maj

or Q

uant

ities

km

ea

ea

ea

m

km

m

m

ton

ton

78

11

27

31

3,334

110

36 Million

14 Million

392,000

40,200

95,432

2,174,126

764,000

Commodity CommodityTotal TotalUoM UoM

Page 10: INFRASTRUCTURE · Motorway Project which will connect central Serbia and Pan-European Corridors 10 and 11. Morava Corridor Motorway Project is a 112 km dual-carriageway motorway,

18 ENKA İNŞAAT VE SANAYİ A.Ş. FACHSHEETS FACTSHEETS ENKA İNŞAAT VE SANAYİ A.Ş. 19Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Page | 18 19 | Page

PROJECT DETAILS

LOCATION:Rreshen - Kalimash, Albania

OWNER / CLIENT: General Roads Directorate of the Government of Albania - GRD

PROJECT DURATION:Oct 2006-Oct 2010

CONTRACT TYPE:Construction & Design Management

CONTRACT VALUE:US$ 1.1 Billion

SIGNIFICANT FEATURES /ACCOMPLISHMENTS:

• The largest public contract ever signed in Albania

• Reduces transportation time from 8 hours to 2 hours

PROJECT DESCRIPTIONThis project is the largest public contract ever signed in Albania. Undertaken by ENKA and Bechtel in September 2006 the Rrëshen-Kalimash Motorway Project is a key connection between Durres Port, Albania’s primary harbour on the Adriatic Sea, and Kosovo.

The 61 km motorway crosses the mountainous northern region of Albania, linking the cities of Rrëshen and Kalimash, and is divided into three sections. Its designers are Scetauroute (France) for Sections 1 and 3, and Italconsult (Italy), for Section 2. Section 1 is an 18 km long stretch from Rrëshen to Reps, section 2 is 27 km long and travels from Reps to Thirra, section 3 connects Thirra and Kolshi and is 15 km long. At Mount Runes, at an altitude of 1,858 m, the construction includes a 5.5 km long double bore tunnel.

In addition to the many economic and social benefits, from the construction of this Motorway, the transportation duration between Tirana and Kosovo border is reduced from 8 hours to 2 hours.

UNIQUE CHALLENGES

The most challenging part of the whole corridor was the segment between Rrëshen and Kalimash, which is around 61 km long. Before the motorway, transportation was provided by poor old mountain road and travel time was eight hours. The Rrëshen - Kalimash Motorway’s main purpose is to serve as a faster and safer route through the mountainous region.

Difficult terrain conditions and harsh climate conditions were two big challenges. To cross this difficult terrain, bridges, viaducts and tunnels were designed and constructed. Due to the 800 m of overburden on top of the tunnel, it was not possible to reach anywhere across the tunnel alignment except the entrance and exit locations. In order to reach portals of the tunnel, 17 km of service road were constructed. This service road was closed for 3 months in the year due to the harsh weather conditions. The total service road constructed for this project is 92 km.

In addition to difficult terrain and harsh climate conditions, geological conditions were not stable and continuous throughout the tunnel and motorway alignment. This enforced engineers to use more than one method during construction.

Despite the difficult conditions, the project was completed successfully and the travel time is reduced from eight hours to two hours. In addition to the great amount of travel time saved, the motorway enabled a safe means of travel in the region. This new route will serve to stimulate the economy in Albania’s north-eastern region.

ENKA SCOPE OF SERVICES

The Motorway is designed as dual carriageways of 2X3.75 m, supplemented with 2-meter emergency shoulder lanes. The major work items comprise of 34 million m3 of excavation, 13 million m3 of earth filling, 0.5 million m3 of concrete, 1.6 million tons of subbase and cement treated base and 0.45 million tons of asphalt. The construction of bridges and viaducts at an altitude of 5 km in the challenging mountainous terrain of Albania is included in the contractual works. At Mount Runes, at an altitude of 1,858 m, construction includes a 5.5 km long double bore tunnel.

RRESHEN - KALIMASH MOTORWAY PROJECT RRESHEN - KALIMASH MOTORWAY PROJECT

Total Length

Total Interchange

Total Tunnel Length

Total Underpass

Total Overpass

Total Bridge Length

Total Haul Road

Total Excavation

Total Fill

Total Concrete

Total Pile

Total Drainage Pipe

Total Subbase&CTB

Total Asphalt

Maj

or Q

uant

ities

Maj

or Q

uant

ities

km

ea

m

ea

ea

m

km

m

m

ton

ton

61

3

11,000

3

4

4,420

92

34 Million

13 Million

501,000

1,389

16,000

1,600,000

455,000

Commodity CommodityTotal TotalUoM UoM

Page 11: INFRASTRUCTURE · Motorway Project which will connect central Serbia and Pan-European Corridors 10 and 11. Morava Corridor Motorway Project is a 112 km dual-carriageway motorway,

20 ENKA İNŞAAT VE SANAYİ A.Ş. FACHSHEETS FACTSHEETS ENKA İNŞAAT VE SANAYİ A.Ş. 21Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Page | 20 21 | Page

PROJECT DETAILS

LOCATION:Brasov - Bors, Romania

OWNER / CLIENT: National Company of the Highways and National Roads of Romania

PROJECT DURATION:Dec 2003-May 2013

CONTRACT TYPE:Construction & Design Management

CONTRACT VALUE:US$ 1.7 Billion

SIGNIFICANT FEATURES /ACCOMPLISHMENTS:

• Largest infrastructure project of the country

• The motorway has critical significance in connecting Romania to Western Europe and constitutes one of the fundamental parts of the country’s motorway system.

PROJECT DESCRIPTION

The Transylvanian Motorway Project is a modern, high speed motorway extending 415 km from the city of Brasov in central Romania through the major cities of Targu Mures, Cluj-Napoca, Zalau and Oradea and ending at Bors in the north eastern part of the country on the Romanian-Hungarian Border. ENKA and Bechtel together worked on two sections of the motorway.

The Transylvanian Motorway has a critical significance in connecting Romania to Western Europe and constitutes one of the fundamental parts of the country’s motorway system. The motorway plays an important role in the integration of the Romanian economy to the European economic system serving as a major link between the European and Central Asian markets.

The motorway project yields substantial economical returns for Romania. The new national highway brings the country’s infrastructure in line with that of its new economic partners in the EU zone. The road eased traffic jams, improved safety, and opened up the country to new possibilities for tourism and trade.

UNIQUE CHALLENGES

ENKA’s scope comprised of design and construction of two sections of 112 km of Autostrada Transylvania. These Sections of the motorway are passing through varying terrain including plains, hills, mountains and valleys requiring the design and construction of more than 60 structures such as bridges and viaducts with a total length of 9,000 m to facilitate the passage of the motorway.

Muddy and weather sensitive soil conditions were the specific construction challenge which required adopting specific construction and execution methods in order to achieve quality and schedule planned.

Quick construction of piles is another significant feature of the project. The monthly peak value of pile construction is 17,345 m of piles.

ENKA SCOPE OF SERVICES

In this 112 km motorway project, scope of works consists of 63 over and underpasses, 8,140 m long bridges, 16 million m3 of excavation, 13 million m3 of fill, 891 thousand m3 of concrete, 176,000 m of pile, 129,000 m of drainage pipe, 2.5 million tons of subbase & CTB and 883 thousand tons of asphalt.

As a result of teamwork, the work hours without a lost time accident reached 11 million person-hours and with providing more than 3,700 hours of work safety & health training for workers, all sections of the project became safe areas in 2012.

AUTOSTRADA TRANSYLVANIA - ROMANIAN MOTORWAY PROJECT AUTOSTRADA TRANSYLVANIA - ROMANIAN MOTORWAY PROJECT

Total Length

Total Interchange

Total Underpass

Total Overpass

Total Bridge Length

Total Haul Road

Total Excavation

Total Fill

Total Concrete

Total Pile

Total Drainage Pipe

Total Subbase&CTB

Total Asphalt

Maj

or Q

uant

ities

Maj

or Q

uant

ities

km

ea

ea

ea

m

km

m

m

ton

ton

112

5

36

27

8,140

180

16 Million

13 Million

891,000

176,295

129,000

2,522,000

883,000

Commodity CommodityTotal TotalUoM UoM

Page 12: INFRASTRUCTURE · Motorway Project which will connect central Serbia and Pan-European Corridors 10 and 11. Morava Corridor Motorway Project is a 112 km dual-carriageway motorway,

22 ENKA İNŞAAT VE SANAYİ A.Ş. FACHSHEETS FACTSHEETS ENKA İNŞAAT VE SANAYİ A.Ş. 23Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Page | 22 23 | Page

PROJECT DETAILS

LOCATION:Bregana - Zagreb, Croatia

OWNER / CLIENT: Hrvastske Autoceste (Croatian Motorways).Consultant: Croatian Civil Engineering Institute

PROJECT DURATION:Jul 1998-Jul 2004

CONTRACT TYPE:Construction & Design Management

CONTRACT VALUE:US$ 955 Million

SIGNIFICANT FEATURES /ACCOMPLISHMENTS:

• Links Croatia and its touristic destinations to Pan-European Transportation Corridor

• Honored with the 2004 Croatian Contractor Safety Award

PROJECT DESCRIPTION

This important motorway project’s total length amounts to 156 km and consists of two separate sections. Section 1, the 13 km Bregana-Jankomir motorway, is a four-lane link from the capital city Zagreb to the border of Croatia and Slovenia, and was opened to circulation in December 2000. The other section, the 143 km Bosiljevo-Sveti Rok motorway, linking central Croatia to the Dalmatian Coast, opened in July 2004.

The motorway is considered vitally important as it provides the principal link between the Zagreb region in central Croatia and the Dalmatian coast. With this motorway, Croatia’s Dalmatian coast is now integrated with Europe’s central and western highway network.

The project was an enormous success. ENKA and Bechtel, who had undertaken the turnkey construction of the motorway in April 1998, completed the project 14 months ahead of schedule, with 4,000 workers employed at the peak of the construction. The project is further distinguished for winning the 2004 Croatian Contractor Safety Award, as it was successfully realized without any compromise in quality or safety.

ENKA assisted client to facilitate US EXIM Bank and OPIC financing for the project.

UNIQUE CHALLENGES

Habitat fragmentation occurs when human-made barriers such as roads, railroads, canals, electric power lines, and pipelines penetrate and divide wildlife habitat. Of these, roads have the most widespread and detrimental impacts. To decrease this impact, in Bregana-Zagreb-Dubrovnik Motorway, 6 wildlife crossings were constructed.

ENKA also determined 70 places of sinkholes on the alignment and adopted its construction methodology to cross over them considering all environmental aspects.

The project was completed in 14 months ahead of schedule, with 4,000 workers employed at the peak of the construction. The project is further distinguished for winning the 2004 Croatian Contractor Safety Award, as it was successfully realized without any compromise in quality or safety.

ENKA SCOPE OF SERVICES

Over the construction, 21 million m3 of earthwork were excavated, 0.65 million m3 of concrete were poured, 19 million m3 of fill material were used and 4.6 million tons of subbase and cement treated base, as well as 1.18 million tons of asphalt, were laid. The works also included the construction of bridges and viaducts reaching a length of 8 km.

BREGANA – ZAGREB - DUBROVNIK MOTORWAY PROJECT BREGANA – ZAGREB - DUBROVNIK MOTORWAY PROJECT

Total Length

Total Interchange

Total Underpass

Total Overpass

Total Bridge Length

Total Haul Road

Total Excavation

Total Fill

Total Concrete

Total Pile

Total Drainage Pipe

Total Subbase&CTB

Total Asphalt

Maj

or Q

uant

ities

Maj

or Q

uant

ities

km

ea

ea

ea

m

km

m

m

ton

ton

156

6

38

20

7,973

234

21 Million

19 Million

650,000

3,835

388,000

4,620,000

1,180,000

Commodity CommodityTotal TotalUoM UoM

Page 13: INFRASTRUCTURE · Motorway Project which will connect central Serbia and Pan-European Corridors 10 and 11. Morava Corridor Motorway Project is a 112 km dual-carriageway motorway,

24 ENKA İNŞAAT VE SANAYİ A.Ş. FACHSHEETS FACTSHEETS ENKA İNŞAAT VE SANAYİ A.Ş. 25Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Page | 24 25 | Page

PROJECT DETAILS

LOCATION:Ankara, Turkey

OWNER / CLIENT: Ministry of Public Works - General Directorate of Highways - TCK.Consultant: Scott Wilson Kirkpatrick & Kutlutas Joint Venture

PROJECT DURATION:Jan 1987-May 1999

CONTRACT TYPE:Construction & Design Management

CONTRACT VALUE:US$ 1.5 Billion

SIGNIFICANT FEATURES /ACCOMPLISHMENTS:

• Links Turkey to Trans-European Motorway Corridor

• 230 km long

• Six to eight lanes

• One of the largest single construction projects ever undertaken in Turkey

• Almost 6,000 Turkish employees

• Financing package named the ‘Deal of Year’ by Euromoney Trade Finance

• 27.4 million staff-hours worked

• Integration of tasks and hands-on training for local field personnel for an effective workforce that kept costs low

PROJECT DESCRIPTION

The Gerede-Ankara and Ankara Peripheral motorway project is one of the largest infrastructure development projects in Turkey. The total length of the motorway is 230 km. It forms a significant part of the Trans-European motorway (TEM). As a major link to the Trans-European Motorway connecting Europe with Iran, the motorway is vital for transporting goods to and from Middle-Eastern markets. The six- to eight-lane high-speed toll way was built in two sections. The first section, a six-lane, 115-kilometre segment, connects the capital, Ankara, with the town of Gerede; the second is an eight-lane, 115 km beltway circling Ankara. It goes through terrain with very difficult and complex geological formations and has been designed in accordance with the highest world standards and specifications.

The project has been executed with a peak manpower of 6,296. This includes the resources and expertise of local contracting companies employed as subcontractors. Plant and equipment to the total value of US$ 130 Million has been used on the project. Resulting highway system is critical to Turkey’s future economic standing, providing the final link for freight and other road traffic between Istanbul, Turkey’s European port, and Ankara. The Ankara-Gerede Motorway demonstrates our ability to provide everything from crushed rock to sophisticated financing for successful completion to Client requirements.

ENKA assisted the client to facilitate US EXIM Bank financing for the project.

UNIQUE CHALLENGES

Building the motorway was a challenge. In some sections the road reached heights of 1.5 km above sea level and yet our team excavated more than 163 million m3 of earth and rock. At peak, excavation reached 6.5 million m3 on August 1990. There was 16.2 million m3 of embankment, and 4.7 million m3 of embankment was accomplished as a peak on August 1990. At the same time, 1.24 million m3 of concrete was poured for the project and 107 thousand of ton rebar were installed, which includes 63 overpasses and underpasses, 25 bridges and viaducts and 560 box culverts. Most of the bridges are of standard design consisting of concrete piers and precast/prestressed concrete U-beams. 5.1 million tons of asphalt was placed and over 332 thousand tons of asphalt was the record on August 1991. The quantity of crushed aggregate was exceeded on 31 million tons.

The alignment traversed rugged terrain, in some places reaching heights of 1.5 km above sea level. Our team mobilized almost 1,500 pieces of heavy construction equipment to accomplish work under difficult weather conditions, including rain that turned fresh excavations into lakes.

Our team of international professionals brought the following experience and capabilities to the Ankara–Gerede Motorway project:

• Complex, megaproject delivery• Maintaining schedule while traversing remote, rigorous terrain• Recruitment, training, and maintaining of a large local workforce and deployment of mobile camps• Coordination between multiple work sites • Timely handling of significant quantities of excavation, backfill, concrete and steel at multiproject locations• Movement of heavy equipment as necessary

ENKA SCOPE OF SERVICES

The alignment forms a significant part of the Trans-European Motorway (TEM). This part of the Motorway system passes between Gerede and Ankara and around the city of Ankara. It goes through terrain with very difficult and complex geological formations and has been designed in accordance with the highest world standards and specifications. ENKA has executed this project with a peak manpower of 6,296. This includes the resources and expertise of local contracting companies employed as subcontractors.

Within the integrated JV, ENKA provided onsite management and supervision, engineering, cost and schedule control, procurement, quality assurance/control, testing and startup, and environmental mitigation. The scope also included licensing and permit applications, utility and drainage system relocation, technology transfer, and public outreach, including the management of almost $100 million in specialty subcontractors for the Government. With almost 6,000 Turkish workers, it was one of our largest international direct-hire jobs.

Construction works consist of 163 million m3 of excavation, 117 million m3 of fill, 1.2 million m3 of concrete, 24 thousand m of pile, 450,000 m of drainage pipe, 16.5 million tons of subbase & CTB and 5.1 million tons of asphalt.

As with all our projects, ENKA implemented its ‘Zero Accidents’ safety policy. Our Lost-Time Injury rate for the project was 0.98 for a total of 27,449,339 staff-hours worked.

ANKARA – GEREDE MOTORWAY PROJECT ANKARA – GEREDE MOTORWAY PROJECT

Total Length

Total Interchange

Total Underpass

Total Overpass

Total Bridge Length

Total Haul Road

Total Excavation

Total Fill

Total Concrete

Total Pile

Total Drainage Pipe

Total Subbase&CTB

Total AsphaltM

ajor

Qua

ntiti

es

Maj

or Q

uant

ities

km

ea

ea

ea

m

km

m

m

ton

ton

230

20

33

30

4,237

345

163 Million

117 Million

1,240,000

24,185

450,000

16,500,000

5,100,000

Commodity CommodityTotal TotalUoM UoM

Page 14: INFRASTRUCTURE · Motorway Project which will connect central Serbia and Pan-European Corridors 10 and 11. Morava Corridor Motorway Project is a 112 km dual-carriageway motorway,

26 ENKA İNŞAAT VE SANAYİ A.Ş. FACHSHEETS FACTSHEETS ENKA İNŞAAT VE SANAYİ A.Ş. 27Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Page | 26 27 | Page

PROJECT DETAILS

LOCATION:Istanbul, Turkey

OWNER / CLIENT: Istanbul Metropolitan Municipality.Consultant: Yüksel Proje & Geotechnik und Tunnelbau Joint Venture

PROJECT DURATION:Sep 1992-Feb 1998

CONTRACT TYPE:Unit Rate

CONTRACT VALUE:US$ 145 Million

SIGNIFICANT FEATURES /ACCOMPLISHMENTS:

• First metro line built in Turkey

PROJECT DESCRIPTION

To construct the first line between Taksim and Levent on the Line M2, ENKA, and its joint venture partners, signed the contract with the Istanbul Metropolitan Municipality for Stage I, Section II works. Along this subway line, there are three stations (Taksim, Osmanbey, Şişli), each with a total length of 180 m. The project is designed to accommodate heavy rail transport system, travelling along the double underground tunnels and accompanying facilities. Total length of tunnels is 10,250 m. Diameters of tunnels range between 4.20 m to 13.40 m. The major diameter along the route is 6.20 m.

UNIQUE CHALLENGES

The Istanbul Metro Project is the first deep excavation in the city centre and it was a challenge to construct metro stations in dense areas. Osmanbey and Sisli cut and cover stations are located under two major avenues of the city, Halaskargazi Caddesi and Buyukdere Caddesi, and engineers gave special attention during construction in order not to cause any traffic congestion.

ENKA SCOPE OF SERVICES

The project scope of works consisted of the construction of 10,250 m of metro tunnel and three stations, each with 180 m of platforms. The “New Austrian Tunnelling Method” was employed in the construction of the tunnels. The project was completed in 1998.

ISTANBUL METRO ISTANBUL METRO

Excavation in Tunnels

Concrete in Tunnels

Reinforcing in Tunnels

Excavation in Stations

Concrete in Stations

Reinforcing in Stations

Maj

or Q

uant

ities m³

ton

ton

464,778

105,604

6,730

223,875

72,361

6,960

Commodity TotalUoM

Page 15: INFRASTRUCTURE · Motorway Project which will connect central Serbia and Pan-European Corridors 10 and 11. Morava Corridor Motorway Project is a 112 km dual-carriageway motorway,

28 ENKA İNŞAAT VE SANAYİ A.Ş. FACHSHEETS FACTSHEETS ENKA İNŞAAT VE SANAYİ A.Ş. 29Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Page | 28 29 | Page

PROJECT DETAILS

LOCATION:Istanbul, Turkey

OWNER / CLIENT: Ministry of Public Works - General Directorate of Highways - TCK

PROJECT DURATION:Mar 1994-Jun 1998

CONTRACT TYPE:Lump Sum - Turnkey

CONTRACT VALUE:US$ 100 Million

SIGNIFICANT FEATURES /ACCOMPLISHMENTS:

• Fabrication & erection of 7500 tons Steel Bridge completed in 16 months

PROJECT DESCRIPTION

Haliç Bridge is a highway bridge on the Golden Horn (Turkish: Haliç) in Istanbul, Turkey. It connects the neighborhoods of Ayvansaray in the southwest and Halıcıoğlu in the northwest. The bridge carries the motorway D-100.

ENKA SCOPE OF SERVICES

The fabrication and erection of the New Golden Horn Steel Bridges, ordered by IHI of Japan, one of the leading steel bridge contractors, were completed by Çimtaş in 16 months, combining advanced engineering expertise with a highly skilled workforce and the latest manufacturing, erection and information technologies.

Çimtaş Gemlik Works fabricated two units of steel bridges over the Golden Horn in Istanbul in 11 months. They had a total weight of 7,340 tons, composed of 74,000 steel elements, assembled by 242,000 m of welding and sustaining 462,500 bolt holes in a configuration of 184 blocks, each of which was 3,2x4,0x9,0 m.

Following the on-shore preassembly of the blocks, which involved pairing up two blocks into one of 18 m length, erection was also completed in 11 months over eight spans of bolting and welding, with the longest span reaching to 139.5 m and the heaviest lift weighing 100 tons.

GOLDEN HORN STEEL BRIDGE

Page 16: INFRASTRUCTURE · Motorway Project which will connect central Serbia and Pan-European Corridors 10 and 11. Morava Corridor Motorway Project is a 112 km dual-carriageway motorway,

30 ENKA İNŞAAT VE SANAYİ A.Ş. FACHSHEETS FACTSHEETS ENKA İNŞAAT VE SANAYİ A.Ş. 31Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Page | 30 31 | Page

MOTORWAYS, BRIDGES & TUNNELS

AIRPORTS & STADIUMS

WATER WORKS, DAMS, PIPELINES & MINING

CEMENT PLANTS

DEVELOPMENT OF MUSCAT INTERNATIONAL AIRPORT MAIN CONTRACT 3

SHEREMETYEVO INTERNATIONAL AIRPORT, TERMINAL 3

FC SHAKHTAR SHAKTAR STADIUM, DONBASS ARENA

aırp

orts

& TA

DIUM

S

aırports & STADIUMS

Page 17: INFRASTRUCTURE · Motorway Project which will connect central Serbia and Pan-European Corridors 10 and 11. Morava Corridor Motorway Project is a 112 km dual-carriageway motorway,

32 ENKA İNŞAAT VE SANAYİ A.Ş. FACHSHEETS FACTSHEETS ENKA İNŞAAT VE SANAYİ A.Ş. 33Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Page | 32 33 | Page

PROJECT DETAILS

LOCATION:Muscat, Oman

OWNER / CLIENT: Ministry of Transport and Communications Public Authority for Civil Aviation. Engineer: COWI-LARSEN Joint Venture (former). Hill International . Project Management Consultant: ADPI

PROJECT DURATION:Feb 2011-Dec 2016

CONTRACT TYPE:Lump Sum

CONTRACT VALUE:US$ 1.8 Billion

SIGNIFICANT FEATURES /ACCOMPLISHMENTS:

• The Development of Muscat International Airport project is the largest ever to be undertaken in the history of Oman.

• State of art Passenger Terminal Building

• 14 Million man hours without LTI

PROJECT DESCRIPTION

On February 23, 2011, Enka and Co. LLC - Bechtel and Co. LLC – Bahwan Engineering Company LLC unincorporated consortium (BEB), was awarded the Main Contract 3 for the development of the Main Terminal Buildings of the Muscat International Airport. The design is to be developed on the basis of the design prepared by the COWI-Larsen Joint Venture. The contract is a Design and Build, Lump Sum Fixed Price contract, except where any item or work, described as provisional or prime cost, is subject to adjustments in accordance with the provisions of the contract.

BEB carried out and is fully responsible for the development and completion of the design, procurement, manufacture, supervision, delivery to site, construction, erection, inspection, testing, trial operation, commissioning and maintenance of equipment and the remediation of defects for the facilities, in accordance with the Employer’s Requirements.

UNIQUE CHALLENGES

The steel structure of the Passenger Terminal Building consists of extremely heavy 3D curved trusses. The first challenge was production, as the manufacturing of such irregular components had its own challenges; however, Çimtaş successfully completed production. Transportation also presented challenges, due to size limitations and the components being produced at the Çimtaş factory in one piece, shipped to site in pieces and welded back together on site, as a pre-assembled truss ready for lifting into place. As the weight of the trusses was substantial, two crawler cranes of 1,600-ton capacity were used. The erection was safely completed, notwithstanding the challenges of an active runway next to the site, together with interface challenges.

ENKA SCOPE OF SERVICES

The buildings and structures in the contract include: Passenger Terminal Building: Enclosed Area – 247,633 m2, North, South and West Piers: Approximately 111,633 m2, Traffic Concourse: Approximately 71,094 m2, North and South Multistory Car Park: Approximately 116,318 m2, North and South Multistory Forecourt Buildings and Lift Building: Approximately 35,615 m2, Forecourt Plaza: Approximately 37,144 m2, Taxi Drivers Facility Building: Approximately 800 m2

The Gross closed building area is around 647,480 m2 with capacity for 12 million passengers per annum (mppa) extendable to 24 mppa and 36 mppa.

In addition to the main quantities specified below, the extent of the work also includes special equipment installations, such as a Conveying System, Visual Docking System, Media Mesh, Signage and way finding systems. Integrated artwork, such as balustrades, glazed escalator sides, glass screens, water features, stone carvings and patterns.

The work of the consortium also includes the installation of MEP systems, such as Rain Water System, Plumbing System (domestic water & sewage systems), Fire Fighting System, Cooling Systems (pipes, valves, supports etc.) – Refrigeration, Ventilation / Air Conditioning & Ductwork, Building Management System (BMS), Water Feature & Pools, SCADA (Supervisory Control & Data Acquisition System), Power Distribution, UPS, Internal, External, Arch, Façade and Emergency Lighting, Lighting Control System, Small Power Installations, Fire Alarm, Public Address System, Car Park & Traffic Management System, Info Display System (containment only), Access Control System (containment only), CCTV System (containment only), IT Structured Cabling System (containment only).

Other Buildings (Provisional Sum)• Guardhouse VIP (approx. 50 m2)

• OAMC Airside (approx. 12,500 m2)

• Ground Handler Workshop (approx. 8,000 m2)

• Staff Amenities Building (Maintenance Yard) (approx. 1,154 m2)

• Maintenance Yard Gate Building (approx. 2,300 m2)

• Waste Management Building (approx. 500 m2)

• Fuel into Plane Operators Building (approx. 2,796 m2)

Access ramps• 5 post tensioned viaducts, total length of 800 m and max.

span 51 m (Approximately 12,380 m2)

Bridges (approx. 1740 m2)

Surface Car Parking and Associated Roads• Shaded car parking for 2000 cars; open car parking for 2000

cars, including shaded walkways to PTB

Roads and Car Park Areas• Asphalt paved, approx. 271,008 m2

• Hard landscaped, approx. 65,988 m2

• Soft landscaped approx. 74,662 m2

Hard landscape around Buildings• Approximately 18,602 m2

DEVELOPMENT OF MUSCAT INTERNATIONAL AIRPORT MAIN CONTRACT 3 DEVELOPMENT OF MUSCAT INTERNATIONAL AIRPORT MAIN CONTRACT 3

Concrete Works

Rebar Works

Earth Works

Structural Steel

Façade

Roofing

Blockworks

Floors

Wall covering

Check-in counters

Boarding Bridges

Remote S516Aircraft Stands

Bus-Boarding Lounges

Hotel Room

Maj

or Q

uant

ities

Maj

or Q

uant

ities

ton

ton

m2

m2

m2

m2

m2

ea

ea

ea

ea

ea

470,000

80,000

4 Million

30,000

135,000

175,000

225,000

600,000

600,000

96

29

30

10

90

Commodity CommodityTotal TotalUoM UoM

Page 18: INFRASTRUCTURE · Motorway Project which will connect central Serbia and Pan-European Corridors 10 and 11. Morava Corridor Motorway Project is a 112 km dual-carriageway motorway,

34 ENKA İNŞAAT VE SANAYİ A.Ş. FACHSHEETS FACTSHEETS ENKA İNŞAAT VE SANAYİ A.Ş. 35Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Page | 34 35 | Page

PROJECT DETAILS

LOCATION:Moscow, Russia

OWNER / CLIENT: OAO Terminal Consultant

PROJECT DURATION:July 2005-Nov 2011

CONTRACT TYPE:Lump Sum - Turnkey

CONTRACT VALUE:US$ 767 Million

ENKA SCOPE OF SERVICES:

• Engineering

• Procurement

• Construction

PROJECT DESCRIPTION

Sheremetyevo International Airport, one of the largest international airports in the Russian Federation, in addition to various Russian airlines, also serves more than 40 foreign carriers. Sheremetyevo Airport’s principal carrier is Aeroflot Russian Airlines, Russia’s largest air carrier, for which Sheremetyevo serves as the base. Initially, the airport had two terminals, Sheremetyevo 1 and Sheremetyevo 2, providing services for domestic and international routes. OAO AEROFLOT decided to build a third terminal to serve as Aeroflot’s and its alliances’ international terminal. Terminal 3 has a carrying capacity of up to 12 million passengers annually, and with the terminal in operation, Sheremetyevo International Airport complex has reached a total carrying capacity of 3,800 passengers per hour, combining arrivals and departures. ENKA was awarded the turnkey design and build contract by JSC TERMINAL in June 2005.

The terminal building consisted of a six-floor reinforced concrete building. The footprint of the building is 52,000 m2 and a total construction area is 170,000 m2. The height of the terminal building is 38.5 m, and the roof has a steel structure dome with a diameter of 66 m and a steel main arch with canopies weighing more than 1,800 tons. The building’s facade is composed of glazing, aluminum composite and natural stone. Apart from the terminal building, major work in the contract included an apron area of 374,000 m2; a multi-story car park for 4,000 cars; a control tower; 12 fixed passenger bridges; various car and bus parks; external facilities, such as a water treatment plant and water supply lines, an MV switch room; infrastructure, including high voltage cable lines, sewage lines, fiber optic cable ducts; construction of the aircraft refueling system, and hard and soft landscaping. Check-in and passport counters and the lounge furniture were also included in the contract work.

UNIQUE CHALLENGES

• As the existing airport facilities were in operation throughout construction, extra special care had to be taken with regard to safety, environmental protection and security.

• The project was conducted with due diligence, taking into consideration compliance with Russian norms and also in accordance with the international (IATA) standards on design and engineering.

• Supply and installation of all of the existing utilities (including provision of power, cold & hot water supply) beyond the site borders were also included in the General Contractor’s Scope of Works.

• The refueling system and its connections were included in the General Contractor’s Scope of Works and all works including installation, testing and commissioning were conducted while the main systems of the airport was operational for other terminals.

• Permanent flyovers and access roads to and from the terminal and construction of all connections were conducted without any disturbance to the existing traffic to/from the running terminals.

SHEREMETYEVO INTERNATIONAL AIRPORT, TERMINAL 3 SHEREMETYEVO INTERNATIONAL AIRPORT, TERMINAL 3

6 storey Terminal Building

3 storey Car park Building

Apron

Concrete Works

Rebar Works

Excavation & Earth Removal

Backfill including gravel, sand and crushed aggregate, which were all imported

Flyover Bridge

Highway

Viaduct

Access Roads and Flyovers

Maj

or Q

uant

ities

m2

m2

m2

m3

ton

m3

m3

m2

m2

m2

m2

170,000

83,000

374,000

313,732

19,752

420,833

608,902

19,750

46,330

5,194

88,000

Commodity TotalUoM

Page 19: INFRASTRUCTURE · Motorway Project which will connect central Serbia and Pan-European Corridors 10 and 11. Morava Corridor Motorway Project is a 112 km dual-carriageway motorway,

36 ENKA İNŞAAT VE SANAYİ A.Ş. FACHSHEETS FACTSHEETS ENKA İNŞAAT VE SANAYİ A.Ş. 37Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Page | 36 37 | Page

PROJECT DETAILS

LOCATION:Donetsk, Ukraine

OWNER / CLIENT: Stadion Shakhtar Limited. Project Designer: Arup Sport

PROJECT DURATION:June 2006-Sep 2009

CONTRACT TYPE:Lump Sum -Turnkey

CONTRACT VALUE:US$ 220 Million

ENKA SCOPE OF SERVICES:

• Engineering

• Procurement

• Construction

PROJECT DESCRIPTION

As a prime contractor ENKA began the construction of the stadium in 2006 and completed in 2009. To meet a tight schedule (three years) for erection works of the five-star arena over 1,600 people worked on site at peak times.

Turn-key construction of UEFA Elite Class stadium in Donetsk, Ukraine for 52,667 visitors, of which 3,680 are VIPs. The Stadium is an oval shape with an inclined roof. Inside the Stadium there are restaurants, bars, cafes, fast food facilities, a sports center, Club Museum and Shops.

The eye-catching stadium was designed by Arup Sport, which was the creative and inspirational force behind some of the world’s greatest arenas, such as the City of Manchester Stadium (Manchester, England), Allianz Arena stadium (Munich, Germany), the new stadium of Valencia CF (Valencia, Spain), Sydney Football Stadium (Sydney, Australia), Beijing National Stadium (or the Bird’s Nest in Beijing, China) etc. The total project budget was US$ 400 million.

CAPACITY• The total seating capacity of the stadi-

um is 52,667.

• There are 290 seats for the media, of which 152 are for journalists and 138 seats for TV commentators (a combi-nation of 46 commentary boxes).

• A total of 196 places and seats for peo-ple with disabilities and their carers (104 and 92, respectively).

• The stadium’s 44 corporate boxes can accommodate a total of 915 people.

• Altogether 180 media representatives can always feel at home at the arena’s spacious Conference Room.

• All the restaurants, bars and cafés at the stadium combined, total 1,830 covers.

• The stadium has more than 1,000 car parking spaces (245 of which are un-derground).

UNIQUE CHALLENGES

Set within the beautiful Leninsky Komsomol Park, this stunning new home for FC SHAKHTAR has become a new symbol for Donetsk city, while providing an unforgettable match experience for spectators.

Its bowl design offers a high degree of comfort, as well as improved viewing quality. Immediately adjacent to the seating areas are a range of facilities catering for every fan’s needs. In addition to adhering to Ukraine’s codes and standards, the stadium’s design meets the most current internationally recognized safety standards. The roof includes a large area of translucent sheeting material to improve daylight and sunlight penetration and promote improved natural turf-growing conditions. Furthermore, large open areas are incorporated into the perimeter of the lower-tier concourse to enable cross ventilation of the pitch. The external elevation of the building provides a seamless glazed facade and a high degree of transparency to the exterior of the building.

The stadium combines an elegance of form with simplicity of materials. It has become a landmark stadium for world class players and a worldwide audience. The stadium’s conceptual design was developed to meet the specific requirements of the club for a natural playing surface, a seating capacity for 51,500 spectators, qualification for UEFA elite status, VIP suites with segregated viewing areas and underground VIP parking, as well as additional facilities such as a club museum, a club shop, a cafeteria and a health club. During the construction, considerable de-watering works were carried out to reduce the level of the underground water table. These were followed up with piling works to improve the load bearing capacity of the soil by using 400 mm x 400 mm friction piles. The tiers comprised a total of 3,400 pre-cast concrete elements. The total amount of concrete used in the works amounted to 120,000 m3. The roof is a three dimensional, structurally efficient design that appears to float above the building. The shape inclines towards the south, resting on a dozen 60 m long steel support trusses that were manufactured and erected by Çimtaş and maneuvered with a giant, 600-ton mobile crane, able to lift steel structures in excess of 230 tons. These 12 steel support trusses designed and manufactured by Mero-TSK have a combined weight of 4,000 tons and carry the space-frame structure of the roof.

FC SHAKHTAR SHAKTAR STADIUM, DONBASS ARENA FC SHAKHTAR SHAKTAR STADIUM, DONBASS ARENA

Concrete

Rebar

Excavation

Cabling

Pre-cast Element

Tubular Pile

Maj

or Q

uant

ities

m3

ton

m3

km

ea

ea

160,000

12,295

458,761

1,200

3,400

3,248

Commodity TotalUoM

Page 20: INFRASTRUCTURE · Motorway Project which will connect central Serbia and Pan-European Corridors 10 and 11. Morava Corridor Motorway Project is a 112 km dual-carriageway motorway,

38 ENKA İNŞAAT VE SANAYİ A.Ş. FACHSHEETS FACTSHEETS ENKA İNŞAAT VE SANAYİ A.Ş. 39Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Page | 38 39 | Page

MOTORWAYS, BRIDGES & TUNNELS

AIRPORTS & STADIUMS

WATER WORKS, DAMS, PIPELINES & MINING

CEMENT PLANTS

UMM QASR BASRA MULTI-PURPOSE TERMINAL (BMT), IRAQ

433 MW NAMAKHVANI HPP CASCADE, GEORGIA

DERNA DESALINATION PLANT, LIBYA

SOUSSA DESALINATION PLANT, LIBYA

ZAWIA DESALINATION PLANT, LIBYA

ZUARA DESALINATION PLANT, LIBYA

OUED ATHMENIA DAM, ALGERIA

AKTAU PORT REHABILITATION, KAZAKHSTAN

KUMTOR GOLD MINE, KYRGYZSTAN

KOKTENKOL MOLYBDENUM, KAZAKHSTAN

BEKME DAM, IRAQ

BERKE DAM, TURKEY

FORMER USSR (CIS) TURKEY NATURAL GAS PIPELINE,

IRAQ - TURKEY CRUDE OIL PIPELINE EXPANSION

BENGHAZI WATER RESERVOIR, LIBYA

WASIA WATER TREATMENT PLANT, SAUDI ARABIA

AL RASS WATER SUPPLY & TREATMENT SYSTEMS, SAUDI ARABIA

RAS LANUF NEW TOWN (WATER SUPPLY & SEWAGE SYSTEMS), LIBYA

BREGA NEW TOWN PROJECT WATER RESERVOIRS & PIPING WORKS, LIBYA

AL KHAFJI PHASE 2 DESALINATION PLANT, SAUDI ARABIA

AL MEDINAH HOUSING (WATER SUPPLY & SEWAGE SYSTEMS), SAUDI ARABIA

ISTANBUL YENIKAPI PRETREATMENT PLANT & PUMPING STATION, TURKEY

DIYARBAKIR & KAHRAMANMARAŞ DRINKING & SEWAGE SYSTEM, TURKEY

WAT

ER W

ORKS

, D

AMS,

PIPE

LINES

&

MIN

ING

WATER WORKS, DAMS, PIPELINES

& MINING

Page 21: INFRASTRUCTURE · Motorway Project which will connect central Serbia and Pan-European Corridors 10 and 11. Morava Corridor Motorway Project is a 112 km dual-carriageway motorway,

40 ENKA İNŞAAT VE SANAYİ A.Ş. FACHSHEETS FACTSHEETS ENKA İNŞAAT VE SANAYİ A.Ş. 41Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Page | 40 41 | Page

UMM QASR BASRA BMT, CONTAINER TERMINAL YARD 5, QUAY WALL & MARINE WORKS

PROJECT DETAILS

LOCATION:Basra - Iraq

OWNER / CLIENT: Aloreen Investment Ltd.

PROJECT DURATION:Dec 2018-Sep 2020

CONTRACT TYPE:Lump Sum, Turn-key

CONTRACT VALUE:US$ 70 Million

PROJECT DESCRIPTION

ENKA was awarded the contract by Aloreen Company on 07th of May 2018. The contract has two effective dates which are Notice of the Commencement Date (NCD) () and Notice to Proceed ( NTP). The NCD and NTP were realized on 27th of June 2018 and 3rd of December 2018, respectively. Engineering, procurement and mobilization works have been commenced following notification of NCD and construction works have been commenced upon notification of NTP.

ENKA‘s responsibilities under this contract include engineering, design, procurement, transport and logistics, construction.

The Port of Umm Qasr is located approximately 5.2 km south of Basrah. It is the largest sea and the only deep-water port of Iraq. The port has road links North-West to Basrah and South across the Kuwait border, plus a main line rail link North-West to Basrah. BMT Umm Qasr Yard-5 is situated at the northern end of the port.

ENKA SCOPE OF SERVICES

The scope of the project includes the design and construction of quay wall structure; dredging; bedding layer; concrete block fabrication and installation; cope unit construction; marine fixtures and accessories installation and backfilling behind quay wall.

Commodity TotalUoM

Dredging

Backfilling

Geotextile

Revetment and scour protection

Concrete

Installation of Marine Fixtures and Accessories

Maj

or Q

uant

ities

m3

m3

m2

m3

m3

ea

1,194,457

472,392

30,631

24,499

120,543

46

433 MW NAMAKHVANI HYDRO POWER PLANT CASCADE PROJECT

PROJECT DETAILS

LOCATION:Kutaisi - Georgia

OWNER / CLIENT: Georgian Government

PROJECT DURATION:2020 - 2023

CONTRACT TYPE:EPC, Lump Sum, Turn-key

CONTRACT VALUE:US$ 750 Million

PROJECT DESCRIPTION

ENKA and Norway’s Clean Energy Group have been awarded the rights to develop, construct, own and operate the 433 MW Namakhvani HPP Cascade Project in Georgia. A perpetual build-own-operate agreement has been signed with the Government of Georgia. The project comes with a 15-year power purchase agreement with the Government of Georgia, backed by a state guarantee for eight months of the year (September through April). Amounts generated in excess of the guarantee, as well as any power generated following the expiry of the power purchase agreement, will be sold in the domestic market or exported. As part of its Association Agreement with the EU, Georgia is committed to developing a transparent hourly day-ahead balancing market for electricity by 2020.

Georgia will play an important role in the planned integration of power systems and energy trading between Georgia, Turkey, Russia, Azerbaijan and Armenia.

ENKA SCOPE OF SERVICES

ENKA will build the Namakhvani HPP Cascade Project as the EPC Contractor. Basic/Tender design, developed earlier by Studio Pietrangeli has been further developed by Temelsu and reviewed by Stucky. Construction is expected to start in 2020. The 433 MW Namakhvani HPP Cascade Project encompasses two separate HPPs on the Rioni River: the Lower Namakhvani HPP (333 MW) and the Upper Namakhvani HPP (100 MW). In addition, approximately 30 km of road, which will be submerged by the reservoir, will be relocated.

Estimated Annual Production

Installed Capacity

Dam Height

Turbine Type

Number of Turbines

Headrace Tunnel Length

Estimated Annual Production

Installed Capacity

Dam Height

Turbine Type

Number of Turbines

Maj

or Q

uant

ities

of L

ower

N

amak

hvan

i HPP

Maj

or Q

uant

ities

of U

pper

N

amak

hvan

i HPPGWh

MW

m

unit

km

GWh

MW

m

unit

1,135

333

105

Francis

3+1

4.4

343

100

59

Kaplan

2

Commodity CommodityTotal TotalUoM UoM

Page 22: INFRASTRUCTURE · Motorway Project which will connect central Serbia and Pan-European Corridors 10 and 11. Morava Corridor Motorway Project is a 112 km dual-carriageway motorway,

42 ENKA İNŞAAT VE SANAYİ A.Ş. FACHSHEETS FACTSHEETS ENKA İNŞAAT VE SANAYİ A.Ş. 43Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Page | 42 43 | Page

PROJECT DETAILS

LOCATION:Derna - Libya

OWNER / CLIENT: General Electricity Company of Libya (GECOL)

PROJECT DURATION:Aug 2006 – Aug 2010

CONTRACT TYPE:Lump Sum Turn Key

CONTRACT VALUE:EUR 38 Million

SIGNIFICANT FEATURES /ACCOMPLISHMENTS:

• 1.1 million man-hours

• First supply and delivery of floating HDPE offshore pipe (dia. 1,400 mm) in total 500 m length on piece bundle from Turkey. First Çanakkale channel crossing of HDPE pipe string by floating method with tug boat in total of 650 m.

• 600 ton of concrete water intake head erection in 12 m depth under seawater.

• 6 pcs of concrete blocks, 85 tons each, transportation by means of floating in 2 miles.

PROJECT DESCRIPTION

Derna Desalination Plant Project, located in Derna city in eastern part of Libya, was in part of a development plan implemented by General Electricity Company of Libya, in the period of 40th Anniversary preparations of Libyan Leader, to cover high demand of reliable water sources in eastern part of Libya.

The Project consisted of engineering, procurement, construction, commissioning and start-up of a 2 x 20,000 m3/day Water Production Plant with two type of fuel, Heavy Fuel Oil (HFO) and Light Fuel Oil (LFO), complete with all Balance of Plant (BOP) systems. Heavy fuel oil (HFO) is used as main fuel for MED Desalination Plant operation whereas; light fuel oil (LFO) are used as back-up fuels. The project consists of a redundant sea water intake system of which complete basic and detailed engineering was included in EPC scope of the Project.

Main process and equipment, MED evaporators, boilers and auxiliaries are supplied by Sidem (Veolia, FR) as consortium partner of the Project.

The project includes a water distribution network line with water storage tanks.

UNIQUE CHALLENGES

Derna Desalination Plant is expected to address the growing demand for water in eastern part of the country and supply reliable water to public.

Sea water intake onshore system construction needed micro piling implementation to eliminate excessive amount of water flows through subsoil cracks. The micro piling system was carefully designed by ENKA to overcome natural difficulties. As part of the EPC Contract, ENKA through its piling specialist subsidiary Kasktaş have installed Ø340 mm micro piles in 685 pcs in total.

Offshore portion of sea water system was challenge in eastern Mediterranean Sea under unexpected open sea conditions. Design and implementation of offshore portion were performed with appropriate design margins and redundancy requirements.

Project site is located in Derna city in the eastern part of Libya in a relatively high populated area. ENKA, while executing the work, successfully managed cultural relations with locals to avoid any clashes and maintained good relations with its neighbors.

Such regional location and high temperatures during summer months created unique challenges for the project workforce peaked at 450 people.

ENKA SCOPE OF SERVICES

ENKA has self performed the basic engineering, detail engineering, procurement, construction, commissioning, start-up and performance testing scope for the project utilizing in-house resources on a lump sum turnkey basis. Specific scope of services provided by ENKA included; complete basic and detailed design and engineering of the plant, supply of all balance of plant (BOP) systems and equipment, all civil works including foundations and structural steel, Product Water Tanks (2 x 20,000 m3), Make Up Water Tank (1 x 500 m3), HFO Tanks (1 x 20,000 m3, 1 x 5,000 m3), 2 x 40,000 m3/day sea water intake system including 20 kg/hr electro-chlorination system, 2 x 1,000 m HDPE offshore sea water intake piping (dia. 1,400 mm), complete interconnecting piping of the plant, fire fighting system, MV/LV electrical & control and switchgear systems with aux. transformers, instrument and plant air supply systems, Emergency Diesel Generators, waste collection and treatment system, batteries and UPS System, ventilation and air conditioning (HVAC) systems, overhead cranes and maintenance hoists, power plant distributed control system (DCS), mechanical and electrical erection, complete civil and structural works, supply of spare parts, and start-up and commissioning of the plant. ENKA further provided training for the O&M personnel who will be operating and maintaining the plant.

ENKA scope also covers 9,000 m water distribution DI piping line (dia. 600 mm) with 2 x 10,000 m3 water storage tanks.

DERNA DESALINATION PLANT PROJECT (SEA WATER THERMAL (MED-TVC) PLANT) DERNA DESALINATION PLANT PROJECT (SEA WATER THERMAL (MED-TVC) PLANT)

Concrete

Structural Steel

Cabling

Equipment

Engineering Hours

Document Qty.

Maj

or Q

uant

ities m3

ton

km

ton

hrs

pcs

14,200

650

170

4,800

81,000

1,296

Commodity TotalUoM

Page 23: INFRASTRUCTURE · Motorway Project which will connect central Serbia and Pan-European Corridors 10 and 11. Morava Corridor Motorway Project is a 112 km dual-carriageway motorway,

44 ENKA İNŞAAT VE SANAYİ A.Ş. FACHSHEETS FACTSHEETS ENKA İNŞAAT VE SANAYİ A.Ş. 45Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Page | 44 45 | Page

PROJECT DETAILS

LOCATION:Soussa - Libya

OWNER / CLIENT: General Electricity Company of Libya (GECOL)

PROJECT DURATION:Aug 2006 – Aug 2010

CONTRACT TYPE:Lump Sum Turn Key

CONTRACT VALUE:EUR 25 Million

SIGNIFICANT FEATURES /ACCOMPLISHMENTS:

• 1.5 million man-hours

• First supply and delivery of floating HDPE offshore pipe (dia. 1,400 mm) in total 500 m length on piece bundle from Turkey. First Çanakkale channel crossing of HDPE pipe string by floating method with tug boat in total of 650 m.

• 600 ton of concrete water intake head erection in 12 m depth under seawater.

• 6 pcs of concrete blocks, 85 tons each, transportation by means of floating in 2 miles.

PROJECT DESCRIPTION

Soussa Desalination Plant Project, located in Soussa city in eastern part of Libya, was in part of a development plan implemented by General Electricity Company of Libya, in the period of 40th Anniversary preparations of Libyan Leader, to cover high demand of reliable water sources in eastern part of Libya.

The Project consisted of engineering, procurement, construction, commissioning and start-up of a 2 x 20,000 m3/day Water Production Plant with two type of fuel, Heavy Fuel Oil (HFO) and Light Fuel Oil (LFO), complete with all Balance of Plant (BOP) systems. Heavy fuel oil (HFO) is used as main fuel for MED Desalination Plant operation whereas; light fuel oil (LFO) are used as back-up fuels. The Project consists of a redundant sea water intake system, complete basic design and detailed design of which, was included in EPC Scope of the project.

Main process and equipment, MED evaporators, boilers and auxiliaries are supplied by Sidem (Veolia, FR) as consortium partner of the Project.

UNIQUE CHALLENGES

Soussa Desalination Plant is expected to address the growing demand for water in eastern part of the country and supply reliable water to public.

Offshore portion of sea water system was challenge in eastern Mediterranean Sea under unexpected open sea conditions. 2 x 500 m HDPE pipe string was floated and sank in one piece to be installed on sea bed. Design and implementation of offshore portion were performed with appropriate design margins and redundancy requirements.

Project site is located in near Soussa city in the eastern part of Libya. ENKA, while executing the work, successfully managed cultural relations with locals to avoid any clashes and maintained good relations with its neighbors.

Such regional location and high temperatures during summer months created unique challenges for the project workforce peaked at 380 employees.

ENKA SCOPE OF SERVICES

ENKA has self-performed the basic engineering, detail engineering, procurement, construction, commissioning, start-up and performance testing scope for the project utilizing in-house resources on a lump sum turnkey basis. Specific scope of services provided by ENKA included; complete basic and detailed design and engineering of the plant, supply of all balance of plant (BOP) systems and equipment, all civil works including foundations and structural steel, Product Water Tanks (2 x 20,000 m3), Make Up Water Tank (1 x 500 m3), HFO Tanks (2 x 5,000 m3), 2 x 40,000 m3/day sea water intake system including 20 kg/hr electro-chlorination system, 2 x 500 m HDPE offshore sea water intake piping (dia. 1,400 mm), complete interconnecting piping of the plant, fire fighting system, MV/LV electrical & control and switchgear systems with aux. transformers, instrument and plant air supply systems, Emergency Diesel Generators, waste collection and treatment system, batteries and UPS System, ventilation and air conditioning (HVAC) systems, overhead cranes and maintenance hoists, power plant distributed control system (DCS), mechanical and electrical erection, complete civil and structural works, supply of spare parts, and start-up and commissioning of the plant. ENKA further provided training for the O&M personnel who will be operating and maintaining the plant.

SOUSSA DESALINATION PLANT PROJECT (SEA WATER THERMAL (MED-TVC) PLANT) SOUSSA DESALINATION PLANT PROJECT (SEA WATER THERMAL (MED-TVC) PLANT)

Concrete

Structural Steel

Cabling

Equipment

Engineering Hours

Document Qty.

Maj

or Q

uant

ities m3

ton

km

ton

hrs

pcs

11,500

460

147

4,000

65,000

1,144

Commodity TotalUoM

Page 24: INFRASTRUCTURE · Motorway Project which will connect central Serbia and Pan-European Corridors 10 and 11. Morava Corridor Motorway Project is a 112 km dual-carriageway motorway,

46 ENKA İNŞAAT VE SANAYİ A.Ş. FACHSHEETS FACTSHEETS ENKA İNŞAAT VE SANAYİ A.Ş. 47Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Page | 46 47 | Page

PROJECT DETAILS

LOCATION:Zawia - Libya

OWNER / CLIENT: General Electricity Company of Libya (GECOL)

PROJECT DURATION:July 2006 – Feb 2012

CONTRACT TYPE:Lump Sum Turn Key

CONTRACT VALUE:EUR 62 Million

SIGNIFICANT FEATURES /ACCOMPLISHMENTS:

• 2.5 million man-hours

• The largest capacity of Desalination Plant Project in Libya

PROJECT DESCRIPTION

Zawia Desalination Plant Project, located in Zawia city in western part of Libya in 60 km distance to capital city Tripoli, was in part of a development plan implemented by General Electricity Company of Libya, in the period of 40th Anniversary preparations of Libyan Leader, to cover high demand of reliable water sources in eastern part of Libya.

The Project consisted of engineering, procurement, construction, commissioning and start-up of a 4 x 20,000 m3/day Water Production Plant with three type of fuel, Heavy Fuel Oil (HFO), NG and Light Fuel Oil (LFO), complete with all Balance of Plant (BOP) systems. NG is planned to be used as main fuel for MED Desalination Plant operation whereas; heavy fuel oil (HFO) are used as back-up fuels.

Main process and equipment, MED evaporators, boilers and auxiliaries are supplied by Sidem (Veolia, FR) as consortium partner of the Project.

The project includes a relatively large water distribution network line in 142 km with water storage tanks and pumping stations.

UNIQUE CHALLENGES

Zawia Desalination Plant is expected to address the growing demand for water in western part of the country and supply reliable water to public.

Project site is located in Zawia city in the western part of Libya in a highly populated area. ENKA, while executing the work, successfully managed cultural relations with locals to avoid any clashes and maintained good relations with its neighbors.

Soil improvement has to be performed by means of replacement of subsoil with adequate fill material in the project site for foundations of heavy loads.

Such regional location and high temperatures during summer months created unique challenges for the project workforce peaked at 620 employees.

ENKA SCOPE OF SERVICES

ENKA has self performed the basic engineering, detail engineering, procurement, construction, commissioning, start-up and performance testing scope for the project utilizing in-house resources on a lump sum turnkey basis. Specific scope of services provided by ENKA included; complete basic and detailed design and engineering of the plant, supply of all balance of plant (BOP) systems and equipment, all civil works including foundations and structural steel, Product Water Tanks (2 x 20,000 m3), Make Up Water Tank (1 x 500 m3), LFO Tank (1 x 2,500 m3), complete interconnecting piping of the plant, fire fighting system, MV/LV electrical & control and switchgear systems with aux. transformers, instrument and plant air supply systems, Emergency Diesel Generators, waste collection and treatment system, batteries and UPS System, ventilation and air conditioning (HVAC) systems, overhead cranes and maintenance hoists, power plant distributed control system (DCS), mechanical and electrical erection, complete civil and structural works, supply of spare parts, and start-up and commissioning of the plant. ENKA further provided training for the O&M personnel who will be operating and maintaining the plant.

ENKA scope also covers 142,000 m water distribution DI piping line with 9 pcs of water storage tanks (2 x 20,000 m3, 5 x 10,000 m3, 1 x 5,000 m3, 1 x 2,500 m3) and 4 pcs of pumping stations.

ZAWIA DESALINATION PLANT PROJECT (SEA WATER THERMAL (MED-TVC) PLANT) ZAWIA DESALINATION PLANT PROJECT (SEA WATER THERMAL (MED-TVC) PLANT)

Concrete

Structural Steel

Cabling

Equipment

Engineering Hours

Document Qty.

Maj

or Q

uant

ities m3

ton

km

ton

hrs

pcs

8,098

486

340

7,900

48,900

1,123

Commodity TotalUoM

Page 25: INFRASTRUCTURE · Motorway Project which will connect central Serbia and Pan-European Corridors 10 and 11. Morava Corridor Motorway Project is a 112 km dual-carriageway motorway,

48 ENKA İNŞAAT VE SANAYİ A.Ş. FACHSHEETS FACTSHEETS ENKA İNŞAAT VE SANAYİ A.Ş. 49Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Page | 48 49 | Page

PROJECT DETAILS

LOCATION:Zuara - Libya

OWNER / CLIENT: General Electricity Company of Libya (GECOL)

PROJECT DURATION:Mar 2007 – Nov 2010

CONTRACT TYPE:Lump Sum Turn Key

CONTRACT VALUE:EUR 20.5 Million

SIGNIFICANT FEATURES /ACCOMPLISHMENTS:

• 1.1 million man-hours

PROJECT DESCRIPTION

Zuara Desalination Plant Project, located in near Zuara city within 10 km in western part of Libya, in 100 km distance to capital city Tripoli, was in part of a development plan implemented by General Electricity Company of Libya, in the period of 40th

Anniversary preparations of Libyan Leader, to cover high demand of reliable water sources in eastern part of Libya.

The Project consisted of engineering, procurement, construction, commissioning and start-up of a 2 x 20,000 m3/day Water Production Plant with two type of fuel, Heavy Fuel Oil (HFO), and Light Fuel Oil (LFO), complete with all Balance of Plant (BOP) systems. HFO is planned to be used as main fuel for MED Desalination Plant operation whereas; light fuel oil (LFO) are used as back-up fuels.

Main process and equipment, MED evaporators, boilers and auxiliaries are supplied by Sidem (Veolia, FR) as consortium partner of the Project.

UNIQUE CHALLENGES

Zuara Desalination Plant is expected to address the growing demand for water in western part of the country and supply reliable water to public.

Project site is located in coast line of Zuara city in the western part of Libya. Soil was weak to withstand heavy loads of the project structures. So ENKA had to perform piling work with dia. 600 mm drill hole in total of 3,696 m in length.

Such regional location and high temperatures during summer months created unique challenges for the project workforce peaked at 280 people.

ENKA SCOPE OF SERVICES

ENKA has self-performed the basic engineering, detail engineering, procurement, construction, commissioning, start-up and performance testing scope for the project utilizing in-house resources on a lump sum turnkey basis. Specific scope of services provided by ENKA included; complete basic and detailed design and engineering of the plant, supply of all balance of plant (BOP) systems and equipment, all civil works including foundations and structural steel, Product Water Tanks (2 x 20,000 m3), Make Up Water Tank (1 x 500 m3), LFO Tank (1 x 5,000 m3), complete interconnecting piping of the plant, firefighting system, MV/LV electrical & control and switchgear systems with aux. transformers, instrument and plant air supply systems, Emergency Diesel Generators, waste collection and treatment system, batteries and UPS System, ventilation and air conditioning (HVAC) systems, overhead cranes and maintenance hoists, power plant distributed control system (DCS), mechanical and electrical erection, complete civil and structural works, supply of spare parts, and start-up and commissioning of the plant. ENKA further provided training for the O&M personnel who will be operating and maintaining the plant.

ZUARA DESALINATION PLANT PROJECT (SEA WATER THERMAL (MED-TVC) PLANT) ZUARA DESALINATION PLANT PROJECT (SEA WATER THERMAL (MED-TVC) PLANT)

Concrete

Structural Steel

Cabling

Equipment

Engineering Hours

Document Qty.

Maj

or Q

uant

ities m3

ton

km

ton

hrs

pcs

4,764

341

185

4,800

28,300

720

Commodity TotalUoM

Page 26: INFRASTRUCTURE · Motorway Project which will connect central Serbia and Pan-European Corridors 10 and 11. Morava Corridor Motorway Project is a 112 km dual-carriageway motorway,

50 ENKA İNŞAAT VE SANAYİ A.Ş. FACHSHEETS FACTSHEETS ENKA İNŞAAT VE SANAYİ A.Ş. 51Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Page | 50 51 | Page

PROJECT DETAILS

LOCATION:Constantine / Mila, Algeria

OWNER / CLIENT: Ministry of Water Resources - National Agency of Dams

PROJECT DURATION:Aug 2002-Mar 2007

CONTRACT TYPE:Unit Rate

CONTRACT VALUE:US$ 45 Million

SIGNIFICANT FEATURES /ACCOMPLISHMENTS:

• Provided much needed water from Beni Haroun and Bou Siaba to the six cities of Batna, Kenchela, Mila, Oum El Bouaghi, Constantine and Jijel, where demand for drinking water and agricultural irrigation water had increased rapidly at the time.

PROJECT DESCRIPTION

The construction of the dam project started in August 2002. The dam reservoir is located at thirty km northwest of the Constantine Province, in the Mila City in East Algeria and was a part of the master project named “Transfer of Beni Haroun” which aimed to transfer the water collected from Beni Haroun and Bou Siaba towards the six cities of Batna, Kenchela, Mila, Oum El Bouaghi, Constantine and Jijel where the demand for drinking water and agricultural irrigation water has been rapidly increasing.

The dam has a height of 44 m, a length of 630 m, and a reservoir capacity of 33.6 million m3. It has a combined concrete tunnel and 313 m long, derivation gallery. The derivation gallery is able to drain the water with a maximum flow rate of 60 m3/second. The pipeline capacity is 4 m3/second for the drinking water and 2.5 m3/second for the irrigation water. The contract included civil engineering works as well as the design, supply, erection, and startup of the hydraulic, electric and control equipment.

The dam was completed in April 2007, together with the additional projects.

UNIQUE CHALLENGES

Soil in the region consists of high plasticity clay and under natural conditions it was impossible to use it as a fill material in an earthwork dam according to the specifications. For this reason, special treatment method was developed and used by engineers to use clay in earthwork filling.

OUED ATHMENIA DAM

ENKA SCOPE OF SERVICES

The water treatment plant was awarded to ENKA and Degremont (France) consortium in December 2004. ENKA’s scope of construction works included detail design, material supply, civil and structural construction of the Water Treatment Plant as well as the leakage tests of the structures. The design, supply, erection and startup of the raw water supply pipeline were also included in ENKA’s scope of works. The major work items are 1 million m3 of excavation, 2.4 million m3 of filling, 30,000 m3 of concrete, 40,000 m of drilling and injection.

The Oued Athmenia Dam Project involves the construction and startup of the dam reservoir and its annex structures as well as the procurement and installation of hydraulic and electrical equipment in Algeria’s Athmenia-Mila region. As of December 2004, the complete hydro mechanical design works, which were manufactured in Turkey, has been accepted by the administration. The electrical design works are in the final stage before completion. The project is planned to be completed in September 2005. At the end of 2004, the completion rate in terms of progress payments was about 83% and the number of personnel, including Turkish and local employees was 269. The final phase was completed in September 2007 as scheduled.

The plant has a capacity of 270,000 m3 of treated water per day.

Major work items entailed 255,000 m3 of excavation, 205,000 m3 of filling, 10,500 m of jet grouting, 1,000 m of piling, 50,000 m3 of concrete, 5,500 tons of rebar, 94,000 m2 of formwork and 500 m of raw water pipeline with 1,600 mm diameter steel pipes.

OUED ATHMENIA DAM

Dam

Tunnel

Tunnel

Shafts

Caverns

Depth (m)

Shaft Linings

Steel Liners for Pressure Tunnels

Maj

or S

peci

ficat

ions

Height (m) x Length (m)

Section (mxm) x length(m)

Section (mxm) x length(m)

Diameter (m) x Depth (m)

Size (mxmxm)

Length (m)

Depth (m)

Diameter (m) x Length (m)

44 x 600

7.5 x 5.5 x 270

3.25 x 3.25 x 600

Dia2.6 x 25

15 x 25 x 12

870

25

Dia 2.7-2.4-1.6 x 184

Commodity TotalUoM

Page 27: INFRASTRUCTURE · Motorway Project which will connect central Serbia and Pan-European Corridors 10 and 11. Morava Corridor Motorway Project is a 112 km dual-carriageway motorway,

52 ENKA İNŞAAT VE SANAYİ A.Ş. FACHSHEETS FACTSHEETS ENKA İNŞAAT VE SANAYİ A.Ş. 53Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Page | 52 53 | Page

AKTAU PORT REHABILITATION PROJECT

PROJECT DETAILS

LOCATION:Aktau, Kazakhstan

OWNER / CLIENT: Aktau Commercial Sea Port

PROJECT DURATION:May 1997-Sep 1999

CONTRACT TYPE:Unit Rate

CONTRACT VALUE:US$ 49.3 Million

SIGNIFICANT FEATURES /ACCOMPLISHMENTS:

• Kazakhstan’s main port on the Caspian Sea

PROJECT DESCRIPTION

Aktau is Kazakhstan’s main port on the Caspian Sea and serves as the major logistics base for the offshore oil fields. The ENKA-Bechtel joint venture signed the contract with Kazakhstan’s Ministry of Transportation for the Aktau Port rehabiliation project. The contract included elevating the port by two meters, replacing all the port utilities, and constructing a new 550 m pile supported quay, a new railroad, a port administation building and a 6,500 m² transit shed as well as additional auxiliary buildings. The port had to be kept operational throughout construction, which was completed in Sep tember 1999.

ENKA SCOPE OF SERVICES

Civil, structural, electrical works for the new quay, construction of administration buildings, roads, and underground structures such as drainage and sewerage facilities.

KUMTOR GOLD MINE

KOKTENKOL MOLYBDENUM PROJECT

PROJECT DETAILS

PROJECT DETAILS

LOCATION:Kumtor, Kyrghyzstan

OWNER / CLIENT: Kumtor Gold Company (Cameco & Kyrghyz Gold)

PROJECT DURATION:July 1994-Dec 1996

CONTRACT TYPE:Unit Rate

CONTRACT VALUE:US$ 55 Million

ENKA SCOPE OF SERVICES:Engineering, Procurement, Construction

SIGNIFICANT FEATURES /ACCOMPLISHMENTS:• Kyrgyzstan’s largest

investment project & the second-highest gold mining operation in the world.

LOCATION:Koktenkol, Kazakhstan

OWNER / CLIENT: Outotec Finland Oy

PROJECT DURATION:Sep 2012-Aug 2013

CONTRACT TYPE:Lump Sum

CONTRACT VALUE:US$ 1.2 Million

ENKA SCOPE OF SERVICES:Engineering, Cost Estimation

SIGNIFICANT FEATURES /ACCOMPLISHMENTS:• Front End Engineering

Design (FEED) for 20 mtpa capacity Mining Facility

PROJECT DESCRIPTION

ENKA and its Canadian partner Kilborn have undertaken EPCM and construction works at Kumtor gold mine site located at 4,200 meters above sea level in Kyrghyzstan. The project also includes the workshop, office building, process plant, tailings disposal dam, 42 km of access roads, improvement of the existing roads, river diversions, helicopter pist, overhead lines and marshaling yard.

PROJECT DESCRIPTION

ENKA and OUTOTEC successfully completed Front End Engineering Design (FEED) services for Koktenkol Molybdenum Project. The Koktenkol Molybdenum Project was a large open pit molybdenum mine, or processing facilities, and associated infrastructure, located in central Kazakhstan, about 150 km southwest of the city of Karaganda. The mine was planned to process 20 million tons of ore per year.

Page 28: INFRASTRUCTURE · Motorway Project which will connect central Serbia and Pan-European Corridors 10 and 11. Morava Corridor Motorway Project is a 112 km dual-carriageway motorway,

54 ENKA İNŞAAT VE SANAYİ A.Ş. FACHSHEETS FACTSHEETS ENKA İNŞAAT VE SANAYİ A.Ş. 55Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Page | 54 55 | Page

BEKHME DAM

PROJECT DETAILS

LOCATION:Mosul, Iraq

OWNER / CLIENT: State Commission for Dams - SCD Ministry of Irrigation

PROJECT DURATION:Sep 1986-Aug 1990

CONTRACT TYPE:Unit Rate

CONTRACT VALUE:US$ 1.5 Billion

SIGNIFICANT FEATURES /ACCOMPLISHMENTS:

• The largest Hydroelectric Dam project of Iraq

PROJECT DESCRIPTION

Construction of civil works including supply and erection of the hydraulic steel structures for the Bekhme Dam Project and turnkey housing complex comprising of 350 villas and 17 social facilities such as Guest House, Restaurant, Club House, Supermarket, Dispensary, Kindergarten, School, Mosque, Bank, Post Office, Laundry and Offices. Due to the Gulf crises and the war this project had been stopped indefinitely since August 1990, when 32% of the work progress had already been completed.

ENKA SCOPE OF SERVICES

ENKA`s scope included detailed engineering, procurement and construction. The Dam works consisted of a rock fill dam with an inclined impervious core, circa 600 m long at crest, height 204 m, Fill volume of 37 million m³, a spillway of 8,900 m³/s capacity, consisting of three tunnels of 12 m diameter and 700 m long with three radial gates, 2 bottom outlets of total discharge capacity of 750 m³/s, with a length of 1,200 m long each 2 diversion tunnels of 12 m diameter and a length of 1,100 m long each, 3 concrete lined tailrace tunnels of dia. 12 m and approximately 640 – 710 m long, a conventional underground powerhouse having 6 units with a total capacity of 1,560 MW and an underground transformer hall and a switchyard hall.

Open Excavation

Underground Excavation

Hydraulic Structures

Concrete

Housing Complex Total Floor Area

Total Asphalt

Maj

or Q

uant

ities m3

m3

ton

m3

m2

ton

11 Million

2.5 Million

25,000

3 Million

80,100

668,100

Commodity TotalUoM

BERKE DAM

Tunnel Excavation

Road & Other Excavation

Tunnel Concrete

Other Concrete

Shotcrete

Consolidated Grouting

Tunnel Excavation

Concrete Lining

Drilling of Grouting

Drilling for Anchors

Drilling for Piezometer

Cement GroutingMaj

or Q

uant

ities

of A

cces

s Tu

nnel

Maj

or Q

uant

ities

of D

iver

sion

Tu

nnel

s

m3

m3

m3

m3

ton

ton

m3

m3

m

m

m

ton

281,257

1.5 Million

42,398

14,500

16,080

200

25,295

39,942

141,922

15,000

15,217

12,448

Commodity CommodityTotal TotalUoM UoM

PROJECT DETAILS

LOCATION:Adana, Turkey

OWNER / CLIENT: Çukurova Electricity Co. Inc. - ÇEAŞ

PROJECT DURATION:Sep 1986-Aug 1990

CONTRACT TYPE:Unit Rate

CONTRACT VALUE:US$ 43 Million

SIGNIFICANT FEATURES /ACCOMPLISHMENTS:

• The largest Hydroelectric Dam on Ceyhan River

PROJECT DESCRIPTION

Project includes phase 1, construction of the diversion tunnel of the Berke Dam on the River Ceyhan as well as the access roads, tunnels & bridges and phase 2, construction of dam.

UNIQUE CHALLENGES

With the purpose of capitalizing on the 200 m waterfall height, this dam was constructed in a valley, which was exceedingly steep with highly difficult transportation and work conditions.

ENKA SCOPE OF SERVICES

ENKA`s scope included procurement, construction and erection. The works included the construction of following items: 500 m long derivation tunnel with horse-shoe section and 13 m diameter, 5 km long approach roads required for the dam construction and operation, and constructed by 1.2 million m3 of excavation, 7 approach tunnels with a total length of 3.5 km, 2 approach bridges, with 3 span, with a total span of 160 m and made of steel prefabricated panels, underground power stations, power tunnels, rock-bolt galleries, over-crest platform excavations, spillway tunnels and approach tunnels.

Page 29: INFRASTRUCTURE · Motorway Project which will connect central Serbia and Pan-European Corridors 10 and 11. Morava Corridor Motorway Project is a 112 km dual-carriageway motorway,

56 ENKA İNŞAAT VE SANAYİ A.Ş. FACHSHEETS FACTSHEETS ENKA İNŞAAT VE SANAYİ A.Ş. 57Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Page | 56 57 | Page

FORMER USSR (CIS) TURKEY NATURAL GAS PIPELINE

PROJECT DETAILS

LOCATION:From the Bulgarian-Turkish border to Ankara, Turkey

OWNER / CLIENT: BOTAŞ – Boru Hatları ile Petrol Taşıma A.Ş. (BOTAŞ – TransportatIon by Pipelines Inc.)

PROJECT DURATION:Sep 1986-Sep 1988

CONTRACT TYPE:Unit Rate

CONTRACT VALUE:US$ 261 Million

SIGNIFICANT FEATURES /ACCOMPLISHMENTS:

• 842 km 24-36” gas pipeline of which 118 km part is offshore at a max depth of 90 m

PROJECT DESCRIPTION

The 842 km, 36-24 inch natural gas pipeline extends from the Bulgarian border of Turkey to Ankara, including a total of 118 km of offshore pipeline between Ambarli-Pendik and Dil Iskelesi-Hersek in the Marmara Sea at a maximum depth of 90 m. Other principal works in the contract included a 20 MW compressor station, 11 reducing and metering stations, 9 pig stations, 32 line valves, a dispatching center, 3 maintenance center, and telecommunication and telecontrol systems. The pipeline has an annual capacity to deliver 14 bcm of natural gas, under 70 barg pressure, into Turkey through the Ukraine. This is equivalent to 75% of Turkey’s current consumption. The project was financed though a number of export credit agencies, such as US Exim, JEXIM, Coface and ECGD.

ENKA SCOPE OF SERVICES

Consortium of ENKA/Spie-Capag/Brown and Root entered into a contract with BO-TAŞ for the construction of the Russian natural gas pipeline in September 1986. The detail design of the pipeline facilities had been done by Fluor (UK) Ltd.

Off-Shore Pipelaying (90m depth)

Compressor Station

Pig Stations

Line Valves

Dispatching Center

Maintenance Center

Reducing & Metering Station

Maj

or Q

uant

ities

km

ea

ea

ea

ea

ea

ea

118

1x20MW

9

32

1

3

11

Commodity TotalUoM

BENGHAZI WATER RESERVOIR

Maj

or Q

uant

ities Excavation

Backfilling

Special Filter & Protection Backfilling

Geomembrane for Slope Protection

Concrete

Special Steel Pipes

m3

m3

m3

m2

m3

ton

2,1 Million

450,000

200,000

150,000

20,000

800

Commodity TotalUoM

PROJECT DETAILS

LOCATION:Benghazi, Libya

OWNER / CLIENT: Great Man-Made River Authority

PROJECT DURATION:July 1988-Apr 1991

CONTRACT TYPE:Unit Rate

CONTRACT VALUE:US$ 65 Million

PROJECT DESCRIPTION

Construction of the civil engineering works and supply, delivery and installation of the associated electrical and mechanical equipment of circular earthfill holding reservoir with a capacity of 4,7 million m3. The reservoir comprises an embankment with 9 m. Height and 1 km. of crest diameter, inlet and outlet works and a spillway. The circular earthfill embankment incorporates an internal sand/gravel system drainage system and has internal slopes lined with a synthetic geomembrane of 150,000 m2.

ENKA SCOPE OF SERVICES

The inlet works, outlet works and spillway are constructed of reinforced concrete. Water is discharged into the reservoir through 3 submerged discharge valves, each with a diameter of 2,000 mm, and a weight of 30 tons, supplied and installed by ENKA. Manufacturing and installation of polyurethane coated buried steel pipework, with diameters varying between 2,000 and 4,000 mm lined at site by cement mortar and cathodically protected and installation of 8 owner-supplied large valves are included. The project also includes installation of a prestressed cylindrical concrete by-pass pipeline of 4 m diameter and 1,800 m long.

Page 30: INFRASTRUCTURE · Motorway Project which will connect central Serbia and Pan-European Corridors 10 and 11. Morava Corridor Motorway Project is a 112 km dual-carriageway motorway,

58 ENKA İNŞAAT VE SANAYİ A.Ş. FACHSHEETS FACTSHEETS ENKA İNŞAAT VE SANAYİ A.Ş. 59Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Page | 58 59 | Page

IRAQ - TURKEY CRUDE OIL PIPELINE EXPANSION

PROJECT DETAILS

LOCATION:Iraq -Turkey

OWNER / CLIENT: BOTAS Transportation by Pipelines Inc. Turkey(Turkish Part)State Organization for Oil Projects - SCOP(Iraqi Part)

PROJECT DURATION:Mar 1983-Oct 1984

CONTRACT TYPE:Lump Sum Turnkey

CONTRACT VALUE:US$ 41 Million (Turkish Part)US$ 29 Million (Iraqi Part)

SIGNIFICANT FEATURES /ACCOMPLISHMENTS:

• Expanded the capacity of 1000 km crude oil line from 35 million t/year to 50 million t/year

PROJECT DESCRIPTION

TURKISH PART

ENKA and its partner Toyo Engineering (Japan) undertook the turn-key contract with BOTAŞ, the Turkish state-owned company for pipeline transportation, and completed the construction in October 1984. The project was designed to increase the capacity of the existing 40-inch. 1,000 km crude oil pipeline from 35 to 50 million ton/year. The design and construction works were carried out simultaneously in Turkey and Iraq. The major work items were the replacement of pumps at existing pump stations, construction of three new pump stations, installation of booster pumps, construction of an 80 km pipeline loop with diameters of 30 and 40 inches, modification of the dispatching center, extension of the existing metering station and the installation of a fourth metering station, two new pump stations complete with HV and MV substations, and fire-fighting, telecontrol and telecommunication, instrumentation, station piping, and cathodic protection systems.

IRAQI PART

Design and construction of expansion project to increase the capacity of existing 40”, 1,000 km crude oil line from 35 million tons/year to 50 million tons/year. Replacement of pumps and motors at existing stations. Modification of dispatching center. Extension of the metering stations and addition of the 4th metering st. Construction of two new pump stations complete with high voltage substation, MV substation, fire fighting/fire alarm system, telecontrol / telecommunication and instrumentation system, 4 x 3.6 MV, 11 KV pump/motor sets, station piping and cathodic protection systems. Tie-in of new stations to existing pipeline.

ENKA SCOPE OF SERVICES

Scope of work includes construction of 80 km of pipeline loop with 30” and 40” diameters, replacement of pumps and motors at existing stations Modification of dispatching center, extension of the metering stations and addition of the 4th metering station, construction of five new pump stations complete with high voltage substation. And tie-in of new stations to existing pipeline.

Page 31: INFRASTRUCTURE · Motorway Project which will connect central Serbia and Pan-European Corridors 10 and 11. Morava Corridor Motorway Project is a 112 km dual-carriageway motorway,

60 ENKA İNŞAAT VE SANAYİ A.Ş. FACHSHEETS FACTSHEETS ENKA İNŞAAT VE SANAYİ A.Ş. 61Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Page | 60 61 | Page

AL RASS WATER SUPPLY AND TREATMENT SYSTEMS

PROJECT DETAILS

LOCATION:Al Rass, Saudi Arabia

OWNER / CLIENT: Ministry of Agriculture and Water

PROJECT DURATION:First Scope:Apr 1985 - Mar 1988 Second Scope:Nov 1985 – July 1987

PROJECT DESCRIPTION

Al-Rass water treatment plants in Saudi Arabia is a smaller example of what ENKA was able to accomplish in Wasia. 60,000 m3/day produces, 10,000 m3 of which is to be distributed with the water system as in terms of the contract, and remain portion will be utilised in agriculture.

ENKA SCOPE OF SERVICES

Scope 1: Design and construction of a water treatment plant. Main works comprise softener building, pumping station, fuel storage tanks, waste water station, wells, administration building and electromechanical works.Scope 2 : Pipe-laying for transmission and distribution network.

WASIA WATER TREATMENT PLANT

PROJECT DETAILS

LOCATION:Wasia – Saudi Arabia

OWNER / CLIENT: Ministry of Agriculture and Water

PROJECT DURATION:Oct 1979-May 1982

CONTRACT TYPE:Lump Sum Turnkey

CONTRACT VALUE:US$ 40 Million

PROJECT DESCRIPTION

The rapidly increasing demand for fresh water of Riyadh, the capital city of Saudi Arabia, is to be met by two water supply projects with a combined capacity of 600,000 m3/day. At the same time the present water distribution system of Riyadh is being improved, and the new areas are added to the distribution system by a third project.

ENKA SCOPE OF SERVICES

Architectural, civil and structural design, and construction and erection of a water treatment plant of 200,000 m³ per day capacity. Laying of 3,000 tons of ductile iron pipes. Civil and building works for coolers, softeners, filters, sludge disposal plant, chemical handling buildings, pump houses, administration buildings, workshops and stores. All mechanical and electrical installation works of the above mentioned units including insulation and painting.

RAS LANUF NEW TOWN PROJECT (WATER SUPPLY AND SEWAGE SYSTEMS)

BREGA NEW TOWN PROJECT WATER RESERVOIRS AND PIPING WORKS

PROJECT DETAILS

PROJECT DETAILS

LOCATION:Ras Lanuf, Libya

OWNER / CLIENT: Secretariat of Heavy Industries, Brega and Ras Lanuf Higher Committee

PROJECT DURATION:Feb 1981-May 1985

CONTRACT TYPE:Lump Sum

CONTRACT VALUE:US$ 224 Million

LOCATION:Marsa El Brega, Libya

OWNER / CLIENT: Secretariat of Heavy Industries, Brega and Ras Lanuf Higher Committee

PROJECT DURATION:May 1986-Aug 1993

PROJECT DESCRIPTION

The sewage treatment plant serving for 20,000 people in Ras-Lanuf, a town built in Libya entirely by ENKA, was equipped with a microstainer system. The system makes it possible to use the already treated water as process water.

ENKA SCOPE OF SERVICES

Storm Water Drainage System and Water Supply System, 17 km long pipeline with a diameter of 400 mm was used to bring water from the nearby industrial area of the ARC to the a/m reservoir.

PROJECT DESCRIPTION

The contract was turnkey and comprises two housing projects covering 432,300 m² construction area consisting of 2,666 single or two-story villas of 18 different types, social buildings, including schools, supermarkets, clinics, post offices and other service units, cultural centers, soccer fields and tennis courts, roads, complete infrastructure, landscaping, telecommunication and interior furnishings of the buildings.

ENKA SCOPE OF SERVICES

All the infrastructure works such as sewerage system, storm water drainage, irrigation and fire fighting network, potable water network, water tanks have been performed in the framework of this turn-key contract. The total length of the pipes layed is 118,673 m.

Page 32: INFRASTRUCTURE · Motorway Project which will connect central Serbia and Pan-European Corridors 10 and 11. Morava Corridor Motorway Project is a 112 km dual-carriageway motorway,

62 ENKA İNŞAAT VE SANAYİ A.Ş. FACHSHEETS FACTSHEETS ENKA İNŞAAT VE SANAYİ A.Ş. 63Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Page | 62 63 | Page

AL MEDINAH AL MUNAWWARAH HOUSING (WATER SUPPLY AND SEWAGE SYSTEMS)

PROJECT DETAILS

LOCATION:Al Medinah, Saudi Arabia

OWNER / CLIENT: Ministry of Public Works and Housing

PROJECT DURATION:Apr 1982-Feb 1988 CONTRACT TYPE:Lump Sum Turnkey

CONTRACT VALUE:US$ 47 Million

PROJECT DESCRIPTION

Al Medinah Al Munawwarah Housing project was composed of 2,084 villas on an area of 2,150,000 m2 and related infrastructure works such as potable water and rain water systems, sewage system and irrigation network.

AL KHAFJI PHASE 2 DESALINATION PLANT

PROJECT DETAILS

LOCATION:Al Khafji, Saudi Arabia

OWNER / CLIENT: Saline Water Conversion Corporation

PROJECT DURATION:Oct 1982-Feb 1986

CONTRACT TYPE:Lump Sum Turnkey

CONTRACT VALUE:US$ 45 Million

PROJECT DESCRIPTION

Single purpose desalination plant to produce 5 million gallons per day desalted water by the evaporation of Arabian Gulf water based on MSF process and transmission of potable water to the distribution terminals in the town of Al Khafji and related office buildings and housing compound.

ENKA SCOPE OF SERVICESAll civil works of the desalination plant. Turn-key construction of sea water intake, outfall and treatment facilities.

Turn-key construction of product water pipeline and facilities for fuel oil supply, storage and handling.

Turn-key construction of control buildings, laboratory facilities, maintenance shop, warehouse, office buildings, mosque and housing compound including HVAC and fire protection systems.

DIYARBAKIR & KAHRAMANMARAŞ DRINKING AND SEWAGE SYSTEM NETWORK

PROJECT DETAILS

LOCATION:Dıyarbakır & Kahramanmaraş, Turkey

OWNER / CLIENT: Province Bank Turkey

PROJECT DURATION:DıyarbakırApr 1982-Apr 1986

KahramanmaraşMay 1985-May 1987

CONTRACT TYPE:Lump Sum

ENKA SCOPE OF SERVICESStorm Drainage System: Pipe laying: 12,445 m Pipe diameters: 1,050 mm, 750 mm, 600 mm, 300 mm

Water Supply System: Pipe laying: 28,000 m, Pipe diameters: 200 mm, 150 mm, 50 mm

Irrigation System: Pipe laying: 6,468 m, Pipe diameters: 225 mm, 110 mm, 63 mm

Sanitary Sewerage System: Pipe laying: 24,432 m Pipe diameters: 330 mm, 250 mm, 200 mm, 160 mm.

ISTANBUL SEWERAGE PROJECT, YENIKAPI PRETREATMENT PLANT AND PUMPING STATION

PROJECT DETAILS

LOCATION:İstanbul, Turkey

OWNER / CLIENT: General Directorate of Istanbul Water & Sewerage Administration – İSKİ

PROJECT DURATION:Sep 1988-Aug 1988

PROJECT DESCRIPTION

Construction of the Yenikapı Pretreatment Plant & Pumping Stations, where a significant portion of the Istanbul Sewerage network converges, had been undertaking by ENKA. The plant processes 1-6 million m3 water per day. The pump station building was constructed as a caisson on ground level with 36 x 27 m horizontal section and 14 m height.

Later, the building was lowered to 14.2 m below sea level. This difficult process took 40 days of concentrated effort, after which floor area concrete was laid, making it possible to adjust the level of the building as required.

ENKA SCOPE OF SERVICES

Contract consisted of construction of a coarse screen house, a pumping station (influent); pretreatment plant, a pumping station (effluent), incoming inceptor, sewers and force mains; fabrication and laying of overflow systems and connecting pipes; construction of roads and firefighting.

PROJECT DESCRIPTION

Construction of the water supply system of Diyarbakır Province consisting of 67 km pipeline. In the Diyarbakır Province Sewage System which we undertook in 1977, 15 km long collector was completed in an extremely hard rocky (basalt) area. The construction was carried in the city.

Turn-key construction of the sewage system network and collectors of the city of Kahramanmaraş including manufacturing of pipes with dia. Between Ø 100 - 1.200 mm. Contract also includes drinking water network of 200 km consisting of Ø 100-800 mm. Dia pipes.

Page 33: INFRASTRUCTURE · Motorway Project which will connect central Serbia and Pan-European Corridors 10 and 11. Morava Corridor Motorway Project is a 112 km dual-carriageway motorway,

64 ENKA İNŞAAT VE SANAYİ A.Ş. FACHSHEETS FACTSHEETS ENKA İNŞAAT VE SANAYİ A.Ş. 65Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Page | 64 65 | Page

MOTORWAYS, BRIDGES & TUNNELS

AIRPORTS & STADIUMS

WATER WORKS, DAMS, PIPELINES & MINING

CEMENT PLANTS

CEMENT PLANTS

MESSEBO CEMENT FACTORY, ETHIOPIA

BENGHAZI CEMENT PLANT, LIBYA

HAWARI CEMENT PLANT, LIBYA

SOUQ AL-KHAMIS CEMENT PLANT, LIBYA

AL KHOMS CEMENT PLANT, LIBYA

TASLUJA CEMENT PLANT, IRAQ

KERBELA CEMENT PLANT, IRAQ

FALLUJA WHITE CEMENT PLANT, IRAQ

BADOOSH CEMENT PLANT, IRAQ

NEW BADOOSH CEMENT PLANT / OPERATION & MAINTENANCE, IRAQ

RASHADIYA CEMENT PLANT, JORDAN

KUBAISA CEMENT PLANT, IRAQ

CEM

ENT P

LANT

S

Page 34: INFRASTRUCTURE · Motorway Project which will connect central Serbia and Pan-European Corridors 10 and 11. Morava Corridor Motorway Project is a 112 km dual-carriageway motorway,

66 ENKA İNŞAAT VE SANAYİ A.Ş. FACHSHEETS FACTSHEETS ENKA İNŞAAT VE SANAYİ A.Ş. 67Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Page | 66 67 | Page

BENGHAZI CEMENT PLANT

PROJECT DETAILS

LOCATION:Benghazi, Libya

OWNER / CLIENT: General National Organization for Industrialization

PROJECT DURATION:First Extension:Mar 1972 - June 1973 Second Extension:Oct 1974 – June 1976

CONTRACT TYPE:Lump Sum Turnkey

CONTRACT VALUE:First Extension: US$ 20 MillionSec. Extension: US$ 25 Million

ENKA SCOPE OF SERVICES:Procurement and Construction Subcontracting works to “Bilfinger Berger”

PROJECT DESCRIPTION

All civil works of a cement plant extension project with a capacity of 600,000 tons/year (First Extension)

All civil works of a cement plant extension project with a capacity of 600,000 tons/year (Second Extension)

MESSEBO CEMENT FACTORY

PROJECT DETAILS

LOCATION:Addis Ababa, Ethiopia

OWNER / CLIENT: Messebo Building Materials Production Share Co.

PROJECT DURATION:Feb 1997-Dec 1999

CONTRACT TYPE:Lump Sum Turnkey

CONTRACT VALUE:US$ 45 Million

PROJECT DESCRIPTION

The construction of the cement factory started in January 1997 for the client, Messebo Building Materials Production Share Company. The plant is located in the northern part of Ethiopia, 7 km from Mekele city.

The project encompassed all the civil and structural works, supply and installation of the structural steel, and the entire mechanical erection works. The mechanical equipment was provided by F.L.Smith of Denmark.

ENKA SCOPE OF SERVICES

The annual capacity of the plant is 600,000 tons and it is capable of producing portland cement with or without additives. The project involved 256,000 m3 of excavation and backfill, 44,000 m3 of concrete, 3,700 tons of structural steel, 3,450 tons of reinforcement, 115,000 m2 of formwork, 7,200 tons of mechanical installation and 500 tons of electrical installation. The project was completed at the end of 1999.

HAWARI CEMENT PLANT

SOUQ AL-KHAMIS CEMENT PLANT

PROJECT DETAILS

PROJECT DETAILS

LOCATION:Benghazi, Libya

OWNER / CLIENT: General National Organization for Industrialisation

PROJECT DURATION:Oct 1975-Nov 1977

CONTRACT TYPE:Lump Sum

CONTRACT VALUE:US$ 50 Million

MAIN QUANTITIES:Formwork: 103,758 m2

Reinforcing Steel: 2,998 tons Reinforced Concrete: 33,242 m3

LOCATION:Souk Al-Khamis, Libya

OWNER / CLIENT: General National Organization for Industrialisation

PROJECT DURATION:Aug 1974-May 1977

CONTRACT TYPE:Lump Sum

CONTRACT VALUE:US$ 40 Million

MAIN QUANTITIES:Formwork: 115,000 m2

Reinforcing Steel: 3,600 tons Reinforced Concrete: 37,000 m3

PROJECT DESCRIPTION

Under the project scope, all civil and building works of the cement plant with a capacity of 1,000,000 tons/year.

ENKA SCOPE OF SERVICES

Subcontractor to main civil contractor “Bilfinger Berger”. ENKA was responsible for the 80 % of the civil works.

PROJECT DESCRIPTION

The project’s scope of works included all civil and building works of a cement plant with a capacity of 1,000,000 tons/year.

ENKA SCOPE OF SERVICES

Subcontractor to main civil contractor “Bilfinger Berger”. The 80 % of the civil works was performed by ENKA.

Page 35: INFRASTRUCTURE · Motorway Project which will connect central Serbia and Pan-European Corridors 10 and 11. Morava Corridor Motorway Project is a 112 km dual-carriageway motorway,

68 ENKA İNŞAAT VE SANAYİ A.Ş. FACHSHEETS FACTSHEETS ENKA İNŞAAT VE SANAYİ A.Ş. 69Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Page | 68 69 | Page

TASLUJA CEMENT PLANT

PROJECT DETAILS

LOCATION:Tasluja, Iraq

OWNER / CLIENT: State Organization for Construction Industries – STOKI

PROJECT DURATION:Mar 1981-Jul 1985First Extension:May 1981-Oct 1985

CONTRACT TYPE:Lump Sum Turnkey

CONTRACT VALUE:US$ 47 Million

MAIN QUANTITIES:Excavation: 155,248 m3

Formwork: 84,080 m2

Reinforced steel: 3,846 tonsSliding formwork: 24,476 m2

Concrete: 40,184 m3

Prestressing wire: 112 tons

PROJECT DESCRIPTION

The project’s scope of works included the procurement and construction of all civil and building works with respect to the cement plant with the capacity of 1,000,000 tons/ year. All civil and building works related with 100 percent extension of Tasluja Cement Plant.

ENKA SCOPE OF SERVICES

ENKA, as construction contractor has undertaken all civil and building works related with the cement plant including detailed designs.

ENKA’s works consist of raw material crushing, storage and handling unit; cement packing, loading and dispatch unit; electrical power supply system; workshops, storage areas; administration building, camp facilities and other auxiliary facilities.

AL KHOMS CEMENT PLANT

PROJECT DETAILS

LOCATION:Al-Khoms, Libya

OWNER / CLIENT: General National Organization for Industrialisation

PROJECT DURATION:Mar 1977-Mar 1979

CONTRACT TYPE:Lump Sum Turnkey

CONTRACT VALUE:US$ 40 Million

MAIN QUANTITIES:Formwork: 57,000 m2

Reinforcing Steel: 1,700 tons Reinforced Concrete: 30,500 m3

PROJECT DESCRIPTION

The scope of works consisted of all civil and building works of a cement plant with a capacity of 1,000,000 tons/year.

ENKA SCOPE OF SERVICES

Subcontractor to main civil contractor “Bilfinger Berger”. ENKA was responsible for the 80% of the civil works.

KERBELA CEMENT PLANT

FALLUJA WHITE CEMENT PLANT

PROJECT DETAILS

PROJECT DETAILS

LOCATION:Kerbela, Iraq

OWNER / CLIENT: State Organization for Construction Industries - STOKI

PROJECT DURATION:May 1981-Mar 1985First Extension:Sep 1981-Aug 1985

CONTRACT TYPE:Lump Sum

CONTRACT VALUE:US$ 48 Million

MAIN QUANTITIES:Excavation: 266,057 m3 Formwork: 170,162 m2 Reinforced steel: 9,360 tonsSliding formwork: 368,392 m3

Concrete: 41,219 m3

Prestressing wire: 108 tons

LOCATION:Falluja, Iraq

OWNER / CLIENT: Iraqi Central Cement State Enterprise

PROJECT DURATION:Jan 1988-Feb 1990

CONTRACT TYPE:Lump Sum

CONTRACT VALUE:US$ 3.4 Million

PROJECT DESCRIPTION

Cement Plant with a capacity of 1,000,000 tons/year (3,000 tons/day of cement clinker in one production line). ENKA,as construction contractor has undertaken all civil and building works related with the cement plant including detailed designs.ENKA’s works consist of raw material crushing, storage and handling unit; clinker production , storage and handling unit; central control and laboratory building; fuel oil and gas systems; cement grinding , storage and handiling unit; cement packing, loading and dispatch unit; electrical power supply system water supply system and auxiliary facilities.

All civil and building works related with 100 percent extension of Kerbela Cement Plant.

PROJECT DESCRIPTION

Technicnical management and consulting, design of preventive maintenance systems, supervision of spare parts manufacturing, periodical check of equipment and machinery, forn design , etc.

ENKA SCOPE OF SERVICES

ENKA’s wholly owned subsidiary, ENKA Teknik managed and operated Falluja White Cement for the Client, Central Cement State Enterprise.

Page 36: INFRASTRUCTURE · Motorway Project which will connect central Serbia and Pan-European Corridors 10 and 11. Morava Corridor Motorway Project is a 112 km dual-carriageway motorway,

70 ENKA İNŞAAT VE SANAYİ A.Ş. FACHSHEETS FACTSHEETS ENKA İNŞAAT VE SANAYİ A.Ş. 71Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Fax +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul | Phone: +90 (212) 376 10 00 (pbx) | Faks: +90 (212) 272 88 69 e-mail: [email protected] | web: www.enka.com

Page | 70 71 | Page

NEW BADOOSH CEMENT PLANT / OPERATION & MAINTENANCE

PROJECT DETAILS

LOCATION:Mosul, Iraq

OWNER / CLIENT: State Enterprise for Cement in Ninevah/SECIN

PROJECT DURATION:Dec 1981 – Apr 1984Sep 1982 – Apr 1984Dec 1982 – Dec 1985

CONTRACT TYPE:Lump Sum Turnkey

CONTRACT VALUE:US$ 3.8 MillionUS$ 432 MillionUS$ 11.5 Million

MAIN QUANTITIES:Excavation: 155,248 m3

Formwork: 84,080 m2

Reinforced steel: 3,846 tonsSliding formwork: 24,476 m2

Concrete: 40,184 m3

Prestressing wire: 112 tons

PROJECT DESCRIPTION

Maintenance, operation and technical administration of grinding mills (separate contract).

Maintenance, operation and technical administration of quality control department (separate contract).

Overall maintenance, operation, technical administration of the 2nd extension of Badoosh Cement Plant (separate contract).

BADOOSH CEMENT PLANT

PROJECT DETAILS

LOCATION:Mosul, Iraq

OWNER / CLIENT: Mosul Public Enterprise for Building Materials

PROJECT DURATION:Oct 1980-Mar 1983

CONTRACT TYPE:Lump Sum Turnkey

CONTRACT VALUE:US$ 6.7 Million

MAIN QUANTITIES:Structural Steel: 2,500 tons

PROJECT DESCRIPTION

The scope of works consisted of design, engineering, fabrication and erection of the steel structure works of homogenisation buildings of the cement plant with a 3,000 tons daily capacity.

ENKA SCOPE OF SERVICES

Design, engineering, fabrication and erection of the steel structure works of homogenisation buildings. Totally 2,500 tons of steel structure works were performed.

RASHADIYA CEMENT PLANT

KUBAISA CEMENT PLANT

PROJECT DETAILS

PROJECT DETAILS

LOCATION:Rashadiya, Jordan

OWNER / CLIENT: National Planning Commitee – South Cement Company Ltd.

PROJECT DURATION:Nov 1981-Jun 1984

CONTRACT TYPE:Lump Sum

CONTRACT VALUE:US$ 42.2 Million

MAIN QUANTITIES:Excavation: 130,000 m3 Formwork: 144,000 m2 Reinforcing Steel: 5,300 tons Steel Structure: 7,400 tons Concrete: 66,000 m3

LOCATION:Kubaisa, Iraq

OWNER / CLIENT: State Organization of Industrial Projects - SOIP

PROJECT DURATION:Jan 1986-Oct 1987

CONTRACT TYPE:Lump Sum Turnkey

CONTRACT VALUE:US$ 16.9 Million

PROJECT DESCRIPTION

The Rashadiya Cement Plant in Jordan with an annual capacity of 2.000.000 tons/year were constructed.

ENKA SCOPE OF SERVICES

In joint venture with Jordan’s Trocon Co. ENKA executed all civil and building works (Main plant building was constructed as heavy steel structure on reinforced concrete foundations), air-conditioning, all steel structure works erection, fabrication of mechanical steel structure such as ducts, chutes (1,440 tons ) and clinker tower erection and infrastructure works.

PROJECT DESCRIPTION

Turn-key construction of railcar bag and bulk cement loading facilities, heavy oil unloading system and railway.

ENKA SCOPE OF SERVICES

Between 1986 and 1988, ENKA’s wholly owned subsidiary, ENKA Teknik constructed the railcar bag and bulk cement loading facilities of the Kubaisa Cement Plant.

Page 37: INFRASTRUCTURE · Motorway Project which will connect central Serbia and Pan-European Corridors 10 and 11. Morava Corridor Motorway Project is a 112 km dual-carriageway motorway,

Balmumcu Mah., Zincirlikuyu Yolu No: 10, 34349 Beşiktaş / İstanbul

Phone: +90 (212) 376 10 00 (pbx) Fax: +90 (212) 272 88 69e-mail: [email protected] web: http://www.enka.com

İNŞAAT VE SANAYİ A.Ş.